Creeping formwork frame body
By introducing an electric climbing component into the climbing formwork, and using the motor to drive the screw to drive the adapter block and support components to move, replacing the hydraulic method for concrete pouring, the problem of aging, cracking, and oil leakage of the oil pipes of the hydraulic climbing formwork was solved, and construction safety was improved. .
Patent Information
- Application Number
- CN202323233319.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-29
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2033-11-29
AI Technical Summary
In the existing technology, the oil pipes of the hydraulic climbing formwork are aging and cracking, resulting in oil leakage, contaminating the operating platform and increasing the risk of accidents.
Electric climbing components are used, including embedded parts, slide rails, sliding sleeves, motors and screws. The motor drives the screw to drive the adapter block and support components to move, replacing the hydraulic method for concrete pouring to avoid oil leakage.
This effectively prevents oil leakage from oil pipes from contaminating the operating platform, reduces the risk of accidents, and improves construction safety.
Smart Images

Figure CN221896174U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a climbing formwork frame. Background Art
[0002] Architecture is a general term for buildings and structures. It is an artificial environment created by people to meet the needs of social life, using the material and technical means they have mastered, and applying certain scientific laws, Feng Shui concepts and aesthetic principles. In order to clearly express the usability, some classifications will distinguish buildings from non-building structures that people do not occupy for a long time. In addition, some architectural scholars also deliberately subdivide the buildings whose appearance is consciously created by people into "architecture" in order to avoid confusion. Bridge construction is also a kind of architecture. During the construction of bridge casting, climbing formwork frames are often needed to reduce the number of lifting machinery and speed up construction.
[0003] For the climbing formwork frame in construction, a hydraulic climbing formwork frame disclosed in the prior art patent publication number CN216427998U can be used. The installation embedded parts of the hydraulic climbing formwork frame are composed of a positioning plate and a positioning plug rod. The positioning plug rod is used to position the solid steel pipe for insertion and fixation. The positioning plate is used for the connection and reinforcement between the anchor seat and the installation embedded parts, so that the anchor seat can be stable relative to the pier, thereby ensuring the smooth use of the climbing formwork frame.
[0004] However, in the above method, the power mode adopted is hydraulic, so there is a risk of oil leakage due to aging and rupture of the oil pipe, causing pollution to the operating platform, which may easily cause the operator to fall and cause an accident. Utility Model Content
[0005] The utility model aims to provide a climbing formwork frame, aiming to solve the technical problem that the power mode adopted in the prior art is hydraulic, so there is a risk of oil leakage due to aging and rupture of the oil pipe, which may cause pollution to the operating platform and easily lead to the operator falling and causing accidents.
[0006] To achieve the above-mentioned purpose, the utility model adopts a climbing formwork frame, including concrete, a climbing formwork frame body, a template, a support assembly and a climbing assembly, wherein the support assembly is arranged on the climbing formwork frame body, and the template is arranged on the support assembly. The climbing assembly includes a plurality of embedded parts, two slide rails, two sliding sleeves, a mounting part, a first motor, a screw and an adapter block. The plurality of embedded parts are arranged on the concrete when the concrete is poured, and the two slide rails are detachably connected to the corresponding embedded parts respectively, and the two sliding sleeves are both provided with slide grooves, and the two slide grooves are respectively slidably connected to the corresponding slide rails, and the two sliding sleeves are fixedly connected to the climbing formwork frame body, and the adapter block is fixedly connected to the climbing formwork frame body, and the mounting part is installed on the two slide rails, and the first motor is installed on the mounting part, and the first motor is located below the mounting part, and the output end of the first motor is fixedly connected to the screw, and the screw is located below the first motor, and the screw is threadedly matched with the adapter block.
[0007] Among them, the supporting assembly includes a bracket, a second motor, a screw, a screw sleeve, a block and an inclined block. The bracket is fixedly connected to the main body of the climbing formwork frame, the second motor is installed on the bracket, the output end of the second motor is fixedly connected to the screw, the screw sleeve is adapted to the screw, the screw sleeve is fixedly connected to the template, the block is slidably connected to the bracket, the block is fixedly connected to the template, and the two ends of the inclined block are respectively fixedly connected to the block and the template.
[0008] Wherein, the support assembly further includes a sleeve rod and a support rod, one end of the sleeve rod is fixedly connected to the bracket, the support rod is slidably connected to the sleeve rod, and the support rod is fixedly connected to the template.
[0009] Wherein, the climbing formwork frame also includes two groups of protection components, and the two groups of protection components are symmetrically arranged on the adapter block.
[0010] Among them, the protective component includes a right-angle plate, a sliding rod, a spring and a supporting block. The right-angle plate is fixedly connected to the adapter block, the slide rail is provided with a plurality of grooves, one end of the sliding rod passes through the right-angle plate and is fixedly connected to the supporting block, the supporting block is provided with an inclined surface, and the two ends of the spring are respectively fixedly connected to the supporting block and the right-angle plate, and the supporting block is adapted to the corresponding grooves.
[0011] Wherein, the protection component also includes a force-applying member, and the force-applying member is fixedly connected to the sliding rod.
[0012] The utility model provides a climbing formwork frame, by setting the climbing assembly, when it is used specifically, when pouring the concrete of the bottom layer, a plurality of the embedded parts are set on the concrete, and then the two slide rails are respectively installed on the corresponding two embedded parts, and the mounting part is installed on the two slide rails, so that the first motor, the screw rod and the adapter block are fixed, and at this time, the two slide grooves are sleeved on the two slide rails, so as to complete the installation of the climbing formwork frame, and then when it is necessary to pour the upper concrete, the first motor is started, and the output end of the first motor drives the screw rod to rotate, and the screw rod drives the adapter block to move, and the adapter block moves upward at this time, and the adapter block moves upward while driving the climbing formwork frame body to move upward, and the climbing formwork frame body moves upward and drives the supporting assembly to move upward, so that the template moves to the specified position and then encloses the pouring space to pour the upper concrete, and after the pouring is completed, the template is kept away from the concrete, so that the hydraulic method is replaced as the power, and the oil leakage is avoided to pollute the operating platform, and the operator will not fall and cause an accident. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0014] Figure 1 It is a structural schematic diagram of the first embodiment of the utility model.
[0015] Figure 2 It is a front view of the first embodiment of the utility model.
[0016] Figure 3 It is a top view of the first embodiment of the utility model.
[0017] Figure 4 It is a structural schematic diagram of a protection component of the second embodiment of the utility model.
[0018] Figure 5 It is a structural schematic diagram of a groove of the second embodiment of the utility model.
[0019] 101-concrete, 102-climbing formwork body, 103-formwork, 104-embedded parts, 105-slide rails, 106-sleeves, 107-mounting parts, 108-first motor, 109-screw, 110-adapter block, 111-bracket, 112-second motor, 113-screw, 114-screw sleeve, 115-block, 116-oblique block, 117-sleeve rod, 118-support rod, 119-slide groove, 201-right angle plate, 202-slide rod, 203-spring, 204-holding block, 205-force member, 206-groove, 207-inclined surface. DETAILED DESCRIPTION
[0020] First embodiment:
[0021] See also Figure 1 to Figure 3 ,in Figure 1 It is a structural schematic diagram of the first embodiment of the utility model. Figure 2 This is a front view of the first embodiment of the utility model. Figure 3 It is a top view of the first embodiment of the utility model.
[0022] The utility model provides a climbing formwork frame: including concrete 101, a climbing formwork frame body 102, a template 103, a support assembly and a climbing assembly, the climbing assembly includes a plurality of embedded parts 104, two slide rails 105, two slide sleeves 106, a mounting member 107, a first motor 108, a screw 109 and an adapter block 110, the support assembly includes a bracket 111, a second motor 112, a screw 113, a screw sleeve 114, a block 115, an inclined block 116, a sleeve rod 117 and a support rod 118. The above scheme solves the technical problem that the power mode adopted in the prior art is hydraulic mode, so there is a risk of oil leakage after the oil pipe is aged and ruptured, causing leakage to the operating platform and causing pollution, which is easy to cause the operator to fall and cause an accident.
[0023] According to this specific embodiment, the support assembly is arranged on the climbing formwork body 102, and the formwork 103 is arranged on the support assembly. The support assembly drives the formwork 103 to move and enclose for pouring.
[0024] Among them, a plurality of embedded parts 104 are arranged on the concrete 101 when the concrete 101 is poured, the two slide rails 105 are detachably connected to the corresponding embedded parts 104, the two slide sleeves 106 are provided with slide grooves 119, the two slide grooves 119 are slidably connected to the corresponding slide rails 105, and the two slide sleeves 106 are fixedly connected to the climbing formwork body 102, the adapter block 110 is fixedly connected to the climbing formwork body 102, and the mounting member 107 is installed on the two slide rails 105. The first motor 108 is installed on the mounting member 107, the first motor 108 is located below the mounting member 107, the output end of the first motor 108 is fixedly connected to the screw 109, the screw 109 is located below the first motor 108, and the screw 109 is threadedly matched with the adapter block 110. By setting the climbing assembly, when the concrete 101 of the bottom layer is poured, a plurality of embedded parts 104 are set on the concrete 101, and then the two slide rails 105 are respectively installed on the bottom of the concrete 101. The mounting member 107 is mounted on the two corresponding embedded parts 104, so that the first motor 108, the screw rod 109 and the adapter block 110 are fixed. At this time, the two slide grooves 119 are sleeved on the two slide rails 105 to complete the installation of the climbing formwork frame. After that, when it is necessary to pour the upper concrete 101, the first motor 108 is started, and the output end of the first motor 108 drives the screw rod 109 to rotate, and the screw rod 109 drives the adapter block 110 to rotate. 10 moves, and the adapter block 110 moves upward at this time. The adapter block 110 moves upward and drives the climbing formwork frame body 102 to move upward. The climbing formwork frame body 102 moves upward and drives the supporting assembly to move upward, so that the formwork 103 moves to the specified position and encloses a pouring space to pour the upper concrete 101. After the pouring is completed, the formwork 103 can be kept away from the concrete 101. In this way, the hydraulic method is replaced as the power, which avoids oil leakage from polluting the operating platform and will not cause the operator to fall and cause an accident.
[0025] Secondly, the bracket 111 is fixedly connected to the climbing formwork body 102, the second motor 112 is installed on the bracket 111, the output end of the second motor 112 is fixedly connected to the screw rod 113, the screw rod sleeve 114 is adapted to the screw rod 113, the screw rod sleeve 114 is fixedly connected to the template 103, the block 115 is slidably connected to the bracket 111, the block 115 is fixedly connected to the template 103, and the two ends of the inclined block 116 are respectively fixedly connected to the block 115 and the template 103. During specific use, the second motor 112 is started, the second motor 112 drives the screw rod 113 to rotate, the screw rod 113 drives the screw rod sleeve 114 to move, and the screw rod sleeve 114 drives the template 103 to approach or move away from the concrete 101. The inclined block 116 and the block 115 are both used to improve the stability of the template 103.
[0026] At the same time, one end of the sleeve rod 117 is fixedly connected to the bracket 111, the support rod 118 is slidably connected to the sleeve rod 117, and the support rod 118 is fixedly connected to the template 103. By setting the support rod 118 and the sleeve rod 117, when the template 103 moves, the template 103 drives the support rod 118 to slide in the sleeve rod 117, thereby further improving the stability of the template 103.
[0027] A climbing formwork frame of the present embodiment is used, and the climbing component is set. When it is used specifically, when pouring the bottom layer of concrete 101, a plurality of embedded parts 104 are set on the concrete 101, and then the two slide rails 105 are respectively installed on the corresponding two embedded parts 104, and the mounting part 107 is installed on the two slide rails 105, so that the first motor 108, the screw rod 109 and the adapter block 110 are fixed. At this time, the two slide grooves 119 are sleeved on the two slide rails 105, so as to complete the installation of the climbing formwork frame. Thereafter, when it is necessary to pour the upper layer of concrete 101, the first motor 108 is started, and the output end of the first motor 108 drives the screw rod 109 to rotate, and the screw rod 109 drives the adapter block 110 to move, and the adapter block 110 moves upward at this time. , the adapter block 110 moves upward and drives the climbing formwork body 102 to move upward. The climbing formwork body 102 moves upward and drives the supporting assembly to move upward, so that the formwork 103 moves to the specified position and encloses the pouring space to pour the upper concrete 101. After the pouring is completed, the formwork 103 can be kept away from the concrete 101. In this way, the hydraulic method is replaced as the power, and the oil leakage is avoided to pollute the operating platform and will not cause the operator to fall and cause an accident. In specific use, the second motor 112 is started, and the second motor 112 drives the screw rod 113 to rotate, and the screw rod 113 drives the screw rod sleeve 114 to move, and the screw rod sleeve 114 drives the formwork 103 to approach or move away from the concrete 101. The inclined block 116 and the block 115 are both used to improve the stability of the formwork 103.
[0028] Second embodiment:
[0029] Based on the first embodiment, please refer to Figure 4 and Figure 5 , Figure 4 is a schematic structural diagram of a protection assembly according to a second embodiment of the present utility model. Figure 5 It is a structural schematic diagram of a groove of the second embodiment of the utility model.
[0030] The utility model provides a climbing formwork frame which also includes two groups of protection components. The protection components include a right-angle plate 201 , a slide bar 202 , a spring 203 , a support block 204 and a force-applying member 205 .
[0031] According to this specific embodiment, the two groups of protection components are symmetrically arranged on the adapter block 110. By arranging the two groups of protection components, the stability of the entire structure can be improved.
[0032] The right-angle plate 201 is fixedly connected to the adapter block 110, the slide rail 105 is provided with a plurality of grooves 206, one end of the slide rod 202 passes through the right-angle plate 201 and is fixedly connected to the abutment block 204, the abutment block 204 is provided with an inclined surface 207, the two ends of the spring 203 are respectively fixedly connected to the abutment block 204 and the right-angle plate 201, the abutment block 204 is adapted to the corresponding grooves 206, and when the adapter block 110 moves upward, the adapter block 110 drives the two right-angle plates 201 to move, thereby driving the two supporting blocks 204 to move upward, so that the inclined surfaces 207 of the two supporting blocks 204 are squeezed, and the supporting blocks 204 drive the springs 203 to contract. Then, after moving to the specified position, the springs 203 reset and extend, driving the supporting blocks 204 to be inserted into the corresponding grooves 206 for support, thereby improving the stability of the adapter block 110, and further improving the stability of the climbing formwork frame main body 102.
[0033] Secondly, the force-applying member 205 is fixedly connected to the slide bar 202 . When disassembly is required, the force-applying member 205 is convenient for pulling the slide bar 202 to drive the supporting block 204 away from the groove 206 .
[0034] When using a climbing formwork frame of the present embodiment, when the adapter block 110 moves upward, the adapter block 110 drives the two right-angle plates 201 to move, thereby driving the two supporting blocks 204 to move upward, so that the inclined surfaces 207 of the two supporting blocks 204 are squeezed, and the supporting blocks 204 drive the springs 203 to contract. Then, when moving to the specified position, the springs 203 reset and extend to drive the supporting blocks 204 to be inserted into the corresponding grooves 206 for support, thereby improving the stability of the adapter block 110, and further improving the stability of the climbing formwork frame main body 102.
[0035] The above disclosure is only a preferred embodiment of the present invention, and certainly cannot be used to limit the scope of rights of the present invention. Ordinary technicians in this field can understand that all or part of the processes of the above embodiment and equivalent changes made according to the claims of the present invention still fall within the scope covered by the utility model.
Claims
1. A climbing formwork frame, comprising concrete, a climbing formwork frame body, a template and a support assembly, wherein the support assembly is arranged on the climbing formwork frame body, and the template is arranged on the support assembly, characterized in that: Also included is a climbing assembly; The climbing assembly includes a plurality of embedded parts, two slide rails, two sliding sleeves, a mounting part, a first motor, a screw and an adapter block. The plurality of embedded parts are arranged on the concrete when the concrete is poured. The two slide rails are detachably connected to the corresponding embedded parts, respectively. The two slide sleeves are provided with slide grooves, and the two slide grooves are slidably connected to the corresponding slide rails, respectively. The two slide sleeves are fixedly connected to the climbing formwork frame body, and the adapter block is fixedly connected to the climbing formwork frame body. The mounting part is installed on the two slide rails, and the first motor is installed on the mounting part. The first motor is located below the mounting part. The output end of the first motor is fixedly connected to the screw, and the screw is located below the first motor. The screw is threadedly matched with the adapter block.
2. The climbing formwork frame according to claim 1, characterized in that: The support assembly includes a bracket, a second motor, a screw, a screw sleeve, a block and an inclined block. The bracket is fixedly connected to the main body of the climbing formwork frame, the second motor is installed on the bracket, the output end of the second motor is fixedly connected to the screw, the screw sleeve is adapted to the screw, the screw sleeve is fixedly connected to the formwork, the block is slidably connected to the bracket, the block is fixedly connected to the formwork, and the two ends of the inclined block are respectively fixedly connected to the block and the formwork.
3. The climbing formwork frame according to claim 2, characterized in that: The support assembly also includes a sleeve rod and a support rod, one end of the sleeve rod is fixedly connected to the bracket, the support rod is slidably connected to the sleeve rod, and the support rod is fixedly connected to the template.
4. The climbing formwork frame according to claim 3, characterized in that: The climbing formwork frame also includes two groups of protection components, and the two groups of protection components are symmetrically arranged on the adapter block.
5. The climbing formwork frame according to claim 4, characterized in that: The protective assembly includes a right-angle plate, a sliding rod, a spring and a supporting block. The right-angle plate is fixedly connected to the adapter block, the slide rail is provided with a plurality of grooves, one end of the sliding rod passes through the right-angle plate and is fixedly connected to the supporting block, the supporting block is provided with an inclined surface, the two ends of the spring are respectively fixedly connected to the supporting block and the right-angle plate, and the supporting block is adapted to the corresponding grooves.
6. The climbing formwork frame according to claim 5, characterized in that: The protection component also includes a force-applying member, and the force-applying member is fixedly connected to the sliding rod.