Overwater operation platform
By designing a quick adjustment mechanism for the threaded part and the connecting sleeve on the water working platform, the problem of low connection efficiency in the existing technology is solved, the rapid adjustment of the height of the crossbar and the stability of the platform are achieved, the installation process is simplified, and the Diagonal braces are installed downstream of the river to prevent water flow from impacting.
Patent Information
- Application Number
- CN202420226107.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-30
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-01-30
AI Technical Summary
The connection efficiency of the horizontal bars and vertical bars of the existing water working platform frame is low. After installation, the height of the cross bars needs to be adjusted repeatedly, which is inconvenient to operate.
A water working platform is designed. The vertical pole is connected through a threaded part and a connecting sleeve. The height of the connecting plate is quickly adjusted by turning the threaded sleeve. The end of the crossbar is inserted horizontally into the connecting plate. A diagonal brace is set downstream of the river to prevent water flow impact. .
It achieves rapid horizontal adjustment of the crossbar and stability of the platform, simplifies the installation process, improves operational convenience, and prevents water flow impact.
Smart Images

Figure CN221919317U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of construction, in particular to an above-water operating platform. Background Art
[0002] Water working platforms are often used in bridge construction. The horizontal bars and vertical bars of the existing water working platform frames are mainly connected by clamps, which has low installation efficiency. After installation, the height of the horizontal bars must be adjusted to keep the height of all horizontal bars consistent. This requires repeatedly turning the bolts on the clamps, which is inconvenient to operate. Utility Model Content
[0003] In view of the deficiencies in the prior art, the utility model aims to provide an above-water working platform.
[0004] A water working platform, including vertical poles and cross bars connecting the vertical poles; characterized in that: two groups of vertical poles are arranged, each group of vertical poles is connected by two upper and lower rows of cross bars, and the ends of the two groups of vertical poles that are close to each other are connected by a row of cross bars; a threaded portion is provided at the upper end of the vertical pole, a threaded sleeve is connected to the threaded portion, a connecting sleeve is sleeved on the vertical pole, the lower end surface of the connecting sleeve abuts against the upper end surface of the threaded sleeve, a connecting disk is integrally formed on the connecting sleeve, and connecting portions are integrally formed at both ends of the cross bar, the connecting portion has a slot and a first connecting hole, the first connecting hole is connected to the slot, the slot is horizontally inserted into the connecting disk, the connecting disk has a second connecting hole, and pins are vertically inserted into the first connecting hole and the second connecting hole.
[0005] It is further arranged that each group of poles includes thick poles and thin poles, and the thick poles are closer to the center of the river than the thin poles.
[0006] It is further provided that wrenches are symmetrically fixed on both sides of the threaded sleeve.
[0007] It is further provided that each connection portion is provided with two first connection holes, and the two first connection holes have different shapes, and the second connection hole is provided corresponding to the first connection hole.
[0008] It is further configured that the above-water working platform further comprises an oblique support rod, the end of the oblique support rod has a connecting portion connected to the connecting plate; the oblique support rod is located at a downstream position of the river.
[0009] It is further provided that the end surface of the connecting portion is a curved surface structure and fits with the side wall of the vertical pole.
[0010] In summary, the utility model has the following beneficial effects: the scheme can quickly adjust the height of the connecting plate by rotating the threaded sleeve, thereby adjusting the end height of the cross bar to quickly achieve the horizontality of the cross bar; at the same time, a diagonal support rod is arranged downstream of the river to prevent water flow impact. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 is a side view of an above-water working platform of an embodiment;
[0012] Figure 2 2. It is a top view of the above-water working platform of the embodiment;
[0013] Figure 3 It is a connection diagram of the vertical rod and the horizontal rod in the embodiment;
[0014] Figure 4 Schematic diagram of the explosion of the vertical rod and the horizontal rod in the embodiment.
[0015] Figure numerals: 1. vertical pole; 11. threaded portion; 2. cross bar; 21. connecting portion; 211. first connecting hole; 212. slot; 3. connecting sleeve; 31. connecting plate; 311. second connecting hole; 4. latch; 5. threaded sleeve; 51. wrench; 6. diagonal support rod; 61. adjusting portion; 62. rod portion; 63. rotating shaft; 64. bolt; 7. bridge. DETAILED DESCRIPTION
[0016] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.
[0017] A water operation platform is located under a bridge 7, and includes a vertical pole 1 and a horizontal pole 2, wherein the horizontal pole 2 connects two adjacent vertical poles 1. Two groups of vertical poles 1 are arranged, and are symmetrically arranged on both sides of the center of a river. Each group of vertical poles 1 is connected by two upper and lower rows of horizontal poles 2, and the ends of the two groups of vertical poles 1 that are close to each other are connected by a row of horizontal poles 2. Each group of vertical poles 1 includes a thick vertical pole 1 and a thin vertical pole 1, and the thick vertical pole 1 is closer to the center of the river than the thin vertical pole 1.
[0018] The specific connection method of the crossbar 2 and the vertical bar 1 is as follows: a threaded portion 11 is provided at the upper end of the vertical bar 1, and a threaded sleeve 5 is connected to the threaded portion 11. A connecting sleeve 3 is sleeved on the vertical bar 1, and the lower end surface of the connecting sleeve 3 abuts against the upper end surface of the threaded sleeve 5. A connecting disk 31 is integrally formed on the connecting sleeve 3. Four groups of second connecting holes 311 are arranged on the connecting disk 31, and each group of second connecting holes 311 has two second connecting holes 311 with different shapes (circular holes and fan-shaped holes). The two ends of the crossbar 2 are integrally formed with connecting portions 21, and the connecting portion 21 is an arc-shaped block structure with an arc less than or equal to 90 degrees. The connecting portion 21 has a slot 212 and a first connecting hole 211, and the first connecting hole 211 is connected to the slot 212. Two first connecting holes 211 with different shapes are arranged in each group of first connecting holes 211 corresponding to the second connecting holes 311. When the slot 212 is horizontally inserted into the connection plate 31, the upper and lower side walls of the slot 212 abut against the upper and lower side walls of the connection plate 31, and the end surface of the connection portion 21 is preferably an arc structure, which fits the side wall of the vertical pole 1. Of course, the end surface of the connection portion 21 can also be a plane. When the connection plate 31 is matched with the slot 212, the first connection hole 211 is aligned with the second connection hole 311, and the pin 4 passes through the first connection hole 211 and the second connection hole 311 at the same time.
[0019] To facilitate the rotation of the threaded sleeve 5, wrenches 51 are symmetrically fixed on both sides of the threaded sleeve 5. For two rows of cross bars 2, two connecting sleeves 3 need to be stacked. For three rows, three connecting sleeves 3 are stacked on each vertical bar, and so on.
[0020] In order to make the platform structure more stable, a diagonal brace 6 is also arranged downstream of the river. The diagonal brace 6 includes a connecting portion 21, an adjusting portion 61 and a rod 62. The connecting portion 21 of the diagonal brace 6 has the same structure as the connecting portion 21 of the cross bar 2, and both have a first connecting hole 211. The adjusting portion 61 is a concave structure when viewed from above. The adjusting portion 61 is rotatably mounted on the connecting portion 21 through a rotating shaft 63, and the rotating axis of the adjusting portion 61 is horizontally arranged (perpendicular to the central axis of the vertical rod). The initial fixation is achieved by frictional contact between the end faces of the adjusting portion 61 and the connecting portion 21, and one end of the rod 62 is rotatably connected to the adjusting portion 61. The bolt 64 passes through the adjusting portion 61 and the rod 62 to connect the nut. The surface of the part of the bolt 64 passing through the rod 62 is smooth, and the part that matches the nut has a thread, that is, only the end of the bolt 64 has a threaded structure. This makes it convenient to adjust the angle at which the rod 62 is inserted into the riverbed mud.
[0021] During the construction of the pole 1, a raft is used to manually hammer the pole 1 into the riverbed mud. The spacing between the poles 1 in the middle of the river channel becomes larger, which is conducive to the passage of floating objects. Only one row of high cross bars 2 is set in the middle, which is also to facilitate the passage of floating objects.
Claims
1. A water working platform, comprising a vertical pole (1) and a horizontal pole (2) connecting the vertical pole (1); characterized in that: Two groups of vertical poles (1) are provided, each group of vertical poles (1) is connected by two upper and lower rows of cross bars (2), and the ends of the two groups of vertical poles (1) close to each other are connected by a row of cross bars (2); a threaded portion (11) is provided at the upper end of the vertical pole (1), a threaded sleeve (5) is connected to the threaded portion (11), a connecting sleeve (3) is sleeved on the vertical pole (1), the lower end surface of the connecting sleeve (3) abuts against the upper end surface of the threaded sleeve (5), and a connecting plate is integrally formed on the connecting sleeve (3) (31), the two ends of the cross bar (2) are integrally formed with connecting parts (21), the connecting part (21) has a slot (212) and a first connecting hole (211), the first connecting hole (211) is connected to the slot (212), the slot (212) is horizontally inserted into the connecting plate (31), the connecting plate (31) has a second connecting hole (311), and the first connecting hole (211) and the second connecting hole (311) are vertically inserted into the plug pin (4).
2. The above-water working platform according to claim 1, characterized in that: Each group of vertical poles (1) comprises a thick vertical pole (1) and a thin vertical pole (1), and the thick vertical pole (1) is closer to the center of the river than the thin vertical pole (1).
3. The above-water working platform according to claim 1, characterized in that: Wrenches (51) are symmetrically fixed on both sides of the threaded sleeve (5).
4. The above-water working platform according to claim 1, characterized in that: Each connection portion (21) is provided with two first connection holes (211), and the two first connection holes (211) have different shapes, and the second connection hole (311) is provided corresponding to the first connection hole (211).
5. The above-water working platform according to claim 1, characterized in that: The above-water working platform further comprises an oblique support rod (6), the end of which comprises a connecting portion (21) connected to a connecting plate (31); the oblique support rod (6) is located at a downstream position of the river.
6. The above-water working platform according to claim 1, characterized in that: The end surface of the connecting portion (21) is a curved surface structure and fits in place with the side wall of the upright pole (1).