Assembly type prefabricated column steel bar and side strip staggered single-face welding structure

By using the dislocated single-sided welded steel bar structure in the precast columns, the problems of high cost and dangerous welding of traditional connection methods are solved, the construction efficiency and tensile strength are improved, and efficient and stable precast column connections are achieved.

CN221896060UActive Publication Date: 2024-10-25DERUI SHENGXING (DALIAN) PREFABRICATED BUILDING TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420498666.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2024-10-25
Estimated Expiration
2034-03-14

AI Technical Summary

Technical Problem

In the traditional way of connecting prefabricated columns to foundations or floors, the grouting sleeve connection is costly and cumbersome to construct. There are dangerous defects caused by the melted state of the main bars when welded on site, and the tensile strength is difficult to meet the design requirements.

Method used

The prefabricated column adopts a single-sided welded structure with staggered steel bars. By setting two tie bars in the prefabricated column, the tie bars are staggered and welded to the main bars, thereby enhancing the tensile strength of the main bars and evenly distributing multiple bars when the prefabricated columns are connected. Group welded structure.

Benefits of technology

It improves construction efficiency and tensile strength, simplifies the construction process, meets design requirements, overcomes the disadvantages of traditional methods, and improves tensile, shear and compressive properties.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221896060U_ABST
    Figure CN221896060U_ABST
Patent Text Reader

Abstract

The utility model discloses an assembly type prefabricated column steel bar and side bar staggered single-face welding structure which comprises two connected main bars and two binding bar steel bars, the diameter of each binding bar steel bar is not larger than that of each main bar, and the central axis of each binding bar steel bar and the central axis of each main bar are located on the same plane. The two binding strip reinforcing steel bars comprise the first binding strip reinforcing steel bar and the second binding strip reinforcing steel bar, and the end of the first binding strip reinforcing steel bar and the end of the second binding strip reinforcing steel bar are arranged in a staggered mode. Compared with the prior art, the utility model has the beneficial effects that the utility model relates to a construction process of up-and-down staggered single-side welding of the steel bar binding strips of the assembly type prefabricated column, the working efficiency is high, the accuracy is strong, the tensile strength can meet the design requirement, many defects of the traditional production are overcome, and the efficiency is high. And the structure is simple, the construction is convenient, and the popularization is easy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of assembled building engineering, and in particular relates to an assembled prefabricated column steel bar staggered single-sided welding structure. Background Art

[0002] The steel bars that bear gravity loads in concrete components are called main bars. Compared with structural steel bars, they are also called longitudinal force-bearing steel bars. The traditional method of connecting prefabricated columns with foundations or floors with reserved extended steel bars usually uses a grouting sleeve connection, which requires pouring concrete and waiting for the concrete strength to increase before the next step of construction. This is costly and cumbersome.

[0003] If the main reinforcement is welded on site, the construction progress can be accelerated. However, due to the weakening of the cross section and stress concentration in the burning area, a melting state is produced during welding, which is a dangerous defect that cannot be ignored. It is very easy to cause local brittle fracture. The material breaks under lower stress, and the material strength is significantly reduced. The tensile strength of the simple welded main reinforcement cannot meet the design requirements. Utility Model Content

[0004] In order to overcome the limitations of the grouting sleeve in the prior art and the shortcomings of the traditional welding method, the utility model provides a:

[0005] The assembled prefabricated column steel bar staggered single-sided welded structure comprises two main bars extending from the prefabricated column and two tie bars, the diameter of the tie bars is not greater than the diameter of the main bars, the tie bars and the central axis of the main bars are on the same plane, the two tie bars include a first tie bar and a second tie bar, and the ends of the first tie bar and the second tie bar are staggered. The main bars at the staggered parts of the tie bars are divided into two sections, one above and one below, and the main bars are burned on only one side, which greatly enhances the tensile strength of the main bars.

[0006] Furthermore, the distance between the end faces of the main reinforcement is 20 to 50 mm.

[0007] Furthermore, the length of the binding steel bars is 10d.

[0008] Furthermore, the distance between the upper end of the first binding steel bar and the upper end of the second binding steel bar is staggered by 20 to 50 mm.

[0009] Furthermore, the lengths of the first binding steel bars are equal to the lengths of the second binding steel bars. The binding steel bars of the same length and the same length of the offset length are symmetrically arranged, which effectively improves the tensile strength of the structure.

[0010] Furthermore, the length of the welded portion between the main reinforcement and the tie reinforcement is 5d.

[0011] Furthermore, in order to ensure the tensile strength and stability of the mechanism, during the prefabricated column connection construction, the welding structure shall be no less than 4 groups and shall be distributed on the cross section of the prefabricated column or foundation pedestal according to the design scheme in the drawings.

[0012] Compared with the prior art, the utility model has the following beneficial effects: the utility model relates to a construction process for upper and lower staggered single-sided welding of steel bar tie bars of assembled prefabricated columns, which has high working efficiency and high accuracy, and the tensile strength can meet the design requirements, overcomes many disadvantages of traditional production, has high efficiency, good tensile, shear and compressive properties, simple structure, convenient construction, and easy promotion. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of the utility model.

[0014] Figure 2 It is a schematic diagram of the bottom structure of a prefabricated pile in an embodiment of the utility model.

[0015] Figure 3 It is a schematic diagram of the welding structure of the utility model.

[0016] Figure 4 This utility model Figure 2 Schematic diagram of the structure of the AA section.

[0017] In the figure: 1 main reinforcement, 2 binding steel bars, 21 first binding steel bars, 22 second binding steel bars. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Example

[0019] The assembled prefabricated column steel bar staggered single-sided welded structure comprises two connected main bars 1 and two tie bars 2 extending from the prefabricated column, the tie bars 2 have the same diameter as the main bars 1, the tie bars 2 and the central axis of the main bars 1 are on the same plane, the two tie bars 2 comprise a first tie bar 21 and a second tie bar 22, and the ends of the first tie bar 21 and the second tie bar 22 are staggered. The main bars at the staggered part of the tie bars have two sections each, and only one side of the main bars is burned, which greatly enhances the tensile strength of the main bars. The distance between the end faces of the main bars 1 is 20 mm. The length of the tie bars is 10d. The distance between the upper end of the first tie bar 21 and the upper end of the second tie bar 22 is staggered by 20-50 mm. The lengths of the first tie bar 21 and the second tie bar 22 are equal. The tie bars of the same length and the staggered length of the same length are symmetrically arranged to effectively improve the tensile strength of this structure. The length of the welded part between the main reinforcement and the tie bar is 5d. In order to ensure the tensile strength and stability of the mechanism, during the prefabricated column connection construction, the welded structure is 32 groups and evenly distributed in the circumferential direction of the cross section of the prefabricated column.

[0020] The specific welding process includes the following steps:

[0021] Step (1), according to the design drawing requirements, during the production of prefabricated columns, main reinforcement of a specified length is reserved at the end according to the design requirements;

[0022] Step (2), installing the prefabricated columns, adjusting the distance between the columns, and reserving a gap between the end faces of the main reinforcement (1);

[0023] Step (3), prepare the steel bars, remove rust and dirt before welding, and keep the electrode surface clean at all times to ensure good conductivity;

[0024] Step (4), when welding the steel bars, attach a tie bar of the same diameter and a specified length to both sides of the butted main bars; weld the attached tie bar to the main bars reserved for the column on the side; the positions of the attached steel bars of the same diameter on both sides of the main bars are staggered up and down.

[0025] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. The prefabricated column steel bar staggered single-sided welding structure is characterized by: The welded structure comprises two connected main bars (1) and two binding bars (2), wherein the diameter of the binding bars (2) is not greater than the diameter of the main bars (1), the binding bars (2) and the central axis of the main bars (1) are located on the same plane, and the two binding bars (2) comprise a first binding bar (21) and a second binding bar (22), and the ends of the first binding bar (21) and the second binding bar (22) are staggered.

2. The assembled prefabricated column steel bar staggered single-sided welded structure according to claim 1, characterized in that: The distance between the end faces of the main reinforcement (1) is 20 to 50 mm.

3. The assembled prefabricated column steel bar staggered single-sided welded structure according to claim 1, characterized in that: The length of the binding steel bars is 10d.

4. The assembled prefabricated column steel bar staggered single-sided welded structure according to claim 1, characterized in that: The distance between the upper end of the first binding steel bar (21) and the upper end of the second binding steel bar (22) is 20-50 mm.

5. The assembled prefabricated column steel bar staggered single-sided welded structure according to claim 1, characterized in that: The first binding steel bars (21) and the second binding steel bars (22) are of equal length.

6. The assembled prefabricated column steel bar staggered single-sided welded structure according to claim 1, characterized in that: The length of the welded part between the main reinforcement and the tie reinforcement is 5d.

7. The assembled prefabricated column steel bar staggered single-sided welded structure according to claim 1, characterized in that: The number of the welding structures is no less than 4 and they are evenly distributed on the cross section of the prefabricated column.