Surveying and mapping engineering surveying and mapping marker post convenient to fix

By designing a foldable hinge connection and floating structure, it solves the problem of difficulty in transporting and fixing the surveying and mapping poles in water, achieving convenient portability and flexible use, and improving work efficiency.

CN221925143UActive Publication Date: 2024-10-29SHANXI INST OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420581350.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-10-29
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

Existing surveying and mapping benchmarks are easily blocked by trees and terrain during the transportation process, making them inconvenient to fix. They are also difficult to effectively fix and use when detecting in water.

Method used

A surveying pole including a middle ruler rod, an upper ruler rod and a lower ruler rod is designed. It is foldable and portable through hinge connections, and is fixed and floated through structures such as pins and snap-in grooves, pull blocks and floating blocks. , combined with the design of L-shaped slides and bolts, to achieve flexible expansion and hiding of the benchmark.

Benefits of technology

It realizes the convenient carrying and fixing of the benchmark, can float in the water, facilitates observation of the depth of caves or holes, and can be quickly unfolded and locked when needed, improving work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221925143U_ABST
    Figure CN221925143U_ABST
Patent Text Reader

Abstract

The utility model discloses a surveying and mapping engineering surveying and mapping marker post convenient to fix, which comprises a middle ruler rod and an upper ruler rod, the top of the middle ruler rod is provided with the upper ruler rod, the bottom of the middle ruler rod is provided with a lower ruler rod, and hinges are respectively arranged among the middle ruler rod, the upper ruler rod and the lower ruler rod. Rulers are arranged on the right sides of the surfaces of the middle ruler rod, the upper ruler rod and the lower ruler rod. According to the surveying and mapping engineering surveying and mapping marker post convenient to fix, the hinges are installed among the middle ruler rod, the upper ruler rod and the lower ruler rod respectively, the middle ruler rod is movably connected with the upper ruler rod and the lower ruler rod through the hinges respectively, when the surveying and mapping engineering surveying and mapping marker post is folded, the upper ruler rod is attached to the right side of the middle ruler rod, and the lower ruler rod is attached to the left side of the middle ruler rod; when the mark post, the storage cavity and the clamping groove are straightened, after the adjacent storage cavity and the clamping groove are aligned, the shifting block is pushed along the open groove in the surface, the plug pin with the frosted sleeve is forced to enter the clamping groove, and the problem that the mark post is inconvenient to fix and contract is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of surveying and mapping benchmarks, in particular to a surveying and mapping benchmark for surveying and mapping engineering which is easy to fix. Background Art

[0002] Engineering surveying is an operation to plan resources such as water conservancy, mines, and mountains in undeveloped areas. When clearing roads and constructing buildings, workers are required to carry surveying instruments to observe everywhere and cooperate with joystick drones in the air to obtain the specific appearance of the place and the degree of surface undulation.

[0003] Benchmark poles are often used in engineering surveying and mapping. They are extended into caves, holes and even lakes and rivers of different depths. In order to conduct in-depth detection, the benchmark poles used are often not short. Such long poles are often blocked by trees and terrain during the process of being carried by staff, making them inconvenient to carry and fix.

[0004] Now, a new type of easy-to-fix surveying and mapping engineering surveying benchmark is proposed to solve the above problems. Utility Model Content

[0005] The utility model aims to provide a surveying and mapping engineering surveying and mapping benchmark which is easy to fix, so as to solve the problem that the benchmark is inconvenient to fix and shrink in the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a surveying and mapping benchmark for surveying and mapping engineering that is easy to fix, comprising a middle ruler rod and an upper ruler rod, an upper ruler rod is arranged on the top of the middle ruler rod, a lower ruler rod is arranged on the bottom of the middle ruler rod, hinges are respectively installed between the middle ruler rod, the upper ruler rod and the lower ruler rod, rulers are arranged on the right side of the surface of the middle ruler rod, the top of the middle ruler rod and the lower ruler rod are provided with storage chambers, and a slot is provided in front of the storage chamber, a latch is longitudinally inserted in the storage chamber, and a shift block is welded in front of the latch, a frosted sleeve is fixed on the outer surface of the latch, and clamping grooves are respectively provided at the bottom of the upper ruler rod and the middle ruler rod.

[0007] Preferably, the shift block can slide up and down along the inner wall of the slot, and the latch can enter and exit the interior of the storage chamber.

[0008] Preferably, the latch is embedded in the snap-fit ​​groove, and the shape of the latch matches the inner chamber of the snap-fit ​​groove.

[0009] Preferably, the outer part of the lower ruler rod is sleeved with a sleeve block, and an inner cavity is laterally arranged on the inner side of the sleeve block, pull blocks are movably inserted on both sides of the inner cavity, and sleeves are welded on the top and bottom of one side of the pull block, a clamping block is welded at the center of one side of the pull block, transverse grooves are respectively opened on the top and bottom of both sides of the sleeve block, and built-in rods are laterally welded on the inner side of the transverse grooves, a spring is welded between the transverse groove and one side of the sleeve, and grooves are arranged at equal intervals inside both sides of the middle ruler rod, the upper ruler rod and the lower ruler rod.

[0010] Preferably, connection blocks are welded below both sides of the outer portion of the sleeve block, and floating blocks are welded at the bottom of the connection blocks.

[0011] Preferably, the built-in rod and the sleeve are in the same horizontal plane, and the spring is wound around the outside of the built-in rod.

[0012] Preferably, an L-shaped slide is provided inside the upper ruler rod, and bolts are engaged and connected between the L-shaped slide and the upper ruler rod, a positioning rod is welded between the two ends above the inside of the L-shaped slide, and a cross bar is movably sleeved on the outside of the positioning rod, and a limited position chamber is provided between the two sides inside the cross bar.

[0013] Preferably, the cross bar can slide up and down along the interior of the limiting chamber, and the positioning rod is embedded in the cross bar.

[0014] Compared with the prior art, the utility model has the following beneficial effects: the easy-to-fix surveying and mapping engineering surveying and mapping benchmark not only makes it easy to carry the benchmark, realizes the auxiliary benchmark floating, but also realizes the top setting installation structure;

[0015] (1) Hinges are installed between the middle ruler rod, the upper ruler rod and the lower ruler rod respectively, and the middle ruler rod is movably connected with the upper ruler rod and the lower ruler rod respectively through hinges. When folded, the upper ruler rod is attached to the right side of the middle ruler rod, and the lower ruler rod is attached to the left side of the middle ruler rod. When the three are straightened, the adjacent storage chambers and the clamping grooves are aligned, and the push block is pushed along the groove on the surface to force the pin with the frosted sleeve to enter the clamping groove, so that the fixing and folding of the standard rod can be completed, which is convenient for carrying and can be unfolded and locked in time;

[0016] (2) By welding a floating block at the bottom of the connecting block, the pull blocks on both sides are pre-pulled out along the middle ruler, the upper ruler and the lower ruler, and the sleeve block is slid vertically up and down. After the position is selected, the object is released, and the spring is allowed to shrink the sleeve along the outer side of the built-in rod. At this time, the card block is embedded in the groove, and the connecting block with the floating block can be moved to various places of the benchmark to help it float on the water so that people can observe the depth of the bottom cave. Even if the distance is too far, the depth of the detection point can be checked in time;

[0017] (3) An L-shaped slide is provided inside the upper ruler rod, and the cross bar is pulled up and down along the L-shaped slide. At this time, the cross bar is sleeved on the outside of the positioning rod by means of the inner limit chamber. The bolts at the bottom can not only fix the cross bar when it is stored, but also unscrew the bolts when the cross bar is pulled out to prevent it from obstructing the extraction of the cross bar. Then, the cross bar is connected with external parts and connected to the upper ruler rod at the top of the benchmark. When stored, it is completely hidden and does not hinder the use of the benchmark body. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a front view cross-sectional structural schematic diagram of the utility model;

[0019] Figure 2 This is a schematic diagram of the front view structure of the latch of the utility model;

[0020] Figure 3 This is a schematic diagram of the cross-sectional structure of the set block of the utility model;

[0021] Figure 4 It is a schematic diagram of the front cross-sectional structure of the L-shaped slideway of the present utility model.

[0022] In the figure: 1. middle ruler rod; 2. ruler; 3. slot; 4. storage chamber; 5. shift block; 6. latch; 7. frosted sleeve; 8. snap-in groove; 9. upper ruler rod; 10. L-shaped slide; 11. bolt; 12. cross bar; 13. limit chamber; 14. positioning rod; 15. sleeve block; 16. lower ruler rod; 17. floating block; 18. connecting block; 19. hinge; 20. pull block; 21. inner cavity; 22. spring; 23. sleeve; 24. built-in rod; 25. groove; 26. clamping block; 27. cross groove. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] Example 1: Please refer to Figure 1-4A surveying and mapping benchmark for surveying and mapping engineering that is easy to fix, including a middle ruler rod 1 and an upper ruler rod 9, the top of the middle ruler rod 1 is provided with an upper ruler rod 9, the bottom of the middle ruler rod 1 is provided with a lower ruler rod 16, hinges 19 are respectively installed between the middle ruler rod 1, the upper ruler rod 9 and the lower ruler rod 16, and rulers 2 are arranged on the right side of the surfaces of the middle ruler rod 1, the upper ruler rod 9 and the lower ruler rod 16, the top of the middle ruler rod 1 and the lower ruler rod 16 are provided with storage chambers 4, and the front of the storage chamber 4 is provided with slots 3, a latch 6 is longitudinally inserted in the storage chamber 4, and a shift block 5 is welded in front of the latch 6, a frosted sleeve 7 is fixed on the outer surface of the latch 6, and a clamping groove 8 is respectively provided at the lower part of the upper ruler rod 9 and the inside of the middle ruler rod 1;

[0025] The shift block 5 can slide up and down along the inner wall of the slot 3, and the latch 6 can enter and exit the interior of the storage chamber 4. The latch 6 is embedded in the clamping slot 8, and the shape of the latch 6 matches the inner chamber of the clamping slot 8;

[0026] Specifically, Figure 1 and Figure 2 As shown, the middle ruler rod 1 is movably connected to the upper ruler rod 9 and the lower ruler rod 16 by hinges 19 respectively. When folded, the upper ruler rod 9 is attached to the right side of the middle ruler rod 1, and the lower ruler rod 16 is attached to the left side of the middle ruler rod 1. When the three are straightened, the adjacent storage chambers 4 and the snap-in grooves 8 are aligned, and the shift block 5 is pushed along the groove 3 on the surface to force the pin 6 with the frosted sleeve 7 to enter the snap-in groove 8, so that the fixing and folding of the benchmark can be completed, which is convenient for carrying and can be timely unfolded and locked.

[0027] Embodiment 2: The outer part of the lower ruler rod 16 is sleeved with a sleeve block 15, and an inner cavity 21 is transversely arranged on the inner side of the sleeve block 15, and pull blocks 20 are movably inserted on both sides of the inner cavity 21, and sleeves 23 are welded on the top and bottom of one side of the pull block 20, and a clamping block 26 is welded at the center of one side of the pull block 20, and transverse grooves 27 are respectively cut on the top and bottom of both sides of the sleeve block 15, and a built-in rod 24 is transversely welded on the inner side of the transverse groove 27, and a spring 22 is welded between the transverse groove 27 and one side of the sleeve 23, and grooves 25 are arranged at equal intervals inside the middle ruler rod 1, the upper ruler rod 9 and both sides of the lower ruler rod 16;

[0028] Connecting blocks 18 are welded to the lower sides of the outer side of the sleeve block 15, and floating blocks 17 are welded to the bottom of the connecting blocks 18. The built-in rod 24 and the sleeve 23 are in the same horizontal plane, and the spring 22 is wound around the outer side of the built-in rod 24.

[0029] Specifically, Figure 1 and Figure 3As shown, along the middle ruler rod 1, the upper ruler rod 9 and the lower ruler rod 16, the pull blocks 20 on both sides are pulled out in advance, and the sleeve block 15 is slid vertically up and down. After the position is selected, it is released, and the spring 22 is allowed to shrink the sleeve 23 along the outer side of the built-in rod 24. At this time, the clamping block 26 is embedded in the groove 25, and the connecting block 18 with the floating block 17 can be moved to various places of the benchmark to help it float on the water for people to observe the depth of the bottom cave.

[0030] Embodiment 3: An L-shaped slideway 10 is provided inside the upper ruler rod 9, and a bolt 11 is meshed and connected between the L-shaped slideway 10 and the upper ruler rod 9, and a positioning rod 14 is welded between the two ends of the upper part of the L-shaped slideway 10, and a cross bar 12 is movably sleeved on the outside of the positioning rod 14, and a limited position chamber 13 is provided between the two sides inside the cross bar 12, and the cross bar 12 can slide up and down along the inside of the limited position chamber 13, and the positioning rod 14 is embedded in the cross bar 12;

[0031] Specifically, Figure 1 and Figure 4 As shown, the cross bar 12 is pulled up and down along the L-shaped slide 10. At this time, the cross bar 12 is sleeved on the outside of the positioning rod 14 by means of the inner limiting chamber 13. The bolt 11 at the bottom can not only fix the cross bar 12 when it is stored, but also unscrew the bolt 11 when the cross bar 12 is pulled out to prevent it from hindering the cross bar 12 from being guided out. After that, the cross bar 12 is connected with external parts to connect with the top ruler 9 of the benchmark.

[0032] Working principle: When the utility model is in use, the middle ruler rod 1 is movably connected with the upper ruler rod 9 and the lower ruler rod 16 by hinges 19. When folded, the upper ruler rod 9 is attached to the right side of the middle ruler rod 1, and the lower ruler rod 16 is attached to the left side of the middle ruler rod 1. When the three are straightened, the adjacent storage chambers 4 and the card slots 8 are aligned, and the block 5 is pushed along the surface slots 3 to force the pin 6 with the frosted sleeve 7 to enter the card slot 8. The fixing and folding of the benchmark can be completed, which is convenient for carrying and can be unfolded and locked in time. Then, the cross bar 12 is pulled up and down along the L-shaped slide 10. At this time, the cross bar 12 is sleeved on the positioning rod 14 by the inner limit chamber 13. On the outside, the bolt 11 at the bottom can not only fix the object when the cross bar 12 is stored, but also unscrew the bolt 11 when the cross bar 12 is pulled out to prevent it from hindering the extraction of the cross bar 12. Then the cross bar 12 is connected with external parts and connected to the upper ruler rod 9 at the top of the benchmark. The pull blocks 20 on both sides can be pre-pulled out along the middle ruler rod 1, the upper ruler rod 9 and the lower ruler rod 16, and the sleeve block 15 can be slid vertically up and down. After the position is selected, the object is released and the spring 22 is allowed to shrink the sleeve 23 along the outside of the built-in rod 24. At this time, the block 26 is embedded in the groove 25, and the connecting block 18 with the floating block 17 can be moved to various places of the benchmark to help it float on the water for people to observe the depth of the bottom cave.

[0033] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. A surveying and mapping benchmark pole that is easy to fix, comprising a middle ruler pole (1) and an upper ruler pole (9), characterized in that: An upper ruler rod (9) is arranged at the top of the middle ruler rod (1), and a lower ruler rod (16) is arranged at the bottom of the middle ruler rod (1). Hinges (19) are respectively installed between the middle ruler rod (1), the upper ruler rod (9) and the lower ruler rod (16). The right sides of the surfaces of the middle ruler rod (1), the upper ruler rod (9) and the lower ruler rod (16) are all arranged with scales (2). The top ends of the middle ruler rod (1) and the lower ruler rod (16) are provided with storage chambers (4), and a slot (3) is provided in front of the storage chamber (4). A latch (6) is longitudinally inserted in the storage chamber (4), and a shift block (5) is welded in front of the latch (6). A frosted sleeve (7) is fixed to the outer surface of the latch (6). A clamping groove (8) is respectively provided at the bottom of the upper ruler rod (9) and the middle ruler rod (1).

2. The easy-to-fix surveying and mapping engineering surveying and mapping benchmark according to claim 1 is characterized by: The shift block (5) can slide up and down along the inner wall of the slot (3), and the latch (6) can enter and exit the interior of the storage chamber (4).

3. The easy-to-fix surveying and mapping engineering surveying and mapping benchmark according to claim 1 is characterized by: The latch pin (6) is embedded in the clamping groove (8), and the shape of the latch pin (6) matches the internal cavity of the clamping groove (8).

4. The easy-to-fix surveying and mapping engineering surveying and mapping benchmark according to claim 1 is characterized by: The outer part of the lower ruler rod (16) is sleeved with a sleeve block (15), and an inner cavity (21) is transversely arranged on the inner side of the sleeve block (15). Pull blocks (20) are movably inserted on both sides of the inner cavity (21), and sleeves (23) are welded on the top and bottom of one side of the pull block (20). A clamping block (26) is welded at the center of one side of the pull block (20). Transverse grooves (27) are respectively cut on the top and bottom of both sides of the sleeve block (15), and an internal rod (24) is transversely welded on the inner side of the transverse groove (27). A spring (22) is welded between the transverse groove (27) and one side of the sleeve (23). Grooves (25) are arranged at equal intervals inside the middle ruler rod (1), the upper ruler rod (9) and the lower ruler rod (16).

5. The easy-to-fix surveying and mapping engineering surveying and mapping benchmark according to claim 4, characterized in that: Connecting blocks (18) are welded below both sides of the outer portion of the sleeve block (15), and floating blocks (17) are welded at the bottom of the connecting blocks (18).

6. The easy-to-fix surveying and mapping engineering surveying and mapping benchmark according to claim 4, characterized in that: The built-in rod (24) and the sleeve (23) are located at the same horizontal plane, and the spring (22) is wound around the outside of the built-in rod (24).

7. The easy-to-fix surveying and mapping engineering surveying and mapping benchmark according to claim 1, characterized in that: An L-shaped slideway (10) is arranged inside the upper ruler rod (9), and a bolt (11) is meshedly connected between the L-shaped slideway (10) and the upper ruler rod (9). A positioning rod (14) is welded between the two ends at the top of the L-shaped slideway (10), and a cross bar (12) is movably sleeved on the outside of the positioning rod (14), and a limited position chamber (13) is arranged between the two sides inside the cross bar (12).

8. The easy-to-fix surveying and mapping engineering surveying and mapping benchmark according to claim 7, characterized in that: The cross bar (12) can slide up and down along the interior of the limiting chamber (13), and the positioning rod (14) is embedded in the cross bar (12).