Water distribution device for sewage treatment
By adopting structures such as intermediate partition walls, bucket bearings and flip plate damping bearings in the sewage treatment device, automatic intermittent distribution of sewage is achieved, which solves the high operation and maintenance costs and maintenance difficulties caused by the increase in equipment in the existing technology, and improves the treatment efficiency and stability.
Patent Information
- Application Number
- CN202420573751.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-22
AI Technical Summary
The existing ecological sewage treatment technology needs to add water distribution pumps, solenoid valves and other equipment when the two tanks are alternately operated, resulting in high investment and operation costs and increased maintenance difficulties, affecting the applicability and stability of the technology.
A water distribution device for sewage treatment was designed. By setting up an intermediate partition wall, water inlet pipe, bucket bearing, flip plate damping bearing and limit rod between the two water distribution pools, the automatic intermittent distribution of sewage is achieved, and the use of electrical equipment is avoided. demand.
It realizes automatic and even distribution of sewage, reduces structural complexity and maintenance difficulty, reduces operating costs, and simplifies operation management.
Smart Images

Figure CN221940241U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sewage treatment, in particular to a water distribution device for sewage treatment. Background Art
[0002] Ecological technology with low investment cost, low operation and maintenance cost, and simple operation and management has become the mainstream technology for rural domestic sewage treatment. In order to improve treatment efficiency, maintain long-term stable operation, and facilitate maintenance, ecological treatment technology often adopts a mode of two pools in parallel and alternating operation. During operation, it is necessary to add water distribution pumps, solenoid valves or electric valves and other equipment to achieve alternating water inflow between the two pools, which increases investment and operation costs, and also increases the difficulty of maintenance, resulting in the lack of obvious advantages of ecological treatment technology and greatly affecting its applicability. Utility Model Content
[0003] The purpose of the utility model is to provide a water distribution device for sewage treatment to solve the problems raised in the above background technology.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a water distribution device for sewage treatment, comprising a first water distribution tank and a second water distribution tank, an intermediate partition wall is arranged between the first water distribution tank and the second water distribution tank, a water inlet pipe is arranged on the middle side of the first water distribution tank and the second water distribution tank, a water bucket bearing is rotatably connected to one side of the interior of the first water distribution tank and the second water distribution tank, a first water bucket and a second water bucket are arranged on the two water bucket bearings respectively, a limit rod is arranged on the first water distribution tank directly below the first water bucket and on the second water distribution tank directly below the second water bucket, a flap damping bearing is rotatably connected to one side of the middle of the first water distribution tank and the second water distribution tank, and a flap is arranged on the flap damping bearing.
[0005] Preferably, the flap has a curvature at both left and right ends along the long side direction.
[0006] Preferably, the first water bucket is located inside the first water distribution tank, and the second water bucket is located inside the second water distribution tank, and both the first water bucket and the second water bucket are in a trapezoidal platform structure.
[0007] Preferably, two sides of the flap are respectively located above the right side of the first water bucket and above the left side of the second water bucket.
[0008] Preferably, a first water distribution tank outlet pipe is provided on one side of the bottom of the first water distribution tank, and a second water distribution tank outlet pipe is provided on one side of the bottom of the second water distribution tank.
[0009] Preferably, a cover plate is provided on the top of the first water distribution tank and the second water distribution tank.
[0010] Compared with the prior art, the beneficial effects of the utility model are:
[0011] The utility model can automatically and evenly distribute sewage from an inlet pipe into two streams of water intermittently through the cooperation between the first water bucket and the second water bucket without the need for electrical equipment control, thereby realizing automatic and intermittent sewage distribution. The device does not require electricity, has a simple structure and is easy to maintain. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the structure of the utility model of the water distribution device for sewage treatment from a top view.
[0013] Figure 2 It is a cross-sectional view of the utility model water distribution device for sewage treatment.
[0014] Figure 3 It is a side elevation cross-sectional view of the utility model water distribution device for sewage treatment.
[0015] Figure 4 It is a structural schematic diagram of the flap of the utility model.
[0016] Figure 5 It is a structural schematic diagram of the second water bucket of the utility model.
[0017] In the figure: water inlet pipe 1; flap 2; bucket bearing 3; second water distribution tank 4; second bucket 5; second water distribution tank outlet pipe 6; first water distribution tank outlet pipe 7; first bucket 8; first water distribution tank 9; flap damping bearing 10; middle partition wall 11; limit rod 12; cover plate 13. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] See also Figures 1 to 5 The utility model provides a technical solution: a water distribution device for sewage treatment, including a first water distribution tank 9 and a second water distribution tank 4, a middle partition wall 11 is fixedly connected between the first water distribution tank 9 and the second water distribution tank 4, a water inlet pipe 1 is fixedly connected to one side in the middle of the first water distribution tank 9 and the second water distribution tank 4, and sewage flows in through the water inlet pipe 1.
[0020] The first water distribution tank 9 and the second water distribution tank 4 are rotatably connected to one side of the interior thereof with a bucket bearing 3. The first bucket 8 and the second bucket 5 are fixedly connected to the two bucket bearings 3 respectively. The first bucket 8 and the second bucket 5 are both in a trapezoidal platform structure. The bucket bearing 3 can be a ball bearing or a sleeve. One end of the bucket bearing 3 is fixed to the bucket, and the other end is rotatably connected to the wall of the water distribution tank. The bucket can rotate freely around the bucket bearing 3.
[0021] The first water bucket 8 is located inside the first water distribution tank 9, and the second water bucket 5 is located inside the second water distribution tank 4. Limit rods 12 are provided on the first water distribution tank 9 directly below the first water bucket 8 and on the second water distribution tank 4 directly below the second water bucket 5. Both ends of the limit rods 12 are fixed to the pool wall between the first water distribution tank 9 and the second water distribution tank 4.
[0022] A flap damping bearing 10 is rotatably connected to one side in the middle of the first water distribution tank 9 and the second water distribution tank 4, and a flap 2 is fixedly connected to the flap damping bearing 10. The flap 2 is bent 90 degrees at both ends along the long side direction. Both sides of the flap 2 are respectively located above the right side of the first water bucket 8 and above the left side of the second water bucket 5. The circular damping shafts in the flap damping bearing 10 are welded at both ends of the center line along the long side direction of the flap 2, and the flap 2 can rotate around the flap damping bearing 10.
[0023] A first water distribution tank outlet pipe 7 is fixedly connected to one side of the bottom of the first water distribution tank 9, and a second water distribution tank outlet pipe 6 is fixedly connected to one side of the bottom of the second water distribution tank 4. A cover plate 13 is installed on the top of the first water distribution tank 9 and the second water distribution tank 4. The cover plate 13 is set to prevent debris from entering the device.
[0024] Before actual use, the flap 2 is tilted toward the first water bucket 8, and sewage flows in from the water inlet pipe 1 and falls on the flap 2. Because the flap is tilted toward the first water bucket 8, the sewage flows into the first water bucket 8 along the slope of the flap 2. When the first water bucket 8 is filled with water, the center of gravity is biased to the left. Under the action of the eccentric force, the first water bucket 8 flips counterclockwise. Due to inertia, the first water bucket 8 will flip until it touches the limit rod 12 and then stops. At this time, the sewage is injected into the first water distribution tank 9. After the water flows out of the first water bucket 8, the center of gravity changes. The bucket 8 rotates clockwise to restore to an upright position, and the sewage flows from the outlet pipe 7 of the first water distribution tank into the subsequent sewage treatment facility for treatment; during the flipping of the first water bucket 8, the right bucket wall of the first water bucket 8 will lift up the left side of the flap 2, causing the flap to tilt toward the second water bucket 5. At this time, the sewage flowing in from the water inlet pipe 1 enters the second water bucket 5. After the second water bucket 5 is full of water, it flips clockwise, lifts up the flap 2 and tilts it toward the first water bucket 8, and so on. The first water bucket 8 and the second water bucket 5 are alternately filled with water, thereby realizing automatic and intermittent distribution of sewage.
[0025] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A water distribution device for sewage treatment, comprising a first water distribution tank (9) and a second water distribution tank (4), characterized in that: An intermediate partition wall (11) is provided between the first water distribution tank (9) and the second water distribution tank (4); a water inlet pipe (1) is provided on one side in the middle of the first water distribution tank (9) and the second water distribution tank (4); a bucket bearing (3) is rotatably connected to one side of the interior of the first water distribution tank (9) and the second water distribution tank (4); a first bucket (8) and a second bucket (5) are provided on the two bucket bearings (3) respectively; a limit rod (12) is provided on the first water distribution tank (9) directly below the first bucket (8) and on the second water distribution tank (4) directly below the second bucket (5); a flap damping bearing (10) is rotatably connected to one side in the middle of the first water distribution tank (9) and the second water distribution tank (4); a flap (2) is provided on the flap damping bearing (10).
2. A water distribution device for sewage treatment according to claim 1, characterized in that: The flap (2) is bent (90) degrees at both left and right ends along the long side direction.
3. A water distribution device for sewage treatment according to claim 1, characterized in that: The first water bucket (8) is located inside the first water distribution tank (9), and the second water bucket (5) is located inside the second water distribution tank (4). Both the first water bucket (8) and the second water bucket (5) are in a trapezoidal platform structure.
4. A water distribution device for sewage treatment according to claim 2, characterized in that: The two sides of the flap (2) are respectively located above the right side of the first water bucket (8) and above the left side of the second water bucket (5).
5. A water distribution device for sewage treatment according to claim 1, characterized in that: A first water distribution tank outlet pipe (7) is provided on one side of the bottom of the first water distribution tank (9), and a second water distribution tank outlet pipe (6) is provided on one side of the bottom of the second water distribution tank (4).
6. A water distribution device for sewage treatment according to claim 5, characterized in that: Cover plates (13) are provided on the tops of the first water distribution tank (9) and the second water distribution tank (4).
