Bottom support device for concrete pouring of pipe pile reinforcement cage
By designing a bottom support device including pallets, leakproof rubber rings and conical rod components, the problem of concrete leakage when the steel cage of pipe piles is lowered is solved, ensuring the optimization of construction quality and cost.
Patent Information
- Application Number
- CN202420213350.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-29
AI Technical Summary
In infrastructure construction, pipe pile steel cages are prone to be stuck when lowered, causing concrete to leak, affecting construction quality, and increasing rework and costs.
A bottom support device including a pallet assembly, a leak-proof rubber ring assembly, a tapered rod assembly and a tapered bucket is designed. The pallet assembly has a steel base plate and a connecting steel bar. The leak-proof rubber ring assembly is used to prevent concrete from leaking. The rod assembly moves in the radial direction of the bottom plate through a cone bucket, and is tightly against the inner wall of the pile hole to ensure that the concrete does not leak.
It effectively avoids concrete leakage, controls the pouring volume and protective layer thickness, improves construction quality, reduces rework and material waste, and reduces construction costs.
Smart Images

Figure CN221941349U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a bottom supporting device for pouring concrete of a pipe pile reinforcement cage, belonging to the technical field of pouring concrete of a pipe pile reinforcement cage. Background Art
[0002] At present, in the construction of foundation structures, it is necessary to first lower the pipe pile reinforcement cage to a certain depth in the existing pile hole, and then pour concrete to form the concrete pipe pile, thereby completing the connection between the concrete pipe pile and the ground foundation at the same time. It is found from actual construction that the depth of the existing pile hole is often tens of meters, while the depth of the concrete pipe pile connected to the ground foundation that needs to be placed in the pile hole is usually only a few meters (such as three meters). Therefore, in order to avoid unnecessary waste of concrete during pouring, the traditional practice is to weld a steel plate of a size matching the diameter of the pile hole at the bottom of the pipe pile reinforcement cage. The steel plate is used to block the concrete and ensure that the concrete is not poured into the space below it. However, the actual situation on site is that the inner wall of the pile hole is usually not smooth, and there are often irregular cement lumps and other protrusions. Therefore, when lowering the pipe pile reinforcement cage, the steel plate at the bottom of the pipe pile reinforcement cage often gets stuck and cannot be lowered smoothly. Faced with this situation, workers often knock on the edge of the steel plate to reduce its cross-section. Although this method achieves the purpose of smoothly lowering the pipe pile reinforcement cage, it leads to the subsequent concrete pouring. The concrete is prone to leakage, resulting in an increase in the volume of concrete pouring, contact between the main reinforcement and the air in the pile hole, and the thickness of the concrete protective layer cannot be effectively controlled. In addition, since there is often mud, water, etc. at the bottom of the pile hole, it will affect the connection quality between the poured concrete and the inner wall of the pile hole to a certain extent. In other words, the construction quality cannot be guaranteed, which often leads to rework, extended construction period, material waste, and invisible increase in construction costs. Utility Model Content
[0003] The utility model aims to provide a bottom support device for pouring concrete of a pipe pile reinforcement cage, which can effectively isolate the pile hole after the pipe pile reinforcement cage is lowered into place without hindering the smooth lowering of the pipe pile reinforcement cage, thereby ensuring that the subsequent poured concrete will not leak.
[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0005] A bottom support device for pouring concrete for a pipe pile reinforcement cage comprises a support plate assembly, a leakproof rubber ring assembly, a cone rod assembly and a cone bucket, wherein: the support plate assembly comprises a steel bottom plate, a plurality of connecting steel bars are arranged on the top surface of the bottom plate, the bottom ends of the connecting steel bars are welded to the top surface of the bottom plate, a positioning cylinder is welded to the top end of the connecting steel bars, a rubber sleeve for connecting the main bars of the pipe pile reinforcement cage is embedded in the positioning cylinder; the leakproof rubber ring assembly comprises a rubber ring; the rubber ring is sleeved on the connecting steel bar and fixed to the top surface of the bottom plate; a plurality of the cone rod assemblies are installed on the bottom surface of the rubber ring extending out of the bottom plate and on the bottom surface of the bottom plate along the radial direction of the bottom plate; the cone rod assembly is squeezed by the cone bucket disposed in the central opening of the bottom plate and can move outward along the radial direction of the bottom plate.
[0006] The advantages of the utility model are:
[0007] The bottom support device of the utility model will not hinder the smooth lowering of the pipe pile reinforcement cage, and after the pipe pile reinforcement cage is lowered into place, it can be tightly pressed against the inner wall of the pile hole, effectively isolating the pile hole, so that the subsequently poured concrete will not leak, and the pouring volume of concrete is effectively controlled, and the main reinforcement is prevented from contacting with the air in the pile hole, and the mud, water, etc. at the bottom of the pile hole are prevented from affecting the connection quality between the poured concrete and the inner wall of the pile hole, and the thickness of the concrete protective layer can be effectively controlled, so that the construction quality is guaranteed, and the problems of rework, extended construction period, waste of materials, invisible increase in construction cost, etc. are avoided. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] Figure 1 It is a three-dimensional schematic diagram of the base support device of the utility model.
[0009] Figure 2 It is a front view schematic diagram of the base support device of the utility model.
[0010] Figure 3 It is a bottom view schematic diagram of the base support device of the utility model.
[0011] Figure 4 It is a three-dimensional schematic diagram of the pallet assembly.
[0012] Figure 5 Schematic diagram of a top view of the pallet assembly.
[0013] Figure 6 yes Figure 5 AA section diagram of .
[0014] Figure 7 Schematic diagram of the bottom view of the pallet assembly.
[0015] Figure 8 It is a three-dimensional schematic diagram of the rubber sleeve.
[0016] Fig. 9It is a three-dimensional schematic diagram of the leak-proof rubber ring assembly.
[0017] Fig.10 It is a schematic diagram of the main view of the leak-proof rubber ring assembly.
[0018] Fig.11 It is a three-dimensional schematic diagram of the cone-rod assembly.
[0019] Fig.12 It is a cross-sectional schematic diagram of the cone-rod assembly.
[0020] Fig.13 It is a schematic diagram illustrating the working principle of the cone rod assembly.
[0021] Fig.14 It is a three-dimensional schematic diagram of the cone bucket.
[0022] Fig.15 It is a schematic diagram for explaining the use of the base support device of the utility model. DETAILED DESCRIPTION
[0023] like Figures 1 to 15 As shown, the bottom support device for concrete pouring of a pipe pile reinforcement cage of the utility model comprises a support plate assembly 10, a leak-proof rubber ring assembly 20, a cone rod assembly 30 and a cone bucket 50, wherein: the support plate assembly 10 comprises a circular steel bottom plate 11, a plurality of connecting steel bars 12 are arranged on the top surface of the bottom plate 11, the bottom ends of the connecting steel bars 12 are welded to the top surface of the bottom plate 11, a positioning cylinder 13 is welded to the top end of the connecting steel bars 12, a rubber sleeve 15 for connecting the main bars 71 of the pipe pile reinforcement cage 70 is embedded in the positioning cylinder 13, and the rubber sleeve 15 is used to connect the main bars 71 of the pipe pile reinforcement cage 70. 5 is used to prevent the main reinforcement 71 from contacting the air in the pile hole 90; the leak-proof rubber ring assembly 20 includes a ring-shaped rubber ring 21, and the rubber ring 21 is made of rubber; the rubber ring 21 is sleeved on the connecting steel bar 12 and fixed to the top surface of the bottom plate 11; a plurality of cone rod assemblies 30 are installed on the bottom surface of the part of the rubber ring 21 extending out of the bottom plate 11 and the bottom surface of the bottom plate 11 along the radial direction of the bottom plate 11; the cone rod assembly 30 is squeezed by the cone bucket 50 disposed in the central opening 111 of the bottom plate 11 and can move outward along the radial direction of the bottom plate 11.
[0024] Specifically, when the cone bucket 50 is lowered into the central opening 111 of the base plate 11, the cone rod assembly 30 is squeezed by the cone bucket 50 and moves outward in the radial direction of the base plate 11, so that when the pipe pile reinforcement cage 70 is lowered into place in the pile hole 90, it is used to abut against the inner wall of the pile hole 90, thereby preventing the bottom support device of the utility model from falling off, so that the cone bucket 50, the base plate 11, and the rubber ring 21 together separate the pile hole 90, thereby preventing the subsequent poured concrete from leaking.
[0025] like Figures 4 to 6The bottom plate 11 has a central opening 111. The number and position of the connecting steel bars 12 arranged on the top surface of the bottom plate 11 should be reasonably designed according to the number and distribution of the main bars 71. All the connecting steel bars 12 are evenly distributed along the circumferential direction of the bottom plate 11 on the edge of the central opening 111 of the bottom plate 11. Preferably, each connecting steel bar 12 is bent into a curved shape to facilitate the smooth lowering of the cone bucket 50 to the central opening 111.
[0026] like Figure 8 The rubber sleeve 15 includes a cylinder body 151 embedded in the positioning cylinder 13, and the two ends of the cylinder body 151 are respectively provided with a limiting convex ring 152. The two limiting convex rings 152 are located outside the positioning cylinder 13 and fit with the cylinder mouth of the positioning cylinder 13, so that the rubber sleeve 15 is not easy to fall off from the positioning cylinder 13. The aperture of the rubber sleeve 15 is adapted to the diameter of the main reinforcement 71 of the pipe pile reinforcement cage 70, so that the main reinforcement 71 can be firmly connected to the positioning cylinder 13 by means of the rubber sleeve 15.
[0027] like Fig. 9 and Fig.10 The rubber ring 21 is provided with a central opening 211, the diameter of the central opening 211 is larger than the circular diameter formed at the top of each connecting steel bar 12, and relative to the bottom plate 11, the positioning tube 13 should be arranged on the inner side of the connecting steel bar 12, so as to facilitate the rubber ring 21 to be inserted into the connecting steel bar 12. Further, a plurality of P-shaped ear plates 22 are evenly distributed on the bottom surface of the rubber ring 21 along its own circumferential direction, and a plurality of groups of fixed ear plates 14 are evenly distributed on the bottom surface of the bottom plate 11 along its own circumferential direction, wherein: each group of fixed ear plates 14 includes an inner fixed ear plate 142 and an outer fixed ear plate 141, the inner fixed ear plate 142 and the outer fixed ear plate 141 are in the same radial direction on the bottom plate 11, the inner fixed ear plate 142 is arranged close to the edge of the central opening 111 of the bottom plate 11, and the outer fixed ear plate 141 is arranged close to the outer edge of the bottom plate 11.
[0028] In the utility model, the outer diameter of the rubber ring 21 is adapted to the inner wall diameter of the pile hole 90. The design of the P-shaped ear plate 22, on the one hand, enables the outer edge of the rubber ring 21 to bend inward by pulling the tapered rod assembly 30, thereby achieving smooth lowering of the base support device of the utility model in the pile hole 90, and preventing the rubber ring 21 from being stuck by cement lumps protruding from the inner wall of the pile hole 90 during the lowering process. On the other hand, when the tapered rod assembly 30 pulls the outer edge of the rubber ring 21 to bend inward, the P-shaped shape effectively prevents the outer edge of the rubber ring 21 from being stuck on the outer edge of the bottom plate 11.
[0029] In actual design, the rubber ring 21 is fixed to the base plate 11 via a bolt assembly 40. Figure 2The bolt assembly 40 includes a bolt 41, a nut 42 and a gasket 43. The bottom plate 11 is provided with a plurality of fixing holes 110 along its circumferential direction, and the rubber ring 21 is provided with a plurality of mounting holes 210 along its circumferential direction. When the rubber ring 21 is placed on the top surface of the bottom plate 11, the bolt 41 passes through the fixing holes 110 and the mounting holes 210 and is then screwed to the nut 42. A gasket 43 is provided between the nut 42 and the rubber ring 21. Figure 2 and Fig.15 The design that the threaded connection portion of the bolt 41 and the nut 42 is located above the rubber ring 21 can increase the force-bearing area of the connection between the bolt 41 and the nut 42 after the subsequent pouring of concrete, thereby effectively preventing loosening.
[0030] In addition, if Figure 7 In order to avoid collision between the bolt assembly 40 and the cone rod assembly 30, the fixing holes 110 provided on the bottom plate 11 and the groups of fixing ear plates 14 are not in the same radial direction.
[0031] like Figures 11 to 13 The cone rod assembly 30 includes a cone rod 31, one end of the cone rod 31 is a cone head 311 and the other end is a cone tail 312, two protruding rings 34 are provided at a position near the cone head 311 on the cone rod 31, and a gap between the two protruding rings 34 forms a slot 340 for clamping the P-shaped ear plate 22, a fixing ring 32 is fixedly provided at the middle part of the cone rod 31, and the fixing ring 32 is connected to one end of a spring 33 sleeved on the cone rod 31, and the spring 33 is between the fixing ring 32 and the outer fixed ear plate 141, and an assembly groove 310 is provided at a position near the cone tail 312 on the cone rod 31, and the notch of the assembly groove 310 is arranged toward the bottom plate 11, and a limiting plate 35 is rotatably installed in the assembly groove 310, and when the limiting plate 35 is not subjected to force, one end of the limiting plate 35 is exposed outside the assembly groove 310 by means of a spring plate 36 connected thereto.
[0032] Specifically, a limit plate 35 can be rotatably installed in the assembly groove 310, wherein: the rotating end of the limit plate 35 is installed in the assembly groove 310 via a rotating shaft 37, and a spring plate 36 is connected between the swinging end of the limit plate 35 and the inner wall of the assembly groove 310; when the limit plate 35 is not subjected to force, the spring plate 36 pushes against the limit plate 35 so that the swinging end of the limit plate 35 is outside the assembly groove 310.
[0033] In actual design, reference Fig.13To understand, the cone rod 31 is arranged through the inner fixed ear plate 142 and the outer fixed ear plate 141 on the bottom plate 11, the outer fixed ear plate 141 is located between the protruding ring 34 and the spring 33, and the inner fixed ear plate 142 is located between the fixing ring 32 and the cone tail 312, wherein: when the cone tail 312 of the cone rod 31 is not squeezed by the cone bucket 50, the outer fixed ear plate 141 abuts against the protruding ring 34 under the action of the spring 33, and the inner fixed ear plate 142 abuts against the fixing ring 32; when the cone tail 312 is squeezed by the cone bucket 50, the spring 33 is compressed, and the cone rod 31 moves outward along the radial direction of the bottom plate 11, and at the same time, the inner fixed ear plate 142 moves through the limiting plate 35, so that the limiting plate 35 is first pressed into the assembly groove 310 and then pops out, which not only plays a limiting role on the cone rod 31, but also allows workers to hear the sound of the limiting plate 35 bouncing onto the bottom plate 11 and know that the cone rod 31 has been pushed into place.
[0034] like Fig.11 and Fig.12 The cone head 311 is conical, and the cone tail 312 is an inclined plane, and the inclination angle of the inclined plane is consistent with the inclination angle of the cone bucket 50. In the utility model, the design of the inclined plane of the cone tail 312 is convenient for inserting each ear plate, and on the other hand, the cone bucket 50 can effectively resist the cone rod 31.
[0035] like Figure 1 and Fig.11 The side of the fixing ring 32 facing the bottom plate 11 is a plane, so as to better and more firmly contact with the bottom plate 11 and prevent the cone rod 31 from rotating randomly.
[0036] Specifically, when the cone rod 31 is not squeezed by the cone bucket 50, the P-shaped ear plate 22 on the rubber ring 21 pulls the outer edge of the rubber ring 21 to bend inward under the drive of the cone rod 31, so that the rubber ring 21 leaves the inner wall of the pile hole 90, ensuring the smooth lowering of the pipe pile reinforcement cage 70. When the cone rod 31 is squeezed by the cone bucket 50, the cone rod 31 moves outward in the radial direction of the bottom plate 11 to the right position, and the outer edge of the rubber ring 21 returns to a plane, while the cone head 311 is flush with the outer edge of the rubber ring 21. At this time, the cone head 311 abuts against the inner wall of the pile hole 90, and the thickness of the concrete protective layer 91 is determined and the thickness of the concrete protective layer 91 is very uniform when viewed along the circumferential direction.
[0037] like Fig.15 The steel cone 50 is hung on the main reinforcement 71 by a rope 60. Fig.14 The cone bucket 50 is provided with a hanging hole 51 for tying a rope 60, wherein: when the pipe pile reinforcement cage 70 is lowered into place in the pile hole 90, the cone bucket 50 is pressed down into the central opening 111 of the bottom plate 11 by a tool, and the rope 60 is broken.
[0038] In actual application, the cone bucket 50 can also be replaced by other components, as long as it can block the central opening 111 of the bottom plate 11 and squeeze the cone rod assembly 30 so that the cone rod 31 abuts against the inner wall of the pile hole 90 so that the base support device of the utility model can have a partition effect on the pile hole 90.
[0039] In the present invention, except the rubber ring 21, the rubber sleeve 15, the spring sheet 36 and the spring 33, all other components are preferably made of steel.
[0040] In the present invention, the pipe pile reinforcement cage 70 belongs to the prior art in the art, and includes a plurality of main reinforcements 71 arranged in a circle, and all the main reinforcements 71 are connected by spiral stirrups 72. When the pipe pile reinforcement cage 70 is lowered into the pile hole 90, the main reinforcements 71 are kept vertical along the depth direction of the pile hole 90.
[0041] refer to Fig.15 The use process of the bottom support device for pouring concrete of the pipe pile reinforcement cage of the utility model is as follows:
[0042] 1) Install the bottom support member at the bottom of the pipe pile reinforcement cage 70, insert the bottom of the main reinforcement 71 into the rubber sleeve 15 in the positioning tube 13 of the support plate assembly 10, and the bottom of the main reinforcement 71 may be installed with a sleeve 73 (not limited) as appropriate, wherein the support plate assembly 10, the anti-leakage rubber ring assembly 20 and the cone rod assembly 30 of the bottom support device of the utility model except the cone bucket 50 constitute the bottom support member;
[0043] 2) The cone bucket 50 is hung on the main reinforcement 71 of the pile reinforcement cage 70 by means of the rope 60, and the cone bucket 50 is now away from the central opening 111;
[0044] 3) lowering the pile reinforcement cage 70 with the bottom support member and the cone bucket 50 installed in the pile hole 90;
[0045] 4) After the pipe pile reinforcement cage 70 is lowered into place, usually when the steel top plate 80 welded on the top of the pipe pile reinforcement cage 70 is placed on the opening of the pile hole 90, the pipe pile reinforcement cage 70 is considered to be lowered into place, and the cone bucket 50 is pressed down by a tool to be placed in the central opening 111 of the bottom plate 11 of the support plate assembly 10 to block the central opening 111, and then the rope 60 is broken;
[0046] 5) The cone bucket 50 squeezes the cone rod assembly 30, so that the cone rod 31 of the cone rod assembly 30 moves outward along the radial direction of the bottom plate 11 and presses against the inner wall of the pile hole 90, so that the cone bucket 50, the bottom plate 11 and the rubber ring 21 together separate the pile hole 90, waiting for the subsequent pouring of concrete.
[0047] As can be seen from the above, by means of the bottom supporting device of the utility model, the cone bucket 50, the bottom plate 11 and the rubber ring 21 have reliably separated the pile hole 90, so when pouring concrete, the concrete will not leak, the concrete pouring volume is effectively controlled, the connection quality between the concrete and the inner wall of the pile hole 90 is reliable, and the bottom supporting device of the utility model effectively controls the position of the pipe pile reinforcement cage 70, and thus the thickness of the concrete protective layer 91 after pouring is effectively guaranteed, uniform and reliable, the quality of the entire construction is guaranteed, and the problems of rework, extended construction period, material waste, and invisible increase in construction cost are avoided.
[0048] The above are preferred embodiments of the present invention and the technical principles used therein. For those skilled in the art, without departing from the spirit and scope of the present invention, any obvious changes such as equivalent transformation, simple replacement, etc. based on the technical solution of the present invention are within the protection scope of the present invention.
Claims
1. A bottom support device for pouring concrete of a pipe pile reinforcement cage, characterized in that: It includes a support plate assembly, a leak-proof rubber ring assembly, a cone rod assembly and a cone bucket, wherein: the support plate assembly includes a steel base plate, a plurality of connecting steel bars are arranged on the top surface of the base plate, the bottom ends of the connecting steel bars are welded to the top surface of the base plate, a positioning tube is welded to the top end of the connecting steel bars, a rubber sleeve for connecting the main bars of the pipe pile steel cage is embedded in the positioning tube; the leak-proof rubber ring assembly includes a rubber ring; the rubber ring is sleeved on the connecting steel bar and fixed to the top surface of the base plate; a plurality of cone rod assemblies are installed on the bottom surface of the rubber ring extending out of the base plate and on the bottom surface of the base plate along the radial direction of the base plate; the cone rod assembly is squeezed by the cone bucket placed in the central opening of the base plate and can move outward along the radial direction of the base plate.
2. The bottom support device for pouring concrete of a pipe pile reinforcement cage according to claim 1 is characterized in that: All the connecting steel bars are evenly distributed along the circumferential direction of the bottom plate, and each of the connecting steel bars 12 is bent into a curved shape.
3. The bottom support device for pouring concrete of a pipe pile reinforcement cage as claimed in claim 2 is characterized in that: A plurality of P-shaped ear plates are evenly distributed on the bottom surface of the rubber ring along its own circumferential direction, and a plurality of groups of fixed ear plates are evenly distributed on the bottom surface of the bottom plate along its own circumferential direction, wherein: each group of fixed ear plates includes an inner fixed ear plate and an outer fixed ear plate, the inner fixed ear plate and the outer fixed ear plate are in the same radial direction on the bottom plate, the inner fixed ear plate is arranged close to the edge of the central opening of the bottom plate, and the outer fixed ear plate is arranged close to the outer edge of the bottom plate.
4. The bottom support device for pouring concrete of a pipe pile reinforcement cage as claimed in claim 3 is characterized in that: The cone rod assembly includes a cone rod, one end of the cone rod is a cone head and the other end is a cone tail, two protruding rings are provided on the cone rod near the cone head, the gap between the two protruding rings forms a slot for clamping the P-shaped ear plate, a fixing ring is provided on the middle part of the cone rod, the fixing ring is connected to one end of a spring sleeved on the cone rod, the spring is between the fixing ring and the external fixed ear plate, an assembly groove is provided on the cone rod near the cone tail, a limit plate is rotatably installed in the assembly groove, when the limit plate is not subjected to force, one end of the limit plate is exposed outside the assembly groove by the spring plate connected thereto.
5. The bottom supporting device for pouring concrete of a pipe pile reinforcement cage as claimed in claim 4 is characterized in that: The cone rod is arranged through the inner fixed ear plate and the outer fixed ear plate on the bottom plate, the outer fixed ear plate is located between the protruding ring and the spring, and the inner fixed ear plate is located between the fixing ring and the cone tail, wherein: when the cone tail is not squeezed by the cone bucket, the outer fixed ear plate abuts against the protruding ring under the action of the spring, and the inner fixed ear plate abuts against the fixing ring; when the cone tail is squeezed by the cone bucket, the cone rod moves outward along the radial direction of the bottom plate, and at the same time, the inner fixed ear plate moves through the limiting plate, so that the limiting plate is first pressed into the assembly groove and then pops out.