Stabilizing structure for large bridge construction

By designing connectors, lifting lugs and support mechanisms, the overall lifting and position measurement of the hinge in large bridge construction is realized, which solves the installation troubles caused by independent lifting and multiple measurements in the prior art, and improves construction efficiency.

CN221941133UActive Publication Date: 2024-11-01科尔沁右翼前旗交通运输事业发展中心
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420249864.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-01
Publication Date
2024-11-01
Estimated Expiration
2034-02-01

AI Technical Summary

Technical Problem

In the construction of large bridges, the existing formwork needs to be independently hoisted and held in the installation process, and multiple measurements are required, which makes the installation more troublesome.

Method used

A stable structure including connectors, hoisting lugs and support mechanisms is designed. Through the cooperation of connectors and hoisting lugs, the overall hoisting of the hoist is realized, and the auxiliary mechanisms such as fixing shells, limiting grooves, spring telescopic plates and positioning are achieved. Roller to ensure accuracy and stability of the installation position.

Benefits of technology

A single overall lifting and position measurement of the hoop is realized, simplifying the installation process and improving the efficiency of large-scale bridge construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941133U_ABST
    Figure CN221941133U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of bridge construction, in particular to a stabilizing structure for large bridge construction, which comprises a connecting piece and a lifting lug, the middle of the upper end of the connecting piece is fixedly connected with the lifting lug, the two ends of the connecting piece are provided with supporting mechanisms, the upper ends of the supporting mechanisms are provided with I-shaped steel, and the upper end of the I-shaped steel is provided with a template base through a cross rod; the supporting mechanism comprises hoops, the hoops are connected through a connecting rod, and an auxiliary mechanism is fixedly connected to the interior of the hoop close to one side of the connecting piece; the auxiliary mechanism comprises a fixing shell, a limiting groove is formed in the inner side of the fixing shell, a spring telescopic plate is fixedly connected to the inner side of the limiting groove, a rotating shaft is fixedly connected to the top end of the spring telescopic plate, and a positioning roller is fixedly connected to the outer side of the rotating shaft. A worker can determine the installation positions of all the hoops by measuring the connecting pieces at a time, and installation is more convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to a stable structure used for large bridge construction. Background Art

[0002] During the construction of large bridges, many components are cast in concrete, and the cap beam built on the top of the pier is one of them. During the casting of the cap beam, a stable structure is needed to fix the formwork;

[0003] In the existing process of fixing the above-mentioned template, a clamp is installed above the pier column, and then a template support frame is installed on the upper end of the clamp to fix the template;

[0004] The clamps on the existing installation templates are all installed independently. During the installation process, they need to be hoisted separately, and multiple measurements are required during the installation process, which makes the installation more troublesome. Therefore, in order to solve the above problems, a stable structure for large bridge construction is proposed. Utility Model Content

[0005] The purpose of the utility model is to provide a stable structure for large bridge construction, so as to solve the problem that the clamps on the existing installation templates are all installed independently, and during the installation process, they need to be hoisted separately, and during the installation process, multiple measurements are required, resulting in troublesome installation.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A stable structure for large bridge construction, comprising a connecting piece and a lifting lug, wherein the middle of the upper end of the connecting piece is fixedly connected with the lifting lug, both ends of the connecting piece are installed with a supporting mechanism, an I-beam is installed on the upper end of the supporting mechanism, and a template base is placed on the upper end of the I-beam through a cross bar;

[0008] The support mechanism comprises a hoop, the hoop is connected by a connecting rod, and an auxiliary mechanism is fixedly connected inside the hoop close to the connecting piece;

[0009] The auxiliary mechanism comprises a fixed shell, a limiting groove is arranged inside the fixed shell, a spring telescopic plate is fixedly connected inside the limiting groove, a rotating shaft is fixedly connected to the top of the spring telescopic plate, and a positioning roller is fixedly connected to the outer side of the rotating shaft.

[0010] As a further optimization of the present invention, the supporting mechanism is installed on both sides of the upper end of the pier, and there are two piers, the piers are columnar, and the piers are parallel to each other.

[0011] As a further optimization of the present invention, there are two I-beams, which are parallel to each other, and a through hole is opened on the inner side of the I-beam. The I-beams are fixedly connected by the through hole, a tie rod and a nut. The tie rod is installed inside the through hole, the tie rod is T-shaped, and one end of the tie rod is spirally connected to the nut.

[0012] As a further optimization of the present invention, there are four clamps, and the clamps correspond to each other in pairs, and the corresponding clamps are connected by connecting rods, and the connecting rods are parallel.

[0013] As a further optimization of the present invention, there are two auxiliary mechanisms fixedly connected to the inner side of the clamps fixedly connected at both ends of the connecting piece, and the angle between the auxiliary mechanism and the connecting piece is 45°.

[0014] As a further optimization of the present invention, there are two limit grooves opened on the inner side of any of the fixed shells, and the spring telescopic plates fixedly connected on the inner side of the limit grooves are parallel to each other, and both ends of the rotating shaft are slidably connected to the inner side of the limit grooves.

[0015] As a further optimization of the present invention, one quarter of the positioning roller is exposed outside the fixed shell, one side of the fixed shell is open, and the fixed shell is opened on the inner side of the clamp.

[0016] Compared with the prior art, the beneficial effects of the utility model are:

[0017] In the utility model, the clamp can be hoisted as a whole at one time through the provided connecting pieces, lifting ears and supporting mechanisms. After the hoisting is completed, the staff can determine the installation positions of all the clamps by performing a single measurement of the connecting pieces, which makes the installation more convenient and can improve the efficiency of large bridge construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0019] Figure 2 For this utility model Figure 1 Schematic diagram of the structure at A in the middle;

[0020] Figure 3 For this utility model Figure 1 Schematic diagram of the structure at B in the middle;

[0021] Figure 4 This is a schematic diagram of the auxiliary mechanism structure of the utility model.

[0022] In the figure: 1. pier column; 2. connecting piece; 3. lifting ear; 4. supporting mechanism; 41. clamp; 42. connecting rod; 43. auxiliary mechanism; 431. fixing shell; 432. limiting groove; 433. spring telescopic plate; 434. rotating shaft; 435. positioning roller; 5. I-beam; 6. pulling rod; 7. nut; 8. template base; 9. cross bar; 10. through hole. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0025] See also Figure 1-4 , the utility model provides a technical solution:

[0026] A stable structure for large bridge construction, including a connector 2 and a lifting lug 3, wherein the lifting lug 3 is fixedly connected to the middle of the upper end of the connector 2, support mechanisms 4 are installed at both ends of the connector 2, an I-beam 5 is installed at the upper end of the support mechanism 4, and a template base 8 is placed on the upper end of the I-beam 5 through a cross bar 9; the support mechanism 4 includes a clamp 41, the clamps 41 are connected by a connecting rod 42, and an auxiliary mechanism 43 is fixedly connected inside the clamp 41 close to the connector 2; the auxiliary mechanism 43 includes a fixed shell 431, a limiting groove 432 is provided on the inner side of the fixed shell 431, a spring telescopic plate 433 is fixedly connected to the inner side of the limiting groove 432, a rotating shaft 434 is fixedly connected to the top of the spring telescopic plate 433, and a positioning roller 435 is fixedly connected to the outer side of the rotating shaft 434.

[0027] As a further implementation of this solution, the support mechanism 4 is installed on both sides of the upper end of the pier 1. There are two piers 1. The piers 1 are cylindrical and parallel to each other. The support mechanism 4 installed on the outside of the two piers 1 can stably support the formwork for pouring the cap beam.

[0028] As a further implementation of this scheme, two I-beams 5 are provided, the I-beams 5 are parallel to each other, a through hole 10 is opened on the inner side of the I-beam 5, the I-beams 5 are fixedly connected by the through hole 10, the tie rod 6 and the nut 7, the tie rod 6 is installed inside the through hole 10, the tie rod 6 is T-shaped, and one end of the tie rod 6 is spirally connected to the nut 7, and the I-beams 5 can be stably connected together by the set tie rod 6 and nut 7;

[0029] As a further implementation of the present solution, four clamps 41 are provided, and the clamps 41 correspond to each other in pairs, and the corresponding clamps 41 are connected by connecting rods 42, and the connecting rods 42 are parallel to each other. By providing multiple connecting rods 42, the clamps 41 can be hoisted at one time;

[0030] As a further implementation of the present solution, two auxiliary mechanisms 43 are provided which are fixedly connected to the inner side of the clamp 41 fixedly connected to both ends of the connector 2. The angle between the auxiliary mechanism 43 and the connector 2 is 45°. The setting of the auxiliary mechanism 43 can prevent the clamp 41 from being scratched against the pier 1 during the hoisting process.

[0031] As a further implementation of the present solution, two limiting grooves 432 are provided on the inner side of any fixed shell 431, and the spring expansion plates 433 fixedly connected to the inner side of the limiting grooves 432 are parallel to each other, and both ends of the rotating shaft 434 are slidably connected to the inner side of the limiting grooves 432, and the spring expansion plates 433 and the rotating shaft 434 can be positioned through the limiting grooves 432;

[0032] As a further implementation of the present invention, one quarter of the positioning roller 435 is exposed outside the fixed shell 431, one side of the fixed shell 431 is open, and the fixed shell 431 is opened inside the clamp 41. Through the above arrangement, the stability of the clamp 41 during lifting can be further improved.

[0033] Workflow: During the pouring of the cap beam of the bridge construction, the staff needs to firmly support the template for pouring the cap beam. During the support process, the staff first hoists the connector 2 to the required position through the lifting lug 3. During the hoisting process, the auxiliary mechanism 43 fixedly connected on both sides of the connector 2 contacts the pier 1, thereby ensuring the stability of the connector 2 and the clamp 41 during the upward movement. Then, the clamps 41 are fixedly connected by bolts to fix the connector 2 on both sides of the upper end of the pier 1. After the fixing is completed, the positioning roller 435 moves to the inside of the fixed shell 431 for storage;

[0034] Next, the staff installs the I-beam 5 at the positions on both sides of the upper end of the clamp 41. After the installation is completed, the I-beams 5 are connected together by tie rods 6 and nuts 7. The connected I-beams 5 are installed at the positions on both sides of the upper end of the pier 1. Then the cross bar 9 is installed on the upper end of the formwork base 8. Finally, the formwork for casting the cap beam is stabilized by the formwork base 8 to complete the installation. In actual use, such a setting can complete the installation at one time, and during the hoisting process, it can be completed at one time, and the installation is more convenient.

[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A stable structure for large bridge construction, comprising a connecting member (2) and a lifting lug (3), characterized in that: A lifting lug (3) is fixedly connected to the middle of the upper end of the connecting member (2), support mechanisms (4) are installed at both ends of the connecting member (2), an I-beam (5) is installed at the upper end of the support mechanism (4), and a template base (8) is placed on the upper end of the I-beam (5) through a cross bar (9); The supporting mechanism (4) comprises a hoop (41), the hoop (41) being connected to each other via a connecting rod (42), and an auxiliary mechanism (43) being fixedly connected inside the hoop (41) on a side close to the connecting member (2); The auxiliary mechanism (43) comprises a fixed shell (431), a limiting groove (432) is provided inside the fixed shell (431), a spring telescopic plate (433) is fixedly connected inside the limiting groove (432), a rotating shaft (434) is fixedly connected at the top end of the spring telescopic plate (433), and a positioning roller (435) is fixedly connected outside the rotating shaft (434).

2. A stable structure for large bridge construction according to claim 1, characterized in that: The support mechanism (4) is installed on both sides of the upper end of the pier column (1), and two pier columns (1) are provided. The pier columns (1) are columnar, and the pier columns (1) are parallel to each other.

3. A stable structure for large bridge construction according to claim 1, characterized in that: The I-beams (5) are provided with two, the I-beams (5) are parallel to each other, a through hole (10) is opened on the inner side of the I-beams (5), the I-beams (5) are fixedly connected by the through hole (10), the tie rod (6) and the nut (7), the tie rod (6) is installed inside the through hole (10), the tie rod (6) is T-shaped, and one end of the tie rod (6) is spirally connected to the nut (7).

4. A stable structure for large bridge construction according to claim 1, characterized in that: Four hoops (41) are provided, and the hoops (41) correspond to each other in pairs. The corresponding hoops (41) are connected by connecting rods (42), and the connecting rods (42) are parallel to each other.

5. A stable structure for large bridge construction according to claim 1, characterized in that: Two auxiliary mechanisms (43) are fixedly connected to the inner side of the clamps (41) fixedly connected to the two ends of the connecting member (2), and the angle between the auxiliary mechanisms (43) and the connecting member (2) is 45°.

6. A stable structure for large bridge construction according to claim 1, characterized in that: There are two limiting grooves (432) opened on the inner side of any of the fixed shells (431), and the spring expansion plates (433) fixedly connected to the inner sides of the limiting grooves (432) are parallel to each other, and both ends of the rotating shaft (434) are slidably connected to the inner sides of the limiting grooves (432).

7. A stable structure for large bridge construction according to claim 1, characterized in that: One quarter of the positioning roller (435) is exposed outside the fixing shell (431), one side of the fixing shell (431) is open, and the fixing shell (431) is opened inside the clamp (41).