Civil engineering construction waste treatment device
By designing separation box and conveyor belt system, combined with electromagnet and water flotation technology, the problem of inability to separate wood products and iron products in the existing technology is solved, multi-stage separation of construction waste is achieved, and the purity of concrete waste is improved, making it easier to In-depth recycling.
Patent Information
- Application Number
- CN202420512871.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-18
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-18
AI Technical Summary
Existing civil engineering construction waste treatment devices cannot effectively separate wood waste from iron waste in concrete waste, resulting in too much impurities in processing waste and cannot be used directly.
A processing device including a separation box, an auxiliary box, a first separation assembly, a second separation assembly and a third separation assembly are designed, and the steel product is separated by a conveyor belt and an electromagnet, the wood product is separated by a water flotation, and the screen plate is used. Further separate the wooden products floating on the water.
Multi-stage separation of construction waste is achieved, the purity of concrete waste is improved, and the subsequent deep processing and recycling are facilitated.
Smart Images

Figure CN221934186U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of construction waste treatment, and in particular relates to a civil engineering construction waste treatment device. Background Art
[0002] As people's awareness of environmental protection increases, the recycling of construction waste has become an important task in civil engineering. Construction waste refers to waste generated during the construction process, including concrete fragments, bricks, tiles, ceramics, steel bars and other materials. These wastes can be reused after classification.
[0003] In the Chinese patent with publication number CN220531788U, a civil engineering construction waste treatment device is mentioned, which can make the construction waste more thoroughly crushed, improve the crushing treatment effect of the construction waste, and improve the practicality; it includes a treatment box, the bottom end of the treatment box is connected with four groups of legs, the upper left end of the treatment box is connected with a feed port, the feed port is connected with a feeding pipe, the bottom end of the treatment box is connected with a discharge pipe, the motor is fixedly installed on the top of the treatment box, the vertical driving shaft and the vertical driven shaft are fixedly sleeved with a first reversing gear, the two groups of pulleys are equipped with a transmission sleeve with a transmission belt, the treatment box and the transmission box are rotatably provided with a transverse driving shaft and a transverse driven shaft, the two groups of bevel gears are meshed with each other, the transverse driving shaft and the transverse driven shaft are fixedly sleeved with a second reversing gear, the two groups of second reversing gears are meshed with each other, and the outer walls of the transverse driving shaft and the transverse driven shaft are evenly provided with multiple groups of transverse crushing heads.
[0004] During the application process, the applicant discovered that the above application had defects during use. Although the application could crush large pieces of concrete construction waste, the wood waste and iron waste mixed in the concrete construction waste could not be separated, resulting in too much impurities in the processed waste and unable to be used directly. Utility Model Content
[0005] The purpose of the utility model is to provide a device for treating construction waste in civil engineering to solve the problems raised in the above-mentioned background technology.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A civil engineering construction waste treatment device, comprising:
[0008] A separation box, wherein the side wall of the separation box is fixedly connected to an auxiliary box, the separation box is communicated with the auxiliary box, a feed inlet is provided on the top of the separation box, a first discharge outlet is provided on the side wall of the separation box, and a second discharge outlet is provided on the lower surface of the separation box;
[0009] a first separation assembly, the first separation assembly being disposed above the interior of the separation box;
[0010] a second separation assembly, the second separation assembly being disposed at a lower portion of the separation box;
[0011] A third separation component is arranged inside the auxiliary box.
[0012] Preferably, the first separation component comprises:
[0013] An upper conveying assembly, the upper conveying assembly comprising two first transmission rollers rotatably connected to the inner wall of the separation box and a first conveyor belt rotatably connected to the first transmission rollers;
[0014] The middle conveying component includes four second transmission rollers rotatably connected to the inner wall of the separation box, the four second transmission rollers are divided into two groups, each group of two second transmission rollers are rotatably connected to a second conveyor belt, one group of the second conveyor belts is arranged parallel to the first conveyor belt, and the other group of the second conveyor belts is arranged obliquely, and the ends of the two groups of the second conveyor belts are abutted, and the inner wall of the separation box is fixedly connected to an electromagnet located inside the inclined second conveyor belt.
[0015] Preferably, the inner wall of the separation box is fixedly connected with an inclined guide plate, one end of the guide plate abuts against the inclined second conveyor belt, the other end of the guide plate extends out a first discharge port, and the inner wall of the separation box is fixedly connected with a spray pipe located above the guide plate.
[0016] Preferably, the second separation assembly includes three third transmission rollers rotatably connected to the inner wall of the separation box, the third transmission rollers are rotatably connected to the third conveyor belts, a limiting rod located above the third conveyor belt is fixedly connected to the inner wall of the separation box, and one end of the third conveyor belt extends above the second discharge port.
[0017] Preferably, the inner wall of the separation box is fixedly connected with a partition located above the third conveyor belt.
[0018] Preferably, the third separation assembly comprises a transmission shaft rotatably connected to the inner wall of the auxiliary box, and a plurality of sieve plates are fixedly connected to the transmission shaft.
[0019] Preferably, a plurality of motors are fixedly connected to the outer wall of the separation box, and the output shafts of the plurality of motors are fixedly connected to the first transmission roller, the second transmission roller and the third transmission roller respectively.
[0020] Compared with the prior art, the beneficial effects of the utility model are:
[0021] The utility model provides a first separation component, a second separation component and a third separation component. After the crushed construction waste enters the separation box, the first separation component can separate the iron products such as nails and steel bars in the construction waste, and then the steel products are discharged from the first discharge port from the guide plate. The construction waste enters the second separation component from the first separation component, and water can be poured into the separation box. The water floats the wooden products mixed in the construction waste on the third conveyor belt. At this time, the third conveyor belt guides the concrete blocks to the second discharge port. Then the third separation component separates the wooden products floating on the water surface from the auxiliary box, completing the multi-stage separation of the construction waste, improving the purity of the concrete in the construction waste, and facilitating the subsequent deep processing and recycling of the concrete waste. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 The overall structure of the utility model is shown in FIG. Figure 1 ;
[0023] Figure 2 The overall structure of the utility model is shown in FIG. Figure 2 ;
[0024] Figure 3 The overall cross-sectional structure of the utility model is shown in FIG. Figure 1 ;
[0025] Figure 4 The overall cross-sectional structure of the utility model is shown in FIG. Figure 2 ;
[0026] In the figure: 1. separation box; 2. auxiliary box; 3. feed port; 4. first discharge port; 5. second discharge port; 6. first drive roller; 7. first conveyor belt; 8. second drive roller; 9. second conveyor belt; 10. electromagnet; 11. third drive roller; 12. third conveyor belt; 13. partition; 14. guide plate; 15. spray pipe; 16. transmission shaft; 17. sieve plate; 18. motor. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] Example:
[0029] See also Figure 1 - Figure 4 As shown, a civil engineering construction waste treatment device comprises:
[0030] A separation box 1, wherein an auxiliary box 2 is fixedly connected to the side wall of the separation box 1, the separation box 1 is communicated with the auxiliary box 2, a feed port 3 is provided on the top of the separation box 1, a first discharge port 4 is provided on the side wall of the separation box 1, and a second discharge port 5 is provided on the lower surface of the separation box 1;
[0031] A first separation component, which is arranged above the interior of the separation box 1;
[0032] A second separation assembly, which is arranged at the lower part of the separation box 1;
[0033] A third separation component is arranged inside the auxiliary box 2 .
[0034] As can be seen from the above, after the construction waste is introduced into the separation box 1 through the feed port 3, the first separation component can separate the steel products inside the construction waste, the second separation component can separate the wooden products inside the construction waste, and the third separation component can separate the separated wooden products from the separation box 1, thereby completing the multi-stage separation of construction waste, increasing the concrete content in the construction waste, and facilitating the subsequent processing of concrete waste.
[0035] The first separation component comprises:
[0036] An upper conveying assembly, the upper conveying assembly comprising two first transmission rollers 6 rotatably connected to the inner wall of the separation box 1 and a first conveyor belt 7 rotatably connected to the first transmission rollers 6;
[0037] The middle conveying component includes four second transmission rollers 8 rotatably connected to the inner wall of the separation box 1, the four second transmission rollers 8 are divided into two groups, each group of two second transmission rollers 8 are rotatably connected to a second conveyor belt 9, one group of the second conveyor belts 9 is arranged parallel to the first conveyor belt 7, and the other group of the second conveyor belts 9 is arranged obliquely, and the ends of the two groups of the second conveyor belts 9 are abutted, and the inner wall of the separation box 1 is fixedly connected to an electromagnet 10 located inside the inclined second conveyor belt 9.
[0038] As can be seen from the above, after the construction waste enters the separation box 1, it will fall on the first conveyor belt 7, the first drive roller 6 drives the first conveyor belt 7 to rotate, and the first conveyor belt 7 drives the construction waste to move to the second conveyor belt 9, and the construction waste will fall on the inclined second conveyor belt 9. Since the electromagnet 10 is energized, the electromagnet 10 can adsorb the steel products inside the construction waste on the second conveyor belt 9, and waste such as concrete and wood products will fall along the inclined second conveyor belt 9 onto the parallel second conveyor belt 9. The inclined second conveyor belt 9 moves the steel products upward, thereby separating the steel products from the construction waste.
[0039] The inner wall of the separation box 1 is fixedly connected with an inclined guide plate 14, one end of the guide plate 14 is in contact with the inclined second conveyor belt 9, and the other end of the guide plate 14 extends out of the first discharge port 4, and the inner wall of the separation box 1 is fixedly connected with a spray pipe 15 located above the guide plate 14, and the spray pipe 15 will spray the construction waste to remove the dust generated by the construction waste during the separation process. As the second conveyor belt 9 drives the steel products to move upward, the steel products will contact the guide plate 14. At this time, since the steel products are away from the electromagnet 10, the attraction between the steel products and the electromagnet 10 is reduced, and the steel products will fall from the second conveyor belt 9 onto the guide plate 14 due to the obstruction of the guide plate 14, and the steel products will be moved out of the separation box 1 from the second discharge port 5 via the guide plate 14.
[0040] The second separation component includes three third drive rollers 11 rotatably connected to the inner wall of the separation box 1, and the third conveyor belt 12 is rotatably connected to the third drive rollers 11. A limiting rod located above the third conveyor belt 12 is fixedly connected to the inner wall of the separation box 1. The limiting rod enables the third conveyor belt 12 to be tightly attached to the third drive rollers 11. One end of the third conveyor belt 12 extends above the second discharge port 5.
[0041] The inner wall of the separation box 1 is fixedly connected with a partition plate 13 located above the third conveyor belt 12 .
[0042] In order to separate the wooden products inside the construction waste, water can be poured at the bottom of the separation box 1. The water will submerge the downwardly inclined end of the third conveyor belt 12. After the construction waste falls on the third conveyor belt 12, the water will float the wooden products inside the construction waste. At this time, the partition 13 is blocked on the water surface, and the floated wooden products are concentrated between the auxiliary box 2 and the partition 13. The third conveyor belt 12 guides the separated concrete construction waste to the second discharge port 5.
[0043] The third separation assembly includes a transmission shaft 16 rotatably connected to the inner wall of the auxiliary box 2 , and a plurality of sieve plates 17 are fixedly connected to the transmission shaft 16 .
[0044] After the transmission shaft 16 rotates, it can drive multiple sieve plates 17 to rotate. The sieve plates 17 can press the wooden products floating on the water surface to the lower part of the water surface, and then the sieve plates 17 push the wooden products upward and push the wooden products to the outside of the auxiliary box 2, so as to remove the wooden products floating on the water surface.
[0045] A plurality of motors 18 are fixedly connected to the outer wall of the separation box 1, and the output shafts of the plurality of motors 18 are respectively fixedly connected to the first transmission roller 6, the second transmission roller 8 and the third transmission roller 11. The motor 18 can drive the first transmission roller 6, the second transmission roller 8 and the third transmission roller 11 to rotate, and then drive the first conveyor belt 7, the second conveyor belt 9 and the third conveyor belt 12 to rotate, so as to transport materials.
[0046] The standard parts used in this utility model can be purchased from the market, and the special-shaped parts can be customized according to the description and the drawings. The specific connection methods of each part adopt the conventional means such as mature bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt the conventional models in the prior art, and the circuit connection adopts the conventional connection method in the prior art, which will not be described in detail here. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
[0047] In the description of the present utility model, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. The meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0048] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0049] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0050] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.
[0051] In the drawings of the embodiments disclosed by the present invention, only the structures related to the embodiments disclosed by the present invention are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present invention can be combined with each other.
Claims
1. A civil engineering construction waste treatment device, characterized in that: include: A separation box (1), wherein the side wall of the separation box (1) is fixedly connected to an auxiliary box (2), the separation box (1) is communicated with the auxiliary box (2), a feed inlet (3) is provided on the top of the separation box (1), a first discharge outlet (4) is provided on the side wall of the separation box (1), and a second discharge outlet (5) is provided on the lower surface of the separation box (1); A first separation component, the first separation component is arranged above the interior of the separation box (1); A second separation component, the second separation component is arranged at the lower part of the separation box (1); A third separation component is arranged inside the auxiliary box (2).
2. The civil engineering construction waste treatment device according to claim 1, characterized in that: The first separation component comprises: An upper conveying assembly, the upper conveying assembly comprising two first transmission rollers (6) rotatably connected to the inner wall of the separation box (1) and a first conveyor belt (7) rotatably connected to the first transmission rollers (6); A middle conveying assembly, the middle conveying assembly comprising four second transmission rollers (8) rotatably connected to the inner wall of a separation box (1), the four second transmission rollers (8) being divided into two groups, each group of two second transmission rollers (8) being rotatably connected to a second conveyor belt (9), one group of the second conveyor belts (9) being arranged parallel to the first conveyor belt (7), the other group of the second conveyor belts (9) being arranged obliquely, and the ends of the two groups of the second conveyor belts (9) being abutted, and the inner wall of the separation box (1) being fixedly connected to an electromagnet (10) located inside the inclined second conveyor belt (9).
3. The civil engineering construction waste treatment device according to claim 2, characterized in that: The inner wall of the separation box (1) is fixedly connected to a guide plate (14) arranged obliquely, one end of the guide plate (14) is in contact with the inclined second conveyor belt (9), and the other end of the guide plate (14) extends out of a first discharge port (4). The inner wall of the separation box (1) is fixedly connected to a spray pipe (15) located above the guide plate (14).
4. The civil engineering construction waste treatment device according to claim 3 is characterized by: The second separation assembly comprises three third transmission rollers (11) rotatably connected to the inner wall of the separation box (1), the third transmission rollers (11) being rotatably connected to a third conveyor belt (12), a limiting rod located above the third conveyor belt (12) being fixedly connected to the inner wall of the separation box (1), and one end of the third conveyor belt (12) extending to above the second discharge port (5).
5. The civil engineering construction waste treatment device according to claim 4, characterized in that: The inner wall of the separation box (1) is fixedly connected with a partition plate (13) located above the third conveyor belt (12).
6. The civil engineering construction waste treatment device according to claim 5, characterized in that: The third separation assembly comprises a transmission shaft (16) rotatably connected to the inner wall of the auxiliary box (2), and a plurality of sieve plates (17) are fixedly connected to the transmission shaft (16).
7. The civil engineering construction waste treatment device according to claim 6, characterized in that: A plurality of motors (18) are fixedly connected to the outer wall of the separation box (1), and the output shafts of the plurality of motors (18) are respectively fixedly connected to the first transmission roller (6), the second transmission roller (8) and the third transmission roller (11).