Intelligent car loader and intelligent car loading system
Through intelligent loading machines and intelligent loading systems, using aggregate belt conveyors, metering belt conveyors and dust collectors, combined with vehicle information identification and control modules, the automation and precise measurement of loading operations in port transportation are realized, solving the existing problems The technology has solved the problems of low efficiency, large safety hazards and inaccurate measurement to achieve an efficient, safe and environmentally friendly loading process.
Patent Information
- Application Number
- CN202323605610.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-28
AI Technical Summary
In port transportation, the existing technology has low loading efficiency, high labor costs, safety hazards, and inaccurate measurement, especially when the grain density changes, which affects the loading accuracy.
An intelligent loading machine and intelligent loading system are designed, including a base, a collecting belt conveyor, a metering belt conveyor, a horizontal dust collector and a controller. Through the vehicle information identification module, indication module and intelligent loading machine control module , realize automated identification, positioning and measurement, reduce manual intervention, and improve loading accuracy and safety.
It achieves safe, environmentally friendly, intelligent and accurate loading operations, solves the problems of many operators at the loading site, large measurement errors, dust pollution and uneven material leakage, and improves loading efficiency and accuracy.
Smart Images

Figure CN221916459U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of port transportation management, and in particular to an intelligent loading machine and an intelligent loading system. Background Art
[0002] In port transportation, bulk grain silos are often used to store grain. For the independent unloading and metering loading of bulk grain silos, the following operation methods are often used:
[0003] 1. Some bulk grain silos have no metering devices on their side walls, so loading is done based on workers’ experience, and then a test weighing is performed on the scale to check whether the loading amount is appropriate.
[0004] 2. Some bulk grain silos are equipped with volume scales on their side walls, which are used to convert the volume of the material into weight to complete the task of metering and loading.
[0005] 3. Add a loading building around each independent silo and use a bulk grain hopper scale for accurate measurement.
[0006] However, the above operation method has the following technical problems:
[0007] 1. Because the position of the material conveying port is fixed, the driver can only rely on manual command to continuously adjust the vehicle position, or the driver can adjust the vehicle position according to the loading situation and prompts to complete the loading of goods. This has low production efficiency, high labor costs, and great safety hazards for personnel.
[0008] 2. When there is no metering device on the side wall of the bulk grain silo, the loading operation is completed by the method of weighing on the scale. It takes multiple loading or unloading to meet the loading weight requirement, and the operation efficiency is extremely low.
[0009] 3. When a volume scale is installed on the side of the bulk grain silo, the volume of the material is measured by the volume scale on the side wall, and then the volume of the material is converted into weight for measurement, thereby completing the loading operation. However, the grain enters the silo through a belt and is thrown from a high place. The density of grain at different positions in the silo is different. When the silo is unloaded and loaded, the density of the grain changes all the time, resulting in inaccurate measurement values. If the material is compacted or has poor fluidity, it will greatly affect the measurement accuracy. Utility Model Content
[0010] In order to solve this technical problem, the present application provides an intelligent loader and an intelligent loading system, which can realize safe, environmentally friendly, intelligent, precise and efficient loading operations.
[0011] To achieve the purpose of this application, this application is implemented through the following technical solutions:
[0012] In a first aspect, the present application provides an intelligent loader, comprising: a base, a collecting belt conveyor, and a metering belt conveyor;
[0013] The base is provided with a discharge port;
[0014] The collecting belt conveyor is fixedly arranged on the base, with the input end close to the edge of one end of the base, and is used to convey materials through the belt;
[0015] The metering belt conveyor is fixedly arranged on the base, with the input end located below the output end of the collecting belt conveyor and the output end located above the discharge port, and is used for metering the material output by the collecting belt conveyor and conveying it to the discharge port.
[0016] In a possible implementation, the output end of the metering belt conveyor has a discharge hopper, and the discharge end of the discharge hopper penetrates into the discharge port.
[0017] In a possible implementation, a horizontal dust collector is fixedly mounted on the base, and a dust suction port of the horizontal dust collector penetrates into the discharge port.
[0018] In a possible implementation, a dust cover is fixedly provided at the lower end of the discharge port.
[0019] In a possible implementation, a screw conveyor is also fixedly disposed on the base, an input end of the screw conveyor is connected to the ash storage compartment of the horizontal dust collector, and an output end of the screw conveyor penetrates into the discharge port.
[0020] In a possible implementation, a controller is further included, which is used to control the start and stop of the collecting belt conveyor, the metering belt conveyor, and the horizontal dust collector according to instructions.
[0021] In a possible implementation, the base is a movable base.
[0022] In a second aspect, the present application provides an intelligent loading system, including: a vehicle information identification module, an indication module, a vehicle information verification module, a processing module, an intelligent loading machine and the intelligent loading machine control module;
[0023] The vehicle information recognition module is arranged at the vehicle entrance area, and is used to recognize the first vehicle information of the vehicle entering and send it to the processing module, wherein the first vehicle information includes: license plate information, vehicle compartment size information and vehicle weight information;
[0024] The vehicle information checking module is used to identify the second vehicle information of the vehicle located in the loading area, and send the second vehicle information and the location information of the loading area to the processing module;
[0025] The processing module includes: a first processing unit, a second processing unit, and a third processing unit;
[0026] The first processing unit is used to send first indication information to the indication module according to the first vehicle information;
[0027] The second processing unit is used to obtain the loading weight according to the first vehicle information;
[0028] The third processing unit is used to send the loading weight and the location information of the loading area corresponding to the second vehicle information to the intelligent loader;
[0029] The indication module comprises: a first indication device and a second indication device; the first indication device is arranged in the vehicle entrance area, and is used to display the first indication information; the second indication device is arranged in the vehicle loading area, and is used to display the second indication information;
[0030] The intelligent loader control module includes: a first control unit, a second control unit, and a third control unit;
[0031] The first control unit is used to control the intelligent loader to move to the loading area corresponding to the position information of the loading area according to the position information of the loading area;
[0032] The second control unit is used to control the input end of the intelligent loader collecting belt conveyor to be connected with the discharge end of the silo;
[0033] The third control unit is used to start the intelligent loader for loading according to the loading weight.
[0034] In a possible implementation, the vehicle information recognition module includes: a first license plate recognition device, a vehicle compartment size calculation device, and a vehicle weight detection device;
[0035] The first license plate recognition device is used to recognize the license plate information of the vehicle;
[0036] The vehicle compartment size measuring device is used to measure the vehicle compartment size information;
[0037] The vehicle weight detection device is used to measure vehicle weight information;
[0038] The vehicle information verification module includes: a second license plate recognition device and a verification module; the second license plate recognition device is used to identify the license plate information of the vehicle located in the loading area to obtain the second vehicle information; the verification module is used to receive the verification information, and when the verification is passed, send the second vehicle information and the location information of the loading area to the processing module.
[0039] In a possible implementation, the intelligent loading system further includes: an interaction module;
[0040] The interactive module includes: a video monitoring device and an intercom device; the video monitoring device is used to collect video images of the loading area and send them to the control center; the intercom device is used for voice intercom between the control center and the loading area.
[0041] The technical effects of the technical solution provided by this application are as follows:
[0042] The intelligent loading machine and intelligent loading system described in the present application realize the safety, environmental protection, intelligence and precision of loading operations; solve the problem of large number of operators and great safety hazards in the loading operation site area; solve the problem of large loading measurement errors and the need for repeated weighing to complete loading; solve the problem of dust pollution during loading operations; solve the problem of uneven loading and easy leakage of materials. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 A schematic diagram of the structure of the intelligent loader provided in the embodiment of the present application;
[0044] Figure 2 A schematic diagram of the structure of the intelligent loader provided in the embodiment of the present application;
[0045] Figure 3 A schematic diagram of the structure of the intelligent loader provided in the embodiment of the present application;
[0046] Figure 4 A schematic diagram of the main structure of the intelligent loader metering belt conveyor provided in the embodiment of the present application;
[0047] Figure 5 A schematic diagram of the right side structure of the intelligent loader metering belt conveyor provided in the embodiment of the present application;
[0048] Figure 6 A schematic diagram of a top view of the structure of an intelligent loader metering belt conveyor provided in an embodiment of the present application;
[0049] Figure 7 A schematic diagram of the left-side structure of the intelligent loader metering belt conveyor provided in the embodiment of the present application;
[0050] Figure 8 A schematic diagram of the main structure of the intelligent loader aggregate belt conveyor provided in the embodiment of the present application;
[0051] Fig. 9 A left-side structural schematic diagram of an intelligent loader aggregate belt conveyor provided in an embodiment of the present application;
[0052] Fig.10 A schematic diagram of a top view of the structure of an intelligent loader aggregate belt conveyor provided in an embodiment of the present application;
[0053] Fig.11A schematic diagram of the right side structure of the intelligent loader aggregate belt conveyor provided in the embodiment of the present application;
[0054] Fig.12 A schematic diagram of the structure of the lower part of the base of the intelligent loading system provided in an embodiment of the present application;
[0055] Fig.13 A structural schematic diagram of the bottom surface of the base of the intelligent loading system provided in an embodiment of the present application;
[0056] Fig.14 A schematic diagram of the structure of the intelligent loading system provided in the embodiment of the present application;
[0057] Fig.15 A schematic diagram of the system architecture of the intelligent loading system provided in the embodiment of the present application;
[0058] Fig.16 A schematic diagram of the system architecture of the intelligent loading system provided in an embodiment of the present application.
[0059] Figure numerals: 1-collecting belt conveyor; 2-screw conveyor; 3-horizontal dust collector; 4-dust cover; 5-metering belt conveyor; 6-base; 7-controller; 8-discharge port; 9-discharge hopper; 10-dust suction port; 11-screw conveyor output end. DETAILED DESCRIPTION
[0060] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0061] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features; in the description of this application, unless otherwise specified, "plurality" means two or more.
[0062] Example 1
[0063] Figure 1-14 An intelligent loading machine provided in Example 1 of the present application, such as Figure 1-14 As shown, it includes: a base 6, a collecting belt conveyor 1, and a metering belt conveyor 5;
[0064] The base 6 has a discharge port 8;
[0065] The collecting belt conveyor 1 is fixedly arranged on the base 6, with the input end close to the edge of one end of the base 6, and is used to convey materials through the belt;
[0066] The metering belt conveyor 5 is fixedly arranged on the base 6 , with its input end located below the output end of the collecting belt conveyor 1 and its output end located above the discharge port 8 , and is used for metering the material output by the collecting belt conveyor 1 and conveying it to the discharge port 8 .
[0067] Optionally, the discharge port 8 has a cover to prevent dust.
[0068] Optionally, the output end of the collecting belt conveyor 1 has a baffle to block the inertia of the material transported on the belt and ensure that the material is input to the input end of the metering belt conveyor 5.
[0069] Optionally, the metering belt conveyor 5 can measure the weight of the material output by the collecting belt conveyor 1 .
[0070] In a possible implementation manner, the output end of the metering belt conveyor 5 has a discharge hopper 9 , and the discharge end of the discharge hopper 9 penetrates into the discharge port 8 .
[0071] In a possible implementation manner, a horizontal dust collector 3 is also fixedly disposed on the base 6 , and a dust suction port 10 of the horizontal dust collector 3 penetrates into the discharge port 8 .
[0072] In a possible implementation manner, a dust cover 4 is fixedly provided at the lower end of the discharge port 8 .
[0073] Optionally, the dust cover 4 is a telescopic dust cover.
[0074] In a possible embodiment, a screw conveyor 2 is also fixedly installed on the base 6, and the screw conveyor input end of the screw conveyor 2 is connected to the dust storage chamber of the horizontal dust collector 3, and the screw conveyor output end 11 penetrates into the discharge port 8, which is used to transport the dust and dirt accumulated in the horizontal dust collector 3 through the screw conveyor and out from the screw conveyor output end 11 for cleaning.
[0075] In a possible implementation manner, a controller 7 is further included, which is used to control the start and stop of the collecting belt conveyor 1, the metering belt conveyor 5, and the horizontal dust collector 3 according to instructions.
[0076] Optionally, it can be controlled manually or automatically by PLC.
[0077] In a possible implementation, the base 6 is a movable base.
[0078] Optionally, the base is moved by moving wheels arranged at the bottom of the base. After moving to a specified position, the brakes are fastened to ensure the stability of the base during operation.
[0079] Example 2
[0080] Based on the above embodiments, Figure 15-16 As shown, the embodiment of the present application also provides an intelligent loading system, including: a vehicle information identification module, an indication module, a vehicle information verification module, a processing module, any of the above-mentioned intelligent loading machines and the intelligent loading machine control module;
[0081] The vehicle information recognition module is arranged at the vehicle entrance area, and is used to recognize the first vehicle information of the vehicle entering and send it to the processing module, wherein the first vehicle information includes: license plate information, vehicle compartment size information and vehicle weight information;
[0082] The vehicle information checking module is used to identify the second vehicle information of the vehicle located in the loading area, and send the second vehicle information and the location information of the loading area to the processing module;
[0083] The processing module includes: a first processing unit, a second processing unit, and a third processing unit;
[0084] The first processing unit is used to send first indication information to the indication module according to the first vehicle information;
[0085] The second processing unit is used to obtain the loading weight according to the first vehicle information;
[0086] The third processing unit is used to send the loading weight and the location information of the loading area corresponding to the second vehicle information to the intelligent loader;
[0087] The indication module comprises: a first indication device and a second indication device; the first indication device is arranged in the vehicle entrance area, and is used to display the first indication information; the second indication device is arranged in the vehicle loading area, and is used to display the second indication information;
[0088] The intelligent loader control module includes: a first control unit, a second control unit, and a third control unit;
[0089] The first control unit is used to control the intelligent loader to move to the loading area corresponding to the position information of the loading area according to the position information of the loading area;
[0090] The second control unit is used to control the input end of the intelligent loader collecting belt conveyor 1 to be connected with the discharge end of the silo;
[0091] The third control unit is used to start the intelligent loader for loading according to the loading weight.
[0092] In a possible implementation, the vehicle information recognition module includes: a first license plate recognition device, a vehicle compartment size calculation device, and a vehicle weight detection device;
[0093] The first license plate recognition device is used to recognize the license plate information of the vehicle;
[0094] The vehicle compartment size measuring device is used to measure the vehicle compartment size information;
[0095] The vehicle weight detection device is used to measure vehicle weight information;
[0096] The vehicle information verification module includes: a second license plate recognition device and a verification module; the second license plate recognition device is used to identify the license plate information of the vehicle located in the loading area to obtain the second vehicle information; the verification module is used to receive the verification information, and when the verification is passed, send the second vehicle information and the location information of the loading area to the processing module.
[0097] Optionally, the vehicle driver sends verification information to the verification module by scanning a QR code, and the verification module performs verification. When the verification is passed, the second vehicle information and the location information of the loading area are sent to the processing module.
[0098] In a possible implementation, the intelligent loading system further includes: an interaction module;
[0099] The interactive module includes: a video monitoring device and an intercom device; the video monitoring device is used to collect video images of the loading area and send them to the control center; the intercom device is used for voice intercom between the control center and the loading area.
[0100] Example 3
[0101] Based on the above embodiments, the present application also provides a detailed implementation method of the intelligent loading system:
[0102] The existing weighing process is modified, and a scanning sensor is installed above the truck scale. During weighing, the car body size data is automatically measured and mapped, which is used to determine the material loading height during automatic loading.
[0103] Install a QR code identification plate and change the original electronic tag identification method to an APP scanning QR code for identification and authentication. The identification result controls the loading equipment, which is realized by the automatic loading PLC. The silo discharge controller LED screen (the screen is mainly used for identification information feedback display) needs to be installed within the driver's visible range.
[0104] A voice intercom extension is installed on the driver's side, and a video intercom management machine is installed in the central control room for information exchange between the driver and the central control room. Due to the high noise level in the on-site environment, the intercom extension needs to be equipped with an outdoor sound column.
[0105] A camera is installed above the loading platform and connected to the Hikvision ISE monitoring platform of Jurong Company, through which the vehicle position is determined and the loading process is monitored.
[0106] PLC, positioning sensor, material level sensor, LED screen, speaker and other hardware equipment are installed on site. PLC control program is developed to control the operation of other loading equipment (bending scraper + valve), and the vehicle positioning is realized through positioning sensor and material sensor. During the loading process, the material sensor is used for real-time monitoring. When the material in the carriage reaches the standard for moving the vehicle, the intelligent cloth loading and moving cloth loading are automatically controlled until the vehicle is full. The LED screen (text) + warning light (green light) + speaker (prompt sound) reminds the driver that the loading is completed and the vehicle leaves the loading position, thus completing the loading process fully automatically.
[0107] The control logic is as follows:
[0108] The vehicle enters the loading position → The driver scans the dispatch order → The identification LED screen displays the identification information → The identification LED screen and the guide LED screen display synchronously to prompt the driver to align with the starting line → The central control room verifies the vehicle information through the upper position and video monitoring, confirms the vehicle position, and the vehicle deviates or drives out of the designated loading position. The positioning sensor judges, LED screen (vehicle deviates, please move slowly to the loading position) + warning light (flashing red light) + speaker (vehicle deviates, please move slowly to the loading position). → Operate the upper position to start loading → After loading starts, the identification LED screen displays "loading in progress" → The material level sensor measures the material height in real time and compares it with the height of the carriage → When the set height limit is reached → Automatically control the intelligent cloth loading movement, and the identification LED screen displays "loading in progress" → After the vehicle loading meets the requirements, the guide LED screen (loading completed) + warning light (flashing green light) + speaker (loading completed, please drive out of the loading position). When the vehicle does not meet the requirements or the material is about to overflow (the material level sensor detects information in real time), the equipment stops loading.
[0109] After the vehicle passes through the weighing room, the quantitative loading system obtains the vehicle's loadable weight (net weight) through the interface program with the collection and distribution system, and controls the batching scale to load the vehicle through the automatic loading PLC to achieve accurate loading. When the measurement data reaches the net weight, the electric valve is closed first and the loading is completed.
[0110] If the pre-loaded cargo (set net weight) cannot be fully loaded due to the cargo (low specific gravity) or the carriage (small carriage), affecting the loading accuracy of the next car, the upper software can be used to manually correct the loading data of the next car.
[0111] Develop PLC upper configuration software (using WinCC, IFIX, Citect or brands of equivalent grade), and realize information interaction with the transportation system and silo discharge control system for loading process control, including but not limited to vehicle information display, automatic loading control, manual loading control, loading equipment operation status display, manual and automatic switching, metering information display, manual voice reminder, manual correction of pre-loaded vehicle weight, belt scale accuracy out-of-tolerance warning (compared with truck scale), etc. The configuration software interface design is concise and clear, and the specific plan needs to be confirmed.
[0112] The operation process is as follows:
[0113] (1) When a vehicle enters the work area for loading, it is first weighed on a truck scale. During the weighing process, the dimensions of the vehicle compartment are measured using a scanning sensor. The data is then uploaded to the loading central control production system and synchronized to the unmanned fully automatic intelligent material placement precision loading machine.
[0114] (2) After receiving the information of the vehicle to be loaded, the central control room notifies the vehicle to enter the loading area. When the vehicle to be loaded enters the license plate recognition area, it starts to identify the information based on the vehicle license plate and compare it with the information of the loading central control production system. After the comparison and recognition is successful, the driver is instructed to stop the vehicle at the designated location under the prompt of the sound and display screen;
[0115] (3) After the vehicle stops at the designated location, the driver uses the scanning function of the Zhoudao.com APP to scan the QR code installed at the port entrance for loading identification and authentication. If the verification is correct, it will be fed back to the port production control center to indicate that the loading preparation work is complete and a loading application will be issued. The port production control center operator will receive the loading application. After receiving the loading application, the port production control center operator will confirm the vehicle location and information and that the loading operation has fully complied with the loading operation regulations through the video monitoring screen. The driver will be prompted to stop the car and turn off the engine through the system sound and display screen, and the parking brake will be applied. After all the work is completed, press the loading button, start with one button, and start loading. If the verification fails, the system will not start and the loading operation cannot be carried out. At the same time, the information will be fed back to the central control room through data communication.
[0116] (4) The operator of the port production control center moves the unmanned fully automatic intelligent material distribution loading system to the designated silo according to the production plan. The unmanned fully automatic intelligent material distribution loading system automatically aligns with the side wall release port of the silo, the material receiving port rises and connects with the side wall release port, the locking device is locked, and the operator presses the loading button; first, the metering belt conveyor starts and resets the metering system to zero, then the loading belt conveyor starts, the equipment self-checks and the operating status is stable, and finally the gate valve opens to discharge the material. During this loading process, the height of the material in the car is determined by the detection data of the metering system in conjunction with the scanning sensor. When the goods are loaded to an appropriate height, the loader moves to start material distribution loading until the loading is completed.
[0117] (5) When the material in the car reaches a given loading mass, the unmanned fully automatic intelligent material distribution loading system sends a closing signal to the gate valve, and the gate valve is immediately closed. The unmanned fully automatic intelligent material distribution loading system belt conveyor runs until the material is completely emptied and then stops. The car driver leaves the loading area according to the sound and display prompts, completing a loading.
[0118] (6) To ensure smooth operation and timely resolution of problems encountered by truck drivers, a video intercom extension is installed on the driver's side and a video intercom management machine is installed in the central control room for information exchange between the driver and the central control room. Due to the high noise level in the on-site environment, the video intercom extension needs to be equipped with an outdoor sound column.
[0119] The embodiments of the present application provide an intelligent loader and an intelligent loading system, which can provide one-stop loading services. The application of the vehicle automatic identification and guidance system can realize accurate vehicle positioning, and the vehicle no longer needs to be moved frequently. It also has a one-button operation mode, which simplifies the operation process and realizes unmanned automatic intelligent material discharge and loading. It realizes accurate measurement and avoids the need for multiple weighing tests of the vehicle to complete the loading weight during the loading operation. At the same time, it reduces the traffic pressure and difficulty of on-site management caused by multiple weighing tests of the vehicle, and improves operation efficiency. A dust removal system is provided to effectively suppress dust and realize green loading operations. It solves the problem of uniform and flat material loading and eliminates the problem of leakage.
[0120] By adopting the implementation methods of this application, the following technical effects can be achieved:
[0121] 1. One-stop loading service, application of vehicle automatic identification and guidance system, to achieve accurate vehicle positioning, no need to move vehicles frequently;
[0122] 2. One-button operation mode simplifies the operation process and realizes unmanned automatic intelligent material unloading and loading;
[0123] 3. Accurate measurement to avoid the need to weigh the vehicle multiple times to complete the loading weight during the loading process;
[0124] 4. Reduce the traffic pressure and difficulty of on-site management caused by multiple vehicle weighing tests, improve work efficiency, and achieve accurate loading. Through the metering device of the loader, the loading accuracy can be controlled within 0.5%, meeting the problem of one-time loading of vehicles;
[0125] 5. Set up a dust removal system to effectively suppress dust and achieve green loading operations;
[0126] 6. The material is loaded evenly and smoothly without leakage;
[0127] In the several embodiments provided in the present application, it should be understood that the disclosed systems, machines and methods can be implemented in other ways. For example, the machine embodiments described above are only schematic, for example, the division of units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of machines or units, which can be electrical, mechanical or other forms.
[0128] The above embodiments are only used to illustrate the technical solution of the present application, but not to limit it. The present application is not limited to the exact structure described above and illustrated in the accompanying drawings, and it cannot be determined that the specific implementation of the present application is limited to these descriptions. For ordinary technicians in the technical field to which the present application belongs, various changes and modifications made without departing from the concept of the present application should be deemed to belong to the protection scope of the present application.
Claims
1. An intelligent loading machine, characterized in that: include: Base (6), aggregate belt conveyor (1), metering belt conveyor (5); The base (6) is provided with a discharge port; The collecting belt conveyor (1) is fixedly arranged on the base (6), with the input end close to the edge of one end of the base (6), and is used to convey materials through the belt; The metering belt conveyor (5) is fixedly arranged on the base (6), with its input end located below the output end of the collecting belt conveyor (1) and its output end located above the discharge port, and is used to meter the material output by the collecting belt conveyor (1) and transport it to the discharge port.
2. The intelligent loading machine according to claim 1, characterized in that: The output end of the metering belt conveyor (5) is provided with a discharge hopper, and the discharge end of the discharge hopper penetrates into the discharge port.
3. The intelligent loading machine according to claim 1, characterized in that: A horizontal dust collector (3) is also fixedly arranged on the base (6), and the dust suction port of the horizontal dust collector (3) penetrates into the discharge port.
4. The intelligent loading machine according to claim 1, characterized in that: A dust cover (4) is also fixedly provided at the lower end of the discharge port.
5. The intelligent loading machine according to claim 3, characterized in that: A screw conveyor (2) is also fixedly arranged on the base (6), the input end of the screw conveyor (2) is connected to the ash storage chamber of the horizontal dust collector (3), and the output end (11) of the screw conveyor penetrates into the discharge port (8).
6. The intelligent loading machine according to claim 5, characterized in that: It also includes a controller (7) for controlling the start and stop of the collecting belt conveyor (1), the metering belt conveyor (5), and the horizontal dust collector (3) according to instructions.
7. The intelligent loading machine according to claim 1, characterized in that: The base (6) is a movable base.
8. An intelligent loading system, characterized in that: include: A vehicle information identification module, an indication module, a vehicle information verification module, a processing module, any intelligent vehicle loader according to claims 1 to 7, and the intelligent vehicle loader control module; The vehicle information recognition module is arranged at the vehicle entrance area, and is used to recognize the first vehicle information of the vehicle entering and send it to the processing module, wherein the first vehicle information includes: license plate information, vehicle compartment size information and vehicle weight information; The vehicle information checking module is used to identify the second vehicle information of the vehicle located in the loading area, and send the second vehicle information and the location information of the loading area to the processing module; The processing module includes: a first processing unit, a second processing unit, and a third processing unit; The first processing unit is used to send first indication information to the indication module according to the first vehicle information; The second processing unit is used to obtain the loading weight according to the first vehicle information; The third processing unit is used to send the loading weight and the location information of the loading area corresponding to the second vehicle information to the intelligent loader; The indication module comprises: a first indication device and a second indication device; the first indication device is arranged in the vehicle entrance area, and is used to display the first indication information; the second indication device is arranged in the vehicle loading area, and is used to display the second indication information; The intelligent loader control module includes: a first control unit, a second control unit, and a third control unit; The first control unit is used to control the intelligent loader to move to the loading area corresponding to the position information of the loading area according to the position information of the loading area; The second control unit is used to control the input end of the intelligent loader collecting belt conveyor (1) to be connected with the discharge end of the silo; The third control unit is used to start the intelligent loader for loading according to the loading weight.
9. The intelligent loading system according to claim 8, characterized in that: The vehicle information recognition module includes: a first license plate recognition device, a vehicle compartment size calculation device and a vehicle weight detection device; The first license plate recognition device is used to recognize the license plate information of the vehicle; The vehicle compartment size measuring device is used to measure the vehicle compartment size information; The vehicle weight detection device is used to measure vehicle weight information; The vehicle information verification module includes: a second license plate recognition device and a verification module; the second license plate recognition device is used to identify the license plate information of the vehicle located in the loading area to obtain the second vehicle information; the verification module is used to receive the verification information, and when the verification is passed, send the second vehicle information and the location information of the loading area to the processing module.
10. The intelligent loading system according to claim 8, characterized in that: Also includes: Interaction module; The interactive module includes: a video monitoring device and an intercom device; the video monitoring device is used to collect video images of the loading area and send them to the control center; the intercom device is used for voice intercom between the control center and the loading area.
Citation Information
Cited By
Intelligent car loader and intelligent car loading system
CN117800117A