Novel prefabricated PHC pipe pile
By designing a stable and clamping structure in the prefabricated PHC pipe piles, the problems of tilt and misalignment during installation are solved, the stability and safety of the pipe piles are improved, and construction safety and installation efficiency are ensured.
Patent Information
- Application Number
- CN202420276825.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-05
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-05
AI Technical Summary
Existing prefabricated PHC pipe piles are prone to tilting and dislocation during installation, resulting in low docking efficiency and potential safety hazards. Especially under the action of earthquakes or external loads, they may cause displacement or toppling, affecting safety.
A new type of prefabricated PHC pipe pile is designed, which adopts a stable structure and a clamping structure, including a base, a bottom cone, a slider, a clamping claw, a sliding plate, a connecting rod, a screw, a limit plate, a worm gear, a worm, a turntable, and a limit stick. , springs and paddles. The combination of these structures ensures that the pipe pile remains stable during installation, prevents shaking or sideways movement, and provides stable clamping under working conditions.
It improves the verticality and stability of the pipe pile, reduces the safety hazards caused by the displacement or toppling of the pile body, enhances the construction safety and installation accuracy, and reduces the possibility of accidents.
Smart Images

Figure CN221919367U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipe piles, in particular to a novel prefabricated PHC pipe pile. Background Art
[0002] Prefabricated PHC piles, or prestressed high-strength concrete piles, are a type of prefabricated component widely used in pile foundation projects. With the rapid development of high-rise buildings and large-scale infrastructure, the demand for prefabricated PHC piles continues to increase, and its production technology and application areas are also constantly expanding.
[0003] The traditional production process of prefabricated PHC piles mainly adopts the centrifugal forming process. Through the high-speed rotation of the centrifuge, the concrete fills the mold under the action of centrifugal force to form the shape of the pile. In this process, prestressing needs to be applied to increase the bearing capacity and crack resistance of the pile. The centrifugal forming process has the advantages of high production efficiency and low cost, but it also has some limitations, such as high requirements for raw materials and defects that are prone to occur during the production process.
[0004] In order to overcome the limitations of the traditional centrifugal forming process, some new prefabricated PHC pile production technologies have emerged in recent years. For example, a technology called "static pressure forming process" has gradually attracted attention. This process uses static pressure rather than centrifugal force to form the piles, which can better control the density and uniformity of concrete, thereby improving the quality and performance of the piles. In addition, some new production processes use composite pile technology, that is, by coating the inner wall of the pile with an anti-corrosion coating or adding an inner liner to improve the durability and strength of the pile.
[0005] In terms of application, the application field of prefabricated PHC piles is also expanding. In addition to the traditional construction field, prefabricated PHC piles have also been widely used in bridges, ports, docks, water conservancy, municipal engineering and other projects. In these projects, the high strength, high durability and seismic performance of prefabricated PHC piles have been fully demonstrated, providing a strong guarantee for the safety and stability of the project.
[0006] In summary, the background technology of prefabricated PHC piles is a process of continuous development and innovation. New production technologies and the expansion of application fields provide more opportunities and challenges for the development of prefabricated PHC piles. In the future, with the advancement of technology and the increase in application demand, the performance and quality of prefabricated PHC piles will be further improved, providing better solutions for more fields and projects.
[0007] For example, a Chinese utility model patent (CN217204024U) discloses a prefabricated PHC pipe pile, which solves the following problems: the existing PHC pipe piles are prone to tilt during installation and are prone to misalignment when the pipe piles are connected, resulting in slow docking efficiency and affecting construction efficiency.
[0008] The device comprises a pipe pile body, a pile tip is fixedly provided at the bottom of the pipe pile body, a movable sleeve is provided on the pipe pile body, connecting rods are symmetrically fixedly provided on both sides of the movable ring, a supporting rod is fixedly provided at the bottom of the end of the connecting rod away from the movable ring, a fixing rod is fixedly provided at the bottom of the supporting rod, a plurality of moving rods are movably inserted in an annular shape in the top of the pipe pile body, a connecting block is fixedly provided at one end of the moving rod located in the pipe pile body, a moving groove used in conjunction with the connecting block is fixedly provided in the pipe pile body, a spring is movably provided on the moving rod between the connecting block and the moving mast, a mounting block is fixedly provided at the end of the moving rod away from the connecting block, and an extrusion block is fixedly provided on the top of the mounting block. The utility model can avoid the tilting of the pipe pile body during the piling process and improve the docking efficiency of the pipe piles.
[0009] When using the above technology, we found the following technical problems in the prior art: the device does not have an appropriate clamping structure, which may pose certain safety hazards. Under the action of earthquakes or other external loads, the pipe piles may shift or topple, posing a threat to the safety of surrounding personnel and structures. To this end, we designed a new type of prefabricated PHC pipe pile to provide another technical solution to the above technical problems. Utility Model Content
[0010] Based on this, it is necessary to provide a new type of prefabricated PHC pipe pile to solve the problems raised in the above background technology.
[0011] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0012] A novel prefabricated PHC pipe pile comprises a pipe pile body, wherein a stabilizing structure is arranged at the bottom end of the outer side of the pipe pile body, a clamping structure is arranged at the top of the stabilizing structure, and a locking structure is arranged at one side of the clamping structure.
[0013] As a preferred embodiment of the novel prefabricated PHC pipe pile provided by the utility model, the stabilizing structure includes a base and a bottom cone, the bottom end of the outer side of the pipe pile body is sleeved and connected with the base, and six bottom cones are evenly fixed at the bottom of the base.
[0014] As a preferred embodiment of the novel prefabricated PHC pipe pile provided by the utility model, the clamping structure includes a slider, a clamping claw and a slide plate, both sides of the top of the base are slidably connected with sliders, the tops of the two sliders are fixed with clamping claws, and one side of the two clamping claws is fixed with a slide plate.
[0015] As a preferred embodiment of the novel prefabricated PHC pipe pile provided by the utility model, the clamping structure also includes a connecting rod, a first screw rod, a second screw rod and a limit plate, and limit plates are fixed on both sides of the top of the pipe pile body, one side of one of the limit plates is rotatably connected to the second screw rod, one side of the second screw rod is fixed to the connecting rod, one side of the connecting rod is fixed to the first screw rod, and the first screw and the other limit plate are rotatably connected.
[0016] As a preferred embodiment of the novel prefabricated PHC pile provided by the utility model, the first screw and the second screw have opposite thread directions, and the first screw and the second screw are respectively threadedly connected to the two slide plates.
[0017] As a preferred embodiment of the novel prefabricated PHC pile provided by the utility model, the locking structure includes a worm wheel and a worm, a worm wheel is fixed to the outer side of the connecting rod, a worm is meshingly connected to one side of the worm wheel, and the worm is rotatably connected to the base.
[0018] As a preferred embodiment of the new prefabricated PHC pipe pile provided by the utility model, the locking structure also includes a turntable, a limit stick, a spring and a paddle. A turntable is fixed to the outside of the worm, a limit stick is slidably connected to one side of the top of the base, a paddle is fixed to the upper end of the outside of the limit stick, a spring is sleeved on the outside of the limit stick, the top of the spring is fixed to the paddle, the bottom of the spring is fixed to the base, and the limit stick is plug-connected to the turntable.
[0019] It can be seen without a doubt that the above-mentioned technical solution of the present application can definitely solve the technical problem to be solved by the present application.
[0020] At the same time, through the above technical solutions, the utility model has at least the following beneficial effects:
[0021] The utility model provides a novel prefabricated PHC pipe pile. The device, through the design of a stabilizing structure and a locking structure, keeps the pipe pile stable during installation to prevent it from shaking or lateral displacement, which helps to improve the verticality and stability of the pipe pile and reduce the possibility of pile body bending.
[0022] The clamping structure of the device is designed to ensure the stability of the prefabricated PHC piles under various working conditions, reducing the potential safety hazards caused by pile displacement or tipping, which helps protect the safety of construction workers and reduce the possibility of accidents. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 This is a schematic diagram of the overall structure of a new type of prefabricated PHC pipe pile of the utility model;
[0025] Figure 2 This is a schematic diagram of the connection between a new type of prefabricated PHC pile base and a sliding block of the utility model;
[0026] Figure 3 This is a schematic diagram of the connection between a new type of prefabricated PHC pile base and a bottom cone of the utility model;
[0027] Figure 4 The utility model is a schematic diagram of the connection between the worm wheel and the worm of a new type of prefabricated PHC pipe pile.
[0028] In the figure: 1. pipe pile body; 2. base; 3. bottom cone; 4. slider; 5. clamping claw; 6. slide plate; 7. connecting rod; 8. first screw; 9. second screw; 10. limit plate; 11. worm gear; 12. worm; 13. turntable; 14. limit stick; 15. spring; 16. pick. DETAILED DESCRIPTION
[0029] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0030] As described in the background art, the device does not have an appropriate clamping structure and may have certain safety hazards. Under the action of an earthquake or other external loads, the pipe pile may shift or topple, posing a threat to the safety of surrounding personnel and structures.
[0031] In order to solve this technical problem, the utility model provides a novel prefabricated PHC pipe pile.
[0032] Specifically, please refer to Figure 1-Figure 4 A novel prefabricated PHC pipe pile specifically includes: a pipe pile body 1, a stabilizing structure is arranged at the bottom end of the outer side of the pipe pile body 1, a clamping structure is arranged at the top of the stabilizing structure, and a locking structure is arranged at one side of the clamping structure.
[0033] The utility model provides a novel prefabricated PHC pipe pile. The device, through the design of a stabilizing structure and a locking structure, keeps the pipe pile stable during installation to prevent it from shaking or lateral displacement, which helps to improve the verticality and stability of the pipe pile and reduce the possibility of pile body bending.
[0034] The clamping structure of the device is designed to ensure the stability of the prefabricated PHC piles under various working conditions, reducing the potential safety hazards caused by pile displacement or tipping, which helps protect the safety of construction workers and reduce the possibility of accidents.
[0035] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features and technical solutions in the embodiments may be combined with each other.
[0036] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0037] Reference Figure 1-Figure 4 A novel prefabricated PHC pipe pile comprises a pipe pile body 1, a stabilizing structure is arranged at the bottom end of the outer side of the pipe pile body 1, a clamping structure is arranged at the top of the stabilizing structure, and a locking structure is arranged at one side of the clamping structure.
[0038] The stable structure includes a base 2 and a bottom cone 3. The bottom end of the outer side of the pipe pile body 1 is sleeved and connected with the base 2. Six bottom cones 3 are evenly fixed at the bottom of the base 2 so that the bottom cones 3 can be nailed into the ground.
[0039] The clamping structure includes a slider 4, a clamping jaw 5, a slide plate 6, a connecting rod 7, a first screw rod 8, a second screw rod 9 and a limit plate 10. The sliders 4 are slidably connected to both sides of the top of the base 2, the clamping jaws 5 are fixed to the tops of the two sliders 4, and the slide plate 6 is fixed to one side of the two clamping jaws 5. The limit plates 10 are fixed to both sides of the top of the pipe pile body 1, one side of one of the limit plates 10 is rotatably connected to the second screw rod 9, the connecting rod 7 is fixed to one side of the second screw rod 9, and the first screw rod 8 is fixed to one side of the connecting rod 7. The first screw rod 8 and the other limit plate 10 are rotatably connected, so that the clamping structure can clamp the pipe pile body 1.
[0040] The first screw rod 8 and the second screw rod 9 have opposite thread rotation directions. The first screw rod 8 and the second screw rod 9 are respectively threadedly connected to the two slide plates 6, so that the rotation of the first screw rod 8 and the second screw rod 9 drives the two slide plates 6 to move closer to or away from each other.
[0041] The locking structure includes a worm wheel 11, a worm 12, a turntable 13, a limit rod 14, a spring 15 and a paddle 16. The worm wheel 11 is fixed to the outer side of the connecting rod 7, and the worm 12 is meshed on one side of the worm wheel 11. The worm 12 is rotatably connected to the base 2, and the turntable 13 is fixed to the outer side of the worm 12. The limit rod 14 is slidably connected to one side of the top of the base 2, and the paddle 16 is fixed to the upper end of the outer side of the limit rod 14. The outer side of the limit rod 14 is sleeved with a spring 15, the top of the spring 15 is fixed to the paddle 16, the bottom of the spring 15 is fixed to the base 2, and the limit rod 14 and the turntable 13 are plug-connected, so that the locking structure can limit the clamping structure.
[0042] The utility model provides a novel prefabricated PHC pipe pile. The device, through the design of a stabilizing structure and a locking structure, keeps the pipe pile stable during installation to prevent it from shaking or lateral displacement, which helps to improve the verticality and stability of the pipe pile and reduce the possibility of pile body bending.
[0043] The clamping structure of the device is designed to ensure the stability of the prefabricated PHC piles under various working conditions, reducing the potential safety hazards caused by pile displacement or tipping, which helps protect the safety of construction workers and reduce the possibility of accidents.
[0044] The use process of a novel prefabricated PHC pipe pile provided by the utility model is as follows: when installing the pipe pile body 1, the user first presses the base 2 and the bottom cone 3 downward to fix them at the installation position, and then slides the pipe pile body 1 into the ground through the through hole inside the base 2. The user presses the paddle 16 to compress the spring 15 and drive the limit rod 14 to slide into the inside of the base 2 to disengage the plug-in connection with the turntable 13. Then the user rotates the turntable 13 to drive the worm 12 to rotate. Since one side of the worm 12 is meshed with the worm wheel 11, the rotation of the worm 12 drives the worm wheel 11 and the connecting rod 14 to rotate. The connecting rod 7 rotates, thereby driving the first screw rod 8 and the second screw rod 9 to rotate. Since the threads of the first screw rod 8 and the second screw rod 9 have opposite rotation directions and are both threadedly connected with the slide plate 6, the rotation of the first screw rod 8 and the second screw rod 9 drives the two slide plates 6 to move closer to or away from each other, thereby enabling the two slide plates 6 to clamp the pile body 1. The prefabricated PHC pile has a suitable clamping structure during installation, which can bring many advantages, including improving stability, enhancing bearing capacity, improving installation accuracy, improving construction efficiency and reducing safety hazards, thereby ensuring the smooth installation and reliable use of the prefabricated PHC pile.
[0045] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and the specification only describe the principles of the utility model. The utility model may be subject to various changes and improvements without departing from the spirit and scope of the utility model. These changes and improvements fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A novel prefabricated PHC pile, comprising a pile body (1), It is characterized in that The bottom end of the outer side of the pipe pile body (1) is provided with a stabilizing structure, the top of the stabilizing structure is provided with a clamping structure, and one side of the clamping structure is provided with a locking structure. The stabilizing structure comprises a base (2) and a bottom cone (3). The bottom end of the outer side of the pipe pile body (1) is sleeve-connected with the base (2), and six bottom cones (3) are evenly fixed at the bottom of the base (2). The clamping structure comprises a slider (4), a clamping claw (5) and a slide plate (6). Both sides of the top of the base (2) are slidably connected with the sliders (4), the tops of the two sliders (4) are fixed with clamping claws (5), and one side of the two clamping claws (5) is fixed with a slide plate (6). The clamping structure also comprises a connecting rod (7), a first screw rod (8), a second screw rod (9) and a limiting plate (10). Both sides of the top of the pipe pile body (1) are fixed with limiting plates (10), one side of one of the limiting plates (10) is rotatably connected with the second screw rod (9), and one side of the second screw rod (9) is fixed with the connecting rod (7). ), a first screw rod (8) is fixed on one side of the connecting rod (7), the first screw rod (8) is rotatably connected to the other limiting plate (10), the locking structure comprises a worm wheel (11) and a worm (12), a worm wheel (11) is fixed on the outer side of the connecting rod (7), a worm wheel (12) is meshingly connected to one side of the worm wheel (11), the worm (12) is rotatably connected to the base (2), the locking structure also comprises a rotating disk (13), a limiting rod (14), a spring (15 ) and a paddle (16), a turntable (13) is fixed on the outer side of the worm (12), a limiting rod (14) is slidably connected to one side of the top of the base (2), a paddle (16) is fixed to the upper end of the outer side of the limiting rod (14), a spring (15) is sleeve-connected to the outer side of the limiting rod (14), the top of the spring (15) is fixed to the paddle (16), the bottom of the spring (15) is fixed to the base (2), and the limiting rod (14) and the turntable (13) are plug-connected.
2. A novel prefabricated PHC pile according to claim 1, It is characterized in that The first screw rod (8) and the second screw rod (9) have opposite thread rotation directions, and the first screw rod (8) and the second screw rod (9) are respectively threadedly connected to the two slide plates (6).