Foundation pit construction monitoring device
By burying multiple monitoring equipment in the same hole during foundation pit construction, the problems of high cost and low efficiency caused by multiple drilling and burying in the existing technology are solved, efficient foundation pit construction monitoring is achieved, and the equipment cost is reduced. Risk of damage.
Patent Information
- Application Number
- CN202420211472.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-01-29
AI Technical Summary
During foundation pit construction, the existing technology requires multiple drilling and burying of monitoring equipment, resulting in high cost, low efficiency, and easy damage to the equipment.
Design a foundation pit construction monitoring device. The deep horizontal displacement inclinometer tube, water level tube, layered settlement magnetic ring and earth pressure gauge are buried in the same hole to realize the function of multiple measurements in one hole. Through the inclinometer tube, steel ring, The combination of settlement magnetic ring, limiter and earth pressure gauge reduces the number of drilling and burying.
It effectively reduces costs, improves monitoring efficiency, reduces the risk of equipment damage, enables simultaneous burial of multi-parameter monitoring, and simplifies the construction process.
Smart Images

Figure CN221895837U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building material measuring equipment, in particular to a foundation pit construction monitoring device for monitoring deep horizontal displacement, water level, soil pressure and stratified settlement. Background Art
[0002] During foundation pit construction, it is often necessary to monitor deep horizontal displacement, water level, stratified settlement and soil pressure. Whether it is automatic monitoring or manual monitoring, corresponding equipment needs to be buried. According to specifications and design requirements, monitoring equipment is usually completed before foundation pit excavation. However, due to the narrow construction site and the influence of construction progress, the time for burying monitoring equipment is tight and the task is heavy, which makes the equipment easily damaged. In addition, the existing equipment adopts a multi-hole and multi-item monitoring method. The equipment needs to enter and exit the site many times, and drilling and burying are required each time, resulting in high costs and low monitoring efficiency. Utility Model Content
[0003] In order to solve the above technical problems, the utility model provides a foundation pit construction monitoring device, which buries a deep horizontal displacement inclinometer tube, a water level tube, a layered settlement magnetic ring and an earth pressure gauge in the same hole to realize the function of multiple measurements in one hole. The monitoring device can solve the problem of increased cost caused by multiple drilling, multiple burials and multiple hole monitoring in the prior art, thereby improving the monitoring efficiency.
[0004] The technical solutions provided by this utility model are as follows:
[0005] A foundation pit construction monitoring device, comprising an inclinometer tube, a steel ring, a settlement magnetic ring, a stopper and an earth pressure gauge;
[0006] The steel ring, the stopper and the sinking magnetic ring are sequentially sleeved on the inclinometer tube from top to bottom, a fixed iron sheet is fixed on the steel ring, and the soil pressure gauge is fixed on the fixed iron sheet.
[0007] Furthermore, the inner diameter of the steel ring is consistent with the outer diameter of the inclinometer tube, and the steel ring is connected to the fixed iron sheet by welding.
[0008] Furthermore, a sealed filter tube is connected to the bottom end of the inclinometer tube, and filter holes are distributed around the tube wall of the sealed filter tube.
[0009] Furthermore, the height of the limiter sleeved on the inclinometer tube does not exceed 1 / 2 of the height of the inclinometer tube.
[0010] Furthermore, the earth pressure gauge is connected to the fixed iron sheet by welding, and a wire is connected to the earth pressure gauge.
[0011] Furthermore, the inner diameter and outer diameter of the sealed filter tube are consistent with those of the inclinometer tube.
[0012] Furthermore, the limiter and the steel ring are respectively mounted at 1 / 3 and 2 / 3 of the height of the inclinometer tube.
[0013] Furthermore, four grooves are evenly distributed around the inner walls of the inclinometer tube and the sealed-end filter tube.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] 1. The utility model provides a foundation pit construction monitoring device, which includes an inclinometer tube, a steel ring, a settlement magnetic ring, a stopper and an earth pressure gauge. The deep horizontal displacement inclinometer tube, the water level tube, the layered settlement magnetic ring and the earth pressure gauge are buried in the same borehole to achieve the function of one hole and multiple measurements. The monitoring device can solve the problem of increased costs caused by multiple drilling, multiple burying and multi-hole monitoring in the prior art, thereby improving the monitoring efficiency;
[0016] 2. The utility model provides a foundation pit construction monitoring device, in which a sealed filter tube is connected to the bottom end of the inclinometer tube. The sealed filter tube has the function of filtering water, soil and silt. During use, the water, soil and silt accumulated inside the inclinometer tube can be filtered through the filter holes. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the structure of the foundation pit construction monitoring device in the embodiment of the utility model;
[0018] Figure 2 This is a schematic diagram of the groove in the embodiment of the utility model;
[0019] Figure 3 It is a schematic diagram of the filter hole in the embodiment of the utility model.
[0020] The reference numerals are as follows:
[0021] 1- inclinometer tube, 2- earth pressure gauge wire, 3- steel ring, 4- earth pressure gauge, 5- fixed iron sheet, 6- limiter, 7- sedimentation magnetic ring, 8- sealed end filter tube, 9- fine sand, 10- plain soil, 11- filter hole. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the embodiments described below are part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.
[0023] Therefore, the detailed description of the embodiments of the present application provided below in conjunction with the accompanying drawings is intended to represent only selected embodiments of the present application, and is not intended to limit the scope of protection claimed in the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.
[0024] It should be understood that in the description of the embodiments of the present utility model, the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate the orientation or position relationship based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the embodiments of the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the embodiments of the present utility model. In addition, the terms "first" and "second" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the embodiments of the present utility model, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.
[0025] In the description of the embodiments of the present utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or can communicate with each other; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the embodiments of the present utility model can be understood according to specific circumstances.
[0026] See also Figure 1 The utility model provides a foundation pit construction monitoring device, including an inclinometer tube, a steel ring, a settlement magnetic ring, a limiter and an earth pressure gauge. The material of the inclinometer tube can be a PVC tube.
[0027] The steel ring, the limiter and the settlement magnetic ring are sequentially mounted on the inclinometer tube from top to bottom, the steel ring is fixed with a fixed iron sheet, and the earth pressure gauge is fixed to the fixed iron sheet. Among them, the limiter is used in conjunction with the settlement magnetic ring to limit the settlement magnetic ring within a certain range when it is buried.
[0028] Optionally, the inner diameter of the steel ring is consistent with the outer diameter of the inclinometer tube, and the steel ring is connected to the fixed iron sheet by welding.
[0029] Optionally, a sealed filter tube is connected to the bottom end of the inclinometer tube, and filter holes are distributed around the tube wall of the sealed filter tube.
[0030] The sealed filter tube connected to the bottom of the inclinometer tube has the function of filtering water, soil and sediment. During use, the water, soil and sediment accumulated inside the inclinometer tube can be filtered through the filter holes. Figure 3 shown.
[0031] Optionally, the height of the limiter sleeve on the inclinometer tube does not exceed 1 / 2 of the height of the inclinometer tube.
[0032] Optionally, the earth pressure gauge is connected to the fixed iron sheet by welding, and a wire is connected to the earth pressure gauge.
[0033] The earth pressure gauge is equipped with corresponding wires according to the burial depth, and the earth pressure gauge and the fixed iron sheet are well fitted when welded.
[0034] Optionally, the sealed filter tube has the same inner diameter and outer diameter as the inclinometer tube.
[0035] Optionally, the limiter and the steel ring are respectively mounted at 1 / 3 and 2 / 3 of the height of the inclinometer tube.
[0036] like Figure 2 As shown, there are four grooves evenly distributed around the inner wall of the inclinometer tube and the sealed filter tube.
[0037] like Figure 1 As shown, during use, the inclinometer tube needs to be buried in the borehole, and the space between the inclinometer tube and the bare soil is filled with fine sand.
[0038] It should be noted that the foundation pit construction monitoring device provided by the utility model includes a settlement magnetic ring, a limit switch and an earth pressure gauge, which are all common devices in the prior art. The utility model does not limit their specific models and does not further elaborate on their working principles.
[0039] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A foundation pit construction monitoring device, characterized in that: It comprises an inclinometer tube (1), a steel ring (3), a sedimentation magnetic ring (7), a stopper (6) and an earth pressure gauge (4); The steel ring (3), the stopper (6) and the sinking magnetic ring (7) are sequentially sleeved on the inclinometer tube (1) from top to bottom, a fixed iron sheet (5) is fixed on the steel ring (3), and the soil pressure gauge (4) is fixed on the fixed iron sheet (5).
2. The foundation pit construction monitoring device according to claim 1 is characterized in that: The inner diameter of the steel ring (3) is consistent with the outer diameter of the inclinometer tube (1), and the steel ring (3) is connected to the fixed iron sheet (5) by welding.
3. The foundation pit construction monitoring device according to claim 1, characterized in that: The bottom end of the inclinometer tube (1) is connected to a sealed filter tube (8), and filter holes (11) are distributed around the tube wall of the sealed filter tube (8).
4. The foundation pit construction monitoring device according to any one of claims 1 to 3, characterized in that: The height of the stopper (6) sleeved on the inclinometer tube (1) does not exceed 1 / 2 of the height of the inclinometer tube (1).
5. The foundation pit construction monitoring device according to claim 4, characterized in that: The soil pressure gauge (4) is connected to the fixed iron sheet (5) by welding, and a wire (2) is connected to the soil pressure gauge (4).
6. The foundation pit construction monitoring device according to claim 3 is characterized in that: The sealed-end filter tube (8) has the same inner diameter and outer diameter as the inclinometer tube (1).
7. The foundation pit construction monitoring device according to claim 5 or 6, characterized in that: The stopper (6) and the steel ring (3) are respectively sleeved at 1 / 3 and 2 / 3 of the height of the inclinometer tube (1).
8. The foundation pit construction monitoring device according to claim 6, characterized in that: The inner walls of the inclinometer tube (1) and the sealed filter tube (8) are evenly distributed with four grooves along the circumference.