Foundation pile drilling device
By designing grout extraction and anti-splash components in the foundation pile drilling device, the problem of mud accumulation in the shielding cover is solved, rapid cleaning and anti-splash effects are achieved, and the stable operation of the equipment is ensured.
Patent Information
- Application Number
- CN202420050481.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-09
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-01-09
AI Technical Summary
During long-term operations of existing foundation pile drilling devices, mud accumulation in the shield increases the difficulty of cleaning, may affect the normal operation of the equipment, and even lead to poor heat dissipation or equipment damage.
A foundation pile drilling protection mechanism is designed, including a slurry pumping component and a splash-proof component. The mud is quickly pumped out through the slurry pump and connecting pipes, and the splash-proof effect is improved through the sealing sleeve plate and fastening bolts to avoid mud accumulation and splashing. .
It effectively reduces the difficulty of mud cleaning, ensures the stable operation of the equipment, improves the anti-splash effect, and avoids heat dissipation problems and equipment damage caused by mud.
Smart Images

Figure CN221896546U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of foundation pile drilling, and in particular relates to a foundation pile drilling device. Background Art
[0002] A pile foundation is a deep foundation that connects the tops of several piles into a whole through a cap to jointly bear dynamic and static loads. A pile is a vertical or inclined foundation component set in the soil. Its function is to penetrate soft, highly compressible soil layers or water and transfer the load borne by the pile to a harder, denser or less compressible bearing layer of the foundation. We usually call the piles in the pile foundation foundation piles.
[0003] Publication No. "CN217106844U" discloses a drilling device for pile foundations, which moves the device to the position where drilling is required, and then the motor runs, the output shaft drives the rotating rod to rotate, so that the blade rotates, the electric push rod is extended and retracted, and the fixed plate is driven to move up and down, so that the blade drills a hole in the ground, and the depth of the drilling hole is adjusted by extending and retracting the electric push rod. When drilling a hole in the ground, soil is easy to splash, and the shielding cover blocks the soil to prevent the soil from splashing everywhere and accidentally injuring others, thereby improving the safety of the device.
[0004] In actual operation, the shield can prevent mud from splashing out, but it also forms a closed space. During long-term operation, mud accumulates in the shield and may form a layer of mud residue. This accumulated mud not only increases the difficulty of cleaning, but also may affect the normal operation of the equipment. Especially in continuous operation, the accumulated mud may cause poor heat dissipation, affect equipment performance, or even damage the equipment.
[0005] In order to solve the above problems, a foundation pile drilling device is proposed in the present application. Utility Model Content
[0006] To solve the problems raised in the above-mentioned background technology. The utility model provides a foundation pile drilling device, which can solve the problem that although the shielding cover can prevent mud from splashing out, it also forms a closed space by adding a foundation pile drilling protection mechanism. During long-term operation, mud accumulates in the shielding cover and may form a layer of mud residue. This accumulated mud not only increases the difficulty of cleaning work, but may also affect the normal operation of the equipment. Especially in continuous operation, the accumulated mud may cause poor heat dissipation, affect equipment performance, and even damage the equipment.
[0007] To achieve the above object, the utility model provides the following technical solutions: a foundation pile drilling device, comprising a mounting base, a foundation pile drilling device body is mounted on the top of the mounting base, and a foundation pile drilling protection mechanism is arranged at the end of the mounting base;
[0008] The pile foundation drilling protection mechanism includes a connecting plate, a protective sleeve plate, a protective cover plate, a slurry extraction assembly and a splash-proof assembly. One end of the connecting plate is fixedly connected to the end of the mounting base, the outer wall of the protective sleeve plate is fixedly connected to the other end of the connecting plate, the protective cover plate is connected to the protective sleeve plate through a connecting side plate, the slurry extraction assembly is arranged on the mounting base, and the splash-proof assembly is arranged on the protective cover plate.
[0009] As a preferred embodiment of a pile drilling device of the utility model, the slurry extraction assembly includes a slurry extraction pump, a connecting sleeve, a connecting pipe and a slurry discharge pipe. The slurry extraction pump is installed on the mounting base, the connecting sleeve is fixedly connected to the inner wall of the protective sleeve, the connecting pipe is arranged between the connecting sleeve and the slurry extraction pump, and they are connected through the connecting pipe, and the end of the slurry discharge pipe is connected to the slurry discharge port of the slurry extraction pump.
[0010] As a preferred embodiment of a pile foundation drilling device of the utility model, the splash-proof assembly includes a sealing sleeve, a mounting plate and fastening bolts, the sealing sleeve is embedded in the inner wall of the protective cover through the mounting plate, the fastening bolts are installed on the mounting plate, and the fastening bolts are threadedly connected to the top of the protective cover.
[0011] As a preferred embodiment of the pile foundation drilling device of the utility model, the side wall of the connecting sleeve is provided with grouting heads in a circular array, and a cavity structure for connecting to the connecting pipe is provided inside the connecting sleeve.
[0012] As a preferred embodiment of the pile foundation drilling device of the utility model, fixing bolts are symmetrically installed on the outer wall of the connecting side plate, and threaded holes matching the fixing bolts are opened on the outer walls of the protective sleeve plate and the protective cover plate.
[0013] As a preferred embodiment of the pile foundation drilling device of the utility model, the top of the protective cover plate is symmetrically provided with limiting holes matching the fastening bolts.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] 1. The slurry pump is installed on the mounting base, the connecting sleeve is fixedly connected to the inner wall of the protective sleeve, a connecting pipe is arranged between the connecting sleeve and the slurry pump, and they are connected through the connecting pipe, and the end of the slurry discharge pipe is connected to the slurry discharge port of the slurry pump. Then, by starting the slurry pump, the slurry can be quickly pumped out through the connecting pipe under the action of multiple slurry pumping heads, and then discharged to a distant place through the slurry discharge pipe, thereby avoiding the accumulation of slurry in the protective sleeve, reducing the difficulty of cleaning the slurry in the later stage, and ensuring the operation of the equipment to be more stable;
[0016] 2. The sealing sleeve is embedded in the inner wall of the protective cover through the mounting plate, and the fastening bolts are installed on the mounting plate. The fastening bolts are connected to the top thread of the protective cover. Then, according to the size of the drill pipe, a suitable sealing sleeve is installed on the inner wall of the protective cover and fixed with the fastening bolts on the mounting plate, thereby effectively improving the splash-proof effect of mud. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0019] Figure 2 This is a schematic diagram of the structure of the slurry pump in the utility model;
[0020] Figure 3 This is a schematic diagram of the structure of the sealing sleeve in the utility model;
[0021] Figure 4 for Figure 3 Enlarged view of part A in .
[0022] In the figure:
[0023] 1. Install the base;
[0024] 2. The main body of the pile drilling device;
[0025] 3. Pile drilling protection mechanism; 31. Connecting plate; 32. Protective sleeve; 321. Connecting side plate; 33. Protective cover; 34. Slurry extraction assembly; 341. Slurry extraction pump; 342. Connecting sleeve; 3421. Slurry extraction head; 343. Connecting pipe; 344. Slurry discharge pipe; 35. Splash-proof assembly; 351. Sealing sleeve; 352. Mounting plate; 353. Fastening bolts. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] like Figure 1 As shown;
[0028] A foundation pile drilling device comprises a mounting base 1, a foundation pile drilling device body 2 is mounted on the top of the mounting base 1, and a foundation pile drilling protection mechanism 3 is arranged at the end of the mounting base 1.
[0029] In this embodiment: Under normal circumstances, the publication number "CN217106844U" discloses a drilling device for pile foundations. During actual operation, although the shielding cover can prevent mud from splashing out, it also forms a closed space. During long-term operation, mud accumulates in the shielding cover and may form a layer of mud residue. This accumulated mud not only increases the difficulty of cleaning work, but may also affect the normal operation of the equipment. Especially in continuous operation, the accumulated mud may cause poor heat dissipation, affect equipment performance, and even damage the equipment. Then, by adding a pile foundation drilling protection mechanism 3, the mud can be extracted and discharged in time when the mud accumulates inside the shielding cover, and the splashing of mud can also be avoided during drilling.
[0030] like Figure 1-Figure 4 As shown;
[0031] Based on the existing foundation pile drilling device, the foundation pile drilling protection mechanism 3 can be added to solve the problem that the shielding cover can prevent mud from splashing out, but at the same time it also forms a closed space. During long-term operation, mud accumulates in the shielding cover and may form a layer of mud residue. This accumulated mud not only increases the difficulty of cleaning work, but may also affect the normal operation of the equipment. Especially during continuous operation, the accumulated mud may cause poor heat dissipation, affect equipment performance, and even damage the equipment.
[0032] More specifically:
[0033] In combination with the above content, in order to promptly extract and discharge the mud when the mud accumulates inside the shielding cover, and also to avoid mud splashing during drilling, a pile drilling protection mechanism 3 is provided at the end of the mounting base 1. The pile drilling protection mechanism 3 includes a connecting plate 31, a protective sleeve plate 32, a protective cover plate 33, a slurry extraction assembly 34 and a splash-proof assembly 35. One end of the connecting plate 31 is fixedly connected to the end of the mounting base 1, and the outer wall of the protective sleeve plate 32 is fixedly connected to the other end of the connecting plate 31. The protective cover plate 33 is covered on the protective sleeve plate 32 by a connecting side plate 321. The slurry extraction assembly 34 is arranged on the mounting base 1, and the splash-proof assembly 35 is arranged on the protective cover plate 33.
[0034] In the present embodiment: during construction at a civil engineering construction site, especially when drilling foundation piles, firstly place the mounting base 1 on one side of the drilling position, and then start the foundation pile drilling device body 2 to perform the drilling operation. In order to avoid mud splashing, one end of the connecting plate 31 is fixedly connected to the end of the mounting base 1, the outer wall of the protective sleeve 32 is fixedly connected to the other end of the connecting plate 31, and the protective cover 33 is connected to the protective sleeve 32 through the connecting side plate 321. The slurry extraction component 34 is arranged on the mounting base 1, and the splash-proof component 35 is arranged on the protective cover 33. Then, under the action of the protective sleeve 32 and the protective cover 33, the splashing of mud can be avoided, and the mud accumulated in the protective sleeve 32 can be extracted by the slurry extraction component 34 and discharged to a distant place, thereby increasing the difficulty of later cleaning. At the same time, the splash-proof effect can be further improved by the splash-proof component 35.
[0035] To be more specific: the slurry extraction assembly 34 includes a slurry extraction pump 341, a connecting sleeve 342, a connecting pipe 343 and a slurry discharge pipe 344. The slurry extraction pump 341 is installed on the mounting base 1. The connecting sleeve 342 is fixedly connected to the inner wall of the protective sleeve 32. A connecting pipe 343 is provided between the connecting sleeve 342 and the slurry extraction pump 341, and they are connected through the connecting pipe 343. The end of the slurry discharge pipe 344 is connected to the slurry discharge port of the slurry extraction pump 341.
[0036] Further, such as Figure 4 As shown, the side wall of the connecting sleeve 342 is provided with slurry extraction heads 3421 in a circular array, and a cavity structure for connecting to the connecting pipe 343 is provided inside the connecting sleeve 342 .
[0037] In this embodiment: in order to discharge the mud accumulated in the protective sleeve 32 more efficiently, the slurry pump 341 is installed on the mounting base 1, the connecting sleeve 342 is fixedly connected to the inner wall of the protective sleeve 32, and a connecting pipe 343 is provided between the connecting sleeve 342 and the slurry pump 341, and they are connected through the connecting pipe 343, and the end of the slurry discharge pipe 344 is connected to the slurry discharge port of the slurry pump 341, and then by starting the slurry pump 341, the mud can be quickly extracted through the connecting pipe 343 under the action of multiple slurry extraction heads 3421, and then discharged to a distant place through the slurry discharge pipe 344, thereby avoiding the accumulation of mud in the protective sleeve 32, reducing the difficulty of cleaning the mud in the later stage, and ensuring that the operation of the equipment is more stable.
[0038] To be more specific: the splash-proof assembly 35 includes a sealing sleeve 351, a mounting plate 352 and fastening bolts 353. The sealing sleeve 351 is embedded in the inner wall of the protective cover 33 through the mounting plate 352. The fastening bolts 353 are installed on the mounting plate 352 and are threadedly connected to the top of the protective cover 33.
[0039] In this embodiment: in order to further improve the splash-proof effect, the sealing sleeve 351 is embedded in the inner wall of the protective cover 33 through the mounting plate 352, and the fastening bolts 353 are installed on the mounting plate 352. The fastening bolts 353 are connected to the top thread of the protective cover 33, and then according to the size of the drill pipe, a suitable sealing sleeve 351 is installed on the inner wall of the protective cover 33 and fixed by the fastening bolts 353 on the mounting plate 352, thereby effectively improving the splash-proof effect of mud.
[0040] It can be understood that: the outer wall of the connecting side plate 321 is symmetrically installed with fixing bolts, the outer walls of the protective sleeve plate 32 and the protective cover plate 33 are both provided with threaded holes matching the fixing bolts, and the top of the protective cover plate 33 is symmetrically provided with limiting holes matching the fastening bolts 353.
[0041] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A pile drilling device, comprising a mounting base (1), a pile drilling device body (2) being mounted on the top of the mounting base (1), characterized in that: A pile drilling protection mechanism (3) is provided at the end of the installation base (1); The pile drilling protection mechanism (3) comprises a connecting plate (31), a protective sleeve plate (32), a protective cover plate (33), a grouting assembly (34) and a splash-proof assembly (35); one end of the connecting plate (31) is fixedly connected to the end of the mounting base (1); the outer wall of the protective sleeve plate (32) is fixedly connected to the other end of the connecting plate (31); the protective cover plate (33) is covered on the protective sleeve plate (32) via a connecting side plate (321); the grouting assembly (34) is arranged on the mounting base (1); and the splash-proof assembly (35) is arranged on the protective cover plate (33).
2. The pile drilling device according to claim 1, characterized in that: The slurry extraction assembly (34) comprises a slurry extraction pump (341), a connecting sleeve (342), a connecting pipe (343) and a slurry discharge pipe (344); the slurry extraction pump (341) is mounted on the mounting base (1); the connecting sleeve (342) is fixedly connected to the inner wall of the protective sleeve (32); the connecting pipe (343) is arranged between the connecting sleeve (342) and the slurry extraction pump (341), and the two are connected via the connecting pipe (343); the end of the slurry discharge pipe (344) is connected to the slurry discharge port of the slurry extraction pump (341).
3. The pile drilling device according to claim 1, characterized in that: The splash-proof assembly (35) comprises a sealing sleeve (351), a mounting plate (352) and a fastening bolt (353); the sealing sleeve (351) is embedded in the inner wall of the protective cover (33) through the mounting plate (352); the fastening bolt (353) is mounted on the mounting plate (352); and the fastening bolt (353) is threadedly connected to the top of the protective cover (33).
4. The pile drilling device according to claim 2, characterized in that: The side wall of the connecting sleeve (342) is provided with slurry extraction heads (3421) in a circular array, and a cavity structure for connecting to the connecting pipe (343) is provided inside the connecting sleeve (342).
5. The pile drilling device according to claim 1, characterized in that: The outer wall of the connecting side plate (321) is symmetrically mounted with fixing bolts, and the outer walls of the protective sleeve plate (32) and the protective cover plate (33) are both provided with threaded holes matching the fixing bolts.
6. The pile drilling device according to claim 3, characterized in that: The top of the protective cover plate (33) is symmetrically provided with limiting holes matching the fastening bolts (353).