Energy-saving water replenishing device suitable for data center cooling tower
By designing an automatic water replenishing mechanism and a temperature control system in the data center cooling tower, the problems of inability to automatically replenish water and lack of temperature control in the existing technology are solved, automatic water replenishment and temperature stability are achieved, reducing staff labor intensity and improving Cooling tower stability.
Patent Information
- Application Number
- CN202420935522.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-04-30
AI Technical Summary
The existing data center cooling tower energy-saving water replenishment device cannot automatically complete the water replenishment work according to the water storage situation in the cooling tower, and lacks control over the water replenishment temperature, which affects the stability of the cooling tower.
An automatic water replenishment mechanism is designed, including a water level tank, a floating ball, a positioning plate, a time delay switch, a water replenishment pipe, a water pump and a transition tank. The floating ball and time delay switch are used to realize automatic water replenishment, and the temperature control fan and deflector are used to realize automatic water replenishment. Realize the control of water replenishment temperature.
It realizes automatic water replenishment without manual connection of pipelines, reduces the labor intensity of workers, ensures the stability of water replenishment temperature through the insulation layer and temperature control system, and improves the stability of the cooling tower.
Smart Images

Figure CN221898292U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of data centers, in particular to an energy-saving water replenishing device for a cooling tower of a data center. Background Art
[0002] A data center is a global collaborative network of specific equipment used to transmit, accelerate, display, calculate, and store data information on the internet network infrastructure. A large data center will store a large number of server cabinets. When the servers on the server cabinets remain in operation for a long time, a large amount of heat will be generated, and the data center needs to be cooled down with the help of cooling towers.
[0003] Among them, after searching, it was found that there is an application number CN202321201175.X, which discloses an energy-saving water replenishment device for a cooling tower in a data center, including a cooling tower and a water replenishment tank, the cooling tower is provided with a pressure valve, the water replenishment tank is provided with a water filling pipe, and the cooling tower is fixedly connected with a water inlet pipe. When it is necessary to connect the water injection pipe and the water inlet pipe, the water injection pipe or the water inlet pipe is first inserted into one end of the connecting pipe. At this time, due to the intervention of the water injection pipe or the water inlet pipe, the closing shape of the connecting pipe gradually expands outward, so that the closing shape of the connecting pipe is parallel to the surface of the connecting pipe. At this time, the connecting pipe is rotated, so that the thread teeth gradually form a thread groove on the water injection pipe or the water inlet pipe, so that a threaded connection is formed between the connecting pipe and the water injection pipe or the water inlet pipe. At this time, the thread is rotated The sleeve is moved to the position where the through groove is located, so the connecting pipe and the water injection pipe or the water inlet pipe are fixed again by the threaded sleeve, so that the water inlet pipe and the water injection pipe are connected more conveniently and quickly, and the sealing performance between the water inlet pipe and the water injection pipe is strengthened by the arranged sealing gasket, so as to avoid water leakage and ensure that the pressure inside the cooling tower will not be lost. Through the arranged limit rod, when the threaded sleeve moves to the position where the through groove is located, the limit rod pops out from the inside of the built-in groove under the elasticity of the spring itself, so that the limit rod is located between the two threaded sleeves, and the threaded sleeve is located between the limit block and the limit rod at this time. Therefore, under the mutual restriction of the two, the threaded sleeve will not move arbitrarily, so as to make the connection between the connecting pipe and the water injection pipe and the water inlet pipe more firmly, and avoid the advantage of their arbitrary separation.
[0004] However, after research, it was found that when the device replenishes water to the cooling tower, the main water pipe and the water inlet pipe need to be connected, and the water replenishment work cannot be automatically completed according to the water storage situation in the cooling tower, which increases the labor intensity of the staff. In addition, the water replenishment temperature is too high or too low, which will affect the stability of the cooling tower. However, the device does not have a structure for regulating the water replenishment temperature. Therefore, a new device is provided to solve this problem. Utility Model Content
[0005] The purpose of the utility model is to provide an energy-saving water replenishment device suitable for a cooling tower in a data center in order to solve the above-mentioned problem that the water replenishment work cannot be automatically completed according to the water storage situation in the cooling tower and the structure has no regulation on the water replenishment temperature.
[0006] The technical solution adopted by the utility model is as follows: it is applicable to a cooling tower energy-saving water replenishment device for a data center, comprising a cooling tower, a protective cover is fixedly installed on one side of the outside of the cooling tower, and a water tank is fixedly installed inside the protective cover;
[0007] A water replenishment mechanism with an automatic water replenishment function is arranged on one side outside the cooling tower.
[0008] Wherein, the water replenishment mechanism includes a water level tank, a floating ball, a positioning plate, a pressure plate, a delay switch, a water replenishment pipe, a water pump and a transition tank. A water level tank is fixedly installed on one side of the outside of the cooling tower, and the water level tank is communicated with the water storage chamber inside the cooling tower. A floating ball is movably connected inside the water level tank. A positioning plate is fixedly installed inside the water level tank. A pressure plate is elastically connected above the positioning plate. Foldable rubber belts are connected between the four sides of the bottom of the pressure plate and the positioning plate. A delay switch is installed above the positioning plate. A water pump is connected to the pipe at the water tank outlet. A transition tank is fixedly installed inside the protective cover, and the transition tank is connected to the water pump outlet pipe. A water replenishment pipe is connected at the transition tank outlet, and the water replenishment pipe is connected to the cooling tower pipe.
[0009] Among them, the inner wall of the protective cover is bonded with an insulation layer, and the insulation layer is made of polyurethane foam, the inner wall of the insulation layer is bonded with an inner layer, and the inner layer is made of carbon fiber cloth, the interior of the transition groove is equidistantly and staggeredly fixed with guide plates A and guide plates B, and the number of guide plates A is four, the number of guide plates B is five, and cavities are provided inside the guide plates A and the guide plates B, and induced draft fans are installed at the cavity outlets of the guide plates A and B, and air outlets are provided on the surface of the protective cover corresponding to the induced draft fans, and the outer wall of the transition groove is tightly fitted with the inner wall of the protective cover on the side where the air outlet is provided, and a temperature control fan is installed above the protective cover, and the outlet of the temperature control fan is connected to the cavity ducts of the guide plates A and B.
[0010] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:
[0011] 1. In the utility model, through the water replenishment mechanism, when the water level inside the cooling tower is lower than the positioning plate, the floating ball falls on the pressure plate, the pressure plate presses the delay switch, triggers the water pump to work, and the water pump guides the water inside the water tank into the transition tank, and then introduces it into the cooling tower through the water replenishment pipe, so as to achieve the purpose of automatic water replenishment. Water replenishment can be achieved without the staff connecting the pipeline, which reduces the labor intensity of the staff.
[0012] 2. In the utility model, the heat-insulating layer made of polyurethane foam on site has good heat-insulating property, which can prevent the external high or low temperature from affecting the water temperature inside the water tank.
[0013] 3. In the utility model, the temperature-controlled fan blows wind of a constant temperature into the cavity of the guide plates A and B, and the induced draft fan cooperates to discharge the excess air in the cavity of the guide plates A and B, so that the temperature of the guide plates A and B is consistent with the temperature of the wind blown out by the temperature-controlled fan, and the water inside the transition trough exchanges heat with the guide plates A and B, so that the temperature of the water flowing out of the water supply pipe is consistent with the temperature of the wind blown out by the temperature-controlled fan, thereby achieving the purpose of regulating the water supply temperature.
[0014] 4. In the utility model, through the second embodiment, water flows along the water guide groove, and the corrugated water guide groove increases the water flow time, thereby increasing the time that the water contacts the guide plates A and B, so that the guide plates A and B have a better temperature control effect on the water. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of a partial three-dimensional structure of the utility model;
[0016] Figure 2 It is a schematic diagram of the overall side section structure of the utility model;
[0017] Figure 3 For the utility model Figure 2 A schematic diagram of the enlarged structure at point A;
[0018] Figure 4 For the utility model Figure 3 A schematic diagram of the enlarged structure at B;
[0019] Figure 5 For the utility model Figure 3 The enlarged schematic diagram of the structure at C;
[0020] Figure 6 This is a schematic diagram of the partial three-dimensional structure of the guide plate B in Example 1 of the utility model;
[0021] Figure 7 This is a schematic diagram of the partial three-dimensional structure of the guide plate B in Example 2 of the present utility model.
[0022] Markings in the figure: 1. Cooling tower; 101. Water level tank; 1011. Floating ball; 102. Positioning plate; 1021. Pressure plate; 1022. Delay switch; 103. Water supply pipe; 2. Protective cover; 201. Insulation layer; 2011. Inner layer; 202. Water tank; 2021. Water pump; 203. Transition trough; 2031. Guide plate A; 2032. Guide plate B; 2033. Draft fan; 204. Temperature control fan. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] In the utility model:
[0025] Reference Figure 1-7 , applicable to the energy-saving water replenishment device of the cooling tower of the data center, comprising a cooling tower 1, a protective cover 2 is fixedly installed on one side of the outside of the cooling tower 1, and a water tank 202 is fixedly installed inside the protective cover 2;
[0026] A water replenishment mechanism with an automatic water replenishment function is arranged on one side of the outside of the cooling tower 1 .
[0027] Embodiment 1:
[0028] Reference Figure 1-4 In this embodiment, the water replenishment mechanism includes a water level tank 101, a floating ball 1011, a positioning plate 102, a pressure plate 1021, a delay switch 1022, a water replenishment pipe 103, a water pump 2021 and a transition tank 203. The water level tank 101 is fixedly installed on one side of the outside of the cooling tower 1, and the water level tank 101 is communicated with the water storage cavity inside the cooling tower 1. The floating ball 1011 is movably connected inside the water level tank 101. The positioning plate 102 is fixedly installed inside the water level tank 101. The positioning plate 102 A pressure plate 1021 is elastically connected to the top, and foldable rubber belts are connected between the four sides of the bottom of the pressure plate 1021 and the positioning plate 102. A delay switch 1022 is installed above the positioning plate 102. A water pump 2021 is connected to the pipeline at the outlet of the water tank 202. A transition groove 203 is fixedly installed inside the protective cover 2, and the transition groove 203 is connected to the outlet pipeline of the water pump 2021. A water supply pipe 103 is connected to the outlet of the transition groove 203, and the water supply pipe 103 is connected to the pipeline of the cooling tower 1;
[0029] When the water level inside the cooling tower 1 is lower than the positioning plate 102, the floating ball 1011 falls on the pressure plate 1021, and the pressure plate 1021 presses the delay switch 1022, triggering the water pump 2021 to work. The water pump 2021 guides the water inside the water tank 202 into the transition tank 203, and then introduces it into the cooling tower 1 through the water supply pipe 103. The water level in the cooling tower 1 rises, and the buoyancy of the water pushes the floating ball 1011 to move upward. The pressure plate 1021 moves away from the delay switch 1022 under the action of the spring force, completing the task of replenishing water to the cooling tower 1.
[0030] Reference Figure 1-3 In this embodiment, a thermal insulation layer 201 is bonded to the inner wall of the protective cover 2, and the thermal insulation layer 201 is made of polyurethane foam. An inner layer 2011 is bonded to the inner wall of the thermal insulation layer 201, and the inner layer 2011 is made of carbon fiber cloth. The thermal insulation layer 201 made of polyurethane foam on site has good thermal insulation properties, which can prevent the external high or low temperature from affecting the water temperature inside the water tank 202. The inner layer 2011 made of carbon fiber cloth has high strength, high durability and good corrosion resistance, which can protect the water tank 202 and the transition trough 203 from being polluted and corroded by the external air.
[0031] Reference Figure 1 , 2 , 3, 5, 6, in this embodiment, the transition groove 203 is fixedly installed with guide plates A2031 and guide plates B2032 in parallel and staggered manner at equal intervals, and the number of guide plates A2031 is four, the number of guide plates B2032 is five, and the guide plates A2031 and the guide plates B2032 are both provided with cavities, and induced draft fans 2033 are installed at the cavity outlets of the guide plates A2031 and B2032, and air outlets are provided at the surface of the protective cover 2 corresponding to the induced draft fans 2033, and the outer wall of the transition groove 203 is tightly fitted with the inner wall of the protective cover 2 on the side where the air outlets are provided, and a temperature control fan 204 is installed above the protective cover 2, and the outlet of the temperature control fan 204 is connected to the cavity pipes of the guide plates A2031 and B2032;
[0032] When it is necessary to replenish water into the cooling tower 1, the temperature control fan 204 blows wind of constant temperature into the cavity of the guide plate A2031 and the guide plate B2032, and the induced draft fan 2033 cooperates to discharge the excess air in the cavity of the guide plate A2031 and the guide plate B2032, so that the temperature of the guide plate A2031 and the guide plate B2032 is consistent with the temperature of the wind blown out by the temperature control fan 204, and the water pump 2021 introduces the water inside the water tank 202 into the transition trough 203, and then the water inside the transition trough 203 flows downward along the top guide plate A2031, and passes through the three guide plates B2032 and the three guide plates A2031 below in turn, and the water exchanges heat with the guide plate A2031 and the guide plate B2032, so that the temperature of the water flowing out of the water supply pipe 103 is consistent with the temperature of the wind blown out by the temperature control fan 204, thereby achieving the purpose of regulating the water supply temperature.
[0033] Embodiment 2:
[0034] In addition to guiding and controlling the temperature of the water added to the cooling tower 1 by the guide plate A2031 and the guide plate B2032, there is another implementation method in the present invention;
[0035] Reference Figure 7In this embodiment, the surfaces of the guide plates A2031 and B2032 are both embedded with water guide grooves, and the water guide grooves are arranged in a wave shape. The water pump 2021 guides the water inside the water tank 202 into the transition groove 203, and the water flows along the water guide grooves. The wave-shaped water guide grooves increase the water flow time, thereby increasing the contact time between the water and the guide plates A2031 and B2032, so that the guide plates A2031 and B2032 have a better temperature control effect on the water.
[0036] Reference Figure 1-6 In this embodiment, the water pump 2021, the induced draft fan 2033 and the temperature control fan 204 are all electrically connected to the external power supply through the delay switch 1022.
[0037] Working principle: First, the insulation layer 201 made of polyurethane foam on site has good thermal insulation properties, which prevents the external high or low temperature from affecting the water temperature inside the water tank 202. The inner layer 2011 made of carbon fiber cloth has high strength, high durability and good corrosion resistance, protecting the water tank 202 and the transition trough 203 from being polluted and corroded by the outside air. Then, when the water level inside the cooling tower 1 is lower than the positioning plate 102, the floating ball 1011 falls on the pressure plate 1021, and the pressure plate 1021 presses the delay switch 1022, triggering the water pump 2021 to work. The water pump 2021 guides the water inside the water tank 202 into the transition trough 203, and then the temperature control fan 204 blows the wind with a constant temperature into the cavity of the guide plate A2031 and the guide plate B2032, and the induced draft fan 2033 cooperates to discharge the excess air in the cavity of the guide plate A2031 and the guide plate B2032. The temperature of the guide plate A2031 and the guide plate B2032 is consistent with the temperature of the wind blown out by the temperature control fan 204, and the water inside the transition trough 203 flows downward along the top guide plate A2031, passing through the three guide plates B2032 and the three guide plates A2031 below in turn. There is also another implementation method, in which the water flows along the water guide trough, and the corrugated water guide trough increases the water flow time, thereby increasing the contact time between the water and the guide plates A2031 and B2032, so that the guide plates A2031 and B2032 have a better temperature control effect on the water. After that, the water inside the transition trough 203 is introduced into the cooling tower 1 through the water supply pipe 103, and the water level in the cooling tower 1 rises. Finally, the buoyancy of the water pushes the floating ball 1011 to move upward, and the pressure plate 1021 moves away from the delay switch 1022 under the action of the spring force, completing the task of replenishing water to the cooling tower 1.
[0038] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An energy-saving water supply device for a cooling tower in a data center, comprising a cooling tower (1), characterized in that: A protective cover (2) is fixedly installed on one side of the outside of the cooling tower (1), and a water tank (202) is fixedly installed inside the protective cover (2); A water replenishment mechanism with an automatic water replenishment function is provided on one side of the outside of the cooling tower (1); The water replenishment mechanism comprises a water level tank (101), a floating ball (1011), a positioning plate (102), a pressure plate (1021), a delay switch (1022), a water replenishment pipe (103), a water pump (2021) and a transition tank (203); A water level tank (101) is fixedly installed on one side of the outside of the cooling tower (1), and the water level tank (101) is communicated with the water storage chamber inside the cooling tower (1), a floating ball (1011) is movably connected inside the water level tank (101), a positioning plate (102) is fixedly installed inside the water level tank (101), a pressure plate (1021) is elastically connected above the positioning plate (102), and the four sides of the bottom of the pressure plate (1021) are connected to the positioning plate (102). A foldable rubber belt is provided, a time delay switch (1022) is installed above the positioning plate (102), a pipe at the outlet of the water tank (202) is connected to a water pump (2021), a transition groove (203) is fixedly installed inside the protective cover (2), and the transition groove (203) is connected to the outlet pipe of the water pump (2021), a water supply pipe (103) is connected to the outlet of the transition groove (203), and the water supply pipe (103) is connected to the pipe of the cooling tower (1).
2. The energy-saving water replenishment device for a cooling tower in a data center as claimed in claim 1, characterized in that: The inner wall of the protective cover (2) is bonded with a thermal insulation layer (201), and the thermal insulation layer (201) is made of polyurethane foam.
3. The energy-saving water replenishment device for a cooling tower in a data center as claimed in claim 2 is characterized in that: The inner wall of the thermal insulation layer (201) is bonded with an inner layer (2011), and the material of the inner layer (2011) is carbon fiber cloth.
4. The energy-saving water replenishment device for a cooling tower in a data center as claimed in claim 1, characterized in that: The transition groove (203) is provided with guide plates A (2031) and guide plates B (2032) fixedly installed in parallel and staggered manner at equal intervals, and the number of guide plates A (2031) is four, and the number of guide plates B (2032) is five, and cavities are provided inside the guide plates A (2031) and inside the guide plates B (2032), and induced draft fans (2033) are installed at the cavity outlets of the guide plates A (2031) and the guide plates B (2032), and air outlet holes are provided at the surface of the protective cover (2) corresponding to the induced draft fans (2033), and the outer wall of the transition groove (203) is tightly fitted with the inner wall of the protective cover (2) on the side where the air outlet holes are provided.
5. The energy-saving water replenishment device for a cooling tower in a data center as claimed in claim 1, characterized in that: A temperature control fan (204) is installed above the protective cover (2), and the outlet of the temperature control fan (204) is connected to the cavity pipes of the guide plate A (2031) and the guide plate B (2032).