Lock catch steel pipe pile cofferdam perpendicularity control device

By designing a vertical control device for the locking steel pipe pile cofferdam that includes a vertical control mechanism and a piezoelectric ceramic piece, the time-consuming and labor-intensive problem of placing the steel pipe vertically into the foundation pit during the installation of the locking steel pipe pile cofferdam is solved, achieving for a more efficient installation process.

CN221895805UActive Publication Date: 2024-10-25CCCC SHEC FIRST HIGHWAY ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420338251.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-22
Publication Date
2024-10-25
Estimated Expiration
2034-02-22

AI Technical Summary

Technical Problem

When installing the existing locking steel pipe pile cofferdam, placing the steel pipe vertically into the foundation pit is time-consuming and labor-intensive, the work efficiency is low, and there is a lack of effective verticality control devices.

Method used

Design a locking steel pipe pile cofferdam verticality control including a base, a vertical control mechanism, a placement slot, a controller, an inclination sensor, an electric push rod, an electric slide rail, a sliding rod, a piezoelectric ceramic piece and an indicator light. The device uses an inclination sensor to detect the inclination of the base, the electric push rod adjusts the level of the base, and the electric slide rail drives the sliding rod and piezoelectric ceramic piece to move to ensure that the steel pipe is installed vertically, and the indicator light prompts the construction personnel to adjust the steel pipe.

Benefits of technology

The efficiency of the locking steel pipe pile cofferdam during installation is improved, ensuring that the steel pipe can be placed vertically into the foundation pit, reducing laborious operations and improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895805U_ABST
    Figure CN221895805U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, in particular to a lock catch steel pipe pile cofferdam perpendicularity control device which comprises a base, a perpendicularity control mechanism is arranged in the base, a containing through groove is formed in the center of the top of the base, a controller is installed on the top of the base, and a binding post is installed on the right side of the base. The perpendicularity control mechanism comprises a connecting base fixedly connected to the corner of the bottom of the base, a supporting base is slidably connected to the outer wall of the connecting base, and an electric push rod is fixedly connected to the interior of the supporting base. The vertical control mechanism in the device is used for controlling vertical installation of the steel pipe, and the problems that when an existing lock catch steel pipe pile cofferdam is installed, the steel pipe in the lock catch steel pipe pile cofferdam needs to be vertically placed in a foundation pit, control over vertical installation of the steel pipe is time-consuming and labor-consuming, and the working efficiency is low are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a locking steel pipe pile cofferdam verticality control device. Background Art

[0002] The locking steel pipe pile cofferdam is composed of steel pipes, C-shaped locks and T-shaped locks, but the existing locking steel pipe pile cofferdam still has shortcomings. Specifically, when installing the existing locking steel pipe pile cofferdam, the steel pipes in the locking steel pipe pile cofferdam need to be placed vertically into the foundation pit. Controlling the vertical installation of the steel pipes is time-consuming and labor-intensive, and the work efficiency is low.

[0003] Therefore, a locking steel pipe pile cofferdam verticality control device is needed to solve the problems raised in the above background technology. Utility Model Content

[0004] The utility model aims to provide a locking steel pipe pile cofferdam verticality control device to solve the problems raised in the above-mentioned background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A locking steel pipe pile cofferdam verticality control device comprises a base, a vertical control mechanism is arranged inside the base, a placement slot is opened at the top center of the base, a controller is installed on the top of the base, and a terminal is installed on the right side of the base;

[0007] The vertical control mechanism includes a connecting seat fixedly connected to the bottom corner of the base, the outer wall of the connecting seat is slidably connected to a support seat, the interior of the support seat is fixedly connected to an electric push rod, the interior of the base and on the front, back and both sides of the placement slot are fixedly connected to an inclination sensor, the interior of the base and near the placement slot are fixedly connected to an electric slide rail, the outer wall of the electric slide rail is installed with a slide table, the top of the slide table is fixedly connected to a sliding rod, the outer wall of the sliding rod and a piezoelectric ceramic piece are fixedly connected in the placement slot, the top of the base and directly above the sliding rod are fixedly connected to an indicator light, and the outer wall of the sliding rod is installed with a displacement sensor.

[0008] As a preferred solution of the utility model, the base is made of aluminum alloy, the placement slot is designed as a circular structure, and the connection method between the controller and the terminal is electrical connection.

[0009] As a preferred solution of the present utility model, the connecting seat, the supporting seat and the sliding rod are all made of aluminum alloy, and the connecting seat is designed as an I-shaped structure.

[0010] As a preferred solution of the utility model, the connection modes of the sliding rod, the piezoelectric ceramic sheet and the base are all sliding connections, and the electric slide rails, the sliding rods and the piezoelectric ceramic sheets are all provided in four groups.

[0011] As a preferred solution of the utility model, the piezoelectric ceramic sheet is designed as an arc-shaped structure, and the piezoelectric ceramic sheet is connected to the indicator light through a wire.

[0012] As a preferred solution of the utility model, the support seat is designed as a circular structure, and the connection method of the inclination sensor, the electric slide rail and the electric push rod with the controller is electrical connection.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] 1. In the utility model, a locking steel pipe pile cofferdam verticality control device is designed, and the vertical control mechanism in the device is used to control the vertical installation of the steel pipe. The base is placed on the top of the foundation pit, and the placement slot is aligned with the foundation pit. The controller starts the inclination sensor, and the inclination sensor detects the inclination of the base. The controller starts the electric push rod according to the detected inclination. The electric push rod adjusts the inclination of the base through the connecting seat to restore the base to the level. The controller starts the electric slide rail, and the electric slide rail drives the sliding rod to move inward through the slide table. The sliding rod drives the piezoelectric ceramic piece to move inward, so that the distance between the piezoelectric ceramic pieces matches the diameter of the steel pipe. After installation, the controller turns off the electric slide rail, the sliding rod and the piezoelectric ceramic sheet no longer move, and the steel pipe is placed down into the foundation pit along the placement slot. When the placed steel pipe is tilted, the tilted steel pipe will squeeze the piezoelectric ceramic sheet in the tilted direction. The squeezed piezoelectric ceramic sheet will generate current and input the current into the indicator light. The indicator light lights up, prompting the construction workers that the steel pipe is tilted. The construction workers adjust the steel pipe according to the indicator light so that the steel pipe can be placed vertically into the foundation pit, which solves the problem that the steel pipe in the existing locking steel pipe pile cofferdam needs to be placed vertically into the foundation pit during installation, and it is time-consuming and labor-intensive to control the vertical installation of the steel pipe, resulting in low work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0016] Figure 2 This is a front cross-sectional view of the utility model;

[0017] Figure 3 This is a front cross-sectional view of the support seat of the utility model.

[0018] In the figure: 1. base; 2. vertical control mechanism; 3. placement slot; 4. controller; 5. terminal; 201. connecting seat; 202. supporting seat; 203. electric push rod; 204. inclination sensor; 205. electric slide rail; 206. slide table; 207. sliding rod; 208. piezoelectric ceramic sheet; 209. indicator light; 210. displacement sensor. DETAILED DESCRIPTION

[0019] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0020] For examples, see Figure 1-3 , the utility model provides a technical solution:

[0021] A locking steel pipe pile cofferdam verticality control device comprises a base 1, a vertical control mechanism 2 is arranged inside the base 1, a placement slot 3 is opened at the top center of the base 1, a controller 4 is installed on the top of the base 1, and a terminal 5 is installed on the right side of the base 1;

[0022] The base 1 is made of aluminum alloy, the placement slot 3 is designed as a circular structure, and the connection method between the controller 4 and the terminal 5 is electrical connection;

[0023] In this embodiment, reference Figure 2 and Figure 3 The vertical control mechanism 2 includes a connecting seat 201 fixedly connected to the bottom corner of the base 1, the outer wall of the connecting seat 201 is slidably connected to a support seat 202, the inside of the support seat 202 is fixedly connected to an electric push rod 203, the inside of the base 1 and the front, back and both sides of the placement slot 3 are fixedly connected to an inclination sensor 204, the inside of the base 1 and the position close to the placement slot 3 is fixedly connected to an electric slide rail 205, the outer wall of the electric slide rail 205 is installed with a slide table 206, the top of the slide table 206 is fixedly connected to a sliding rod 207, the outer wall of the sliding rod 207 and the inside of the placement slot 3 is fixedly connected to a piezoelectric ceramic piece 208, the top of the base 1 and directly above the sliding rod 207 is fixedly connected to an indicator light 209, and the outer wall of the sliding rod 207 is installed with a displacement sensor 210;

[0024] The connecting seat 201, the supporting seat 202 and the sliding rod 207 are all made of aluminum alloy. The connecting seat 201 is an I-shaped structure. The sliding rod 207, the piezoelectric ceramic piece 208 and the base 1 are connected in a sliding manner. The electric slide rail 205, the sliding rod 207 and the piezoelectric ceramic piece 208 are all provided with four groups. The piezoelectric ceramic piece 208 is an arc-shaped structure design. The piezoelectric ceramic piece 208 is connected to the indicator light 209 through a wire. The supporting seat 202 is a circular structure design. The inclination sensor 204, the electric slide rail 205 and the electric push rod 203 are connected to the controller 4 in an electrical connection. The inclination sensor 204 will detect the inclination degree of the base 1. The controller 4 starts the electric push rod 203 according to the detected inclination degree. The electric push rod 203 adjusts the connection by pushing the connecting seat 201 up and down. The base 1 is tilted to restore the base 1 to a horizontal level, the controller 4 starts the electric slide rail 205, the electric slide rail 205 drives the sliding rod 207 to move inward through the slide 206, and the sliding rod 207 drives the piezoelectric ceramic sheet 208 to move inward. After the distance between the piezoelectric ceramic sheets 208 matches the diameter of the steel pipe, the controller 4 turns off the electric slide rail 205, the sliding rod 207 and the piezoelectric ceramic sheet 208 no longer move, and the steel pipe is placed downward along the placement groove 3 into the foundation pit. When the placed steel pipe is tilted, the tilted steel pipe will squeeze the piezoelectric ceramic sheet 208 in the tilted direction. The squeezed piezoelectric ceramic sheet 208 will generate current and input the current into the indicator light 209. The indicator light 209 lights up, prompting the construction personnel that the steel pipe is tilted. The construction personnel adjust the steel pipe according to the indicator light 209 so that the steel pipe can be placed vertically into the foundation pit.

[0025] The working process of the utility model: when the locking steel pipe pile cofferdam verticality control device designed by the present invention is in operation, the base 1 is placed on the top of the foundation pit, so that the placement slot 3 is aligned with the foundation pit, the controller 4 starts the inclination sensor 204, the inclination sensor 204 detects the inclination degree of the base 1, the controller 4 starts the electric push rod 203 according to the detected inclination degree, the electric push rod 203 adjusts the inclination of the base 1 by pushing the connecting seat 201 up and down, so that the base 1 is restored to the level, the controller 4 starts the electric slide rail 205, the electric slide rail 205 drives the sliding rod 207 to move inward through the slide table 206, and the sliding rod 207 drives After the piezoelectric ceramic sheets 208 are moved inward so that the distance between the piezoelectric ceramic sheets 208 matches the diameter of the steel pipe, the controller 4 turns off the electric slide rail 205, the sliding rod 207 and the piezoelectric ceramic sheets 208 no longer move, and the steel pipe is placed downward along the placement groove 3 into the foundation pit. When the placed steel pipe is tilted, the tilted steel pipe will squeeze the piezoelectric ceramic sheets 208 in the tilted direction. The squeezed piezoelectric ceramic sheets 208 will generate current and input the current into the indicator light 209. The indicator light 209 lights up, prompting the construction personnel that the steel pipe is tilted. The construction personnel adjust the steel pipe according to the indicator light 209 so that the steel pipe can be placed vertically in the foundation pit.

[0026] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A locking steel pipe pile cofferdam verticality control device, comprising a base (1), characterized in that: A vertical control mechanism (2) is arranged inside the base (1); a placement slot (3) is provided at the center of the top of the base (1); a controller (4) is installed on the top of the base (1); and a terminal (5) is installed on the right side of the base (1); The vertical control mechanism (2) comprises a connecting seat (201) fixedly connected to a bottom corner of the base (1); the outer wall of the connecting seat (201) is slidably connected to a supporting seat (202); the interior of the supporting seat (202) is fixedly connected to an electric push rod (203); the interior of the base (1) and at the front, back and both sides of the placement slot (3) are fixedly connected to an inclination sensor (204); the interior of the base (1) and at a position close to the placement slot (3) are fixedly connected to An electric slide rail (205) is connected, a slide table (206) is installed on the outer wall of the electric slide rail (205), a sliding rod (207) is fixedly connected to the top of the slide table (206), a piezoelectric ceramic piece (208) is fixedly connected to the outer wall of the sliding rod (207) and in the placement groove (3), an indicator light (209) is fixedly connected to the top of the base (1) and directly above the sliding rod (207), and a displacement sensor (210) is installed on the outer wall of the sliding rod (207).

2. The locking steel pipe pile cofferdam verticality control device according to claim 1 is characterized in that: The base (1) is made of aluminum alloy, the placement slot (3) is designed as a circular structure, and the controller (4) and the terminal (5) are connected in an electrical manner.

3. The locking steel pipe pile cofferdam verticality control device according to claim 1 is characterized in that: The connecting seat (201), the supporting seat (202) and the sliding rod (207) are all made of aluminum alloy, and the connecting seat (201) is designed as an I-shaped structure.

4. The locking steel pipe pile cofferdam verticality control device according to claim 1 is characterized in that: The connection modes of the sliding rod (207), the piezoelectric ceramic sheet (208) and the base (1) are all sliding connections, and the electric slide rail (205), the sliding rod (207) and the piezoelectric ceramic sheet (208) are all provided in four groups.

5. The locking steel pipe pile cofferdam verticality control device according to claim 1 is characterized in that: The piezoelectric ceramic sheet (208) is designed as an arc-shaped structure, and the piezoelectric ceramic sheet (208) is connected to the indicator light (209) via a wire.

6. The locking steel pipe pile cofferdam verticality control device according to claim 1 is characterized in that: The support seat (202) is designed as a circular structure, and the inclination sensor (204), the electric slide rail (205) and the electric push rod (203) are all connected to the controller (4) in an electrical manner.