High-stability hydraulic engineering foundation pile

By using cylinders to control the contact between the gas rod and limit parts with the soil in the foundation piles of water conservancy projects, combined with threaded connections and sliding components, the problem of insufficient stability of the foundation pile is solved, and higher grip and stability are achieved, reducing the Safety hazards.

CN221941408UActive Publication Date: 2024-11-01淄博市太河水库管理中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420452621.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-09
Publication Date
2024-11-01
Estimated Expiration
2034-03-09

AI Technical Summary

Technical Problem

During the use of existing water conservancy project foundation piles, due to the lack of equipment to improve grip, the stability is insufficient and safety hazards are posed.

Method used

A high-stability water conservancy project foundation pile was designed. By setting a cylinder between the bearing and the pile body, the height of the gas rod is controlled, and the connecting rod and limiting parts are driven to contact the soil, increasing grip, and connecting and sliding components are threaded. Achieve convenient disassembly and assembly.

Benefits of technology

It effectively improves the stability of the foundation pile, avoids shaking, enhances grip, reduces safety hazards, and is suitable for promotion and use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941408U_ABST
    Figure CN221941408U_ABST
Patent Text Reader

Abstract

The utility model relates to the related technical field of foundation piles, in particular to a high-stability hydraulic engineering foundation pile which comprises a bearing platform, a pile body is installed at the bottom end of the bearing platform, a pile head is fixedly installed at the bottom end of the pile body, an air cylinder is installed on the pile body, an air rod is installed at the output end of the air cylinder, and a connecting rod is fixedly installed at the bottom end of the air rod. Adjusting assemblies are installed at the two side ends of the connecting rod correspondingly, and second limiting pieces are installed on the adjusting assemblies. According to the device, the foundation pile bearing platform and the pile body are convenient to disassemble and assemble, the height of a connecting rod is adjusted by controlling an air rod through an air cylinder in the pile body, the connecting rod drives a second limiting piece to move towards the outer end in the downward moving process, and the stability of the device is guaranteed by making contact with soil on the outer side of the pile body through the second limiting piece; and when the bottom end of the connecting rod moves downwards, the connecting blocks on the two sides can be extruded to move outwards, the road holding force of the pile body is further guaranteed, the stability of the pile body is effectively improved, and shaking is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field related to foundation piles, and in particular to a high-stability foundation pile for a water conservancy project. Background Art

[0002] Pile foundation is a professional term in building structure. To understand its meaning, we must understand what pile foundation, pile group foundation and single pile foundation are. Pile foundation is a foundation composed of pile and cap connected to the top of the pile. If the pile body is completely buried in the soil and the bottom of the cap is in contact with the soil, it is called a low cap pile foundation; if the upper part of the pile body is exposed to the ground and the bottom of the cap is above the ground, it is called a high cap pile foundation. Building pile foundation is usually a low cap pile foundation.

[0003] There are still some shortcomings in the use of existing foundation piles for water conservancy project construction. When the existing foundation piles for water conservancy project construction are in use, the foundation piles generally play a load-bearing role, and the existing foundation piles do not have a device to improve their grip, resulting in insufficient stability of the foundation piles. Therefore, when in use, it is easy to cause certain safety hazards due to its insufficient grip. A high-stability water conservancy project foundation pile is needed to solve this problem. Utility Model Content

[0004] The utility model aims to provide a high-stability foundation pile for water conservancy projects to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a high-stability foundation pile for water conservancy projects, comprising a cap, a pile body is installed at the bottom end of the cap, a pile head is fixedly installed at the bottom end of the pile body, a cylinder is installed on the pile body, a gas rod is installed at the output end of the cylinder, a connecting rod is fixedly installed at the bottom end of the gas rod, adjustment components are installed on both side ends of the connecting rod, a second limit piece is installed on the adjustment component, connecting blocks are installed on both side ends of the bottom end of the connecting rod, and a first limit piece is fixedly installed on the connecting block.

[0006] As the preferred technical solution of the utility model, a fixed block is installed on the adjustment component and is fixedly connected to the connecting rod. A movable rod is connected to one side of the fixed block. The movable rod and the fixed block are movably connected via a rotating shaft. The other end of the movable rod is movably connected to the moving block via a rotating shaft.

[0007] As a preferred technical solution of the utility model, a second sliding block is fixedly installed at the bottom end of the moving block, a bottom block is fixedly installed in the pile body, a second sliding groove is opened on the bottom block, and the second sliding groove is slidably connected to the second sliding block at the bottom end of the moving block.

[0008] As a preferred technical solution of the utility model, a spring is installed at one end of the moving block, and a second limiting member is fixedly installed at the other end of the moving block.

[0009] As a preferred technical solution of the utility model, both side ends of the pile body are provided with openings, and the diameter of the openings is larger than the diameter of the second limiting member.

[0010] As the preferred technical solution of the utility model, stabilizing rods are fixedly installed on both side ends of the connecting rod, a first sliding block is fixedly installed on the stabilizing rod, a first sliding groove is opened on the inner wall of the pile body, and the first sliding groove is slidably connected to the first sliding block on the stabilizing rod.

[0011] As a preferred technical solution of the utility model, threaded holes are provided on the pile body and the cap, and the cap and the pile body are threadedly connected through locking bolts in the threaded holes.

[0012] Compared with the prior art, the utility model has the following beneficial effects:

[0013] (1) The utility model is a high-stability foundation pile for water conservancy projects. The foundation pile cap and the pile body arranged in the device are convenient for disassembly and assembly. The height of the connecting rod is adjusted by controlling the air rod through the internal cylinder. During the downward movement of the connecting rod, the second limit member is driven to move outward. The second limit member is in contact with the soil outside the pile body to ensure its stability. When the bottom end of the connecting rod moves downward, it squeezes the connecting blocks on both sides to move outward, further ensuring the grip of the pile body, effectively improving the stability of the pile body and avoiding shaking. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0015] Figure 1 It is a structural schematic diagram of a high-stability foundation pile for a water conservancy project according to an embodiment of the utility model;

[0016] Figure 2 It is a schematic diagram of the structure inside a high-stability foundation pile of a water conservancy project according to an embodiment of the utility model;

[0017] Figure 3 According to the utility model Figure 2 Schematic diagram of the structure enlarged at point A in the middle.

[0018] Reference numerals:

[0019] 1. Cap; 2. Pile body; 3. Opening; 4. Pile head; 5. Threaded hole; 6. Locking bolt; 7. Cylinder; 8. Gas rod; 9. Connecting rod; 10. Stabilizing rod; 11. First slider; 12. First slide groove; 13. Fixed block; 14. Rotating shaft; 15. Movable rod; 16. Connecting block; 17. First limiting member; 18. Moving block; 19. Second limiting member; 21. Spring; 22. Second slider; 23. Bottom block; 24. Second slide groove. DETAILED DESCRIPTION

[0020] Below, in conjunction with the accompanying drawings and specific implementation methods, the utility model is further described:

[0021] Example 1

[0022] See also Figure 1 to Figure 2 Embodiment 1 is described, comprising a cap 1, a pile body 2 is installed at the bottom end of the cap 1, a pile head 4 is fixedly installed at the bottom end of the pile body 2, a cylinder 7 is installed on the pile body 2, a gas rod 8 is installed at the output end of the cylinder 7, a connecting rod 9 is fixedly installed at the bottom end of the gas rod 8, adjusting components are installed on both sides of the connecting rod 9, a second limiter 19 is installed on the adjusting component, connecting blocks 16 are installed on both sides of the bottom end of the connecting rod 9, a first limiter 17 is fixedly installed on the connecting block 16, a stabilizing rod 10 is fixedly installed on both sides of the connecting rod 9, a first sliding block 11 is fixedly installed on the stabilizing rod 10, a first sliding groove 12 is provided on the inner wall of the pile body 2, the first sliding groove 12 is slidably connected to the first sliding block 11 on the stabilizing rod 10, threaded holes 5 are provided on the pile body 2 and the cap 1, and the cap 1 and the pile body 2 are threadedly connected through locking bolts 6 on the threaded holes 5;

[0023] In this embodiment, the pile foundation cap 1 is directly connected to the pile body 2 through the threaded hole 5 and the locking bolt 6, which facilitates the disassembly and assembly between the cap 1 and the pile body 2.

[0024] Example 2

[0025] See also Figure 2 to Figure 3Embodiment 2 is described. This embodiment further describes Embodiment 1, including an adjustment component, a fixed block 13 is installed on the adjustment component and is fixedly connected to the connecting rod 9, a movable rod 15 is connected to one side of the fixed block 13, the movable rod 15 is movably connected to the fixed block 13 through a rotating shaft 14, the other end of the movable rod 15 is movably connected to a moving block 18 through the rotating shaft 14, a second slider 22 is fixedly installed at the bottom end of the moving block 18, a bottom block 23 is fixedly installed in the pile body 2, the bottom block 23 is not connected to the connecting rod 9, the bottom block 23 is fixedly installed inside the pile body 2, a second slide groove 24 is opened on the bottom block 23, the second slide groove 24 is slidably connected to the second slider 22 at the bottom end of the moving block 18, a spring 21 is installed at one end of the moving block 18, a second stopper 19 is fixedly installed at the other end of the moving block 18, openings 3 are opened on both side ends of the pile body 2, and the diameter of the opening 3 is larger than the diameter of the second stopper 19;

[0026] In this embodiment, the adjustment assembly is movably connected to the fixed block 13 through the rotating shaft 14 and the movable rod 15, and the second limiter 19 is moved to ensure the grip of the entire pile body 2. The second limiter 19 is symmetrically designed and has three groups to better ensure its stability.

[0027] In specific application, the foundation pile cap 1 and the pile body 2 set in the device are directly connected through the threaded hole 5 and the locking bolt 6, which is convenient for the disassembly and assembly between the cap 1 and the pile body 2. The pile body 2 is set to control the air rod 8 through the internal cylinder 7 to adjust the height of the connecting rod 9, wherein the two side ends of the connecting rod 9 are connected through the fixed block 13, and are movably connected with the fixed block 13 through the rotating shaft 14 and the movable rod 15, driving the second limiting member 19 on the movable block 18 to move outward. First, the pile head 4 and the pile body 2 are inserted into the ground and then the grip of the entire pile body 2 is ensured by moving the second limiting member 19. The second limiting member 19 is symmetrically designed and has three groups to better ensure its stability. When the bottom end of the connecting rod 9 moves downward, it will squeeze the connecting blocks 16 on both sides to move outward, and then extend the first limiting member 17 outward, further ensuring the grip of the pile body 2, effectively improving the stability of the pile body 2, and avoiding shaking, which is suitable for popularization and use.

[0028] In the description of the present invention, it should be noted that the terms "top", "bottom", "one side", "the other side", "front", "back", "middle part", "inside", "top end", "bottom end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance; in addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a communication between the two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0029] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A high-stability foundation pile for a water conservancy project, characterized in that: The invention comprises a bearing platform (1), a pile body (2) is installed at the bottom end of the bearing platform (1), a pile head (4) is fixedly installed at the bottom end of the pile body (2), a cylinder (7) is installed on the pile body (2), a gas rod (8) is installed at the output end of the gas cylinder (7), a connecting rod (9) is fixedly installed at the bottom end of the gas rod (8), adjustment components are installed at both side ends of the connecting rod (9), a second limiter (19) is installed on the adjustment component, a connecting block (16) is installed at both side ends of the bottom end of the connecting rod (9), and a first limiter (17) is fixedly installed on the connecting block (16).

2. A high-stability water conservancy engineering foundation pile according to claim 1, characterized in that: A fixed block (13) is installed on the adjustment component and is fixedly connected to the connecting rod (9); a movable rod (15) is connected to one side of the fixed block (13); the movable rod (15) and the fixed block (13) are movably connected via a rotating shaft (14); and the other end of the movable rod (15) is movably connected to the moving block (18) via the rotating shaft (14).

3. A high-stability water conservancy engineering foundation pile according to claim 2, characterized in that: A second sliding block (22) is fixedly installed at the bottom end of the moving block (18), a bottom block (23) is fixedly installed in the pile body (2), a second sliding groove (24) is provided on the bottom block (23), and the second sliding groove (24) is slidably connected to the second sliding block (22) at the bottom end of the moving block (18).

4. A high-stability water conservancy engineering foundation pile according to claim 2, characterized in that: A spring (21) is installed at one end of the moving block (18), and a second limiting member (19) is fixedly installed at the other end of the moving block (18).

5. A high-stability water conservancy engineering foundation pile according to claim 4, characterized in that: Openings (3) are provided at both side ends of the pile body (2), and the diameter of the openings (3) is greater than the diameter of the second limiting member (19).

6. A high-stability water conservancy engineering foundation pile according to claim 1, characterized in that: Stabilizing rods (10) are fixedly mounted on both side ends of the connecting rod (9), a first sliding block (11) is fixedly mounted on the stabilizing rod (10), a first sliding groove (12) is provided on the inner wall of the pile body (2), and the first sliding groove (12) is slidably connected to the first sliding block (11) on the stabilizing rod (10).

7. The high-stability foundation pile for water conservancy engineering according to claim 1, characterized in that: The pile body (2) and the cap (1) are both provided with threaded holes (5), and the cap (1) and the pile body (2) are threadedly connected via locking bolts (6) on the threaded holes (5).