Efficient concrete prefabricated component connecting device
By using the bolted fit of screw holes and bolts in the connection device of concrete precast components, combined with the design of slots, clamping plates, fixing rings, bumps and insulation layers, the problem of high installation difficulty of concrete precast components is solved and achieved More stable and durable connection effect.
Patent Information
- Application Number
- CN202420492926.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-13
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-13
AI Technical Summary
Existing concrete precast components are difficult to install in the construction area, especially due to the complexity of connecting steel bars and holes, which makes installation inconvenient.
A high-efficiency concrete prefabricated component connection device is designed, which is bolted by setting screw holes and bolts between the first casing and the second casing, and setting slots, clamping plates, fixing rings, and bumps on the pipe wall. , spring sheets and insulation layer to enhance the stability and protection of the connection.
It reduces the difficulty of connecting and installing concrete precast components, improves the stability and durability of the connection, and effectively prevents corrosion especially in humid environments.
Smart Images

Figure CN221919806U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of prefabricated concrete components, in particular to a high-efficiency prefabricated concrete component connecting device. Background Art
[0002] Precast concrete components are concrete components that are prefabricated in factories or construction sites using concrete and steel bars. They have the characteristics of fast production speed, easy installation and use, and standard specifications. They are currently widely used in the construction field.
[0003] During the production of existing precast concrete components, corresponding molds can be used according to actual needs to cast steel bars and concrete in the molds, and then the precast components are transported to the installation location and connected together. During long-term use and observation, it is found that when existing precast concrete components are installed in the construction area, they are usually connected through reserved steel bars and holes and then poured with concrete or welded together, which leads to the problem of high installation difficulty and inconvenience.
[0004] To this end, the utility model provides a high-efficiency prefabricated concrete component connecting device. Utility Model Content
[0005] In order to make up for the deficiencies of the prior art and solve at least one problem raised in the background technology, a high-efficiency precast concrete component connecting device is proposed.
[0006] The technical solution adopted by the utility model to solve its technical problem is: the utility model describes an efficient precast concrete component connection device, comprising a first sleeve; the inner side wall of the first sleeve is sleeved with a second sleeve; the side walls of the first sleeve and the second sleeve are both provided with a plurality of screw holes; bolts are connected in the screw holes; the bolts and the screw holes are bolted together; in this step, the first sleeve is arranged inside the precast concrete component and the second sleeve is arranged outside the precast concrete component, and when connecting, the second sleeve is directly sleeved into the first sleeve and then the second sleeve and the first sleeve are bolted together by bolts to connect the precast concrete components together, so as to reduce the installation difficulty during connection and facilitate the connection, installation and use of the precast concrete components.
[0007] Preferably, the inner side wall of the first sleeve and the side wall of the second sleeve are both provided with a plurality of slots; the inner side wall of the first sleeve and the side wall of the second sleeve are both fixedly connected with a plurality of clamping plates; the clamping plates and the slots are arranged alternately; in this step, by arranging the slots and the clamping plates to be pressed against each other when the first sleeve and the second sleeve are sleeved together, the contact surface between the first sleeve and the second sleeve can be increased to improve the position stability when the second sleeve is connected to the first sleeve.
[0008] Preferably, a plurality of fixing rings are fixedly connected to the inner wall of the second sleeve; the fixing rings are aligned with the screw holes; in this step, by setting the fixing rings to be clamped in the middle of the bolt when the bolt is bolted to the screw hole, the situation in which the bolt position moves up and down or left and right after bolting, resulting in a reduction in the bolting effect, can be reduced.
[0009] Preferably, a plurality of protrusions are fixedly connected to the top and bottom of the second sleeve; the protrusions are located between the card slot and the card plate; this step can reduce the gap between the first sleeve and the second sleeve by setting the protrusions, increase the friction between the first sleeve and the second sleeve when the first sleeve and the second sleeve are fitted together, and make the position of the first sleeve and the second sleeve more stable when they are connected to each other.
[0010] Preferably, a plurality of spring sheets are fixedly connected to the inner side wall of the fixing ring; the spring sheets are arranged in an arc shape; in this step, by arranging the spring sheets to contact the middle part of the bolt, the rebound force generated by the deformation of the spring sheets can make the position of the bolt more stable, so as to reduce the situation where the bolt position moves up and down or left and right and causes looseness.
[0011] Preferably, a pair of insulation layers are fixedly connected to the side wall of the second sleeve; the pair of insulation layers are symmetrically arranged; this step plays a protective role by arranging the insulation layer between the first sleeve and the second sleeve after the first sleeve and the second sleeve are sleeved together, which can reduce the situation in which moisture is conducted to the inside of the second sleeve in a humid environment, thereby corroding internal parts.
[0012] The beneficial effects of the utility model are as follows:
[0013] 1. The utility model discloses a high-efficiency precast concrete component connection device, which is configured such that a first sleeve is located inside the precast concrete component and a second sleeve is located outside the precast concrete component. When connecting, the second sleeve is directly inserted into the first sleeve and then the second sleeve and the first sleeve are bolted together by bolts to connect the precast concrete components together, so as to reduce the installation difficulty during connection and facilitate the connection, installation and use of the precast concrete components.
[0014] 2. The utility model discloses a high-efficiency precast concrete component connection device, which increases the contact surface between the first sleeve and the second sleeve by arranging a clamping groove and a clamping plate to press the first sleeve and the second sleeve together when the first sleeve and the second sleeve are sleeved together, so as to improve the position stability when the second sleeve and the first sleeve are connected. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The utility model will be further described below in conjunction with the accompanying drawings.
[0016] Figure 1 It is a stereogram in the utility model;
[0017] Figure 2 It is a cross-sectional view in the utility model;
[0018] Figure 3 It is a schematic diagram of the matching structure of the card slot and the card plate in the utility model;
[0019] Figure 4 It is a schematic diagram of the matching structure of the fixing ring and the spring sheet in the utility model;
[0020] Figure 5 This is a schematic diagram of the sealing ring structure in the utility model
[0021] Legend:
[0022] 1. First sleeve; 11. Second sleeve; 12. Screw hole; 13. Bolt; 2. Slot; 21. Clamp plate; 3. Fixing ring; 4. Bump; 5. Spring sheet; 6. Insulation layer; 7. Sealing ring. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] Specific examples are given below.
[0025] like Figures 1 to 3 As shown, an efficient concrete precast component connection device described in an embodiment of the utility model comprises a first sleeve 1; the inner side wall of the first sleeve 1 is sleeved with a second sleeve 11; the side walls of the first sleeve 1 and the second sleeve 11 are both provided with a plurality of screw holes 12; bolts 13 are connected in the screw holes 12; the bolts 13 and the screw holes 12 are bolted together; when working, when pouring the concrete precast component, the first sleeve 1 is poured inside the concrete precast component, the second sleeve 11 is poured outside the concrete precast component, and the second sleeve 11 is inserted into the first sleeve 1 when connecting. The screw holes 12 on the first sleeve 1 and the second sleeve 11 are aligned in the first sleeve 1, and then the bolts 13 are bolted into the screw holes 12 to complete the connection of the precast concrete component. In this step, the first sleeve 1 is arranged inside the precast concrete component and the second sleeve 11 is arranged outside the precast concrete component. When connecting, the second sleeve 11 is directly inserted into the first sleeve 1 and then the second sleeve 11 and the first sleeve 1 are bolted together by the bolts 13 to reduce the installation difficulty during connection and facilitate the connection, installation and use of the precast concrete components.
[0026] like Figures 1 to 3As shown, the inner side wall of the first sleeve 1 and the side wall of the second sleeve 11 are both provided with a plurality of slots 2; the inner side wall of the first sleeve 1 and the side wall of the second sleeve 11 are both fixedly connected with a plurality of clamping plates 21; the clamping plates 21 and the slots 2 are arranged alternately; during operation, when the second sleeve 11 is inserted into the first sleeve 1, the slots 2 opened on the first sleeve 1 and the clamping plates 21 raised on the second sleeve 11 are respectively aligned with the protrusion on the first sleeve 1 and the slots 2 opened on the second sleeve 11, and then the second sleeve 11 is inserted into the first sleeve 1. When the fitting is completed, the slots 2 and the clamping plates 21 will be pressed together. In this step, by setting the slots 2 and the clamping plates 21 to be pressed together when the first sleeve 1 and the second sleeve 11 are fitted together, the contact surface between the first sleeve 1 and the second sleeve 11 can be increased to improve the position stability of the second sleeve 11 when it is connected to the first sleeve 1.
[0027] like Figure 2 and Figure 4 As shown, a plurality of fixing rings 3 are fixedly connected to the inner wall of the second sleeve 11; the fixing ring 3 and the screw hole 12 are aligned; during operation, when the bolt 13 is bolted to the screw hole 12, the fixing ring 3 is aligned with the screw hole 12 and the bolt 13 passes through the fixing ring 3. When the bolting is completed, the fixing ring 3 is clamped in the middle of the bolt 13, and the situation that the position of the bolt 13 moves up and down or left and right can be reduced by clamping in the middle of the bolt 13. In this step, the fixing ring 3 is clamped in the middle of the bolt 13 when the bolt 13 is bolted to the screw hole 12, and the situation that the bolt 13 moves up and down or left and right after bolting and the bolting effect is reduced can be reduced.
[0028] like Figure 2 As shown, a plurality of protrusions 4 are fixedly connected to the top and bottom of the second sleeve 11; the protrusions 4 are located between the card slot 2 and the card plate 21; during operation, when the second sleeve 11 is fitted with the first sleeve 1, the inner wall of the first sleeve 1 will contact the side wall of the second sleeve 11, and the protrusions 4 will contact the inner wall of the first sleeve 1 to reduce the gap between the first sleeve 1 and the second sleeve 11, and increase the friction between the first sleeve 11 and the second sleeve 11 to make the connection between the first sleeve 1 and the second sleeve 11 more stable. In this step, the protrusions 4 are provided to reduce the gap between the first sleeve 1 and the second sleeve 11, and increase the friction between the first sleeve 1 and the second sleeve 11 when the first sleeve 1 and the second sleeve 11 are fitted, so that the position of the first sleeve 1 and the second sleeve 11 when connected to each other can be more stable.
[0029] like Figure 4As shown, a plurality of spring sheets 5 are fixedly connected to the inner side wall of the fixing ring 3; the spring sheets 5 are arranged in an arc shape; during operation, when the middle part of the bolt 13 passes through the fixing ring 3, the side wall of the bolt 13 will contact the spring sheet 5 on the inner side wall of the fixing ring 3, and when the bolt 13 is bolted, its side wall will squeeze the spring sheet 5 to deform it, and the rebound force generated by the deformation of the spring sheet 5 can reversely squeeze the bolt 13, so that the position of the bolt 13 can be more stable. In this step, by setting the spring sheet 5 to contact the middle part of the bolt 13, the rebound force generated by the deformation of the spring sheet 5 can make the position of the bolt 13 more stable, so as to reduce the situation where the bolt 13 moves up and down or left and right and causes loosening.
[0030] like Figure 2 As shown, a pair of insulation layers 6 are fixedly connected to the side wall of the second sleeve 11; the pair of insulation layers 6 are symmetrically arranged; during operation, when the first sleeve 1 and the second sleeve 11 are fitted together, the insulation layer 6 will simultaneously enter the interior of the first sleeve 1, and at this time, the insulation layer 6 will be located between the side wall of the second sleeve 11 and the inner wall of the first sleeve 1. When the building is relatively humid, the insulation layer 6 can reduce the situation where moisture enters the second sleeve 11 and causes corrosion of the internal structure. This step plays a protective role by arranging the insulation layer 6 between the first sleeve 1 and the second sleeve 11 after the first sleeve 1 and the second sleeve 11 are fitted together, which can reduce the situation where moisture is conducted to the inside of the second sleeve 11 in a humid environment, thereby corroding internal parts.
[0031] like Figure 5 As shown, a plurality of sealing rings 7 are fixedly connected to the side wall of the first sleeve 1; the sealing ring 7 is aligned with the screw hole 12; during operation, the sealing ring 7 is aligned with the screw hole 12 and is outside the screw hole 12. When the bolt 13 is bolted to the screw hole 12, one side of the bolt 13 will contact the sealing ring 7 to reduce the gap between the bolt 13 and the first sleeve 1. In this step, the sealing ring 7 is arranged to reduce the gap between the side wall of the bolt 13 and the side wall of the first sleeve 1 when the bolt 13 is bolted to the screw hole 12, and the moisture entering the first sleeve 1 from the gap between the bolt 13 and the first sleeve 1 in a humid environment to cause corrosion.
[0032] Working principle: When pouring the precast concrete component, the first sleeve 1 is poured inside the precast concrete component, and the second sleeve 11 is poured outside the precast concrete component. When connecting, the second sleeve 11 is inserted into the first sleeve 1 so that the screw holes 12 on the first sleeve 1 and the second sleeve 11 are aligned, and then the bolts 13 are bolted into the screw holes 12 to complete the connection of the precast concrete component. When the second sleeve 11 is inserted into the first sleeve 1, the slots 2 on the first sleeve 1 and the raised plates 21 on the second sleeve 11 are respectively aligned. The protrusion on the first sleeve 1 is aligned with the slot 2 opened on the second sleeve 11, and then the second sleeve 11 is inserted into the first sleeve 1. When the sleeve is completed, the slot 2 and the clamping plate 21 will be pressed together. When the bolt 13 is bolted to the screw hole 12, the fixing ring 3 is aligned with the screw hole 12. At this time, the bolt 13 will pass through the fixing ring 3. When the bolting is completed, the fixing ring 3 will be clamped in the middle of the bolt 13. By clamping in the middle of the bolt 13, the bolt 13 can be prevented from moving up and down or left and right. When the second sleeve 11 is sleeved with the first sleeve 1, the fixing ring 3 is aligned with the screw hole 12. At this time, the bolt 13 will pass through the fixing ring 3. When the bolting is completed, the fixing ring 3 will be clamped in the middle of the bolt 13. By clamping in the middle of the bolt 13, the bolt 13 can be prevented from moving up and down or left and right. When the first sleeve 1 is closed, the inner wall of the first sleeve 1 will contact the side wall of the second sleeve 11. At this time, the protrusion 4 will contact the inner wall of the first sleeve 1 to reduce the gap between the first sleeve 1 and the second sleeve 11, which can increase the friction between the first sleeve 1 and the second sleeve 11, so that the connection between the first sleeve 1 and the second sleeve 11 is more stable. When the middle part of the bolt 13 passes through the fixing ring 3, the side wall of the bolt 13 will contact the spring sheet 5 on the inner side wall of the fixing ring 3. When the bolt 13 is bolted, its side wall will squeeze the spring sheet 5 to deform it. The rebound force generated by the deformation of the spring sheet 5 can reversely squeeze the bolt 13, which can The position of the bolt 13 is made more stable. When the first sleeve 1 and the second sleeve 11 are fitted together, the insulation layer 6 will enter the first sleeve 1 at the same time. At this time, the insulation layer 6 will be located between the side wall of the second sleeve 11 and the inner wall of the first sleeve 1. When the building is relatively humid, the insulation layer 6 can reduce the moisture from entering the second sleeve 11 and causing corrosion of the internal structure. The sealing ring 7 is aligned with the screw hole 12 and is on the outside of the screw hole 12. When the bolt 13 is bolted to the screw hole 12, one side of the bolt 13 will contact the sealing ring 7 to reduce the gap between the bolt 13 and the first sleeve 1.
[0033] The above shows and describes the basic principles, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A high-efficiency precast concrete component connection device, comprising a first sleeve (1); characterized in that: The second sleeve (11) is sleeved on the inner wall of the first sleeve (1); the side walls of the first sleeve (1) and the second sleeve (11) are both provided with a plurality of screw holes (12); bolts (13) are connected in the screw holes (12); the bolts (13) and the screw holes (12) are bolted together.
2. The high-efficiency precast concrete component connection device according to claim 1, characterized in that: The inner side wall of the first sleeve (1) and the side wall of the second sleeve (11) are both provided with a plurality of clamping grooves (2); the inner side wall of the first sleeve (1) and the side wall of the second sleeve (11) are both fixedly connected with a plurality of clamping plates (21); the clamping plates (21) and the clamping grooves (2) are arranged in a staggered manner.
3. The high-efficiency precast concrete component connection device according to claim 2, characterized in that: A plurality of fixing rings (3) are fixedly connected to the inner wall of the second sleeve (11); the fixing rings (3) and the screw holes (12) are aligned with each other.
4. The high-efficiency precast concrete component connection device according to claim 3, characterized in that: A plurality of protrusions (4) are fixedly connected to the top and bottom of the second sleeve (11); the protrusions (4) are located between the card slot (2) and the card plate (21).
5. The high-efficiency precast concrete component connection device according to claim 4, characterized in that: A plurality of spring sheets (5) are fixedly connected to the inner side wall of the fixing ring (3); the spring sheets (5) are arranged in an arc shape.
6. The high-efficiency precast concrete component connection device according to claim 5, characterized in that: A pair of thermal insulation layers (6) are fixedly connected to the side wall of the second sleeve (11); the pair of thermal insulation layers (6) are symmetrically arranged.