Pipe placing machine for hydraulic engineering construction

By designing a construction pipe laying machine for water conservancy projects and using a combination of vehicles and pipe lifting devices, the problems of low pipe handling efficiency and poor adaptability of mechanical equipment in traditional construction methods have been solved, achieving efficient and stable pipe placement, and improving Construction quality and safety.

CN221916871UActive Publication Date: 2024-10-29HUNAN BOHUI ENG PROJECT MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420713909.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-10-29
Estimated Expiration
2034-04-09

AI Technical Summary

Technical Problem

In traditional water conservancy project construction methods, the transportation and placement of pipelines are inefficient and pose a threat to workers' health. It is difficult for large mechanical equipment to adapt to small or complex terrain environments, limiting construction efficiency and quality.

Method used

A pipe laying machine for water conservancy project construction is designed, which includes a vehicle and a pipe hanging device fixed on the vehicle. The pipe hanging device includes a mounting base, a frame, a traveling mechanism and a lifting mechanism. The driving motor drives the rotating disk to rotate and travel. The motor drives the gear to rotate and the rewinding motor drives the rewinding wheel to rotate, realizing the lifting, lifting and moving of the pipeline and reducing manual handling.

Benefits of technology

It improves construction efficiency, reduces manual handling, ensures the stability of pipeline placement and construction quality, and simplifies the device structure to facilitate operation and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221916871U_ABST
    Figure CN221916871U_ABST
Patent Text Reader

Abstract

The utility model discloses a hydraulic engineering construction pipe placing machine, which comprises a vehicle and a pipe hanging device fixedly arranged on the vehicle, the pipe hanging device comprises a mounting base, a rack, a walking mechanism and a hanging mechanism, the mounting base is fixedly connected on the vehicle, the rack is fixedly connected on the mounting base, the walking mechanism is arranged on the rack, and the hanging mechanism is arranged on the rack. The walking mechanism comprises a walking table capable of performing linear motion, and a hoisting mechanism is arranged on the walking table. The utility model relates to the technical field of pipe laying machines, and has the advantages of quickening the construction efficiency and improving the construction quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipe laying machines, in particular to a pipe laying machine for water conservancy project construction. Background Art

[0002] The construction quality and efficiency of water conservancy projects are directly related to the success of the project. In these projects, pipeline laying is a basic and key link. Its quality and speed affect the progress and safety of the entire project. However, the traditional pipeline laying method has significant shortcomings, especially in the efficiency of manual pipeline placement and the applicability of large-scale mechanical equipment.

[0003] First, in traditional construction methods, the transportation and placement of pipelines often rely on a large amount of manpower. Workers need to manually carry pipelines weighing hundreds of kilograms and then carefully place them in the predetermined location. This process is not only extremely inefficient, but also puts a heavy burden on the workers' physical health.

[0004] In addition, although large-scale mechanical equipment has been introduced to improve efficiency in response to the inefficiency of manual operations, these equipment are often difficult to adapt to narrow or complex construction environments due to their large size and complex operation.

[0005] Therefore, these deficiencies in the existing technology have seriously limited the efficiency and quality of water conservancy project construction, and a new solution is urgently needed. Utility Model Content

[0006] In view of the above-mentioned deficiencies existing in the prior art, the purpose of the utility model is to provide a pipe laying machine for water conservancy project construction which can speed up construction efficiency and improve construction quality.

[0007] The utility model adopts the following technical solution to achieve the above-mentioned purpose: a pipe laying machine for water conservancy project construction, comprising a vehicle and a pipe hanging device fixedly installed on the vehicle, the pipe hanging device comprising a mounting base, a frame, a traveling mechanism and a lifting mechanism, the mounting base is fixedly connected to the vehicle, the mounting base is fixedly connected to the frame, the frame is provided with the traveling mechanism, the traveling mechanism comprises a traveling platform capable of linear motion, and the traveling platform is provided with the lifting mechanism.

[0008] In the above technical solution, the mounting base includes a mounting base, a rotating disk and a driving motor. The mounting base is fixedly connected to the vehicle, the rotating disk is rotatably connected to the mounting base, the driving motor is also fixedly connected to the mounting base, the driving motor is dynamically connected to the rotating disk, and the frame is fixedly connected to the rotating disk.

[0009] In the above technical solution, the frame includes a support frame and a straight-moving motion frame fixedly connected to the support frame, the support frame is fixedly connected to the rotating disk, the straight-moving motion frame is provided with the walking mechanism, the support frame is fixedly connected to a stable support frame, and the bottom end of the stable support frame is rotatably connected to a universal wheel.

[0010] In the above technical solution, the walking mechanism also includes a rack, a gear and a walking motor. The walking platform is slidably connected to the straight-moving motion frame, the rack is fixedly connected to the straight-moving motion frame, the walking platform is fixedly connected to the walking motor, the gear is fixedly connected to the power shaft of the walking motor, and the gear is meshingly connected to the rack.

[0011] In the above technical solution, the lifting mechanism includes a winding motor, a winding wheel and a sling. The winding motor is fixedly connected to the walking platform, and the power output end of the winding motor is fixedly connected to a rotating shaft. Two groups of winding wheels are fixedly connected to the rotating shaft, and each group of winding wheels is fixedly connected to the sling. The sling is wound around the winding wheel, and a hanging sleeve is provided at the bottom of the sling. A through-hole is provided on the walking platform to match the sling, and the sling passes through the through-hole. A roller is rotatably connected to the through-hole, and the sling is in contact with the roller.

[0012] In the above technical solution, the straight-moving motion frame includes two groups of horizontal frames arranged parallel to each other, and the corresponding sides of the two groups of horizontal frames are fixedly connected with rail platforms, and the rail platforms are provided with rail grooves. The walking platform is matched with each group of the rail grooves and is rotatably connected with rail wheels, and the rail wheels are located in the rail grooves.

[0013] Compared with the prior art, the utility model has the following beneficial effects: the device can be easily moved to different construction sites through the vehicle, and the driving motor drives the rotating disk to rotate to adjust the lifting direction, which provides greater working flexibility, and the walking mechanism also enables the walking platform to perform linear motion on the frame. When the walking platform performs linear motion, it can drive the lifting mechanism to perform linear motion, and the winding motor can drive the winding wheel to rotate to realize the retraction and release of the sling, that is, the pipeline can be put inside the sling sleeve, and then the winding motor drives the winding wheel to rotate to reel in the sling. At this time, the pipeline rises, and then the walking motor drives the gear to rotate to realize the movement of the walking platform. When the walking platform moves to the construction tunnel, the winding motor rotates to make the winding wheel roll out the sling, and the pipeline is lowered into the tunnel. Such a structure can reduce manual handling, speed up construction efficiency, ensure stable placement of the pipeline, improve construction quality, and the device has a simple structure, is easy to operate, and is convenient for maintenance and repair. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the structure of the utility model;

[0015] Figure 2 It is a structural schematic diagram of another perspective of the utility model;

[0016] Figure 3 This is a structural schematic diagram of the pipe hanging device in the utility model;

[0017] Figure 4 It is a schematic diagram of the top view of the structure of the pipe hanging device in the utility model.

[0018] In the figure: 100 vehicle, 201 mounting base plate, 202 rotating disk, 203 support frame, 204 straight motion frame, 205 stable support frame, 206 walking platform, 207 rack, 208 gear, 209 walking motor, 210 horizontal frame, 211 rail platform, 212 rail groove, 213 winding motor, 214 winding wheel, 215 sling, 216 rotating shaft, 217 through-hole, 218 sling. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] See also Figure 1 —4. A pipe laying machine for water conservancy project construction, comprising a vehicle 100 and a pipe hanging device fixedly mounted on the vehicle 100, wherein the pipe hanging device comprises a mounting base, a frame, a traveling mechanism and a lifting mechanism;

[0021] Wherein, the mounting base includes a mounting base plate 201, a rotating disk 202 and a driving motor, the mounting base plate 201 is fixedly connected to the vehicle 100, the mounting base plate 201 is rotatably connected with the rotating disk 202, the mounting base plate 201 is also fixedly connected with the driving motor, the driving motor is power-connected with the rotating disk 202, so that the rotating disk 202 can be driven to perform linear motion by the driving motor, and a frame is fixedly connected to the rotating disk 202, the frame includes a support frame 203 and a straight-moving motion frame 204 fixedly connected to the support frame 203, the above-mentioned support frame 203 is fixedly connected to the rotating disk 202, the straight-moving motion frame 204 is provided with a walking mechanism, the support frame 203 is also fixedly connected with a stable support frame 205, the bottom end of the stable support frame 205 is rotatably connected with a universal wheel, the frame can be further supported by the stable support frame 205, and when the rotating disk 202 rotates, the movement of the frame can also be facilitated by the universal wheel at the bottom;

[0022] In addition, the above-mentioned walking mechanism includes a walking platform 206, a rack 207, a gear 208 and a walking motor 209. The walking platform 206 is slidably connected to the straight motion frame 204, and the straight motion frame 204 is fixedly connected with a rack 207. The walking platform 206 is fixedly connected with a walking motor 209. The power shaft of the walking motor 209 is fixedly connected with a gear 208. The gear 208 is meshed with the rack 207. In this way, when the walking motor 209 drives the gear 208 to rotate, the walking platform 206 can be made to move linearly under the left and right sides of the rack 207. Furthermore, the straight motion frame 204 includes two sets of horizontal frames 210 arranged in parallel with each other, and rail platforms 211 are fixedly connected to the corresponding sides of the two sets of horizontal frames 210, and rail platforms 211 are provided with rail grooves 212. Each set of rail grooves 212 on the walking platform 206 is rotatably connected to rail wheels, and the rail wheels are located in the rail grooves 212. The cooperation between the rail wheels and the rail platforms 211 can reduce friction and improve the movement smoothness of the walking platform 206. The above-mentioned rack 207 is fixedly connected to the top of the horizontal frame 210. At the same time, in order to improve the walking force, the above-mentioned walking motor 209 and the matching gear 208 and rack 207 are provided with two sets;

[0023] Furthermore, the walking platform 206 is also provided with a lifting mechanism, which includes a winding motor 213, a winding wheel 214 and a sling 215. The walking platform 206 is fixedly connected with the winding motor 213, and the power output end of the winding motor 213 is fixedly connected with a rotating shaft 216. The rotating shaft 216 is fixedly connected with two sets of winding wheels 214. The two sets of winding wheels 214 are respectively close to the two ends of the walking platform 206, and each set of winding wheels 214 is fixedly connected with a sling 215. The sling 215 is also wound around the winding wheel 214. The sling A hanging sleeve 218 is provided at the bottom of 215, and a through-hole 217 is provided on the walking platform 206 to match the hanging belt 215. The hanging belt 215 passes through the through-hole 217, and a roller is rotatably connected to the through-hole 217. The hanging belt 215 conflicts with the roller. When the two sets of winding wheels 214 of the winding motor 213 rotate, the winding wheels 214 can retract or release the hanging belt 215, thereby realizing the lifting and lowering of the pipeline on the hanging sleeve 218, and the friction between the hanging belt 215 and the through-hole 217 is reduced by the roller, thereby ensuring the service life of the hanging belt 215.

[0024] In summary, the present embodiment discloses a pipe laying machine for water conservancy project construction, which is mainly used to place pipes. Specifically, the pipe hanging device can be moved to the construction site by the vehicle 100, and then the winding motor 213 drives the winding wheel 214 to rotate to make the hanging sleeve 218 descend, and then the pipe is manually put on the hanging sleeve 218, and then the winding motor 213 works to reel in the sling 215. At this time, the pipe rises, and when it rises to a certain height, the gear 208 is driven to rotate by the walking motor 209, so that the walking platform 206 drives the lifting mechanism to move linearly. After the pipe moves to the corresponding construction tunnel, the winding motor 213 works to lower the pipe, and finally the hanging sleeve 218 is manually removed from the pipe. The device of this embodiment can reduce manual handling, speed up construction efficiency, ensure stable placement of the pipe, and improve construction quality. At the same time, the above-mentioned device is also simple in structure, easy to operate, and convenient to maintain and repair.

[0025] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

[0026] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A pipe laying machine for water conservancy project construction, comprising a vehicle (100) and a pipe hanging device fixedly mounted on the vehicle (100), characterized in that: The pipe hanging device comprises a mounting base, a frame, a traveling mechanism and a lifting mechanism, wherein the mounting base is fixedly connected to the vehicle (100), the frame is fixedly connected to the mounting base, the traveling mechanism is provided on the frame, the traveling mechanism comprises a traveling platform (206) capable of linear motion, and the traveling platform (206) is provided with the lifting mechanism.

2. A pipe laying machine for water conservancy project construction according to claim 1, characterized in that: The mounting base comprises a mounting base (201), a rotating disk (202) and a driving motor. The mounting base (201) is fixedly connected to the vehicle (100). The rotating disk (202) is rotatably connected to the mounting base (201). The driving motor is also fixedly connected to the mounting base (201). The driving motor is power-connected to the rotating disk (202). The rotating disk (202) is fixedly connected to the frame.

3. A pipe laying machine for water conservancy project construction according to claim 2, characterized in that: The frame comprises a support frame (203) and a rectilinear motion frame (204) fixedly connected to the support frame (203); the support frame (203) is fixedly connected to the rotating disk (202); the rectilinear motion frame (204) is provided with the walking mechanism; a stabilizing support frame (205) is fixedly connected to the support frame (203); and a universal wheel is rotatably connected to the bottom end of the stabilizing support frame (205).

4. A pipe laying machine for water conservancy project construction according to claim 3, characterized in that: The walking mechanism further comprises a rack (207), a gear (208) and a walking motor (209); the walking platform (206) is slidably connected to the rectilinear motion frame (204); the rectilinear motion frame (204) is fixedly connected to the rack (207); the walking platform (206) is fixedly connected to the walking motor (209); the gear (208) is fixedly connected to the power shaft of the walking motor (209); and the gear (208) is meshedly connected to the rack (207).

5. The pipe laying machine for water conservancy project construction according to claim 4, characterized in that: The lifting mechanism comprises a winding motor (213), a winding wheel (214) and a sling (215); the winding motor (213) is fixedly connected to the walking platform (206); the power output end of the winding motor (213) is fixedly connected to a rotating shaft (216); two groups of winding wheels (214) are fixedly connected to the rotating shaft (216); each group of winding wheels (214) is fixedly connected to the sling (215); the sling (215) is wound around the winding wheel (214); a hanging sleeve (218) is provided at the bottom of the sling (215); a through-hole (217) is provided on the walking platform (206) to match the sling (215); the sling (215) passes through the through-hole (217); a roller is rotatably connected to the through-hole (217); and the sling (215) contacts the roller.

6. The pipe laying machine for water conservancy project construction according to claim 4, characterized in that: The straight motion frame (204) includes two groups of horizontal frames (210) arranged parallel to each other, and rail platforms (211) are fixedly connected on corresponding sides of the two groups of horizontal frames (210), and rail grooves (212) are provided on the rail platforms (211). Each group of the rail grooves (212) on the walking platform (206) is matched with rail wheels that are rotatably connected, and the rail wheels are located in the rail grooves (212).