Long-distance large-diameter pipe jacking construction device
By designing a combination of embedded support frames and lifting platforms in the pipe jacking construction equipment, and using motor drive and sliding structures, the problem of unstable lifting of long-distance large-diameter pipes has been solved, and the construction efficiency and practicality of the equipment have been improved.
Patent Information
- Application Number
- CN202420406572.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-04
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-03-04
AI Technical Summary
Existing pipe jacking construction equipment is unstable when lifting long-distance large-diameter pipes, resulting in low construction efficiency.
A long-distance large-diameter pipe jacking construction device including a pre-embedded support frame and a lifting platform is designed. The lifting platform is driven by a motor for lifting and lowering. It is combined with a sliding groove and an electric telescopic rod to achieve stable lifting and installation of the pipeline.
It improves the stability and construction efficiency of pipeline lifting, facilitates pipeline installation and loading operations, and enhances the practicality of the equipment.
Smart Images

Figure CN221897253U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipe jacking construction, in particular to a long-distance and large-diameter pipe jacking construction device. Background Art
[0002] Pipe jacking is a trenchless construction method, a pipeline burial construction technology with no excavation or less excavation. Pipe jacking construction is to use the jacking force generated by the jacking equipment in the working pit to overcome the friction between the pipeline and the surrounding soil, push the pipeline into the soil according to the designed slope, and transport the soil away. After one section of the pipe is pushed into the soil layer, the second section of the pipe is pushed in. The principle is to use the thrust of the main jacking cylinder and the pipeline room, relay room, etc. to push the tool pipe or tunnel boring machine from the working pit through the soil layer to the receiving pit and lift it. The pipeline follows the tool pipe or tunnel boring machine and is buried between the two pits.
[0003] At present, when carrying out pipe jacking construction, most of the time, lifting equipment is used to lift the pipeline into the construction well and then install it. However, the existing lifting equipment can only lift shorter pipelines when lifting pipelines. It is inconvenient to lift some long-distance and large-diameter pipelines, and it is easy to be unstable. At the same time, when the pipeline is lowered into the construction well, it shakes and is not easy to install and dock, which reduces the construction efficiency.
[0004] Therefore, a long-distance large-diameter jacking pipe construction device capable of improving stability is now designed to solve this type of defect. Utility Model Content
[0005] In view of the deficiencies in the prior art, the utility model provides a long-distance and large-diameter jacking pipe construction device, which solves the problem of unstable long-distance pipeline lifting during the prior jacking pipe construction.
[0006] To achieve the above objectives, the utility model is implemented through the following technical solutions: a long-distance large-diameter jacking pipe construction device, including an embedded support frame and a lifting platform, the lifting platform is located on the inner side of the embedded support frame, the right side of the top of the embedded support frame is fixedly connected to a motor through a bracket, the output shaft of the motor is fixedly connected to a rotating rod through a coupling, and the left end of the rotating rod is rotatably connected to the left side of the top of the embedded support frame through a bearing.
[0007] Preferably, sliding grooves are provided on both sides of the top of the lifting platform, a strip sliding rod is slidably installed on the inner side of the sliding groove, the top of the strip sliding rod is fixedly connected to a connecting frame, both sides of the surface of the rotating rod are fixedly connected to a winding drum, and a cable is wound on the surface of the winding drum, and one end of the cable is fixedly connected to the connecting frame.
[0008] Wherein, vertical sliding grooves are provided on both sides of the inner cavity of the embedded support frame, sliding blocks are slidably installed on the inner side of the vertical sliding grooves, and the sliding blocks are fixedly connected to the connecting frame through a bracket, and a placement groove is provided on the top of the lifting platform.
[0009] The rear portion of the strip-shaped sliding rod is fixedly connected to the electric telescopic rod through an opening, and the rear end of the electric telescopic rod is fixedly connected to the rear portion of the inner side of the sliding groove.
[0010] Beneficial effects: The utility model provides a long-distance large-diameter jacking pipe construction device. Compared with the existing technology, it has the following beneficial effects:
[0011] The long-distance large-diameter jacking pipe construction device has a lifting platform arranged on the inner side of the embedded support frame, and the lifting platform is driven by a motor to lift and lower. The arrangement of these structures can drive the large-diameter pipe to be lifted and transported, and improve the stability in the process, thereby ensuring high efficiency during construction. When reaching the bottom, the height can be directly adjusted for installation, thereby effectively improving the efficiency of construction. At the same time, after reaching the top, the lifting platform can also be moved out of the inner side of the embedded support frame, thereby facilitating the loading of the pipe and satisfying the current construction.
[0012] The long-distance and large-diameter jacking pipe construction device has a placement groove on the top of the lifting platform. This structural setting can facilitate the deployment of steel cables from the bottom when the pipe is placed on the lifting platform, thereby restraining the pipe and improving the overall practicality of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the structure of the utility model;
[0014] Figure 2 It is a schematic diagram of the lifting platform, motor and rotating rod structure of the utility model;
[0015] Figure 3 It is a schematic diagram of the structure of the strip sliding rod and the electric telescopic rod of the utility model.
[0016] In the figure: 1. embedded support frame; 2. lifting platform; 3. motor; 4. rotating rod; 5. sliding groove; 6. strip sliding rod; 7. connecting frame; 8. placement groove; 9. winding drum; 10. cable; 11. vertical sliding groove; 12. sliding block; 13. electric telescopic rod. DETAILED DESCRIPTION
[0017] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0018] See also Figure 1-3The utility model provides a technical solution: a long-distance large-diameter jacking pipe construction device, including an embedded support frame 1 and a lifting platform 2, the lifting platform 2 is located on the inner side of the embedded support frame 1, and the right side of the top of the embedded support frame 1 is fixedly connected with a motor 3 through a bracket. The motor 3 is a servo motor, and the output shaft of the motor 3 is fixedly connected with a rotating rod 4 through a coupling, and the left end of the rotating rod 4 is rotatably connected to the left side of the top of the embedded support frame 1 through a bearing.
[0019] As an optional embodiment, sliding grooves 5 are provided on both sides of the top of the lifting platform 2, and a strip sliding rod 6 is slidably installed on the inner side of the sliding groove 5. The top of the strip sliding rod 6 is fixedly connected to a connecting frame 7. Winding drums 9 are fixedly connected to both sides of the surface of the rotating rod 4, and a cable 10 is wound on the surface of the winding drum 9. The cable 10 is a steel cable, and one end of the cable 10 is fixedly connected to the connecting frame 7.
[0020] Furthermore, vertical slide grooves 11 are provided on both sides of the inner cavity of the embedded support frame 1, and a sliding block 12 is slidably installed on the inner side of the vertical slide groove 11, and the sliding block 12 is fixedly connected to the connecting frame 7 through a bracket, and a placement groove 8 is provided on the top of the lifting platform 2.
[0021] The rear portion of the strip-shaped sliding rod 6 is fixedly connected to the electric telescopic rod 13 through an opening, and the rear end of the electric telescopic rod 13 is fixedly connected to the rear portion of the inner side of the sliding groove 5 .
[0022] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0023] When in use, first embed the embedded support frame 1 in the ground, so that the embedded support frame 1 is connected to the pipeline laying position, and in the initial state, the electric telescopic rod 13 is started to push the lifting platform 2 backward, so that the lifting platform 2 moves out of the inner side of the embedded support frame 1, and then the pipeline is lifted to the top of the lifting platform 2. The staff has arranged steel cables and other restraining structures inside the placement groove 8 in advance to fix the pipeline. After the installation is completed, the electric telescopic rod 13 is started to pull the pipeline and the lifting platform 2 to the inner side of the embedded support frame 1 again. After the lifting platform completely enters the inner side of the embedded support frame 1, the motor 3 is started to drive the rotating rod 4 to rotate. At this time, the pull cable 10 is extended under the limit of the sliding block 12 to drive the lifting platform 2 and the pipeline to descend as a whole. When it descends to the bottom of the embedded support frame 1, the pipeline is removed for installation.
Claims
1. A long-distance large-diameter pipe jacking construction device, comprising a pre-buried support frame (1) and a lifting platform (2), characterized in that: The lifting platform (2) is located inside the embedded support frame (1); the right side of the top of the embedded support frame (1) is fixedly connected to a motor (3) via a bracket; the output shaft of the motor (3) is fixedly connected to a rotating rod (4) via a coupling; and the left end of the rotating rod (4) is rotatably connected to the left side of the top of the embedded support frame (1) via a bearing member.
2. A long-distance large-diameter pipe jacking construction device according to claim 1, characterized in that: Sliding grooves (5) are provided on both sides of the top of the lifting platform (2), a strip sliding rod (6) is slidably mounted inside the sliding groove (5), the top of the strip sliding rod (6) is fixedly connected to a connecting frame (7), and winding drums (9) are fixedly connected to both sides of the surface of the rotating rod (4), and a cable (10) is wound on the surface of the winding drum (9), and one end of the cable (10) is fixedly connected to the connecting frame (7).
3. A long-distance large-diameter pipe jacking construction device according to claim 2, characterized in that: Vertical slide grooves (11) are provided on both sides of the inner cavity of the embedded support frame (1), a sliding block (12) is slidably installed inside the vertical slide groove (11), and the sliding block (12) is fixedly connected to the connecting frame (7) through a bracket, and a placement groove (8) is provided on the top of the lifting platform (2).
4. A long-distance large-diameter pipe jacking construction device according to claim 2, characterized in that: The rear portion of the strip-shaped sliding rod (6) is fixedly connected to the electric telescopic rod (13) via an opening, and the rear end of the electric telescopic rod (13) is fixedly connected to the rear portion of the inner side of the sliding groove (5).
Citation Information
Cited By
Production process of non-prestressed concrete cylinder pipe jacking construction pipeline based on laser positioning
CN119957727A
Production technology of non-prestressed steel cylinder concrete pipe jacking construction pipeline based on laser positioning
CN119957727B