Multifunctional pump unloading valve test bed

By designing a multi-functional pump unloading valve test bench and using a combination of emulsion tanks, pumps, diverters and test pipelines, individual control and centralized testing of multiple unloading valves are achieved, solving the problem of separate equipment testing in the existing technology. Complex and time-consuming problems that meet market needs.

CN221898775UActive Publication Date: 2024-10-25NANJING LIUHE COAL MINE MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421147125.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-24
Publication Date
2024-10-25
Estimated Expiration
2034-05-24

AI Technical Summary

Technical Problem

The existing unloading valve test bench can only meet the test of individual unloading valves, and the test conditions are complex. It cannot meet the needs of centralized testing of multiple unloading valves on one device, and the debugging time is long.

Method used

A multifunctional pump unloading valve test bench is designed, including an emulsion tank, a pump, a diverter and multiple sets of test pipelines. Each set of test pipelines includes a liquid inlet connection high-pressure pipeline, an unloading valve to be tested, and a pressure regulating connection. High-pressure pipelines and control valves realize individual control and centralized testing of various unloading valves through flow dividers and control valves.

Benefits of technology

It realizes centralized testing of various unloading valves, simplifies test conditions, shortens equipment debugging and testing time, and meets market demand.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221898775U_ABST
    Figure CN221898775U_ABST
Patent Text Reader

Abstract

The utility model discloses a multifunctional unloading valve test bed for a pump. The multifunctional unloading valve test bed comprises an emulsion tank, a pump, a flow divider and a plurality of groups of test pipelines, each group of test pipelines comprises a liquid inlet connection high-pressure pipeline, a to-be-tested unloading valve, a pressure regulating connection high-pressure pipeline and a control valve I; an outlet of the emulsion tank is connected with a high-pressure liquid inlet of the flow divider through a pump, and each group of test pipelines are respectively connected with different flow-dividing liquid outlets in the flow divider; in each group of test pipelines, the liquid inlet connection high-pressure pipeline is connected with a liquid inlet of the unloading valve to be tested, an unloading liquid outlet of the unloading valve to be tested is connected with the emulsion tank, a high-pressure liquid outlet of the unloading valve to be tested is connected with the first control valve through the pressure regulation connection high-pressure pipeline, and the first control valve is connected with the emulsion tank. According to the utility model, various unloading valve tests can be integrated on one device, and various unloading valves can be independently controlled without mutual influence; the complex working condition of single equipment test in the past is solved; and the equipment debugging test time is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an unloading valve test platform, in particular to a multifunctional pump unloading valve test bench. Background Art

[0002] The unloading valve is a key component for maintaining constant pressure on the emulsion pump. There are many types of unloading valve products. The existing unloading valve test bench can only meet the test of a single unloading valve, and the test conditions are complex. The unloading valve debugging test time is long. The current test bench can no longer meet the requirements of testing multiple unloading valves on one device. Summary of the invention

[0003] The technical problem to be solved by the utility model is to provide a multifunctional pump unloading valve test bench in view of the deficiencies of the above-mentioned prior art. The multifunctional pump unloading valve test bench can concentrate various unloading valve tests on one device, and can control various unloading valves separately without affecting each other; it solves the complex working conditions of separate equipment testing in the past; it shortens the equipment debugging test time and meets market demand.

[0004] In order to achieve the above technical purpose, the technical solution adopted by the utility model is:

[0005] A multifunctional pump unloading valve test bench comprises an emulsion tank, a pump, a flow divider and multiple test pipelines;

[0006] Each set of test pipelines includes a liquid inlet connection high-pressure pipeline, a test unloading valve, a pressure regulating connection high-pressure pipeline and a control valve;

[0007] The outlet of the emulsion tank is connected to the high-pressure liquid inlet of the diverter through a pump, the diverter is provided with a plurality of diverter outlets, and each group of test pipelines is respectively connected to different diverter outlets in the diverter;

[0008] In each set of test pipelines, the diverter outlet is connected to the liquid inlet of the unloading valve to be tested through a liquid inlet connecting high-pressure pipeline, the unloading outlet of the unloading valve to be tested is connected to an inlet of the emulsion tank, the high-pressure outlet of the unloading valve to be tested is connected to the liquid inlet of control valve one through a pressure regulating connecting high-pressure pipeline, and the outlet of control valve one is connected to another inlet of the emulsion tank.

[0009] As a further improved technical solution of the utility model, the control valve 1 is a pressure control valve.

[0010] As a further improved technical solution of the utility model, the diverter is fixedly connected to one side of the emulsion tank, and the unloading valve to be tested is placed above the emulsion tank.

[0011] As a further improved technical solution of the utility model, each set of test pipelines also includes a high-pressure pipeline and a second control valve; the diverter outlet is connected to the liquid inlet high-pressure pipeline through the liquid inlet high-pressure pipeline and the second control valve.

[0012] As a further improved technical solution of the utility model, the second control valve is a flow control valve.

[0013] The beneficial effects of the utility model are:

[0014] The utility model has multiple functions for the multifunctional pump unloading valve test bench. It can not only test a single unloading valve to be tested, but also test multiple unloading valves to be tested. Multiple unloading valves to be tested can be tested on the multifunctional pump unloading valve test bench, i.e., one device. The complex working conditions of the previous single equipment test are solved. Through different control valves 1 and 2, various unloading valves to be tested can be controlled separately and then tested without affecting each other. The equipment debugging test time is shortened to meet market demand. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a top view of the structure of the utility model.

[0016] Figure 2 It is a structural side view of the utility model. DETAILED DESCRIPTION

[0017] The specific implementation of the utility model is further described below according to the accompanying drawings:

[0018] like Figure 1-2 As shown, a multifunctional pump unloading valve test bench includes an emulsion tank 1, a pump, a flow divider 2 and multiple test pipelines. Each test pipeline includes a liquid inlet connection high-pressure pipeline 3, a test unloading valve 4, a pressure regulating connection high-pressure pipeline 5 and a control valve 6.

[0019] like Figure 1 As shown, the outlet of the emulsion tank 1 is connected to the high-pressure liquid inlet 201 of the diverter 2 through a pump. The diverter 2 is provided with a plurality of diverter outlets, and each group of test pipelines is connected to different diverter outlets in the diverter 2 respectively.

[0020] like Figure 2 As shown, in each group of test pipelines, the diverter outlet of the diverter 2 is connected to the liquid inlet of the unloading valve 4 to be tested through the liquid inlet connecting high-pressure pipeline 3, the unloading outlet 401 of the unloading valve 4 to be tested is connected to an inlet of the emulsion tank 1, the high-pressure outlet of the unloading valve 4 to be tested is connected to the liquid inlet of the control valve 6 through the pressure regulating connecting high-pressure pipeline 5, and the liquid outlet of the control valve 6 is connected to another inlet of the emulsion tank 1.

[0021] In this embodiment, the control valve 6 is a manual pressure control valve.

[0022] In this embodiment, the diverter 2 is fixedly connected to one side of the emulsion tank 1 , and a plurality of unloading valves 4 to be tested are placed above the emulsion tank 1 .

[0023] In this embodiment, each set of test pipelines also includes a high-pressure pipeline 8 and a control valve 7; the diversion outlet of the diverter 2 is connected to the liquid inlet high-pressure pipeline 3 through the liquid inlet high-pressure pipeline 8 and the control valve 7.

[0024] In this embodiment, the control valve 2 7 is a manual flow control valve. The initial state of the control valve 2 7 is a closed state, and liquid cannot flow into the unloading valve 4 to be tested. The control valve 2 7 is arranged on the liquid inlet high pressure pipeline 8.

[0025] Working principle:

[0026] like Figure 1 , the pump (such as: emulsion pump) is powered on and started, the liquid (emulsion) enters the pump from the emulsion tank 1, and then the pump transports the high-pressure liquid to the high-pressure liquid inlet 201 of the diverter 2, and the corresponding control valve 2 7 is opened according to the position of the unloading valve 4 to be tested that needs to be tested, and the high-pressure liquid enters the liquid inlet of the unloading valve 4 to be tested from the diverter outlet of the diverter 2, the liquid inlet high-pressure pipeline 8, the control valve 2 7, and the liquid inlet connection high-pressure pipeline 3. The liquid enters the control valve 1 6 from the high-pressure liquid outlet of the unloading valve 4 to be tested and the pressure regulating connection high-pressure pipeline 5, and then enters the emulsion tank 1 through the control valve 1 6. The liquid flows to the following direction: Figure 2 As shown by the arrow in . By adjusting the control valve 6, the pressure of the liquid in the pressure regulating connection high-pressure pipeline 5 is adjusted. When the pressure reaches the pressure in the factory test requirements, observe whether there is liquid flowing out of the unloading outlet 401 of the unloading valve 4 to be tested and then entering the emulsion tank 1. If so, the unloading valve 4 to be tested meets the factory test requirements. Different types of unloading valves 4 to be tested have different factory test requirements, and actual operation tests are performed according to actual conditions. Since multiple diversion outlets of the diverter 2 are connected to multiple groups of test pipelines, the test bench of this embodiment can test multiple unloading valves 4 to be tested. Figure 1 A, B, C, and D respectively represent different types of unloading valves 4 to be tested, or test connection interfaces of different types of unloading valves 4 to be tested, for example: XF800 unloading valve, HPCD automatic unloading valve, XF630 unloading valve, and XF400-500 two-way unloading valve.

[0027] Features of the multifunctional pump unloading valve test bench of this embodiment: The multifunctional pump unloading valve test bench of this embodiment has multiple functions, that is, it can not only test a single unloading valve 4 to be tested, but also test multiple unloading valves 4 to be tested; multiple unloading valves 4 to be tested can be concentrated on the multifunctional pump unloading valve test bench of this embodiment, that is, one device for testing. The complex working conditions of the single equipment test in the past have been solved. Through different control valves 2 7 and control valves 1 6, various unloading valves 4 to be tested can be controlled separately and then tested without affecting each other. The equipment debugging test time is shortened to meet market demand.

[0028] The protection scope of the present invention includes but is not limited to the above embodiments. The protection scope of the present invention shall be based on the claims. Any replacement, deformation, and improvement of the technology that can be easily thought of by technicians in this field shall fall within the protection scope of the present invention.

Claims

1. A multifunctional pump unloading valve test bench, characterized in that: It comprises an emulsion tank (1), a pump, a flow divider (2) and a plurality of test pipelines; Each set of test pipelines includes a liquid inlet connection high-pressure pipeline (3), a test unloading valve (4), a pressure regulating connection high-pressure pipeline (5) and a control valve (6); The outlet of the emulsion tank (1) is connected to the high-pressure liquid inlet (201) of the diverter (2) through a pump, the diverter (2) is provided with a plurality of diverter outlets, and each group of test pipelines is respectively connected to a different diverter outlet in the diverter (2); In each group of test pipelines, the diverter outlet of the diverter (2) is connected to the liquid inlet of the unloading valve (4) to be tested via the liquid inlet connection high-pressure pipeline (3), the unloading outlet (401) of the unloading valve (4) to be tested is connected to an inlet of the emulsion tank (1), the high-pressure outlet of the unloading valve (4) to be tested is connected to the liquid inlet of the control valve (6) via the pressure regulating connection high-pressure pipeline (5), and the liquid outlet of the control valve (6) is connected to the other inlet of the emulsion tank (1).

2. The multifunctional pump unloading valve test bench according to claim 1 is characterized in that: The control valve 1 (6) is a pressure control valve.

3. The multifunctional pump unloading valve test bench according to claim 1 is characterized in that: The flow divider (2) is fixedly connected to one side of the emulsion tank (1), and the unloading valve (4) to be tested is placed above the emulsion tank (1).

4. The multifunctional pump unloading valve test bench according to claim 1, characterized in that: Each group of test pipelines also includes a high-pressure pipeline (8) and a second control valve (7); the diverter outlet of the diverter (2) is connected to the liquid inlet high-pressure pipeline (3) through the liquid inlet high-pressure pipeline (8) and the second control valve (7).

5. The multifunctional pump unloading valve test bench according to claim 4 is characterized in that: The control valve 2 (7) is a flow control valve.