River surveying instrument deviation rectifying device
By introducing structures such as tie rods, pull handles, baffles, springs, limit rods and externally threaded pipes into the river surveying and mapping instrument correction device, the problem of accuracy loss during equipment adjustment in the existing technology is solved, and the angle and height of the equipment are adjusted. Precise control ensures measurement accuracy.
Patent Information
- Application Number
- CN202420293051.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-18
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-02-18
AI Technical Summary
In the existing correction device for river surveying and mapping instruments, the outside of the threaded rod of the angle adjustment component lacks an anti-accidental touch structure, and the connecting rod of the rotating component lacks a positioning structure, resulting in the inability to ensure measurement accuracy when the equipment is adjusted.
A positioning structure including a pull rod, a pull handle, a stopper, a spring, a limit rod and a socket is designed to prevent the rotation of the connecting rod from changing the lateral angle of the equipment, and to protect the threaded rod through an externally threaded pipe and a protective cover to prevent Height changes caused by accidental touch.
It effectively prevents the accuracy loss caused by accidental touch after adjustment of the equipment, ensuring the stability of the measurement accuracy.
Smart Images

Figure CN221898485U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of surveying instruments, in particular to a deviation correction device for river surveying instruments. Background Art
[0002] River surveying is the work of mapping the riverbed and the terrain on both sides of the river for the development and regulation of the river, and collecting and drawing relevant water level data accordingly. The main contents include plane and elevation control measurement, river terrain measurement, river longitudinal and cross-sectional measurement, continuous measurement of water level and historical flood level, measurement of instantaneous water surface line of a river section and investigation or measurement of important landforms along the river. Due to the accuracy of existing surveying instruments, patent CN216593360U proposes a "river surveying instrument correction device". By setting up a height adjustment component and a rotation component, the height and lateral angle of the surveying instrument can be changed to achieve the purpose of correction and improve the measurement accuracy of the surveying instrument.
[0003] However, in this solution, the outside of the threaded rod in the angle adjustment assembly does not have an anti-accidental touch structure, and the connecting rod in the rotating assembly does not have a positioning structure. When the threaded rod or the connecting rod is touched, the height and lateral angle of the equipment will change, thereby making it impossible to guarantee the measurement accuracy of the surveying instrument. Therefore, a correction device for a river surveying instrument is proposed. Utility Model Content
[0004] The utility model aims to solve the shortcomings in the prior art and proposes a deviation correction device for a river surveying instrument.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a deviation correction device for a river channel surveying instrument, comprising a lower supporting plate, a rotating column is movably provided on the top of the lower supporting plate, a middle supporting plate is fixedly provided on the top of the rotating column, a connecting rod is movably provided in the lower supporting plate, a positioning structure is provided on one side of the lower supporting plate, two sliding rods are movably provided in the middle supporting plate, both of the sliding rods are hinged with an oblique plate, the tops of the two oblique plates are movably provided with the same upper supporting plate, the two sliding rods are movably provided with the same threaded rod, a protective structure is provided on one side of the middle supporting plate, and a plurality of holes are provided on the connecting rod.
[0006] As a further description of the above technical solution:
[0007] The positioning structure includes a vertical plate fixedly mounted on a lower support plate, a pull rod movably provided on the vertical plate, a pull handle fixedly provided at one end of the pull rod, two limit rods fixedly provided on one side of the pull handle, and the two limit rods are movably connected to the vertical plate.
[0008] As a further description of the above technical solution:
[0009] Two blocking pieces are fixedly arranged on the pull rod, and a spring is sleeved on the pull rod. One end of the spring is in contact with the blocking piece, and the other end of the spring is in contact with the vertical plate.
[0010] As a further description of the above technical solution:
[0011] The vertical plate is provided with three through holes, the inner walls of the three through holes are provided with sealing rings, and the inner walls of the sealing rings and the pull rods are fitted with the two limit rods.
[0012] As a further description of the above technical solution:
[0013] The protective structure comprises an externally threaded pipe fixedly mounted on the middle bearing plate, and a protective cover is movably provided on the externally threaded pipe.
[0014] As a further description of the above technical solution:
[0015] The inner wall of the protective cover is provided with threads, and the external threaded pipe is matched with the threads of the inner wall of the protective cover.
[0016] The utility model has the following beneficial effects:
[0017] 1. Compared with the prior art, the correction device of the river surveying instrument is provided with a pull rod, a pull handle, a baffle, a spring, a limit rod and a socket. After the lateral angle is adjusted, the pull handle spring is released to push the baffle, and the baffle drives the pull rod, so that one end of the pull rod is inserted into the socket to realize the positioning of the connecting rod, which can prevent the connecting rod from being rotated and causing the lateral angle of the equipment to be changed.
[0018] 2. Compared with the prior art, the correction device of the river surveying instrument is equipped with an external threaded tube and a protective cover. The height of the upper plate can be adjusted by rotating the threaded rod. After the adjustment, the protective cover is installed on the outside of the external threaded tube, which can protect the threaded rod and prevent the threaded rod from being accidentally touched, causing the height of the upper plate to change, thereby ensuring the measurement accuracy of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a three-dimensional structural schematic diagram of a deviation correction device for a river surveying instrument proposed by the utility model;
[0020] Figure 2 This is a three-dimensional schematic diagram of a deviation correction device for a river surveying instrument proposed by the utility model with the protective structure removed;
[0021] Figure 3 This is an exploded schematic diagram of a protective structure in a deviation correction device for a river surveying instrument proposed by the utility model;
[0022] Figure 4 It is a three-dimensional schematic diagram of a positioning structure in a deviation correction device of a river surveying instrument proposed by the utility model;
[0023] Figure 5 The utility model provides a three-dimensional structural schematic diagram of a connecting rod in a deviation correction device of a river surveying instrument.
[0024] Legend:
[0025] 1. Lower bearing plate; 2. Rotating column; 3. Middle bearing plate; 4. Connecting rod; 5. Positioning structure; 501. Vertical plate; 502. Pull rod; 503. Pull handle; 504. Baffle; 505. Spring; 506. Limit rod; 6. Sliding rod; 7. Oblique plate; 8. Upper bearing plate; 9. Threaded rod; 10. Protection structure; 101. Externally threaded pipe; 102. Protective cover; 11. Socket. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] Reference Figures 1 to 5 The utility model provides a deviation correction device for a river surveying instrument, comprising a lower bearing plate 1, a rotating column 2 is movably provided on the top of the lower bearing plate 1, a middle bearing plate 3 is fixedly provided on the top of the rotating column 2, a connecting rod 4 is movably provided in the lower bearing plate 1, a positioning structure 5 is provided on one side of the lower bearing plate 1, the positioning structure 5 comprises a vertical plate 501 fixedly installed with the lower bearing plate 1, a pull rod 502 is movably provided on the vertical plate 501, a pull handle 503 is fixedly provided at one end of the pull rod 502, two limiting rods 506 are fixedly provided on one side of the pull handle 503, the two limiting rods 506 are movably connected to the vertical plate 501, and the vertical plate 501 There are three through holes, and the inner walls of the three through holes are all provided with sealing rings. The inner wall of the sealing ring and the pull rod 502 are fitted with two limit rods 506. The setting of the limit rods 506 can realize the positioning of the pull rod 502 to prevent it from rotating. Two blocking pieces 504 are fixed on the pull rod 502. A spring 505 is sleeved on the pull rod 502. One end of the spring 505 is fitted with the blocking piece 504, and the other end of the spring 505 is fitted with the vertical plate 501. The setting of the positioning structure 5 can realize the positioning of the connecting rod 4 to prevent the connecting rod 4 from being rotated to change the lateral angle of the device;
[0028] Two sliding rods 6 are movably provided in the middle supporting plate 3, and the two sliding rods 6 are hinged with inclined plates 7. The same upper supporting plate 8 is movably provided on the top of the two inclined plates 7. The same threaded rod 9 is movably provided in the two sliding rods 6. A protective structure 10 is provided on one side of the middle supporting plate 3. The protective structure 10 includes an externally threaded tube 101 fixedly installed with the middle supporting plate 3, and a protective cover 102 is movably provided on the externally threaded tube 101. The inner wall of the protective cover 102 is provided with threads. The threads of the inner wall of the externally threaded tube 101 and the protective cover 102 are adapted to each other. The setting of the protective structure 10 can protect the threaded rod 9 and prevent the threaded rod 9 from being accidentally touched, which causes the height of the upper supporting plate 8 to change, thereby ensuring the measurement accuracy of the equipment. A plurality of sockets 11 are provided on the connecting rod 4.
[0029] Working principle: When adjusting the lateral angle of the device, pull the handle 503 outward, and the handle 503 drives the pull rod 502, and the pull rod 502 drives the baffle 504, and the baffle 504 squeezes the spring 505. When one end of the pull rod 502 is out of the socket 11, the connecting rod 4 can be rotated to adjust the lateral angle of the device. After the adjustment, stop rotating the connecting rod 4, release the handle 503, the spring 505 pushes the baffle 504, and the baffle 504 drives the pull rod 502, so that one end of the pull rod 502 is inserted into the socket 11, so as to position the connecting rod 4, and prevent the connecting rod 4 from being rotated to change the lateral angle of the device. The height of the upper plate 8 can be adjusted by rotating the threaded rod 9. After the adjustment, the protective cover 102 is installed on the outside of the external threaded tube 101, which can protect the threaded rod 9 and prevent the threaded rod 9 from being accidentally touched to change the height of the upper plate 8, thereby ensuring the measurement accuracy of the equipment.
[0030] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A deviation correction device for a river surveying instrument, comprising a lower bearing plate (1), Features: A rotating column (2) is movably provided on the top of the lower supporting plate (1), a middle supporting plate (3) is fixedly provided on the top of the rotating column (2), a connecting rod (4) is movably provided in the lower supporting plate (1), a positioning structure (5) is provided on one side of the lower supporting plate (1), two sliding rods (6) are movably provided in the middle supporting plate (3), an inclined plate (7) is hinged on the two sliding rods (6), the same upper supporting plate (8) is movably provided on the top of the two inclined plates (7), the same threaded rod (9) is movably provided in the two sliding rods (6), a protective structure (10) is provided on one side of the middle supporting plate (3), and a plurality of insertion holes (11) are provided on the connecting rod (4).
2. A deviation correction device for a river surveying instrument according to claim 1, Features: The positioning structure (5) comprises a vertical plate (501) fixedly mounted on the lower supporting plate (1), a pull rod (502) being movably provided on the vertical plate (501), a pull handle (503) being fixedly provided at one end of the pull rod (502), two limit rods (506) being fixedly provided on one side of the pull handle (503), and the two limit rods (506) are movably connected to the vertical plate (501).
3. A deviation correction device for a river surveying instrument according to claim 2, Features: Two baffles (504) are fixedly provided on the pull rod (502), and a spring (505) is sleeved on the pull rod (502). One end of the spring (505) is in contact with the baffle (504), and the other end of the spring (505) is in contact with the vertical plate (501).
4. A deviation correction device for a river surveying instrument according to claim 2, Features: The vertical plate (501) is provided with three through holes, the inner walls of the three through holes are all provided with sealing rings, and the inner walls of the sealing rings and the pull rod (502) are in close contact with the two limit rods (506).
5. A deviation correction device for a river surveying instrument according to claim 1, Features: The protective structure (10) comprises an externally threaded pipe (101) fixedly mounted on the middle support plate (3), and a protective cover (102) is movably provided on the externally threaded pipe (101).
6. A deviation correction device for a river surveying instrument according to claim 5, Features: The inner wall of the protective cover (102) is provided with threads, and the threads of the externally threaded tube (101) and the inner wall of the protective cover (102) are matched.
