Transition section roadbed pavement structure of road bridge
By adopting reinforced concrete buffer structure and foam concrete support structure in the roadbed structure of the bridge transition section, combined with glass fiber geogrid and drainage system, the problem of jumping from the bridge head caused by subsidence at the intersection of the bridge head and the roadbed is solved, and road safety is improved and pavement flatness extend service life.
Patent Information
- Application Number
- CN202420049404.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-09
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-09
AI Technical Summary
The prior art is prone to subsidence after long use at the bridgehead and roadbed, causing the bridgehead to jump off and affect driving safety.
A transition section roadbed structure of road bridge was designed, including setting up a buffer structure below the roadbed and setting up a support structure below the bridge. The buffer structure adopts reinforced concrete and gravel support pillars, and the support structure adopts foam concrete support columns and rubber shock absorbing pads. Paint fiberglass geogrid and asphalt concrete layers on the roadbed surface, and drainage holes and filters are installed to remove accumulated water.
The impact force of the vehicle is buffered through shock absorbers and rubber shock absorbers, and the sand and gravel dilute rainwater, prevent road collapse, reduce the phenomenon of jumping from the bridgehead, improve road safety and road flatness, and extend service life.
Smart Images

Figure CN221940988U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of road engineering, in particular to a transition section roadbed and pavement structure of a road bridge. Background Art
[0002] Chinese patent CN215925645U discloses a connection structure for the transition section of a road surface and a bridge. The utility model adopts a segmented water discharge to avoid rainwater accumulation causing moisture in the transition section, and to avoid rainwater directly contacting the bridge piers and being discharged, thereby avoiding the bridge piers from contacting the rainwater and causing accelerated aging.
[0003] Although this structure can effectively drain rainwater and reduce the aging of bridge piers, long-term use will cause a certain amount of subsidence at the junction of the bridge head and the roadbed, which will cause the vehicle to jump off the bridge head and affect driving safety. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model provides a transition section roadbed and pavement structure for a road bridge, which solves the problem of vehicle jumping at the bridge head due to sinking at the junction of the bridge head and the roadbed caused by long-term use.
[0005] To achieve the above objectives, the utility model is implemented through the following technical solutions: a transition section roadbed and pavement structure of a road bridge, including a roadbed and a connected bridge, a buffer structure is provided below the roadbed, and a support structure is provided below the bridge, the buffer structure includes a steel structure arranged in an upper base layer of the roadbed, the gaps between the steel structures are filled with concrete, the middle base layer below the upper base layer of the roadbed is filled with gravel, a plurality of concrete pillars are fixedly provided inside the gravel, the tops of the concrete pillars are fixedly connected to the upper base layer of the roadbed through shock-absorbing blocks, anti-sinking plates are fixedly provided at the bottoms of the concrete pillars, and a foundation is laid below the anti-sinking plates.
[0006] Preferably, the support structure comprises a plurality of support columns, and the periphery of the support columns is filled with foam concrete.
[0007] Preferably, the surface of the roadbed and the butt bridge is paved with glass fiber geogrid and asphalt concrete layer from bottom to top.
[0008] Preferably, a water-blocking plate is fixedly provided at the roadside of the roadbed and the bridge, and drainage holes are provided at the roadbed and the bridge at the position of the water-blocking plate.
[0009] Preferably, a filter net is fixedly provided above the drainage hole.
[0010] Preferably, a rubber shock-absorbing pad is fixedly provided at the end where the support column is connected to the bridge.
[0011] Beneficial Effects
[0012] The utility model provides a transition section roadbed and pavement structure of a road bridge. Compared with the prior art, it has the following beneficial effects:
[0013] (1) The roadbed and pavement structure of the transition section of the road bridge uses the shock-absorbing blocks above the concrete pillars, the rubber shock-absorbing pads on the support pillars, and the foam concrete around the support pillars to cushion the impact force generated by the passing vehicles. The gravel around the concrete pillars dilutes the rainwater on the road surface during rainy days, thereby preventing the accumulation of rainwater under the roadbed and causing road collapse, reducing damage to the roadbed and bridge, reducing the occurrence of vehicle jumping at the bridge head, and improving the safety of road driving.
[0014] (2) The roadbed and pavement structure of the transition section of the road bridge uses glass fiber geogrids in the asphalt concrete layer to reduce the loosening and pitting of the asphalt concrete pavement, which causes a decrease in flatness, thereby ensuring driving safety and comfort. At the same time, the accumulated water on the roadbed is discharged through the drainage holes on the roadbed, reducing the accumulation of rainwater on the roadbed and the damage to the roadbed surface by rainwater, thereby increasing its service life. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a three-dimensional diagram of the utility model;
[0016] Figure 2 It is the front view of the utility model;
[0017] Figure 3 It is a top view of the utility model.
[0018] In the figure: 1. Roadbed; 2. Bridge; 3. Buffer structure; 31. Steel structure; 32. Concrete; 33. Gravel; 34. Concrete pillars; 35. Shock-absorbing blocks; 36. Anti-sinking plates; 37. Foundation; 4. Support structure; 41. Support columns; 42. Foam concrete; 43. Rubber shock-absorbing pads; 5. Fiberglass geogrids; 6. Asphalt concrete layer; 7. Drainage holes; 8. Filter nets. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] The utility model provides two technical solutions:
[0021] Figure 1-3 The first embodiment is shown: a roadbed and pavement structure of a transition section of a road bridge, comprising a roadbed 1 and a butt bridge 2, a buffer structure 3 being provided below the roadbed 1, a support structure 4 being provided below the bridge 2, the buffer structure 3 comprising a steel structure 31 arranged in an upper base layer of the roadbed 1, the gaps between the steel structures 31 being filled with concrete 32, the interior of a middle base layer below the upper base layer of the roadbed 1 being filled with gravel 33, a plurality of concrete pillars 34 being fixedly provided inside the gravel 33, the tops of the concrete pillars 34 being fixedly connected to the upper base layer of the roadbed 1 via shock-absorbing blocks 35, anti-sinking plates 36 being fixedly provided at the bottoms of the concrete pillars 34, a foundation 37 being laid below the anti-sinking plates 36, the support structure 4 comprising a plurality of support columns 41, the surroundings of the support columns 41 being filled with foam concrete 42, and rubber shock-absorbing pads 43 being fixedly provided at the ends of the support columns 41 where they are connected to the bridge 2.
[0022] The shock-absorbing blocks 35 above the concrete pillars 32, the rubber shock-absorbing pads 43 on the support pillars 41, and the foamed concrete 42 around the support pillars 41 are used to buffer the impact force generated when the vehicle passes by, and the gravel 33 around the concrete pillars 34 is used to dilute the rainwater on the road surface on rainy days, thereby preventing the rainwater from accumulating under the roadbed 1 and causing the road surface to collapse, reducing the damage to the roadbed 1 and the bridge 2, reducing the occurrence of vehicle jumping at the bridge head, and improving the safety of road driving.
[0023] Figure 2-3 A second embodiment is shown, which mainly differs from the first embodiment in that glass fiber geogrid 5 and asphalt concrete layer 6 are laid on the surface of the roadbed 1 and the docking bridge 2 from bottom to top, baffles are fixedly provided at the roadside positions of the roadbed 1 and the bridge 2, drainage holes 7 are provided at the roadbed 1 and the bridge 2 at the baffle positions, and a filter net 8 is fixedly provided above the drainage hole 7. Impurities in rainwater are blocked by the filter net 8 to prevent impurities from entering the drainage hole 7, thereby ensuring the normal use of the drainage hole 7.
[0024] The glass fiber geogrid 5 in the asphalt concrete layer 6 can reduce the loose peeling and potholes of the asphalt concrete pavement, which causes a decrease in flatness, thereby ensuring driving safety and comfort. At the same time, the accumulated water on the roadbed 1 is discharged through the drainage holes 7 on the roadbed 1, reducing the accumulation of rainwater on the roadbed 1 and reducing the damage to the surface of the roadbed 1 by rainwater, thereby increasing its service life.
[0025] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art, and the model parameters of each electrical appliance are not specifically limited, and conventional equipment can be used.
[0026] When in use, first pour the foundation 37 at the bottom of the docking position with the bridge 2, and after the foundation 37 solidifies, pour multiple concrete pillars 34 on its surface, and provide shock-absorbing blocks 35 at the upper ends of the concrete pillars 34, and cast anti-sinking plates 36 at the lower ends, and then fill gravel 33 around the concrete pillars 34. After filling, lay the steel structure 31 inside the upper base of the roadbed 1, and fill concrete 32 in the gaps of the steel structure 31. At the same time, pour multiple support columns 41 below the docking of the bridge 2 and the roadbed 1, and provide rubber shock-absorbing pads 43 at the positions where the support columns 41 contact the bridge 2, and then fill foam concrete 42 around the support columns 41, and then lay glass fiber geogrids 5 on the surfaces of the roadbed 1 and the bridge 2. After laying, pour an asphalt concrete layer 6 on the glass fiber geogrids 5.
[0027] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A roadbed and pavement structure for a transition section of a road bridge, comprising a roadbed and a butted bridge, characterized in that: A buffer structure is provided below the roadbed, and a supporting structure is provided below the bridge. The buffer structure includes a steel structure arranged in an upper base layer of the roadbed, gaps between the steel structures are filled with concrete, a middle base layer below the upper base layer of the roadbed is filled with gravel, a plurality of concrete pillars are fixedly provided inside the gravel, the tops of the concrete pillars are fixedly connected to the upper base layer of the roadbed via shock-absorbing blocks, anti-sinking plates are fixedly provided at the bottoms of the concrete pillars, and a foundation is laid below the anti-sinking plates.
2. The transition section roadbed and pavement structure of a road bridge according to claim 1, characterized in that: The supporting structure comprises a plurality of supporting columns, and the periphery of the supporting columns is filled with foam concrete.
3. The transition section roadbed and pavement structure of a road bridge according to claim 1, characterized in that: The surfaces of the roadbed and the butt bridge are paved with glass fiber geogrid and asphalt concrete layers from bottom to top.
4. The transition section roadbed and pavement structure of a road bridge according to claim 1, characterized in that: Water-blocking plates are fixedly arranged at the roadside positions of the roadbed and the bridge, and drainage holes are arranged at the roadbed and the bridge at the positions of the water-blocking plates.
5. The transition section roadbed and pavement structure of a road bridge according to claim 4, characterized in that: A filter net is fixedly arranged above the drainage hole.
6. The transition section roadbed and pavement structure of a road bridge according to claim 2, characterized in that: A rubber shock-absorbing pad is fixedly arranged at the end where the support column is connected to the bridge.