Coke feeding and conveying system
By designing the coke feeding and conveying system and using the distributor to switch the coke supply between the second conveyor belt and the third conveyor belt, the problem of coke accumulation or lack of material in blast furnace production is solved, and efficient coke supply and storage control are achieved. .
Patent Information
- Application Number
- CN202323454911.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-18
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-18
AI Technical Summary
The existing coke supply system has problems with coke accumulation or material shortage during blast furnace production, making it difficult to achieve real-time control and affecting the smooth progress of production.
A coke feeding and conveying system is designed, including a first conveyor belt, a second conveyor belt, a third conveyor belt, a distributor, a trough and a conveying elevated frame. The second conveyor belt and the third conveyor belt are connected through the distributor. Switch coke supply between blast furnaces and silos to achieve real-time switching to ensure matching of coke supply and storage.
It improves the efficiency of coke supply and transportation, meets the blast furnace production needs, realizes real-time control of coke supply and storage, and avoids coke accumulation or material shortage.
Smart Images

Figure CN221923558U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of coke feeding, and more specifically relates to a coke feeding and conveying system. Background Art
[0002] During the coke sintering process in the blast furnace, the required amount of coke is often supplied regularly. The existing coke supply relies on vehicles. Due to the different supply periods of vehicles, there are some times when the supply of coke is concentrated and the coke supply is greater than the blast furnace needs. This part of the coke needs to be sent to the silo for storage.
[0003] In the prior art, the above problem is mostly solved by manually coordinating the delivery positions of vehicles. However, the above method has the problem of time lag, which can easily cause the accumulation of coke or shortage of materials at the blast furnace position, and it is difficult to adjust the supply of coke in real time, thus affecting the smooth progress of production. Utility Model Content
[0004] The utility model aims to provide a coke feeding and conveying system, which can carry out material-by-material conveying on the supplied coke, so as to meet the production requirements of blast furnaces, realize the effective storage of excess coke, and meet different coke feeding rates.
[0005] To achieve the above-mentioned purpose, the technical solution adopted by the utility model is: to provide a coke feeding and conveying system, including a first conveyor belt, a second conveyor belt, a third conveyor belt, a distributor, a ore trough, a conveying platform and a silo, the feeding end of the first conveyor belt is provided with a feeding hopper; the second conveyor belt and the third conveyor belt are respectively connected to the discharging end of the first conveyor belt; the distributor is arranged at the discharging end of the first conveyor belt, and the distributor has a first state for connecting the first conveyor belt and the second conveyor belt and a second state for connecting the first conveyor belt and the third conveyor belt; the discharging end of the third conveyor belt extends into the ore trough for feeding into the ore trough; the conveying platform is arranged between the ore trough and the blast furnace for supplying coke from the ore trough to the blast furnace; the second conveyor belt extends to the silo.
[0006] In a possible implementation, the feed hopper includes a first feed hopper and a second feed hopper, a dumper for unloading coke from a coke transport vehicle is provided above the first feed hopper, and the second feed hopper is used to receive coke unloaded from a dump truck.
[0007] In some embodiments, two first feed hoppers and two tippers are respectively provided, and the two first feed hoppers and the two tippers are provided in one-to-one correspondence.
[0008] In one possible implementation, the distributor includes a distributor hopper and two distributor chutes connected to the bottom of the distributor hopper, the lower mouth of the distributor hopper is open, the two distributor chutes are symmetrically arranged below the distributor hopper, the second conveyor belt is located below the distributor chute, and two swing plates corresponding to the two distributor chutes are hinged in the distributor hopper, and the swing plates are used to open the distributor chute to allow the coke in the distributor hopper to enter the distributor chute, or to block the distributor chute to allow the coke to fall onto the third conveyor belt.
[0009] In a possible implementation, the extension directions of the first conveyor belt and the third conveyor belt are arranged in parallel, the first conveyor belt is connected to the third conveyor belt through a guide roller, the guide roller is arranged at the feed end of the third conveyor belt and is located above the third conveyor belt, and the guide roller is used to guide the discharge end of the first conveyor belt to be connected to the feed end of the third conveyor belt.
[0010] In some embodiments, a discharge end of the first conveyor belt extends into the distribution hopper, and the guide roller is located at the rear side of the discharge end of the first conveyor belt.
[0011] In some embodiments, an overlapping shaft extends in the distribution hopper along the direction of the first conveyor belt, and the swing end of the swing plate can swing to overlap the peripheral wall of the overlapping shaft to open the upper opening of the distribution chute.
[0012] In some embodiments, the material distribution chute includes an upper chute and a lower chute connected below the upper chute, the two upper chutes extend obliquely from top to bottom toward opposite sides, and the two lower chutes extend from top to bottom toward adjacent sides.
[0013] In a possible implementation, the direction of the second conveyor belt is arranged perpendicular to the direction of the first conveyor belt.
[0014] In a possible implementation, two conveying viaducts are provided, and the two conveying viaducts are respectively connected to the two blast furnaces in a one-to-one correspondence.
[0015] The scheme shown in the embodiment of the present application is compared with the prior art. In the coke feeding and conveying system provided by the embodiment of the present application, the coke on the first conveyor belt can be switched between the second conveyor belt and the third conveyor belt through a divider. The third conveyor belt can deliver the coke to the ore bin, and then to the blast furnace via the conveyor elevated frame. When the coke in the blast furnace reaches the required amount, the divider will guide the coke to the second conveyor belt so that the coke can be delivered to the silo for storage. The above-mentioned conveying method realizes the real-time switching between the blast furnace coke supply and the coke silo storage, thereby improving the feeding and conveying efficiency of the coke and meeting the production needs of the blast furnace. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor.
[0017] Figure 1 A schematic diagram of the top view of the coke feeding and conveying system provided in an embodiment of the utility model;
[0018] Figure 2 For the utility model embodiment Figure 1 The main structural diagram of the middle distributor;
[0019] Figure 3 For the utility model embodiment Figure 2 A schematic diagram of the main structure of the middle distributor in another state;
[0020] Figure 4 For the utility model embodiment Figure 2 The left side structural diagram of the middle distributor;
[0021] Figure 5 This is a left-side structural schematic diagram of another embodiment of the distributor provided in the utility model.
[0022] Among them, the reference numerals in the figure are:
[0023] 1. First conveyor belt; 2. Second conveyor belt; 3. Third conveyor belt; 4. Distributor; 41. Distributor hopper; 42. Distributor chute; 43. Swing plate; 44. Guide roller; 45. Overlap shaft; 46. Upper chute; 47. Lower chute; 5. Ore chute; 6. Conveying platform; 7. Feed hopper; 71. First feed hopper; 72. Second feed hopper; 73. Tipper; 8. Silo; 9. Blast furnace. DETAILED DESCRIPTION
[0024] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0025] It should be noted that when an element is referred to as being "disposed on" another element, it may be directly on the other element or indirectly on the other element. It should be understood that the orientation or positional relationship indicated by the terms "length", "width", "upper", "lower", "front", "back", "top", "bottom", "inside", "outside", etc. is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model. The terms "first" and "second" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the utility model, the meaning of "several" is two or more, unless otherwise clearly and specifically defined.
[0026] Please also read Figures 1 to 5 Now, the coke feeding and conveying system provided by the utility model is described. The coke feeding and conveying system comprises a first conveyor belt 1, a second conveyor belt 2, a third conveyor belt 3, a distributor 4, a ore trough 5, a conveying elevated frame 6 and a silo 8. The feeding end of the first conveyor belt 1 is provided with a feeding hopper 7; the second conveyor belt 2 and the third conveyor belt 3 are respectively connected to the discharging end of the first conveyor belt 1; the distributor 4 is arranged at the discharging end of the first conveyor belt 1, and the distributor 4 has a first state for connecting the first conveyor belt 1 and the second conveyor belt 2 and a second state for connecting the first conveyor belt 1 and the third conveyor belt 3; the discharging end of the third conveyor belt 3 extends into the ore trough 5, for feeding into the ore trough 5; the conveying elevated frame 6 is arranged between the ore trough 5 and the blast furnace 9, for supplying coke from the ore trough 5 to the blast furnace 9; the second conveyor belt 2 extends to the silo 8.
[0027] Compared with the prior art, the coke feeding and conveying system provided in the present embodiment is that the coke on the first conveyor belt 1 can be switched between the second conveyor belt 2 and the third conveyor belt 3 through the divider 4. The third conveyor belt 3 can deliver the coke to the ore trough 5, and then deliver it to the blast furnace 9 through the conveying viaduct 6. When the coke in the blast furnace 9 reaches the required amount 73, the divider 4 guides the coke to the second conveyor belt 2 so that the coke can be delivered to the silo 8 for storage. The above-mentioned conveying method realizes the real-time switching between the two states of coke supply to the blast furnace 9 and the storage of the coke silo 8, thereby improving the feeding and conveying efficiency of the coke and meeting the production needs of the blast furnace 9.
[0028] In one possible implementation, see Figures 1 to 5The feed hopper 7 includes a first feed hopper 71 and a second feed hopper 72. A dumper 73 for unloading coke from a coke transport vehicle is provided above the first feed hopper 71. The second feed hopper 72 is used to receive coke unloaded from a dump truck.
[0029] In this embodiment, the feed hopper 7 includes a first feed hopper 71 and a second feed hopper 72. In order to facilitate vehicles to unload coke onto the first conveyor belt 1, the first feed hopper 71 and the second feed hopper 72 are arranged at the feed end of the first conveyor belt 1. The second feed hopper 72 is suitable for coke transport vehicles with self-unloading capabilities, and the above coke transport vehicles can directly unload coke into the second feed hopper 72. The first feed hopper 71 is suitable for coke transport vehicles without self-unloading capabilities, and the tipping machine 73 above the first feed hopper 71 is used to unload coke transport vehicles without self-unloading capabilities. The above-mentioned first feed hopper 71 and the second feed hopper 72 are arranged to be applicable to coke transport vehicles with self-unloading capabilities and coke transport vehicles without self-unloading capabilities, which improves the applicability of the system and can realize the effective acceptance of coke in different vehicles.
[0030] In some embodiments, see Figures 1 to 5 There are two first feed hoppers 71 and two tippers 73 respectively, and the two first feed hoppers 71 and the two tippers 73 are arranged in one-to-one correspondence. A tipper 73 is correspondingly provided above each first feed hopper 71. The coke on two coke transport vehicles without self-unloading capability is unloaded synchronously through the two first feed hoppers 71, thereby improving the unloading efficiency of the coke.
[0031] In one possible implementation, see Figures 1 to 5 The distributor 4 includes a distributor hopper 41 and two distributor chutes 42 connected to the bottom of the distributor hopper 41. The lower mouth of the distributor hopper 41 is open, and the two distributor chutes 42 are symmetrically arranged below the distributor hopper 41. The second conveyor belt 2 is located below the distributor chutes 42. Two swing plates 43 corresponding to the two distributor chutes 42 are hinged in the distributor hopper 41. The swing plates 43 are used to open the distributor chutes 42 to allow the coke in the distributor hopper 41 to enter the distributor chutes 42, or to block the distributor chutes 42 to allow the coke to fall onto the third conveyor belt 3.
[0032] In this embodiment, the distributor 4 is in the form of a combination of a distributor hopper 41 and a distributor chute. The swing plate 43 in the distributor hopper 41 can swing to a position blocking the distributor chute 42 to open the lower opening of the distributor hopper 41. The swing plate 43 can also swing to a position blocking the lower opening of the distributor hopper 41 to open the distributor chute 42. When the distributor chute 42 is connected to the distributor hopper 41, the coke is sent to the second conveyor belt 2 below through the distributor chute 42; when the lower opening of the distributor hopper 41 is open, the coke is directly unloaded onto the third conveyor belt 3. The above-mentioned distribution method simplifies the structure of the distributor 4 and also reduces the wear degree of the distributor 4.
[0033] On this basis, see Figures 1 to 5 The extension directions of the first conveyor belt 1 and the third conveyor belt 3 are arranged in parallel. The first conveyor belt 1 is connected to the third conveyor belt 3 through a guide roller 44. The guide roller 44 is arranged at the feed end of the third conveyor belt 3 and is located above the third conveyor belt 3. The guide roller 44 is used to guide the discharge end of the first conveyor belt 1 to be connected to the feed end of the third conveyor belt 3.
[0034] In some embodiments, see Figures 1 to 5 The discharge end of the first conveyor belt 1 extends into the sub-hopper 41, and the guide roller 44 is located at the rear side of the discharge end of the first conveyor belt 1. The discharge end of the first conveyor belt 1 extends forward into the sub-hopper 41 to prevent the coke from falling outside the sub-hopper 41 during the discharge process.
[0035] The first conveyor belt 1 and the third conveyor belt 3 are arranged in series by setting the guide roller 44, and the first conveyor belt 1 and the third conveyor belt 3 are connected to each other. The first conveyor belt 1 and the third conveyor belt 3 have the same extension direction, the third conveyor belt 3 is lower than the first conveyor belt 1, and extends to the bottom of the feed hopper 41. The guide roller 44 can bend the first conveyor belt 1 backward and downward (that is, downward to the side of the first conveyor belt 1), and then extend forward to the bottom of the feed hopper 7 (forming the third conveyor belt 3).
[0036] In some embodiments, see Figures 1 to 5 The material distribution hopper 41 is provided with a lap shaft 45 extending along the direction of the first conveyor belt 1, and the swing end of the swing plate 43 can swing to overlap the peripheral wall of the lap shaft 45 to open the upper opening of the material distribution chute 42. The lap shaft 45 provided in the material distribution hopper 41 can support and limit the swing end of the swing plate 43, so that the swing plate 43 is stably located at the position of opening the powder chute, thereby realizing the effective transportation of coke to the powder chute.
[0037] In some embodiments, see Figures 1 to 5 The material distribution chute 42 includes an upper chute 46 and a lower chute 47 connected to the lower part of the upper chute 46. The two upper chutes 46 extend obliquely from top to bottom to opposite sides, and the two lower chutes 47 extend from top to bottom to adjacent sides.
[0038] In this embodiment, the distribution chute 42 includes an upper chute 46 and a lower chute 47. The upper chute 46 can guide the coke in the distribution hopper 41 to both sides of the third conveyor belt 3, and the lower chute 47 can unload the coke in the upper chute 46 from both sides of the third conveyor belt 3 downward to the second conveyor belt 2, so that the coke can be smoothly transported to the silo 8 position.
[0039] In one possible implementation, see Figures 1 to 5The direction of the second conveyor belt 2 is perpendicular to the direction of the first conveyor belt 1, which is convenient for the structural layout of the device, improves the space utilization efficiency, realizes the conversion of the coke conveying direction, and improves the conveying efficiency.
[0040] In one possible implementation, see Figures 1 to 5 There are two conveying elevated frames 6 , and the two conveying elevated frames 6 are respectively connected to the two blast furnaces 9 in a one-to-one correspondence, and can simultaneously supply coke to the two blast furnaces 9 to meet the coking needs of the blast furnaces 9 .
[0041] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. Coke feeding and conveying system, characterized in that: It includes a first conveyor belt, a second conveyor belt, a third conveyor belt, a distributor, a ore trough, a conveyor frame and a silo, wherein a feed hopper is provided at the feed end of the first conveyor belt; the second conveyor belt and the third conveyor belt are respectively connected to the discharge ends of the first conveyor belt; the distributor is arranged at the discharge end of the first conveyor belt, and the distributor has a first state for connecting the first conveyor belt and the second conveyor belt and a second state for connecting the first conveyor belt and the third conveyor belt; the discharge end of the third conveyor belt extends into the ore trough for feeding into the ore trough; the conveyor frame is arranged between the ore trough and the blast furnace for supplying coke from the ore trough to the blast furnace; the second conveyor belt extends toward the silo.
2. The coke feeding and conveying system according to claim 1, characterized in that: The feed hopper includes a first feed hopper and a second feed hopper. A tipper for unloading coke from a coke transport vehicle is provided above the first feed hopper, and the second feed hopper is used to receive coke unloaded from a dump truck.
3. The coke feeding and conveying system according to claim 2, characterized in that: There are two of the first feed hopper and the two dumpers respectively, and the two first feed hoppers and the two dumpers are arranged in a one-to-one correspondence.
4. The coke feeding and conveying system according to claim 1, characterized in that: The distributor includes a distributor hopper and two distributor chutes connected to the bottom of the distributor hopper, the lower mouth of the distributor hopper is open, the two distributor chutes are symmetrically arranged below the distributor hopper, the second conveyor belt is located below the distributor chutes, and two swing plates corresponding to the two distributor chutes are hinged in the distributor hopper, and the swing plates are used to open the distributor chutes to allow the coke in the distributor hopper to enter the distributor chutes, or to block the distributor chutes to allow the coke to fall onto the third conveyor belt.
5. The coke feeding and conveying system according to claim 4, characterized in that: The extension directions of the first conveyor belt and the third conveyor belt are arranged in parallel. The first conveyor belt is connected to the third conveyor belt through a guide roller. The guide roller is arranged at the feed end of the third conveyor belt and is located above the third conveyor belt. The guide roller is used to guide the discharge end of the first conveyor belt to be connected to the feed end of the third conveyor belt.
6. The coke feeding and conveying system according to claim 5, characterized in that: The discharge end of the first conveyor belt extends into the distribution hopper, and the guide roller is located at the rear side of the discharge end of the first conveyor belt.
7. The coke feeding and conveying system according to claim 4, characterized in that: The material distribution hopper is provided with an overlapping shaft extending along the direction of the first conveyor belt, and the swing end of the swing plate can swing to overlap the peripheral wall of the overlapping shaft to open the upper opening of the material distribution chute.
8. The coke feeding and conveying system according to claim 7, characterized in that: The material distribution chute includes an upper chute and a lower chute connected below the upper chute. The two upper chutes extend obliquely from top to bottom toward opposite sides, and the two lower chutes extend from top to bottom toward adjacent sides.
9. The coke feeding and conveying system according to any one of claims 1 to 8, characterized in that: The direction of the second conveyor belt is perpendicular to the direction of the first conveyor belt.
10. The coke feeding and conveying system according to claim 1, characterized in that: There are two conveying elevated frames, and the two conveying elevated frames are respectively connected to the two blast furnaces in a one-to-one correspondence.