JDG pipeline joint capable of preventing pipe blockage

By designing the combined structure of the main body of the pipe joint and the sealing sleeve, the risk of blockage and difficulty in threading the pipe at the JDG pipe joint are solved, reliable connection and sealing between pipes are achieved, blockage during concrete pouring is avoided, and construction efficiency is improved. and security.

CN221929237UActive Publication Date: 2024-10-29CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323396587.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2024-10-29
Estimated Expiration
2033-12-13

AI Technical Summary

Technical Problem

JDG pipes have problems such as the risk of clogging at the joints and difficulty in threading. The existing tape wrapping method cannot ensure tightness, and the operation is inconvenient and inefficient.

Method used

A JDG pipe joint including a joint body, a tightening component and a wrapping sealing sleeve is designed. The joint body is sleeved on the pipe end, the pipe is fixed using a structure of bolts and screw holes, and a soft wrapping sealing sleeve is used to achieve a sealed connection. , to avoid clogging during concrete pouring.

Benefits of technology

It achieves reliable connection between pipes, prevents concrete slurry from entering, and ensures the smooth progress of subsequent threading construction. It has a simple structure and low cost, reducing material consumption and waste tape pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221929237U_ABST
    Figure CN221929237U_ABST
Patent Text Reader

Abstract

The utility model discloses a JDG pipeline connector capable of preventing pipe blockage. The JDG pipeline connector comprises a connector body (1), a fastening assembly and a wrapping sealing sleeve (2). The joint main body (1) is of a tubular structure, and the inner diameter of the joint main body (1) is larger than the outer diameter of the JDG pipeline, so that two adjacent JDG pipelines (3) are respectively inserted into the joint main body (1) from two ends of the joint main body (1); the multiple sets of fastening assemblies are arranged on the connector body (1) in pairs, and each pair of fastening assemblies can movably abut against the two JDG pipelines (3) so that the two JDG pipelines (3) can be fixed in a butt joint mode through the connector body (1). One ends of the pair of wrapping sealing sleeves (2) are arranged at the two ends of the connector body (1) respectively, and the other ends of the pair of wrapping sealing sleeves (2) wrap the two JDG pipelines (3) respectively in a sealed mode. The problems that in the prior art, a JDG pipeline has the blocking risk and is difficult to penetrate can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a pipeline connecting device, in particular to a JDG pipeline joint which can prevent pipe blockage. Background Art

[0002] JDG pipe (sleeve-type tight-fitting galvanized steel conduit, rigid metal flat conduit for electrical installation) is the latest type of protective conduit for electrical lines. It uses galvanized steel pipe and thin-walled steel pipe as the jumper grounding wire, which overcomes the shortcomings of ordinary metal conduits such as complex construction and large construction losses. It also solves the problems of poor fire resistance and difficult grounding of PVC pipes. It can replace various traditional wire conduits such as PVC pipes and SC pipes, and is increasingly used in the integrated wiring and fire protection wiring in the field of building electrical.

[0003] At the joint of two adjacent JDG pipes, the gap between the pipes is large, and it is necessary to wrap tape around the joint of the two adjacent JDG pipes to seal the joint tightly to prevent the concrete slurry from flowing into the JDG pipe during concrete pouring and causing blockage of the JDG pipe, making it impossible to carry out subsequent threading construction. However, the tape wrapping cannot guarantee the density, and the tape is prone to breakage during the concrete vibration process, causing the concrete slurry to flow into the JDG pipe, resulting in the risk of JDG pipe blockage and difficulty in threading the pipe; at the same time, the tape wrapping also has the problem of inconvenient operation and low efficiency. Therefore, it is necessary to provide a JDG pipe joint that prevents pipe blockage, which can solve the problems of JDG pipe blockage risk and difficulty in threading the pipe in the prior art. Summary of the invention

[0004] The utility model aims to provide a JDG pipe joint which can prevent pipe blockage, and can solve the problems of blockage risk and pipe threading difficulty of JDG pipes in the prior art.

[0005] The utility model is achieved in this way:

[0006] A JDG pipe joint for preventing pipe blockage comprises a joint body, a tightening assembly and a wrapping sealing sleeve; the joint body is a tubular structure, and the inner diameter of the joint body is larger than the outer diameter of the JDG pipe, so that two adjacent JDG pipes are respectively inserted into the joint body from both ends of the joint body; a plurality of sets of tightening assemblies are arranged in pairs on the joint body, and each pair of tightening assemblies can be movably pressed against two JDG pipes respectively, so that the two JDG pipes are butt-jointed and fixed through the joint body; one end of a pair of wrapping sealing sleeves is respectively arranged at both ends of the joint body, and the other ends of the pair of wrapping sealing sleeves are respectively sealed and wrapped on the two JDG pipes.

[0007] The middle part of the joint body is formed with an inner concave portion, the inner diameter of which is smaller than the outer diameter of the JDG pipe, so that two adjacent JDG pipes can abut against the inner wall of the inner concave portion after being inserted into the joint body.

[0008] A pair of screw holes is formed on the joint body, and each set of fastening components includes bolts. The bolts of a pair of fastening components are respectively matched and screwed into the pair of screw holes, and one end of the bolt passes through the joint body and is tightened on the outer wall of the JDG pipe.

[0009] The pair of screw holes are symmetrically arranged on both sides of the inner recess, and the screw holes are located in the middle between the end of the joint body and the inner recess.

[0010] The axial direction of the screw hole and the bolt is located in the radial direction of the JDG pipeline.

[0011] The other end of the bolt is formed with a handle, and the outer diameter of the handle is larger than the hole diameter of the screw hole.

[0012] The wrapping sealing sleeve is a soft sleeve, and the inner diameter of the wrapping sealing sleeve is smaller than the outer diameter of the JDG pipe, so that the two ends of the wrapping sealing sleeve can be sealed and fitted on the outer wall of the JDG pipe and the joint body, so that the JDG pipe and the joint body are sealed and connected.

[0013] A bending portion is formed in the middle of the wrapping sealing sleeve, so that the wrapping sealing sleeve is folded through the bending portion and wrapped around the end of the joint body, or the wrapping sealing sleeve is unfolded through the bending portion and wrapped around the joint body and the JDG pipe.

[0014] Compared with the prior art, the utility model has the following beneficial effects:

[0015] 1. The utility model is provided with a joint body and bolts, and the joint body can be sleeved on the butt ends of two adjacent JDG pipes to close the larger joint gap between the two JDG pipes without wrapping tape, and the plugging is convenient and efficient. The bolts are screwed in to tighten the joint body and the JDG pipe, ensuring that the two adjacent JDG pipes are reliably connected through the joint body, and will not shift during the concrete pouring and vibration process, preventing concrete slurry from entering the JDG pipe through the pipe joint and causing the JDG pipe to be blocked, thereby ensuring the subsequent threading construction.

[0016] 2. The utility model is provided with a wrapping sealing sleeve, which utilizes the deformation of the wrapping sealing sleeve made of soft material to completely wrap the joint body and the JDG pipe, thereby ensuring the completeness and sealing of the wrapping at the joint gap between the joint body and the JDG pipe, thereby further preventing concrete slurry from clogging the JDG pipe, thereby ensuring subsequent threading construction.

[0017] 3. The utility model has a simple structure and low cost, can improve the appearance of the joint between two adjacent JDG pipes, does not require the use of tape, reduces material consumption, and avoids the occurrence of waste tape contaminating concrete. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1It is a structural schematic diagram of a JDG pipe joint for preventing pipe blockage according to the utility model;

[0019] Figure 2 It is a schematic diagram of the installation of the JDG pipe joint for preventing pipe blockage of the utility model;

[0020] Figure 3 It is a schematic diagram of a connection node of a joint body, a wrapping sealing sleeve and a JDG pipe in a JDG pipe joint for preventing pipe blockage according to the utility model.

[0021] In the figure, 1 is the connector body, 101 is the inner recess, 2 is the wrapped sealing sleeve, 201 is the bent portion, 3 is the JDG pipe, 401 is the bolt, and 402 is the hand-held portion. DETAILED DESCRIPTION

[0022] The utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

[0023] Please see attached Figure 1 To Attachment Figure 3 A JDG pipe joint for preventing pipe blockage comprises a joint body 1, a fastening assembly and a wrapping sealing sleeve 2; the joint body 1 is a tubular structure, and the inner diameter of the joint body 1 is slightly larger than the outer diameter of the JDG pipe, so that two adjacent JDG pipes 3 are respectively inserted into the joint body 1 from both ends of the joint body 1; a plurality of sets of fastening assemblies are arranged in pairs on the joint body 1, and each pair of fastening assemblies can be movably tightened on two JDG pipes 3 respectively, so that the two JDG pipes 3 are butt-jointed and fixed through the joint body 1; one ends of a pair of wrapping sealing sleeves 2 are respectively arranged at both ends of the joint body 1, and the other ends of the pair of wrapping sealing sleeves 2 are respectively sealed and wrapped on the two JDG pipes 3.

[0024] The joint body 1 is used to sleeve the butt ends of two adjacent JDG pipes 3 to ensure the closure of the joints of the two JDG pipes 3. There is no need to wrap the joints of the two JDG pipes 3 with tape, and the sleeve connection is convenient and quick. The wrapping sealing sleeve 2 is wrapped around the joint between the joint body 1 and the JDG pipe 3, and the wrapping sealing of the wrapping sealing sleeve 2 is used to ensure the connection sealing between the two JDG pipes 3. The fastening assembly is pressed against the JDG pipe 3 to ensure that the JDG pipe 3 is stably inserted into the joint body 1, thereby ensuring the connection reliability between the two JDG pipes 3.

[0025] Preferably, the joint body 1 can be made of a metal pipe, the length of the joint body 1 can be determined according to the sleeve length between the joint body 1 and the JDG pipe 3 , and the size of the joint body 1 can be determined according to the size of the JDG pipe 3 .

[0026] Please see attached Figure 1 and attached Figure 2An inner recess 101 is formed in the middle of the joint body 1 , and the inner diameter of the inner recess 101 is slightly smaller than the outer diameter of the JDG pipe 3 , so that two adjacent JDG pipes 3 can abut against the inner wall of the inner recess 101 after being inserted into the joint body 1 .

[0027] The concave structure of the concave portion 101 is used to limit the JDG pipe 3 and control the plug-in lengths between the two JDG pipes 3 and the joint body 1 to be consistent, which can further improve the connection reliability of the two JDG pipes 3.

[0028] Please see attached Figure 1 and attached Figure 2 A pair of screw holes (not shown in the figure) are formed on the joint body 1, and each set of fastening components includes a bolt 401. The bolts 401 of a pair of fastening components are respectively matched and screwed into a pair of screw holes, and one end of the bolt 401 passes through the joint body 1 and is tightened on the outer wall of the JDG pipe 3.

[0029] The bolt 401 is screwed inwardly into the joint body 1 and tightened with the JDG pipe 3 by rotating the thread of the bolt 401 and the screw hole. It is suitable for JDG pipes 3 of different sizes, can ensure the insertion stability of the JDG pipe 3 in the joint body 1, and prevent the JDG pipe 3 from shifting or even falling off.

[0030] The number of bolts 401 is consistent with the number of screw holes and they are arranged in pairs. The bolts 401 are preferably a pair, and the number of bolts 401 can also be increased according to actual tightening requirements.

[0031] Please see attached Figure 1 and attached Figure 2 The pair of screw holes are symmetrically arranged on both sides of the inner recess 101 , and the screw holes are located in the middle between the end of the joint body 1 and the inner recess 101 .

[0032] The joint body 1 adopts a symmetrical structure, and a pair of screw holes, a pair of bolts 401 and a pair of wrapped sealing sleeves 2 are all arranged in a symmetrical form, so that the force on the two JDG pipes 3 is uniform and the connection is stable and reliable.

[0033] Please see attached Figure 1 and attached Figure 2 The axial direction of the screw hole and the bolt 401 is located in the radial direction of the JDG pipe 3, and the bolt 401 is vertically pressed against the outer wall of the JDG pipe 3 to ensure the connection reliability between the JDG pipe 3 and the joint body 1.

[0034] Please see attached Figure 1 and attached Figure 2 The other end of the bolt 401 is formed with a handle 402, and the outer diameter of the handle 402 is larger than the aperture of the screw hole.

[0035] The hand-held portion 402 facilitates holding the rotating bolt 401, which is beneficial for quick disassembly and assembly between the JDG pipe 3 and the joint body 1, and can also prevent the bolt 401 from being completely screwed into the joint body 1 and unable to be removed.

[0036] Please see attached Figure 2 and attached Figure 3 The wrapping sealing sleeve 2 is a soft sleeve, and the inner diameter of the wrapping sealing sleeve 2 is slightly smaller than the outer diameter of the JDG pipe 3, so that the two ends of the wrapping sealing sleeve 2 can be sealed and fitted on the outer wall of the JDG pipe 3 and the joint body 1, so that the JDG pipe 3 and the joint body 1 are sealed and connected.

[0037] Preferably, the wrapping sealing sleeve 2 can be made of rubber material. Since the inner diameter of the wrapping sealing sleeve 2 is slightly smaller than the outer diameter of the JDG pipe 3, the elastic deformation of the wrapping sealing sleeve 2 is used to ensure that it is completely wrapped around the JDG pipe 3 and the joint body 1 and does not fall off, and its wrapping sealing performance. In addition, the wrapping sealing sleeve 2 can be folded. When the JDG pipe 3 is not plugged in, the other end of the wrapping sealing sleeve 2 is folded at the end of the joint body 1 to avoid affecting the insertion of the JDG pipe 3 into the joint body 1. After the JDG pipe 3 is plugged in, the other end of the wrapping sealing sleeve 2 is folded to wrap around the wrapping sealing sleeve 2.

[0038] Please see attached Figure 1 To Attachment Figure 3 A bending portion 201 is formed in the middle of the wrapping sealing sleeve 2, so that the wrapping sealing sleeve 2 is folded through the bending portion 201 and wrapped around the end of the joint body 1, or the wrapping sealing sleeve 2 is unfolded through the bending portion 201 and wrapped around the joint body 1 and the JDG pipe 3.

[0039] The bending portion 201 can be bent and deformed to facilitate the folding of the other end of the wrapped sealing sleeve 2, thereby facilitating the connection of the joint body 1 and the JDG pipe 3 through the wrapped sealing sleeve 2.

[0040] Please see attached Figure 1 To Attachment Figure 3 The connection method between two adjacent JDG pipes 3 of the utility model is:

[0041] When the joint body 1 is produced, one end of the wrapping sealing sleeve 2 is integrally formed or glued to the end of the joint body 1, and the other end of the wrapping sealing sleeve 2 is folded and wrapped around one end of the wrapping sealing sleeve 2 through the bending portion 201, as shown in the attached Figure 1 As shown, the two ends of the joint body 1 are symmetrically provided with wrapped sealing sleeves 2.

[0042] Select a joint body 1 of appropriate size according to the diameter of the JDG pipe 3 , insert the connecting ends of two adjacent JDG pipes 3 into both ends of the joint body 1 respectively, and plug the JDG pipe 3 until it abuts against the inner wall of the inner recess 101 .

[0043] Hold the handle 402 and screw the bolt 401 into the joint body 1 through the screw hole and tighten it against the outer wall of the JDG pipe 3, so that the joint body 1 and the JDG pipe 3 are relatively fixed. The two JDG pipes 3 are tightened and fixed with two bolts 401, thereby ensuring the firmness of the connection between the two adjacent JDG pipes 3.

[0044] The other end of the wrapped sealing sleeve 2 is unfolded through the bent portion 201 to wrap around the JDG pipe 3, as shown in the attached Figure 2 and attached Figure 3 As shown, since the wrapping sealing sleeve 2 is made of soft material and its diameter is slightly smaller than the diameter of the JDG pipe 3, the wrapping sealing sleeve 2 is sealed and wrapped around the JDG pipe 3 and the joint body 1, sealing the connection between the JDG pipe 3 and the joint body 1, thereby ensuring the docking sealing between the two adjacent JDG pipes 3.

[0045] The above are only preferred embodiments of the present invention and are not intended to limit the scope of protection of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A JDG pipe joint for preventing pipe blockage, characterized by: The invention comprises a joint body (1), a tightening assembly and a wrapping sealing sleeve (2); the joint body (1) is a tubular structure, and the inner diameter of the joint body (1) is larger than the outer diameter of the JDG pipe, so that two adjacent JDG pipes (3) are respectively inserted into the joint body (1) from both ends of the joint body (1); a plurality of sets of tightening assemblies are arranged in pairs on the joint body (1), and each pair of tightening assemblies can be movably pressed against two JDG pipes (3), so that the two JDG pipes (3) are butt-jointed and fixed through the joint body (1); one end of a pair of wrapping sealing sleeves (2) is respectively arranged at both ends of the joint body (1), and the other ends of the pair of wrapping sealing sleeves (2) are respectively wrapped and sealed on the two JDG pipes (3).

2. The JDG pipe joint for preventing pipe blockage according to claim 1 is characterized in that: An inner recess (101) is formed in the middle of the joint body (1), and the inner diameter of the inner recess (101) is smaller than the outer diameter of the JDG pipe (3), so that two adjacent JDG pipes (3) can abut against the inner wall of the inner recess (101) after being inserted into the joint body (1).

3. The JDG pipe joint for preventing pipe blockage according to claim 2 is characterized in that: A pair of screw holes is formed on the joint body (1), and each set of fastening components includes bolts (401). The bolts (401) of the pair of fastening components are respectively matched and screwed into the pair of screw holes, and one end of the bolt (401) passes through the joint body (1) and is tightened on the outer wall of the JDG pipe (3).

4. The JDG pipe joint for preventing pipe blockage according to claim 3 is characterized in that: The pair of screw holes are symmetrically arranged on both sides of the inner recess (101), and the screw holes are located in the middle between the end of the joint body (1) and the inner recess (101).

5. The JDG pipe joint for preventing pipe blockage according to claim 3 is characterized in that: The axial direction of the screw hole and the bolt (401) is located in the radial direction of the JDG pipe (3).

6. The JDG pipe joint for preventing pipe blockage according to claim 3 or 5, characterized in that: The other end of the bolt (401) is formed with a handle (402), and the outer diameter of the handle (402) is larger than the hole diameter of the screw hole.

7. The JDG pipe joint for preventing pipe blockage according to claim 1 is characterized in that: The wrapping sealing sleeve (2) is a soft sleeve, and the inner diameter of the wrapping sealing sleeve (2) is smaller than the outer diameter of the JDG pipe (3), so that the two ends of the wrapping sealing sleeve (2) can be sealed and fitted on the outer walls of the JDG pipe (3) and the joint body (1), so that the JDG pipe (3) and the joint body (1) are sealed and connected.

8. The JDG pipe joint for preventing pipe blockage according to claim 1 or 7, characterized in that: A bending portion (201) is formed in the middle of the wrapping sealing sleeve (2), so that the wrapping sealing sleeve (2) can be folded through the bending portion (201) to wrap around the end of the joint body (1), or the wrapping sealing sleeve (2) can be unfolded through the bending portion (201) to wrap around the joint body (1) and the JDG pipe (3).