Dust removal and denitration integrated device for cement kiln

By designing vertical electrostatic dust collectors and denitrification reactors in cement kilns, electrostatic dust collectors and multi-layer catalyst layers are used to reduce dust concentration, and combined with ash cleaning device, the problems of catalyst blockage and high energy consumption are solved, achieving high efficiency and low efficiency Cost dust removal and denitrification effect.

CN221933602UInactive Publication Date: 2024-11-01FUJIAN LONGKING DSDN ENGINEERING CO LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420106621.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-16
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the SCR denitrification process of existing cement kilns, high dust-containing flue gas causes the catalyst to be blocked and worn, and the existing dust removal device covers a large area, has high energy consumption and high operating costs.

Method used

Design a cement furnace and kiln dust removal and denitrification integrated device, including a vertical electrostatic precipitator and a denitrification reactor, use the anode plate and cathode line in the electrostatic precipitator to perform electrostatic precipitation, and reduce dust concentration through the rectifier layer and multi-layer catalyst layer , combined with the ash cleaning device to realize the pre-dust removal function of the catalyst, reducing system resistance and operating costs.

Benefits of technology

It effectively reduces the risk of catalyst blockage and wear, reduces the equipment footprint and energy consumption, reduces the operating and maintenance costs, and improves the stability and reliability of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221933602U_ABST
    Figure CN221933602U_ABST
Patent Text Reader

Abstract

The utility model relates to a dust removal and denitration integrated device for a cement kiln. The dust removal and denitration integrated device is connected with a preheater of a cement production line through an inlet flue. The device comprises an electric dust remover and a denitration reactor which are communicated. The electric dust remover comprises a dust removal bin, a dust removal ash hopper, anode frames provided with swinging anode plates and cathode frames provided with swinging cathode wires, the dust removal bin extends in the vertical direction, the top of the dust removal bin is communicated with the inlet flue, the dust removal ash hopper is connected to the bottom of the dust removal bin, and the multiple anode frames and the multiple cathode frames are arranged in the dust removal bin at equal intervals in a staggered mode. The denitration reactor comprises a reaction bin, a reaction ash hopper, a catalyst layer, a rectification layer and an ash removal device, the reaction bin extends in the vertical direction, the reaction ash hopper is connected to the bottom of the reaction bin, the catalyst layer is arranged in the reaction bin, the rectification layer is arranged in the reaction bin and below the catalyst layer, and the ash removal device is used for removing ash on the bottom face of a denitration catalyst. Wherein the flue gas in the dust removal bin flows from top to bottom, and the flue gas in the reaction bin flows from bottom to top.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of water conservancy flue gas treatment, and in particular to an integrated device for dust removal and denitrification of a cement kiln. Background Art

[0002] SCR denitrification technology is the mainstream technology for cement kilns to achieve ultra-low NOx emissions in flue gas. However, due to the high dust concentration of flue gas at the end of cement kilns, which is as high as 80-120g / Nm3, and the high content of alkaline earth metals in the dust, it has the characteristics of high viscosity, strong adhesion and small particle size. This type of high-dust flue gas directly entering the SCR denitrification reactor can easily cause problems such as blockage and wear of the SCR denitrification catalyst. Therefore, considering the adverse effects of dust on the catalyst is the key to affecting the cement denitrification process.

[0003] At present, the mainstream cement SCR denitrification processes are high-temperature and high-dust, high-temperature and medium-dust, and high-temperature and low-dust SCR denitrification technologies.

[0004] The high-temperature and high-dust SCR denitration process is a process route that does not have a dust removal device, but directly sets up an SCR denitration reactor at the outlet of the C1 preheater. The catalyst of this route is very easy to accumulate dust or become clogged, and once the operating conditions of the previous stage fluctuate, a large amount of dust will accumulate on the surface of the catalyst, which will lead to catalyst clogging, wear, and deactivation, affecting the operation of the entire system. In order to alleviate the clogging of the catalyst, a rake-type compressed air soot blower is required to blow soot continuously, which consumes a lot of energy and has high operating costs.

[0005] The high-temperature medium-dust SCR denitration process is a process route in which a horizontal electrostatic precipitator is set up at the front end of the SCR denitration reactor, and the flue gas enters the SCR denitration reactor after dust removal. This route solves the problem of high dust content in the flue gas in the catalyst, but its electrostatic precipitator is a horizontal structure with horizontal air intake, which occupies a large space as a whole, has a high system operation resistance, and still needs to be separately designed with a rake-type compressed air soot blower for continuous soot blowing, which consumes a lot of energy, has a high system resistance, high operating cost, and occupies a large space.

[0006] The high-temperature, low-dust SCR denitration process uses a high-temperature metal filter bag to remove dust at the front end of the SCR denitration reactor, which removes most of the dust in the flue gas, and the dust concentration entering the SCR denitration is only mg level, thus solving the problem of catalyst wear and blockage, and the catalyst can also use a catalyst with a smaller pitch. However, the overall cost of the metal filter bag is high, and it occupies a large area. In addition, due to the small particle size of cement dust, it is easy to embed in the filter bag. As the operating time increases, the filter bag resistance rises rapidly, the system resistance is large, the operating cost is high, and the operating and maintenance cost is also high. Utility Model Content

[0007] The purpose of the utility model is to provide an integrated device for dust removal and denitrification of a cement kiln to solve the problems raised in the above-mentioned background technology.

[0008] In order to solve the above technical problems, the utility model adopts the following technical solutions.

[0009] The utility model provides an integrated device for dust removal and denitration of a cement kiln, which is connected to a preheater of a cement production line through an inlet flue, and an ammonia spraying device is arranged on the inlet flue. The device comprises: an electrostatic precipitator, comprising a dust removal bin, a dust removal ash hopper, an anode frame equipped with a swingable anode plate and a cathode frame equipped with a swingable cathode wire, the dust removal bin extends vertically, the top of the dust removal bin is connected to the inlet flue, the dust removal ash hopper is connected to the bottom of the dust removal bin and communicates with the dust removal bin, and a plurality of anode frames and a plurality of cathode frames are staggered and arranged in the dust removal bin at equal intervals; a denitration reactor, comprising a reaction bin, a reaction ash hopper, a catalyst layer, a rectifying layer and a dust cleaning device, the reaction bin extends vertically The reaction ash hopper is connected to the bottom of the reaction bin and communicated with the reaction bin. The catalyst layer is arranged in the reaction bin, the catalyst layer includes a denitration catalyst, and the catalyst layer is provided with multiple layers at intervals from top to bottom. The rectifying layer is arranged in the reaction bin and below the catalyst layer. A plurality of rectifying holes extending vertically are evenly distributed on the rectifying layer. The cleaning device is arranged in the reaction bin for cleaning the bottom surface of the denitration catalyst. The dust removal bin and the reaction bin are adjacently arranged and provided with a communicating port. The flue gas in the dust removal bin flows from top to bottom and enters the reaction bin through the communicating port. The flue gas in the reaction bin flows from bottom to top.

[0010] In some embodiments of the present application, the dust removal bin and the reaction bin are integrally connected; a partition is provided between the dust removal bin and the reaction bin, the partition serves as a common side wall between the dust removal bin and the reaction bin, and the connecting port is provided on the partition.

[0011] In some embodiments of the present application, the connecting port is located below the anode frame and the cathode frame in the dust removal chamber and below the rectifying layer in the reaction chamber, and the reaction chamber is also provided with a smoke exhaust port located above the catalyst layer.

[0012] In some embodiments of the present application, the anode plates and the cathode wires are both extended vertically; and a plurality of the anode plates on the anode frame and the cathode wires on the cathode frame are both arranged side by side and spaced apart.

[0013] In some embodiments of the present application, the deNOx reactor also includes a guide vane; the guide vane is disposed in the reaction chamber, below the rectifying layer, and close to the connecting port; the guide vane is inclined upward from one end close to the connecting port to an end away from the connecting port; a plurality of guide vanes are provided at intervals up and down, and the inclination angle of the guide vanes gradually decreases from top to bottom.

[0014] In some embodiments of the present application, the integrated dust removal and denitrification device for a cement furnace further includes a dust interceptor disposed at the connecting port.

[0015] In some embodiments of the present application, the integrated dust removal and denitrification device for a cement furnace also includes an ash discharger; the ash discharger is used to receive dust discharged from the bottom outlet of the dust removal ash hopper and the bottom outlet of the reaction ash hopper, and discharge the dust to the raw material storage.

[0016] In some embodiments of the present application, the reaction chamber is connected to the waste heat boiler through an outlet flue.

[0017] It can be seen from the above technical solutions that the embodiments of the utility model have at least the following advantages and positive effects:

[0018] In the integrated device for dust removal and denitrification of cement kilns of the embodiment of the utility model, the high-temperature flue gas from the preheater of the cement production line enters the dust removal bin of the electrostatic precipitator through the inlet flue connection.

[0019] The dust removal bin and the reaction bin are both extended vertically, that is, the dust removal bin and the reaction bin are both vertical structures, and the dust removal bin and the reaction bin are arranged adjacent to each other, which greatly reduces the floor space of the electrostatic precipitator and the denitrification reactor.

[0020] The flue gas enters from the top of the dust removal bin, which can reduce the number of elbows used to connect the dust removal bin and the preheater, and is conducive to the flue gas from the preheater to smoothly enter the dust removal bin, reducing system resistance.

[0021] The flue gas in the dust removal bin flows from top to bottom, and the cathode wire in the dust removal bin discharges at high voltage, so that the charged anionic and cationic dust ions entering the dust removal bin are separated, the cationic dust is adsorbed by the cathode wire, and the anionic dust is adsorbed by the anode plate. Since both the anode plate and the cathode wire can swing, as the flue gas flows, the anode plate and the cathode wire swing under the action of the airflow, and the dust on the anode plate and the cathode wire falls into the dust removal hopper. There is no need to set up a vibration device for vibrating the anode plate and the cathode wire, which reduces the power consumption of the electrostatic precipitator during operation and reduces the maintenance workload of the electrostatic precipitator.

[0022] The flue gas after dust removal by the electrostatic precipitator enters the reaction chamber through the connecting port, and the flue gas passes through the rectifying layer and the multi-layer catalyst layer from bottom to top in the reaction chamber, and then is discharged from the reaction chamber from the exhaust port. When passing through the rectifying layer, the rectifying layer is evenly distributed with a plurality of rectifying holes extending vertically. The plurality of rectifying holes play the role of evenly distributing the flue gas flow field, and the flue gas flows in a vertical direction under the rectification of the rectifying holes, ensuring that the flue gas is blown toward the denitrification catalyst in a direction perpendicular to the bottom surface of the denitrification catalyst in the catalyst layer. Since the denitrification catalyst has a porous structure, when the flue gas passes through the bottom catalyst layer, the denitrification catalyst can block most of the dust in the flue gas at the bottom surface of the denitrification catalyst, reducing the concentration of dust when entering the subsequent catalyst layer, thereby avoiding the problem of blockage and wear of the denitrification catalyst in the subsequent catalyst layer. The cleaning device can also be used to clean the dust accumulated on the bottom surface of the denitrification catalyst. After being swept, the dust falls into the ash hopper for collection, so that the bottom catalyst layer has a pre-dust removal function. Combined with the front-end electrostatic precipitator, a large amount of dust has been removed, reducing the system resistance and ensuring the stability and reliability of the denitrification reaction. At the same time, the investment and operating costs are lower, and the entire device is more energy-saving and carbon-reducing. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The various objects, features and advantages of the present invention will become more apparent by considering the following detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. The accompanying drawings are only exemplary illustrations of the present invention and are not necessarily drawn to scale. In the accompanying drawings, the same reference numerals always represent the same or similar parts. Among them:

[0024] Figure 1 It is a structural schematic diagram of a cement kiln countercurrent dust removal and denitrification integrated device according to one embodiment of the utility model.

[0025] The reference numerals in the accompanying drawings are as follows: 1. Cement rotary kiln; 2. Preheater; 30. Inlet flue; 3. Electrostatic precipitator; 31. Dust removal bin; 32. Dust ash hopper; 33. Anode frame; 34. Cathode frame; 40. Outlet flue; 4. Denitrification reactor; 41. Reaction bin; 42. Reaction ash hopper; 43. Catalyst layer; 44. Rectifier layer; 45. Cleaning device; 46. Partition; 461. Connecting port; 47. Guide vane; 5. Dust interceptor; 6. Ash discharger; 7. Waste heat boiler; 8. Fan; 9. Ammonia injection grid. DETAILED DESCRIPTION

[0026] Although the present invention can be easily embodied as embodiments of different forms, only some of the specific embodiments are shown in the drawings and described in detail in this specification. It should be understood that this description should be regarded as an exemplary description of the principles of the present invention and is not intended to limit the present invention to that described herein.

[0027] Thus, a feature indicated in this specification will be used to illustrate one of the features of an embodiment of the utility model, rather than implying that each embodiment of the utility model must have the described feature. In addition, it should be noted that this specification describes many features. Although some features can be combined together to illustrate possible system designs, these features can also be used in other combinations that are not explicitly described. Thus, unless otherwise stated, the described combinations are not intended to be limiting.

[0028] In the embodiments shown in the drawings, the indications of directions (such as up, down, left, right, front and back) used to explain the structure and movement of various elements of the utility model are not absolute but relative. These descriptions are appropriate when these elements are in the positions shown in the drawings. If the descriptions of the positions of these elements change, the indications of these directions also change accordingly.

[0029] See also Figure 1 The utility model provides an integrated dust removal and denitrification device for a cement kiln, which is connected to a preheater 2 of a cement production line through an inlet flue 30, and an ammonia injection grid 9 is provided on the inlet flue 30. Specifically, the preheater 2 is connected to the outlet of the cement rotary kiln, and the inlet flue 30 is connected to the top of the preheater 2 and the integrated dust removal and denitrification device.

[0030] The integrated device for dust removal and denitrification of cement kilns comprises an electrostatic precipitator 3 and a denitrification reactor 4.

[0031] The electrostatic precipitator 3 includes a dust removal bin 31, a dust removal hopper 32, an anode frame 33 equipped with a swingable anode plate and a cathode frame 34 equipped with a swingable cathode wire. The dust removal bin 31 extends vertically, the top of the dust removal bin 31 is connected to the top of the preheater 2, the dust removal hopper 32 is connected to the bottom of the dust removal bin 31 and communicates with the dust removal bin 31, and a plurality of anode frames 33 and a plurality of cathode frames 34 are arranged in the dust removal bin 31 at equal intervals and staggered.

[0032] The denitration reactor 4 includes a reaction bin 41, a reaction ash hopper 42, a catalyst layer 43, a rectifying layer 44 and a cleaning device 45. The reaction bin 41 extends vertically, the reaction ash hopper 42 is connected to the bottom of the reaction bin 41 and communicates with the reaction bin 41, the catalyst layer 43 is arranged in the reaction bin 41, the catalyst layer 43 includes a denitration catalyst, and the catalyst layer 43 is provided with multiple layers at intervals up and down, the rectifying layer 44 is arranged in the reaction bin 41 and below the catalyst layer 43, and a plurality of rectifying holes extending vertically are evenly distributed on the rectifying layer 44, and the cleaning device 45 is arranged in the reaction bin 41 for cleaning the bottom surface of the denitration catalyst.

[0033] The dust removal bin 31 and the reaction bin 41 are arranged adjacent to each other and are provided with a connecting port 461 . The smoke in the dust removal bin 31 flows from top to bottom and enters the reaction bin 41 through the connecting port 461 . The smoke in the dust removal bin 31 flows from bottom to top.

[0034] Through the above structural design, after the high-temperature flue gas from the cement rotary kiln 1 exchanges heat with the cement raw material through the preheater 2, the ammonia spraying device atomizes the ammonia water through compressed air and sprays it into the inlet flue 30 for evaporation and mixing with the flue gas.

[0035] The dust removal bin 31 and the reaction bin 41 both extend vertically, that is, the dust removal bin 31 and the reaction bin 41 are both vertical structures, and the dust removal bin 31 and the reaction bin 41 are arranged adjacent to each other, which greatly reduces the floor space of the electrostatic precipitator 3 and the denitration reactor 4.

[0036] The flue gas enters from the top of the dust removal bin 31, which can reduce the number of elbows used to connect the dust removal bin 31 and the preheater 2, and is conducive to the flue gas from the preheater 2 to smoothly enter the dust removal bin 31, thereby reducing system resistance and increasing the flow rate of the flue gas in the dust removal bin 31. Under the same flow requirement, the cross-sectional area of ​​the dust removal bin 31 can be smaller, further reducing the footprint of the electrostatic precipitator 3.

[0037] The flue gas in the dust removal bin 31 flows from top to bottom, and the cathode wire 34 in the dust removal bin 31 performs high-voltage discharge, so that the charged anionic and cationic dust ions entering the dust removal bin 31 are separated, and the cation-carrying dust is adsorbed by the cathode wire 34, and the anion-carrying dust is adsorbed by the anode plate 33. Since the anode plate 33 and the cathode wire 34 can be swingably arranged in the dust removal bin 31, as the flue gas flows, the anode plate 33 and the cathode wire 34 swing under the action of the airflow, and the dust on the anode plate 33 and the cathode wire 34 is shaken off into the dust removal ash hopper 32. There is no need to set up a beating device for beating the anode plate 33 and the cathode wire 34, which effectively reduces the volume of the dust removal bin 31, reduces the floor space of the electrostatic precipitator 3, and reduces the power consumption of the electrostatic precipitator 3 during operation.

[0038] The flue gas after dust removal by the electrostatic precipitator 3 enters the reaction chamber 41 through the connecting port 461. The flue gas passes through the rectifying layer 44 and the multi-layer catalyst layer 43 from bottom to top in the reaction chamber 41 and then is discharged from the reaction chamber 41 from the exhaust port. When passing through the rectifying layer 44, the rectifying layer 44 is evenly distributed with a plurality of rectifying holes extending in the vertical direction. The plurality of rectifying holes play the role of evenly distributing the flue gas flow field, and the flue gas flows in the vertical direction under the rectification of the rectifying holes, ensuring that the flue gas is blown toward the denitration catalyst in a direction perpendicular to the bottom surface of the denitration catalyst in the catalyst layer 43. Since the denitration catalyst is a porous structure, when the flue gas passes through the bottom catalyst layer 43, the denitration catalyst can block most of the dust in the flue gas at the bottom surface of the denitration catalyst, reducing the concentration of dust when entering the subsequent catalyst layer 43, thereby avoiding the problem of blockage and wear of the denitration catalyst in the subsequent catalyst layer 43. The cleaning device 45 can also be used to clean the dust accumulated on the bottom surface of the denitrification catalyst. After being swept, the dust falls into the ash hopper for collection, so that the bottom catalyst layer 43 has a pre-dust removal function. Combined with the front-end electrostatic precipitator 3, a large amount of dust has been removed, which reduces the system resistance and ensures the stability and reliability of the denitrification reaction. At the same time, the investment and operating costs are lower, and the entire device is more energy-saving and carbon-reducing.

[0039] It should be noted that the preheater 2 as a whole has a certain height, and the outlet of the preheater 2 is located at the top. The relevant technology adopts a horizontal electrostatic precipitator 3. When the outlet of the preheater 2 is connected to the horizontal electrostatic precipitator 3, at least one U-shaped tube and one L-shaped tube are required. The number of elbows is large, which increases the resistance to the flow of flue gas, and the flue gas enters the horizontal electrostatic precipitator 3 horizontally. Due to the large number of elbows, under the same floor area, the floor space of the dust removal bin 31 needs to be reduced accordingly, thereby reducing the flow rate of the flue gas in the dust removal bin 31. Therefore, the horizontal structure of the electrostatic precipitator 3 has a greater requirement for the cross-sectional area.

[0040] In the present embodiment, the top of the dust removal bin 31 and the top of the preheater 2 are connected by a U-shaped tube, which reduces the number of elbows and makes the flue gas from the preheater 2 to the dust removal bin 31 flow more smoothly, with less system resistance, thereby increasing the flow rate of the flue gas in the dust removal bin 31, lowering the cross-sectional area requirement for the dust removal bin 31 and reducing the floor space occupied.

[0041] The connecting port 461 is located below the anode frame 33 and the cathode frame 34 in the dust removal chamber 31 , and below the rectifying layer 44 in the reaction chamber 41 . The reaction chamber 41 is also provided with a smoke exhaust port located above the catalyst layer 43 .

[0042] The anode plate and the cathode wire are both in the shape of long strips, one end of the anode plate is fixedly connected and the other end is movably connected and / or one end of the cathode wire is fixedly connected and the other end is movably connected.

[0043] Since the anode plate and the cathode wire are both long strips, they have a certain flexibility. Under the action of airflow, the end of the anode plate that is movably connected will cause the anode plate to swing, and the end of the cathode wire that is movably connected will cause the cathode wire to swing.

[0044] Specifically, the movable connection method can be that a first slot is provided on the anode frame, the lower end of the anode plate is inserted into the first slot, the volume of the first slot is larger than the volume of the lower end of the anode plate, and provides a movable space for the swing of the anode plate. A second slot is provided on the cathode frame, the lower end of the cathode wire is inserted into the second slot, and the volume of the second slot is larger than the volume of the lower end of the cathode wire, and provides a movable space for the swing of the cathode wire.

[0045] The anode plates and cathode wires are both extended vertically, and multiple anode plates on the anode frame 33 and cathode wires on the cathode frame 34 are arranged side by side and spaced apart. The flue gas entering the dust removal bin 31 can pass through the spaces between the anode plates and the spaces between the cathode wires, extending the residence time of the flue gas in the dust removal bin 31, which is conducive to increasing the flue gas flow rate entering the cross section of the dust removal bin, effectively reducing the volume of the dust removal bin 31, and reducing the floor space of the electrostatic precipitator. In this embodiment, the multiple anode plates 33 and the multiple cathode wires 34 are all in the shape of shutters.

[0046] The dust removal bin 31 and the reaction bin 41 are connected as one body, and a partition 46 is provided between the dust removal bin 31 and the reaction bin 41. The partition 46 serves as a common side wall between the dust removal bin 31 and the reaction bin 41, and the communication port 461 is provided on the partition 46. It can also be said that a partition 46 is provided in an integrated bin, and the partition 46 divides the integrated bin into the dust removal bin 31 and the reaction bin 41. Not only the manufacturing materials of the dust removal bin 31 and the reaction bin 41 are reduced, but also the dust removal bin 31 and the reaction bin 41 are provided as a whole without any interval between them, which further reduces the occupied area.

[0047] The integrated dust removal and denitrification device for cement kiln further comprises a dust interceptor 5 arranged at the connecting port 461 . The dust interceptor 5 performs mechanical dust removal to intercept the flake dust collected by the dust hopper 32 , so as to prevent the dust from being carried into the denitrification reactor 4 by the flue gas.

[0048] The flue gas enters the denitration reactor 4 after being dedusted by the electrostatic precipitator 3. The connecting port 461 is arranged on the side wall of the reaction bin 41 and is close to the entrance of the reaction ash hopper 42. The smoke exhaust port is arranged at the top of the reaction bin 41. Since the bottom opening of the reaction bin 41 is connected to the entrance of the reaction ash hopper 42, the reaction ash hopper 42 is vertically connected to the reaction bin 41, so that the dust falling in the vertical direction is more easily collected by the reaction ash hopper 42. Therefore, the connecting port 461 is arranged on the side wall of the reaction bin 41 to make way for the bottom opening of the reaction bin 41. After the flue gas enters the reaction bin 41 from the connecting port 461 on the side wall of the reaction bin 41, it begins to float up and passes through the uniform flow field and rectification of the rectifying layer 44, so that the flue gas evenly passes through the multiple catalyst layers 43 vertically upward in sequence, and finally is discharged upward from the smoke exhaust port at the top of the reaction bin 41 along the flow direction of the flue gas, and the smoke exhaust is smoother.

[0049] The denitration reactor 4 also includes a guide plate 47, which is arranged in the reaction chamber 41. The guide plate 47 is arranged below the rectifying layer 44 and close to the connecting port 461. The guide plate 47 is inclined upward from one end close to the connecting port 461 to the end away from the connecting port 461. When the flue gas enters the reaction chamber 41 from the connecting port 461 on the side wall of the reaction chamber 41, the flue gas flows horizontally. Under the action of the guide plate 47, the flow direction of the flue gas can be changed, so that the flue gas turns to flow toward the finishing layer above the connecting port 461. The guide plate 47 can prevent the flue gas from lifting the dust collected in the reaction ash hopper 42 downward, so that the flue gas flow field flowing from bottom to top in the reaction chamber 41 is smoother.

[0050] There are multiple guide vanes 47 spaced apart from each other, and the inclination angle of the guide vanes 47 gradually decreases from top to bottom. That is to say, the upper guide vane 47 has a larger inclination angle, and the lower guide vane 47 has a smaller inclination angle. The upper guide vane 47 is closer to the rectifying layer 44, and the lower guide vane 47 is farther away from the rectifying layer 44. The side of the rectifying layer 44 close to the smoke inlet is defined as the proximal end, and the other side away from the smoke inlet is defined as the distal end. The upper guide vane 47 has a larger inclination angle, which can guide the smoke to the proximal end of the rectifying layer 44, and the lower guide vane 47 has a smaller inclination angle, which can guide the smoke to the distal end of the rectifying layer 44. The inclination angle of the middle guide vane 47 is moderate, which can guide the smoke to the middle of the rectifying layer 44, so that the smoke is evenly blown to various areas of the rectifying layer 44, achieving the effect of evenly distributing the smoke. The guide piece 47 may be in an arc shape or a straight line shape.

[0051] It should be noted that by uniformly distributing the flue gas flow field through the guide vanes 47 and the rectifying layer 44 , it is possible to avoid the situation where the amount of flue gas in certain areas is too large, causing dust to block the catalyst.

[0052] The denitration catalyst may be one or more of a plate type, a honeycomb type and a corrugated plate type. In the present embodiment, the denitration catalyst is a honeycomb type denitration catalyst.

[0053] The catalyst layer 43 further includes a support frame, which is used to support the denitration catalyst. The support frame may be a mesh structure, so that the flue gas can contact the denitration catalyst through the support frame.

[0054] In this embodiment, multiple groups of cleaning devices 45 are provided, and correspond to the multiple layers of catalyst layers 43 one by one. Each group of cleaning devices 45 is used to clean the bottom surface of the denitration catalyst in each catalyst layer 43. The catalyst layer 43 and the rectifying layer 44 are arranged along the cross-sectional direction of the reaction chamber 41, and each group of cleaning devices 45 includes multiple cleaning devices 45 extending in the transverse direction. In other embodiments, only one group of cleaning devices 45 can be provided to clean the bottom surface of the denitration catalyst on the bottommost catalyst layer 43.

[0055] The cleaning device 45 may be a cleaning device 45 of various forms such as sonic wave, shock wave, or rake type.

[0056] The cleaning device 45 is arranged adjacent to the bottom of the catalyst layer 43. The cleaning device 45 can be a purge pipe, which uses compressed gas to clean the bottom surface of the denitration catalyst. In addition, the purge direction of the purge pipe is upward, which is consistent with the flow direction of the flue gas. However, the blowing force of the purge pipe is greater than the flow force of the flue gas. The large dust swept down by the purge pipe will fall due to gravity and be collected in the ash hopper, while the other fine dust swept down will be carried by the flue gas through the catalyst and continue to flow upward. The purge pipe can provide power for the fine dust to pass through the catalyst with the flue gas.

[0057] The dust cleaning device 45 can also be a brush, and the back and forth movement of the brush is used to clean the bottom surface of the denitration catalyst. The bottom catalyst layer 43 is intercepted and matched with the dust cleaning device 45 to achieve the effect of secondary dust removal.

[0058] The rectifying layer 44 can use rectifying grids or honeycomb wear-resistant bricks. When the rectifying layer 44 uses honeycomb wear-resistant bricks, the honeycomb wear-resistant bricks have good wear resistance and can reduce the degree of wear caused by powder. In addition, the pores in the honeycomb wear-resistant bricks are small, and the honeycomb wear-resistant bricks can also play a role in dust interception, blocking most of the dust on the bottom surface of the rectifying layer 44. The cleaning device 45 is also used to clean the bottom surface of the rectifying layer 44, reducing the amount of dust entering the subsequent catalyst layer 43, and ensuring the stability and reliability of the denitration reactor 4.

[0059] It should be noted that the existing SCR denitration reactor 4 is basically designed in the way that the flue gas enters from the top and exits from the bottom. A few of the ways that the flue gas enters from the bottom and exits from the top are only used in dust-free or dust-free fields. The conventional SCR reactor is arranged from top to bottom. Since the catalyst pores in the SCR reactor are small, dust is more likely to adhere to the catalyst surface and form blockages, which not only affects the SCR reaction, but also causes resistance to increase. In order to solve the problem of catalyst blockage, on the one hand, various forms of soot blowing devices such as sound waves, shock waves, and rakes are set in the SCR denitration reactor 4 to blow up the dust on the catalyst surface and take it away with the flue gas; on the other hand, the catalyst pitch is increased to reduce blockage. However, the above measures are difficult to ensure that the catalyst does not get blocked when the dust concentration is as high as 60g / Nm3 or above. Once the catalyst is blocked, the overall denitration efficiency will be reduced, the system resistance will be greatly increased, and the system will eventually have to be shut down for manual cleaning, which will affect the stability and reliability of the SCR denitration system.

[0060] The cement kiln dust removal and denitrification integrated device also includes an ash discharger 6. The ash discharger 6 is used to receive dust discharged from the bottom outlet of the dust removal ash hopper 32 and the bottom outlet of the reaction ash hopper 42, and discharge the dust to the raw material warehouse to recycle the dust, reduce the production cost of cement, and avoid excessive dust accumulation in the dust removal ash hopper 32 and the reaction ash hopper 42.

[0061] The reaction bin 41 is connected to the waste heat boiler 7 through the outlet flue 40, and the waste heat boiler 7 extends vertically. The smoke outlet of the reaction bin 41 is arranged at the top of the reaction bin 41 and is connected to the top of the waste heat boiler 7, and the bottom of the waste heat boiler 7 is connected to the raw material mill. The flue gas after denitration is led to the waste heat boiler 7 for waste heat recovery, and then transported to the raw material mill for subsequent heat exchange.

[0062] The fan 8 is arranged on the flue between the waste heat boiler 7 and the raw material grinding equipment, and is used to drive the flow of flue gas in the flue. The fan 8 provides driving force for the flow of flue gas when the device is running.

[0063] The following provides a specific embodiment of the integrated device for dust removal and denitrification of cement kilns using the utility model.

[0064] Taking a 5000t / d cement kiln as an example, the flue gas temperature discharged from the preheater 2 of the cement production line C1 is about 260-350℃, and the dust concentration reaches 80-120g / Nm3. The flue gas enters the integrated dust removal and denitrification device from top to bottom through the inlet flue, and first enters the electrostatic precipitator 3, with a flue gas flow rate of up to 3.5m / s. At the same time, an ammonia spraying device is provided on the inlet flue. According to the original NOx concentration value, the ammonia water is atomized by compressed air and sprayed into the flue to evaporate and mix with the flue gas. After the flue gas enters the electrostatic precipitator 3, the dust is charged under the electrostatic action of the electric field of the anode frame and the cathode frame, and the dust with cations is adsorbed by the cathode wire, and the dust with anions is adsorbed by the anode plate. Since the anode plate and the cathode wire can be swingably arranged in the dust removal bin, as the flue gas flows, the anode plate and the cathode wire swing under the action of the airflow, and the dust on the anode plate and the cathode wire is shaken off into the dust removal hopper 32. At the same time, in order to avoid secondary dust emission, a dust interceptor 5 is provided at the connecting port 461 at the lower part of the electrostatic precipitator 3, so as to use the dust interceptor 5 to perform mechanical dust removal and intercept the flake dust collected by the dust hopper 32. The dust removal efficiency of the electrostatic precipitator 3 can reach 65%, so that the dust concentration entering the denitration reactor 4 is reduced to 28-42 g / Nm3, and the dust concentration is greatly reduced.

[0065] After dust removal by the electrostatic precipitator 3, the flue gas enters the closely attached denitration reactor 4 from bottom to top. The inlet of the denitration reactor 4 is provided with a guide plate 47, which is used to guide the flue gas. At the same time, a rectifying layer 44 is provided to ensure that the flue gas passing through the catalyst layer 43 is evenly distributed and the flue gas is homogenized. After the rectified uniform flue gas contacts the denitration catalyst in the bottom catalyst layer 43, the dust will be further intercepted and adhered to the lower surface of the denitration catalyst due to the honeycomb pore structure of the denitration catalyst. When accumulated to a certain extent, the dust can be swept down by the dust cleaning device 45 arranged at the bottom of the catalyst layer 43 and fall into the reaction ash hopper 42. After the secondary dust removal of the flue gas is achieved, the process can achieve a dust removal efficiency of 40%, and at this time 80% of the dust in the flue gas has been removed. The dust concentration of flue gas is greatly reduced, thus effectively avoiding the blockage of denitration catalyst, ensuring that the flue gas enters the denitration catalyst and can effectively convert NOx in the flue gas into harmless nitrogen and water through catalytic action. The flue gas after denitration is led to the waste heat boiler 7 for waste heat recovery, and then sent to the raw material mill equipment through the fan 8 for subsequent heat exchange. The dust collected by the dust removal hopper 32 and the reaction hopper 42 is transported back to the raw material warehouse through the ash discharger 6.

[0066] Although the utility model has been described with reference to several typical embodiments, it should be understood that the terms used are illustrative and exemplary, rather than restrictive. Since the utility model can be implemented in a variety of forms without departing from the spirit or essence of the utility model, it should be understood that the above-mentioned embodiments are not limited to any of the aforementioned details, but should be widely interpreted within the spirit and scope defined by the attached claims, so all changes and modifications falling within the scope of the claims or their equivalents should be covered by the attached claims.

Claims

1. An integrated device for dust removal and denitrification of a cement kiln, connected to a preheater of a cement production line through an inlet flue, and an ammonia spraying device is provided on the inlet flue. It is characterized in that include: An electrostatic precipitator, comprising a dust removal bin, a dust removal hopper, an anode frame equipped with a swingable anode plate, and a cathode frame equipped with a swingable cathode wire, wherein the dust removal bin extends vertically, the top of the dust removal bin is connected to the inlet flue, the dust removal hopper is connected to the bottom of the dust removal bin and is in communication with the dust removal bin, and a plurality of anode frames and a plurality of cathode frames are staggered and arranged in the dust removal bin at equal intervals; A denitration reactor, comprising a reaction chamber, a reaction ash hopper, a catalyst layer, a rectifying layer and a ash cleaning device, wherein the reaction chamber extends vertically, the reaction ash hopper is connected to the bottom of the reaction chamber and communicates with the reaction chamber, the catalyst layer is arranged in the reaction chamber, the catalyst layer comprises a denitration catalyst, the catalyst layer is provided with multiple layers spaced up and down, the rectifying layer is arranged in the reaction chamber and below the catalyst layer, a plurality of rectifying holes extending vertically are uniformly distributed on the rectifying layer, and the ash cleaning device is arranged in the reaction chamber and used to clean the bottom surface of the denitration catalyst; The dust removal bin and the reaction bin are arranged adjacent to each other and are provided with a connecting port. The smoke in the dust removal bin flows from top to bottom and enters the reaction bin through the connecting port. The smoke in the reaction bin flows from bottom to top.

2. The integrated device for dust removal and denitrification of cement kilns according to claim 1, It is characterized in that The dust removal bin and the reaction bin are integrally connected; A partition is provided between the dust removal bin and the reaction bin. The partition serves as a common side wall between the dust removal bin and the reaction bin, and the communication port is provided on the partition.

3. The integrated device for dust removal and denitrification of cement kilns according to claim 1, It is characterized in that The communication port is located below the anode frame and the cathode frame in the dust removal chamber, and below the rectifying layer in the reaction chamber. The reaction chamber is also provided with a smoke exhaust port located above the catalyst layer.

4. The integrated device for dust removal and denitrification of cement kilns according to claim 1, It is characterized in that The anode plate and the cathode line both extend vertically; A plurality of the anode plates and the cathode lines are arranged side by side and spaced apart.

5. The integrated device for dust removal and denitrification of cement kilns according to claim 1, It is characterized in that The denitration reactor further includes a guide plate; The guide plate is arranged in the reaction chamber, and the guide plate is arranged below the rectifying layer and close to the communication port; The guide plate is inclined upward from one end close to the communication port to one end away from the communication port; A plurality of guide plates are provided at intervals in the upper and lower parts, and the inclination angle of the guide plates gradually decreases from top to bottom.

6. The integrated device for dust removal and denitrification of cement kilns according to claim 1, It is characterized in that The integrated dust removal and denitrification device for cement kiln further comprises a dust interceptor arranged at the connecting port.

7. The integrated device for dust removal and denitrification of cement kilns according to claim 1, It is characterized in that The cement kiln dust removal and denitrification integrated device also includes an ash discharger; The ash discharger is used to receive the dust discharged from the bottom outlet of the dust removal ash hopper and the dust discharged from the bottom outlet of the reaction ash hopper, and discharge the dust to the raw material warehouse.

8. The integrated device for dust removal and denitrification of cement kilns according to claim 1, It is characterized in that The reaction chamber is connected to the waste heat boiler through an outlet flue.

Citation Information

Cited By

  • Dust removal and denitration integrated device for cement kiln

    CN117942756A

  • Cement kiln dust removal and denitration integrated device

    CN117942756B