Solid waste treatment device for building
By using a combination of elastic bladders and vibrating screens in construction solid waste treatment devices, the problem of clogging of materials stuck in the screen holes is solved, automated cleaning is realized, and the processing efficiency and system automation level are improved.
Patent Information
- Application Number
- CN202420271133.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-04
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-04
AI Technical Summary
In the existing construction waste cement block solid waste treatment system, materials are easily stuck in the mesh holes of the screen, causing blockage, requiring manual cleaning, and cleaning is inconvenient.
The elastic bag is used to clean the material stuck in the screen hole. Through the cooperation of the vibrating screen and the sliding part, the elastic force of the elastic bag is used to remove the blocked material, avoiding manual intervention.
It effectively solves the problem of material clogging, improves processing efficiency, reduces the need for manual cleaning, and improves the automation level of the processing system.
Smart Images

Figure CN221908360U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a solid garbage treatment device for construction. Background Art
[0002] With the acceleration of industrialization and urbanization, the construction industry has also developed rapidly, and the amount of construction waste has increased day by day. In particular, construction concrete waste is transported to the suburbs or villages by construction units without being processed, and then piled up in the open air or landfilled.
[0003] A construction waste cement block solid waste treatment system comprises a jaw crusher, an impact crusher, a screening device and a transmission mechanism, wherein the jaw crusher cooperates with a vibrating feeder, the transmission mechanism comprises a first conveyor belt having one end arranged below a discharge port of the jaw crusher, a second conveyor belt having one end arranged below the other end of the first conveyor belt, and a third conveyor belt having one end arranged below a discharge port of the impact crusher, the other end of the second conveyor belt being arranged at a feed port of the impact crusher, and the other end of the third conveyor belt being arranged at a feed port of the screening device; the screening device comprises a screening box, in which a first screen, a second screen and a third screen are arranged from top to bottom, the first screen, the second screen and the third screen separate the screening box from top to bottom into a first screening chamber, a second screening chamber, a third screening chamber and a fourth screening chamber, a first discharge port is arranged on a side wall of the first screening chamber, a first material guide plate is arranged at the first discharge port, a return conveyor belt is arranged below the first material guide plate, and the upper end of the return conveyor belt is located above the feed port of the impact crusher. The construction waste can be effectively crushed through the jaw crusher, impact crusher and return conveyor belt. The screening equipment can screen and classify the crushed waste. The waste particles after screening and classification are uniform and can effectively remove impurities such as plastic and paper in the waste.
[0004] When the above-mentioned construction waste cement block solid waste treatment system processes garbage, due to the irregular shape and size of the material, there will be a problem of the material getting stuck in the sieve holes of the screen. Once the material is stuck in the sieve holes, it will hinder the material from passing through the sieve holes and will also hinder the material from moving on the sieve. When the sieve holes are blocked by the material, it is necessary to manually clean the blocked logistics in the sieve holes, which is inconvenient to clean. Utility Model Content
[0005] The utility model aims to overcome the defects of the prior art and provide a construction solid waste treatment device, which uses an elastic bag to clean the materials stuck in the sieve holes, so as to solve the technical problem of the prior art that the materials stuck in the sieve holes need to be cleaned manually.
[0006] The technical solution to achieve the above purpose is a construction solid waste treatment device, comprising:
[0007] A bracket, the bracket having a first end and a second end disposed opposite to each other, wherein a height of the first end is higher than a height of the second end;
[0008] A vibrating screen is arranged on the support, wherein the vibrating screen is formed with a plurality of screening areas, and the screening areas are formed with a plurality of screen holes, wherein the screen holes of the screening areas close to the first end are smaller than the screen holes of the screening areas close to the second end;
[0009] A screening channel is arranged at the bottom of the vibrating screen and corresponds to the screening area; and
[0010] A sliding member is movably arranged on the top of the vibration screen, and an elastic bag is arranged at the bottom of the sliding member, and the elastic bag is attached to the surface of the vibration screen.
[0011] Furthermore, two guide rods are fixedly mounted on the top of the bracket, the two guide rods are arranged on two opposite sides of the vibration screen, and the sliding member is slidably mounted on the guide rods.
[0012] Furthermore, the sliding member is formed with a sleeve corresponding to the guide rod, the sleeve is sleeved on the guide rod, a telescopic rod is provided at the end of the guide rod, and one end of the telescopic rod is fixed to the sliding member.
[0013] Furthermore, the telescopic rod comprises:
[0014] A first sleeve tube is sleeved on the guide rod and arranged near the end of the guide rod, and a first push plate is fixedly installed on the side of the first sleeve tube;
[0015] a second sleeve tube sleeved on the guide rod and arranged close to the sleeve, a second push plate fixedly installed on the side of the second sleeve hole, and the second push plate is fixedly connected to the sliding member; and
[0016] A telescopic component with adjustable length is connected between the first push plate and the second push plate.
[0017] Further, two opposite side portions of the first sleeve tube are formed with first fixing openings, and two first clamping rods are rotatably mounted on the top of the first sleeve tube, and the ends of the first clamping rods are clamped on the guide rod through the first fixing openings by rotating the two first clamping rods;
[0018] A first driving motor is disposed on the top of the first sleeve, and the first driving motor drives the first clamping rod.
[0019] Further, the second sleeve tube is formed with second fixing openings at two opposite side portions, and two second clamping rods are rotatably mounted on the top of the second sleeve tube, and the ends of the second clamping rods are clamped on the guide rod through the second fixing openings by rotating the two second clamping rods;
[0020] A second driving motor is disposed on the top of the second sleeve, and the second driving motor drives the second clamping rod.
[0021] Furthermore, a pressure relief valve is fixedly installed on the top of the sliding member, and the pressure relief valve controls the connection with the elastic bag.
[0022] Furthermore, a pressure limiting valve is fixedly installed on the top of the sliding member, and the pressure limiting valve controls the connection with the elastic bag.
[0023] Furthermore, a pressure pump is fixedly installed on the top of the sliding member, and the pressure pump is connected to the elastic bag.
[0024] Furthermore, the tail end of the vibrating screen is connected with a crushing device.
[0025] Compared with the prior art, the utility model has the following beneficial effects:
[0026] The elastic bag is used to clean the material stuck in the sieve hole, so as to solve the technical problem of manually cleaning the material stuck in the sieve hole in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 The utility model is a structural schematic diagram of a solid waste treatment device for construction.
[0028] Figure 2 for Figure 1 Schematic diagram of the structure at A in the middle.
[0029] Figure 3 for Figure 1 Schematic diagram of the structure at B in the figure.
[0030] Figure 4 The utility model is a schematic structural diagram of a sliding part of a solid waste treatment device for construction.
[0031] Legend: 1. Bracket; 2. Vibrating screen; 3. Guide rod; 4. Sliding part; 41. Sleeve; 5. Telescopic rod; 6. Pressure relief valve; 7. Pressure limiting valve; 8. Pressure pump. DETAILED DESCRIPTION
[0032] The utility model is further described below in conjunction with the accompanying drawings and specific embodiments.
[0033] See also Figure 1A construction solid waste treatment device comprises: a bracket 1, wherein the bracket 1 has a first end and a second end arranged opposite to each other, the height of the first end is higher than the height of the second end; a vibrating screen 2 arranged on the bracket 1, wherein the vibrating screen 2 forms a plurality of screening areas, wherein the screening areas form a plurality of sieve holes, and the sieve holes of the screening areas close to the first end are smaller than the sieve holes of the screening areas close to the second end; a screening channel arranged at the bottom of the vibrating screen 2 and corresponding to the position of the screening area; and a sliding member 4 movably arranged on the top of the vibrating screen 2, wherein an elastic bag is arranged at the bottom of the sliding member 4, and the elastic bag is attached to the surface of the vibrating screen 2.
[0034] In the present invention, a preferred implementation is: start the vibrating screen 2, the vibrating screen 2 vibrates, so that when the construction waste is poured in later, the construction waste can fall into the sieve hole smoothly, reducing the probability of the construction waste blocking the sieve hole, placing the crushed construction waste on the vibrating screen 2, and the construction waste of different sizes falls into each screening channel through the sieve holes of different sizes, so as to classify the construction waste by size, start the sliding member 4, the sliding member 4 moves from the first end of the bracket 1 to the second end, and the elastic bag removes the construction waste stuck in the sieve hole from the sieve hole. Preferably, the vibrating screen 2 is also connected to a magnetic separation device, and the magnetic separation device separates the construction waste into the sieve hole. The construction waste in the screening area is subjected to magnetic separation. After adsorption and screening, the construction waste contains construction waste containing iron products such as steel bars and iron wires. The magnetic separation device is also connected to a wind separation device; the iron products in the small-sized materials are first screened out by the magnetic separation component to recycle the iron products; the materials after magnetic separation are passed into the wind separation component, which is used to wind-separate the small-sized materials. The wind separation component can separate solid waste such as packaging bags, plastic bags and wood from the materials. Most of the materials after wind separation by the wind separation component are sand and gravel particles. The sand and gravel particles selected by wind can be packaged and used for projects such as building backfill, while solid waste such as packaging bags, plastic bags and wood can be treated by incineration power generation. The rational use of construction waste is achieved, and the construction solid waste is prevented from occupying space and the accumulation of construction solid waste is prevented from harming the environment.
[0035] Further, two guide rods 3 are fixedly mounted on the top of the bracket 1, and the two guide rods 3 are arranged on opposite sides of the vibration screen 2, and the sliding member 4 is slidably arranged on the guide rods 3. Preferably, the guide rods 3 can prevent the sliding member 4 from sliding out of the range of the vibration screen 2.
[0036] See also Figure 2 and Figure 3; Further, the sliding member 4 is formed with a sleeve 41 corresponding to the guide rod 3, the sleeve 41 is sleeved on the guide rod 3, the end of the guide rod 3 is provided with a telescopic rod 5, one end of the telescopic rod 5 is fixed to the sliding member 4. Preferably, a placement opening is formed at the bottom of the sleeve 41, and construction personnel can fix the sleeve 41 on the guide rod 3 through the placement opening, and the placement opening occupies 1 / 3 of the area of the sleeve 41, so as to facilitate the construction personnel to fix it.
[0037] Furthermore, the telescopic rod 5 includes: a first sleeve tube that is sleeved on the guide rod 3 and arranged near the end of the guide rod 3, and a first push plate is fixedly installed on the side of the first sleeve tube; a second sleeve tube that is sleeved on the guide rod 3 and arranged near the sleeve 41, and a second push plate is fixedly installed on the side of the second sleeve hole, and the second push plate is fixedly connected to the sliding member 4; and a telescopic component that is adjustable in length and connected between the first push plate and the second push plate. Preferably, a connecting port is provided at the bottom of the first sleeve tube and the second sleeve tube, and through the connecting port, the construction personnel can conveniently fix the first sleeve tube and the second sleeve tube to the guide rod 3.
[0038] Furthermore, the first sleeve tube has two opposite side portions formed with first fixing openings, and the top of the first sleeve tube is rotatably mounted with two first clamping rods, and the ends of the first clamping rods are rotated so that the ends of the first clamping rods clamp the guide rod 3 through the first fixing openings; the top of the first sleeve tube is provided with a first driving motor, and the first driving motor drives the first clamping rod. When the sliding member 4 is not needed, the construction personnel can drive the first clamping rod through the first driving motor so that the first clamping rod clamps the guide rod 3 to fix the sliding member 4.
[0039] Furthermore, the second sleeve tube is provided with a second fixing opening at two opposite side portions, and the top of the second sleeve tube is rotatably provided with two second clamping rods, and the ends of the second clamping rods are clamped through the second fixing openings by rotating the two second clamping rods; the top of the second sleeve tube is provided with a second driving motor, and the second driving motor drives the second clamping rod. When the sliding member 4 is not needed, the construction personnel can drive the second clamping rod through the second driving motor, so that the first clamping rod clamps the guide rod 3 to fix the sliding member 4.
[0040] See also Figure 4Further, a pressure relief valve 6 is fixedly installed on the top of the sliding member 4, and the pressure relief valve 6 is controlled to connect to the elastic bag. Preferably, the pressure relief valve 6 is connected to the elastic bag through the pressure relief pipe. When the air pressure or hydraulic pressure in the elastic bag needs to be released, the pressure relief valve 6 is opened, and the air pressure or hydraulic pressure in the elastic bag is discharged through the pressure relief valve 6, and the elastic bag is reset under the action of its own elastic force.
[0041] Furthermore, a pressure limiting valve 7 is fixedly installed on the top of the sliding member 4, and the pressure limiting valve 7 controls the connection with the elastic bag. Preferably, the pressure limiting valve 7 is connected to the elastic bag through a pressure limiting pipe, and when the air pressure or hydraulic pressure applied to the elastic bag exceeds a preset value, the pressure limiting valve 7 opens, which can prevent the pressure applied to the elastic bag from exceeding the preset value and damaging the elastic bag or the vibrating screen 2.
[0042] Furthermore, a pressure pump 8 is fixedly installed on the top of the sliding member 4, and the pressure pump 8 is connected to the elastic bag. By connecting the pressure pump 8 to the elastic bag, a positive pressure is generated in the elastic bag, so that the elastic bag generates a protrusion relative to the mesh of the screen, so as to clean the debris in the mesh through the protrusion. Preferably, the elastic bag is made of silicone or rubber, and a plurality of convex particles are formed on the side of the elastic bag facing the vibration screen 2. The convex particles protrude from the surface of the elastic bag and are evenly distributed on the side of the elastic bag facing the screen. The diameter of the convex particles is less than 1 mm, the height is less than 1 mm, and the distance between adjacent convex particles is less than 0.5 mm.
[0043] Furthermore, a crushing device is connected to the tail end of the vibration screen 2. Preferably, after the screening is completed, the oversized construction waste can be crushed again, and after the crushing is completed, the crushed construction waste can be poured into the vibration screen 2 for re-screening.
[0044] The following is an explanation of the use of the construction solid waste treatment device of the utility model.
[0045] The vibrating screen 2 is started and vibrates to facilitate the subsequent pouring of construction waste, so that the construction waste can fall into the sieve holes smoothly, reducing the probability of the construction waste blocking the sieve holes. The crushed construction waste is placed on the vibrating screen 2, and the construction waste of different sizes falls into each screening channel through the sieve holes of different sizes, so that the construction waste can be classified by size. The sliding member 4 is started and moved from the first end of the bracket 1 to the second end. The elastic bag removes the construction waste stuck in the sieve holes from the sieve holes. Preferably, the vibrating screen 2 is also connected to a magnetic separation device, which separates the construction waste in the screening area. The waste is subjected to magnetic separation to absorb and screen. The construction waste contains steel bars, iron wires and other iron products. The magnetic separation device is also connected to a wind separation device. The iron products in the small-sized materials are first screened out by the magnetic separation component to recycle the iron products. The materials after magnetic separation are passed into the wind separation component, which is used to wind-separate the small-sized materials. The wind separation component can separate the solid waste such as packaging bags, plastic bags and wood in the materials. Most of the materials after wind separation by the wind separation component are sand and gravel particles. The sand and gravel particles selected by wind can be packaged and used for projects such as building backfill, while solid waste such as packaging bags, plastic bags and wood can be treated by incineration power generation. The rational use of construction waste is achieved, and the construction solid waste is prevented from occupying space and the accumulation of construction solid waste is prevented from harming the environment.
[0046] The utility model is described in detail above in conjunction with the embodiments of the drawings. A person skilled in the art can make various variations of the utility model according to the above description. Therefore, some details in the embodiments should not constitute a limitation of the utility model, and the scope of protection of the utility model shall be defined by the scope of the attached claims.
Claims
1. A construction solid waste treatment device, characterized in that: include: A bracket, the bracket having a first end and a second end disposed opposite to each other, wherein a height of the first end is higher than a height of the second end; A vibrating screen is arranged on the support, wherein the vibrating screen is formed with a plurality of screening areas, and the screening areas are formed with a plurality of screen holes, wherein the screen holes of the screening areas close to the first end are smaller than the screen holes of the screening areas close to the second end; A screening channel is arranged at the bottom of the vibrating screen and corresponds to the position of the screening area; as well as A sliding member is movably arranged on the top of the vibration screen, and an elastic bag is arranged at the bottom of the sliding member, and the elastic bag is attached to the surface of the vibration screen.
2. A construction solid waste treatment device according to claim 1, characterized in that: Two guide rods are fixedly mounted on the top of the bracket. The two guide rods are arranged on two opposite sides of the vibration screen, and the sliding member is slidably arranged on the guide rods.
3. A construction solid waste treatment device according to claim 2, characterized in that: The sliding member is formed with a sleeve corresponding to the guide rod, the sleeve is sleeved on the guide rod, a telescopic rod is arranged at the end of the guide rod, and one end of the telescopic rod is fixed to the sliding member.
4. A construction solid waste treatment device according to claim 3, characterized in that: The telescopic rod comprises: A first sleeve tube is sleeved on the guide rod and arranged near the end of the guide rod, and a first push plate is fixedly installed on the side of the first sleeve tube; a second sleeve tube sleeved on the guide rod and arranged close to the sleeve, a second push plate fixedly mounted on the side of the second sleeve tube, and the second push plate and the sliding member are fixedly connected; and A telescopic component with adjustable length is connected between the first push plate and the second push plate.
5. A construction solid waste treatment device according to claim 4, characterized in that: The first sleeve tube is provided with first fixing openings at two opposite side portions, and two first clamping rods are rotatably mounted on the top of the first sleeve tube, so that the ends of the first clamping rods clamp the guide rod through the first fixing openings by rotating the two first clamping rods; A first driving motor is disposed on the top of the first sleeve, and the first driving motor drives the first clamping rod.
6. A construction solid waste treatment device according to claim 4, characterized in that: The second sleeve tube is provided with second fixing openings at two opposite side portions, and two second clamping rods are rotatably mounted on the top of the second sleeve tube, so that the ends of the second clamping rods clamp the guide rod through the second fixing openings by rotating the two second clamping rods; A second driving motor is disposed on the top of the second sleeve, and the second driving motor drives the second clamping rod.
7. A construction solid waste treatment device according to claim 1, characterized in that: A pressure relief valve is fixedly mounted on the top of the sliding member, and the pressure relief valve controls the connection with the elastic bag.
8. A construction solid waste treatment device according to claim 1, characterized in that: A pressure limiting valve is fixedly installed on the top of the sliding member, and the pressure limiting valve controls the connection with the elastic bag.
9. A construction solid waste treatment device according to claim 1, characterized in that: A pressure pump is fixedly installed on the top of the sliding member, and the pressure pump is connected to the elastic bag.
10. A construction solid waste treatment device according to claim 1, characterized in that: The tail end of the vibrating screen is connected with a crushing device.