Variable connection bridge and overwater construction platform

By designing a variable connection bridge, the length and inclination angle adjustment of the bridge body are used to solve the problem of insufficient adaptability caused by size and posture fixation in the prior art, and stable docking and high efficiency in water level changes and ship shift operations are achieved. construction.

CN221941095UActive Publication Date: 2024-11-01THE THIRD ENG CO LTD OF CCCC FOURTH HARBOR ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323400110.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2024-11-01
Estimated Expiration
2033-12-13

AI Technical Summary

Technical Problem

Due to the fixed size and posture of the existing link bridges, they cannot adapt to the changes in the relative position of the water construction platform and the ship due to changes in water level and ship movement operations.

Method used

A variable connection bridge is designed, through the swing connection between the first bridge body and the water construction platform and the position of the second bridge body along the length direction of the first bridge body is adjustable, combining the slide rail, locking structure and universal wheel, Achieve adjustment of the bridge length and inclination angle to adapt to water level changes and the working conditions of ship shifting operations.

Benefits of technology

It realizes stable docking under water level changes and ship shifting operations, improves the docking efficiency between the construction platform and the ship, avoids uneven stress and damage to the bridge body, and enhances stability and stiffness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941095U_ABST
    Figure CN221941095U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of port engineering, and provides a variable connection bridge and an overwater construction platform, and the variable connection bridge comprises a first bridge body and a second bridge body; one end of the first bridge body can be connected with an overwater construction platform in a swinging manner, and the axis of the swinging connection is in the horizontal direction; the second bridge body is connected to the other end of the first bridge body, and the position of the second bridge body in the length direction of the first bridge body is adjustable. The connecting bridge can solve the problems that an existing connecting bridge cannot be applied to the working conditions that the relative positions of an overwater construction platform and a ship can be changed due to water level change, ship moving operation and the like due to the fixed size and posture.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of port engineering, in particular to a variable connecting bridge and an above-water construction platform. Background Art

[0002] With the continuous development of port engineering technology, in order to ensure the quality and progress of the project, it is often necessary to build a water platform to cope with complex sea conditions and provide a stable construction platform. In order to achieve the connection between the construction ship and the water platform, a connecting bridge needs to be configured for the water platform.

[0003] At present, the connecting bridges mainly include floating rafts, suspension bridges and fixed connecting bridges. The floating rafts will float up and down with the changes in the water surface and can adapt to the changes in water level, but there is a risk of capsizing when the waves are too large. The suspension bridges and fixed connecting bridges have higher stability, but due to their fixed size and posture, they cannot be used in working conditions where the relative position of the water construction platform and the ship will change due to water level changes, ship moving operations, etc. Utility Model Content

[0004] The purpose of the utility model is to solve the problem that the existing connecting bridge cannot be used in working conditions where the relative position of the water construction platform and the ship will change, such as water level changes and ship moving operations, due to its fixed size and posture, and to provide a variable connecting bridge and water construction platform.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0006] A variable connecting bridge comprises a first bridge body and a second bridge body; one end of the first bridge body can be swingably connected to an above-water construction platform, and the axis of the swing connection is along the horizontal direction; the second bridge body is connected to the other end of the first bridge body, and the position of the second bridge body along the length direction of the first bridge body is adjustable.

[0007] The swing connection can be achieved in various ways, including but not limited to hinges and hole-shaft matching; the swingable angle of the swing connection can be less than or equal to three hundred and sixty degrees.

[0008] The position adjustment of the second bridge body can be achieved in various ways, including but not limited to stepless adjustment, such as setting multiple installation positions for the second bridge body on the first bridge body, and changing the relative position of the second bridge body to the first bridge body by changing the installation position of the second bridge body; stepless adjustment, such as setting a gear rack mechanism or a screw mechanism between the first bridge body and the second bridge body.

[0009] The variable connecting bridge of the present scheme consists of a first bridge body and a second bridge body, wherein the position of the second bridge body along the length direction of the first bridge body is adjustable, so that the overall length of the variable connecting bridge can be adjusted, and thus can adapt to changes in the relative distance between the water construction platform and the ship; the first bridge body can swing along the horizontal axis relative to the water construction platform, so as to adjust the overall inclination angle of the variable connecting bridge, and then combined with the above-mentioned overall length adjustment function of the variable connecting bridge, it can adapt to changes in the relative height of the water construction platform and the ship; in summary, the inclination angle and length of the variable connecting bridge of the present scheme are adjustable, so it can be suitable for working conditions such as water level changes, ship moving operations, etc. that will cause changes in the relative position of the water construction platform and the ship.

[0010] As a preferred solution of the present utility model, the second bridge body is connected to the first bridge body via a slide rail, and the slide rail is along the length direction of the first bridge body.

[0011] The slide rail can be installed on the second bridge body side or the first bridge body side; the number of the slide rail can be one or more.

[0012] This solution realizes position adjustment of the second bridge body and the first bridge body through the slide rail. On the one hand, it can realize stepless adjustment, that is, the second bridge body can stop at any position within the travel of the slide rail, so that the variable connecting bridge has more different lengths to adapt to different usage environments; on the other hand, the friction resistance of the slide rail is small, which can reduce the difficulty of adjusting the second bridge body.

[0013] As a preferred solution of the utility model, the slide rails are arranged on both sides of the second bridge body.

[0014] The number of rails on each side can be greater than or equal to one.

[0015] In this solution, slide rails are arranged on both sides of the second bridge body, which can avoid the situation where the second bridge body is subjected to force on one side and has poor stability.

[0016] As a preferred solution of the utility model, it also includes a locking structure, and the locking structure is used to lock the relative position of the first bridge body and the second bridge body.

[0017] The locking structure can be in various forms, including but not limited to a snap-on locking structure, a threaded locking structure, and a friction locking structure.

[0018] This solution adds a locking structure, which can lock the relative position of the second bridge body and the first bridge body when the position of the second bridge body is not required to be adjustable, thereby improving the stability of the variable connecting bridge.

[0019] As a preferred solution of the utility model, a universal wheel is provided at one end of the second bridge body away from the first bridge body, and the second bridge body is connected to the ship via the universal wheel.

[0020] This solution achieves the docking of the second bridge body and the ship through universal wheels. The second bridge body can move freely on the ship deck through the universal wheels, which can prevent the distance or angle change between the ship and the water construction platform from exceeding the adjustment range of the variable connecting bridge, and the distance or angle between the ship and the water construction platform from changing when the second bridge body is locked relative to the first bridge body, thereby causing the first bridge body and the second bridge body to be stretched and damaged.

[0021] As a preferred solution of the utility model, truss structures are provided on both sides of the first bridge body, and / or truss structures are provided on both sides of the second bridge body; the truss structures are parallel to the vertical plane.

[0022] The truss structure includes but is not limited to a triangular truss, a parallel chord truss, and a slope truss; the truss structure is parallel to the vertical plane, that is, the axis of each member in the truss structure is parallel to the vertical plane.

[0023] In this solution, trusses parallel to the vertical plane are arranged on both sides of the first bridge body and / or the second bridge body, which can enhance the rigidity of the first bridge body and / or the second bridge body and avoid excessive deformation or even fracture of the first bridge body and / or the second bridge body under external loads.

[0024] A water construction platform comprises a platform body and a variable connecting bridge of the utility model.

[0025] The number of the variable connection bridges can be one or more.

[0026] The water construction platform of this scheme adopts a variable connecting bridge of the utility model, so it can maintain docking with the ship under working conditions such as water level changes, ship moving operations, etc., which will cause the relative positions of the water construction platform and the ship to change, thereby maintaining normal operations under these conditions and improving operating efficiency.

[0027] As a preferred embodiment of the utility model, it also includes a winch and a sling; the winch is arranged on the above-water construction platform; one end of the sling is connected to the first bridge body, and the other end of the sling is connected to the winch; the winch can drive the first bridge body to swing by retracting and releasing the sling.

[0028] This solution uses a winch to control the swing of the first bridge body through a sling, which can reduce the manpower consumption required for adjusting the first bridge body.

[0029] As a preferred embodiment of the present invention, a hanger is also connected to the first bridge body, and the hanger includes a hanging point and a supporting structure; the height of the hanging point is higher than the highest point of the first bridge body, and the hanging point is used to connect with the sling, and the hanging point and the first bridge body are connected through the supporting structure; the supporting structure is arranged on at least one side of the first bridge body along its width direction, and the supporting structure is located on the outside of the first bridge body.

[0030] The specific height of the hanging point is determined according to actual needs. For example, if the first bridge body is used for personnel passage, the height of the hanging point is higher than the height of the operating personnel; the supporting structure includes but is not limited to plate-like components and rod-like components.

[0031] This solution provides a hanger specially connected to the sling on the first bridge body, wherein the hanging point is located above the first bridge body and the supporting structure is located outside the first bridge body. This can prevent the sling from interfering with the passage space of the first bridge body, thereby causing inconvenience to the passage of personnel or equipment.

[0032] As a preferred solution of the utility model, a fixed pulley is further provided on the above-water construction platform, the height of the fixed pulley is higher than the highest point of the first bridge body, and the sling passes around the fixed pulley.

[0033] According to the actual arrangement requirements of the sling, the number of the fixed pulleys can be one or more.

[0034] This solution ensures that the sling is connected to the first bridge body from a position higher than the first bridge body through a fixed pulley, so there is no need to arrange the winch at a high place. Instead, the winch can be set at a position that is convenient for maintenance or operation, thereby improving the convenience of using the winch.

[0035] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:

[0036] 1. The inclination angle and length of the variable connecting bridge of this scheme can be adjusted, so it can be applied to working conditions such as water level changes and ship moving operations that may cause changes in the relative position of the water construction platform and the ship.

[0037] 2. The water construction platform of this scheme adopts a variable connecting bridge of the utility model, so it can maintain docking with the ship under working conditions such as water level changes, ship moving operations, etc., which will cause changes in the relative position of the water construction platform and the ship, and thus maintain normal operations under these conditions and improve operating efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is a side view structural schematic diagram of a variable connecting bridge of the utility model in an unfolded state;

[0039] Figure 2It is a side view structural schematic diagram of a variable connecting bridge of the utility model in a retracted state;

[0040] Figure 3 It is a partially enlarged side structural schematic diagram of a variable connecting bridge of the utility model;

[0041] Figure 4 This is a schematic diagram of the cross-sectional structure of a variable connecting bridge of the utility model;

[0042] Icons: 1-first bridge body; 2-second bridge body; 3-platform body; 4-truss structure; 51-channel steel; 52-locating pin; 6-winch; 7-sling; 8-hanger; 81-hanging point; 82-support structure; 9-fixed pulley; 10-flexible railing; 11-universal wheel; 12-ship. DETAILED DESCRIPTION

[0043] The utility model is described in detail below in conjunction with the accompanying drawings.

[0044] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0045] In the description of the following specific embodiments, the terms indicating the orientation or position relationship such as "upper", "lower", "left", "right", "center", "inside", "outside", etc. are all based on the expression of the orientation or position relationship shown in the drawings, or the orientation or position relationship when the device / apparatus is usually used. These terms of orientation or position relationship are only for the convenience of description or simplification of the description in the specific embodiments, so that technicians can quickly understand the scheme, rather than indicating or implying that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation of the present invention.

[0046] The terms "horizontal", "vertical" and the like do not require the corresponding devices / components / elements to be absolutely horizontal or vertical or suspended, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted. Alternatively, it can be simply understood that the corresponding devices / components / elements are set in specific directions such as "horizontal" and "vertical", and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the solution of the utility model.

[0047] The terms “first”, “second”, “third”, etc. are merely used to distinguish the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.

[0048] The terms "set", "installed", "connected" and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection. It can be welding, riveting, bolting, threaded connection and other commonly used connection methods in the field. It can be directly connected or indirectly connected through an intermediate medium. It can also be the internal connection of two elements.

[0049] Example 1

[0050] like Figures 1 to 4 As shown, a variable connecting bridge adopted in this embodiment includes a first bridge body 1 and a second bridge body 2; one end of the first bridge body 1 can be swingably connected to an above-water construction platform, and the axis of the swing connection is along the horizontal direction; the second bridge body 2 is connected to the other end of the first bridge body 1, and the position of the second bridge body 2 along the length direction of the first bridge body 1 is adjustable, and the end of the second bridge body 2 away from the first bridge body 1 can be docked with a ship 12 or other floating structures, such as another above-water construction platform.

[0051] Specifically, the first bridge body 1 and the second bridge body 2 of the present embodiment adopt a sleeve connection method, that is, the cross-sectional size of the first bridge body 1 is larger than the cross-sectional size of the second bridge body 2, the first bridge body 1 is hollow and open on the side facing the second bridge body 2, and the second bridge body 2 is sleeved in the opening of the first bridge body 1; the connection method of the present embodiment can ensure the continuity of the overall surface of the variably connected bridge when the relative position of the second bridge body 2 with the first bridge body 1 is adjusted, thereby avoiding the formation of voids on the bridge deck.

[0052] Furthermore, this embodiment also includes a locking structure, which is used to lock the relative position of the first bridge body 1 and the second bridge body 2. Specifically, Figure 4As shown, the locking structure of this embodiment includes channel steels 51 respectively welded to the left and right sides of the first bridge body 1, and the second bridge body 2 is sleeved in the groove of the channel steel 51; a plurality of positioning holes distributed at intervals along its length are opened on the side wall of the channel steel 51, and positioning holes are also opened on the corresponding side wall of the second bridge body 2. When the positioning holes on the channel steel 51 are aligned with the positioning holes on the second bridge body 2, the relative position locking of the channel steel 51 and the second bridge body 2 can be achieved by inserting the positioning pins 52 therein, thereby achieving the relative position locking of the first bridge body 1 and the second bridge body 2.

[0053] The locking structure may also be in other forms, for example, only a plurality of positioning holes distributed at intervals along the length of the channel steel 51 are opened, and the positioning holes are specifically threaded through holes. When it is necessary to lock the relative position of the first bridge body 1 and the second bridge body 2, a screw is inserted into the positioning hole and tightened until the screw abuts against the second bridge body 2, so that the relative position of the first bridge body 1 and the second bridge body 2 can be locked.

[0054] Furthermore, the second bridge body 2 is connected to the first bridge body 1 via a slide rail, and the slide rail is along the length direction of the first bridge body 1.

[0055] Furthermore, slide rails are provided on both sides of the second bridge body 2. Specifically, the slide rails of this embodiment are symmetrically arranged on the left and right sides of the first bridge body 1; when the second bridge body 2 is adjusted, the position of the slide rails is fixed, which can reduce the demand for activity space of this embodiment and the probability of interference between the slide rails and other structures.

[0056] Furthermore, a universal wheel 11 is provided at one end of the second bridge body 2 away from the first bridge body 1, and the second bridge body 2 is connected to the ship 12 via the universal wheel 11. The universal wheel 11 is specifically provided at the bottom of the second bridge body 2, and there are two universal wheels 11, which are spaced apart along the width direction of the second bridge body 2.

[0057] Furthermore, both sides of the first bridge body 1 are provided with a truss structure 4, and / or both sides of the second bridge body 2 are provided with a truss structure 4; the truss structure 4 is parallel to the vertical plane. Figure 3 As shown, in this embodiment, truss structures 4 are provided on both sides of the first bridge body 1 and on both sides of the second bridge body 2; and further, the truss structure 4 of this embodiment is located on the upper side of the first bridge body 1 and the second bridge body 2, so that it can also serve as a railing.

[0058] Example 2

[0059] like Figure 1 to Figure 2 As shown, the water construction platform used in this embodiment includes a platform body 3 and a variable connecting bridge in Example 1.

[0060] Specifically, the first bridge body 1 of this embodiment is connected to the platform body 3 through a rotary bearing, so that the first bridge body 1 can swing relative to the platform body 3; and in order to avoid the truss structure 4 of the first bridge body 1 from interfering with the platform body 3 during the swinging process, as shown in FIG. Figure 3 As shown, the truss structure 4 is not arranged within the range of the length D on one side of the first bridge body 1 close to the platform body 3, and D is greater than zero; the specific value of D depends on the specific structure of the platform body 3. Specifically in this embodiment, if the truss structure 4 is arranged throughout the length of the first bridge body 1, the guardrail of the platform body 3 will interfere with the truss structure 4 on the first bridge body 1. Therefore, D in this embodiment is greater than the guardrail height of the platform body 3.

[0061] A flexible railing 10 is connected between the side of the truss structure 4 of the first bridge body 1 close to the platform body 3 and the platform body 3. The flexible railing 10 can be made of materials such as nylon rope and iron chain, so that it can be deformed when the first bridge body 1 is folded to avoid interfering with the movement of the first bridge body 1, and can also be used as a railing to prevent people or equipment from falling after the first bridge body 1 is lowered.

[0062] Furthermore, the present embodiment further comprises a winch 6 and a sling 7; the winch 6 is arranged on the water construction platform; one end of the sling 7 is connected to the first bridge body 1, and the other end of the sling 7 is connected to the winch 6; the winch 6 can drive the first bridge body 1 to swing by retracting and releasing the sling 7. The present embodiment further arranges a remote controller for the winch 6, and the staff can control the winch 6 through the remote controller, thereby controlling the swinging action of the first bridge body 1.

[0063] Furthermore, the first bridge body 1 is also connected with a hanger 8, which includes a hanging point 81 and a supporting structure 82; the height of the hanging point 81 is higher than the highest point of the first bridge body 1, and the hanging point 81 is used to connect with the sling 7, and the hanging point 81 and the first bridge body 1 are connected through the supporting structure 82; the supporting structure 82 is arranged on at least one side of the first bridge body 1 along the width direction thereof, and the supporting structure 82 is located on the outside of the first bridge body 1. Specifically, as Figure 3 and Figure 4 As shown, the hanging point 81 of this embodiment is a rod-shaped component with an axis arranged along the width direction of the first bridge body 1, and the length of the rod-shaped component is greater than or equal to the width of the first bridge body 1; support structures 82 are arranged on the outer sides of the left and right side walls of the first bridge body 1, and the two support structures 82 extend from both sides to both sides of the rod-shaped component, thereby forming a door-shaped frame with a shape similar to "ㄇ", avoiding interference with the passage of personnel or equipment on the first bridge body 1; a single support structure 82 specifically includes two rods with an angle, which form a triangular structure after being connected to the first bridge body 1, and has high stability.

[0064] Furthermore, a fixed pulley 9 is provided on the water construction platform. The height of the fixed pulley 9 is higher than the highest point of the first bridge body 1 , and the sling 7 passes around the fixed pulley 9 .

[0065] When there is no need to dock with the ship 12, Figure 2 As shown, the second bridge body 2 is folded up, and the winch 6 is used to tighten the sling 7, so as to minimize the space occupied by the variable connecting bridge and avoid the variable connecting bridge from interfering with the work of the water construction platform or the ship 12;

[0066] When it is necessary to dock with the ship 12, Figure 1 As shown, the winch 6 is first controlled by a remote control to loosen the sling 7, and the first bridge body 1 is lowered to a position as close to the deck of the ship 12 as possible, and then the second bridge body 2 is adjusted to make the second bridge body 2 close to the ship 12 until the universal wheel 11 reaches the deck of the ship 12, and the locking structure is locked, so that personnel or equipment can pass on the variable connecting bridge; when the transfer of personnel or equipment is completed, the second bridge body 2 is retracted and the first bridge body 1 is pulled up.

[0067] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A variable connection bridge, It is characterized in that The invention comprises a first bridge body (1) and a second bridge body (2); one end of the first bridge body (1) can be swingably connected to an above-water construction platform, and the axis of the swing connection is along a horizontal direction; the second bridge body (2) is connected to the other end of the first bridge body (1), and the position of the second bridge body (2) along the length direction of the first bridge body (1) is adjustable.

2. A variable connection bridge according to claim 1, It is characterized in that The second bridge body (2) is connected to the first bridge body (1) via a slide rail, and the slide rail is along the length direction of the first bridge body (1).

3. A variable connection bridge according to claim 2, It is characterized in that The slide rails are arranged on both sides of the second bridge body (2).

4. A variable connection bridge according to any one of claims 1 to 3, It is characterized in that It also comprises a locking structure, wherein the locking structure is used to lock the relative position of the first bridge body (1) and the second bridge body (2).

5. A variable connection bridge according to any one of claims 1 to 3, It is characterized in that A universal wheel (11) is provided at one end of the second bridge body (2) away from the first bridge body (1), and the second bridge body (2) is connected to the ship (12) via the universal wheel (11).

6. A variable connection bridge according to any one of claims 1 to 3, It is characterized in that Both sides of the first bridge body (1) are provided with truss structures (4), and / or both sides of the second bridge body (2) are provided with truss structures (4); the truss structures (4) are parallel to the vertical plane.

7. A water construction platform, comprising a platform body (3), It is characterized in that It also comprises a variable connecting bridge as claimed in any one of claims 1 to 6.

8. The water construction platform according to claim 7, It is characterized in that It also comprises a winch (6) and a sling (7); the winch (6) is arranged on the above-water construction platform; one end of the sling (7) is connected to the first bridge body (1), and the other end of the sling (7) is connected to the winch (6); the winch (6) can drive the first bridge body (1) to swing by retracting and extending the sling (7).

9. The above-water construction platform according to claim 8, It is characterized in that The first bridge body (1) is also connected to a hanger (8), the hanger (8) comprising a hanging point (81) and a supporting structure (82); the height of the hanging point (81) is higher than the highest point of the first bridge body (1), the hanging point (81) is used to connect with the sling (7), and the hanging point (81) and the first bridge body (1) are connected via the supporting structure (82); the supporting structure (82) is arranged on at least one side of the first bridge body (1) along its width direction, and the supporting structure (82) is located on the outside of the first bridge body (1).

10. The water construction platform according to claim 8, It is characterized in that A fixed pulley (9) is also provided on the above-water construction platform. The height of the fixed pulley (9) is higher than the highest point of the first bridge body (1), and the sling (7) passes around the fixed pulley (9).