Through the combined structure of the prefabricated beam group and the caisson wall plate and the cover plate, the traditional high-supported formwork was abolished, and the rapid and safe construction of the caisson roof plate was achieved, solving the problems of complex bracket installation and dismantling and long construction cycle.

CN221941438UActive Publication Date: 2024-11-01POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420466581.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-11
Publication Date
2024-11-01
Estimated Expiration
2034-03-11

AI Technical Summary

Technical Problem

The existing high-support form construction methods in caisson construction have problems such as complex installation and disassembly, long construction cycle and safety hazards.

Method used

The combination structure of prefabricated beam group, caisson wall plate, prefabricated cover plate and cast-in-place roof plate is adopted. The prefabricated beam group serves as the temporary and permanent support of the cast-in-place roof plate. Through the connection between the prefabricated beam and the caisson wall plate and the cover plate, The traditional high-supporting form construction method has been abolished, and the cast-in-place roof panel does not need to be equipped with support from the bottom.

Benefits of technology

The construction process is simplified, the safety hazards of tall formwork support are eliminated, the construction cycle is shortened, and the construction speed and safety are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941438U_ABST
    Figure CN221941438U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of open caisson construction, in particular to an open caisson top plate structure. Comprising a precast beam group, an open caisson wall plate, a precast cover plate and a cast-in-place top plate, the prefabricated beam set comprises a plurality of prefabricated girders arranged at intervals, and the two ends of each prefabricated girder are connected with the open caisson wall plates. The two sides of the prefabricated cover plate are in lap joint between the adjacent prefabricated girders, or one side of the prefabricated cover plate is in lap joint with the prefabricated girders, and the other side of the prefabricated cover plate is in lap joint with the open caisson wall plate; the cast-in-place top plate is cast above the prefabricated cover plate and / or the open caisson wall plate, the cast-in-place top plate is connected with the prefabricated girder through a first connecting structure, and the cast-in-place top plate is connected with the open caisson wall plate through a second connecting structure. According to the open caisson top plate structure, potential safety hazards caused by high and large formwork supporting are eliminated, the open caisson top plate structure is safer and more reliable, the construction speed can be increased, and the construction period is short.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of caisson construction, in particular to a caisson top plate structure. Background Art

[0002] Caisson construction is widely used in the jacking construction of various municipal pipelines. After the jacking construction is completed, the caisson used for jacking needs to be used as a permanent structure for maintenance and other purposes, which requires the installation of a top plate in the caisson. Since the span and depth of the caisson are generally large, and there are large-diameter pipes, valves and other facilities in the well before the top plate construction, the existing high-support formwork construction is difficult, and there are also problems such as complex support installation and removal, long construction period and potential safety hazards. Utility Model Content

[0003] The utility model aims to provide a caisson top plate structure to alleviate the problems of the existing high formwork construction method, such as complex bracket installation and disassembly, long construction period and potential safety hazards.

[0004] In order to solve the above technical problems, the technical solution provided by the utility model is:

[0005] A caisson top plate structure, comprising: a prefabricated beam group, a caisson wall plate, a prefabricated cover plate and a cast-in-place top plate;

[0006] The prefabricated beam group includes a plurality of prefabricated beams arranged at intervals, and both ends of each of the prefabricated beams are connected to the caisson wall plate;

[0007] The two sides of the prefabricated cover plate are overlapped between the adjacent prefabricated beams, or one side of the prefabricated cover plate is overlapped with the prefabricated beam, and the other side is overlapped with the caisson wall plate;

[0008] The cast-in-place top plate is cast above the prefabricated cover plate and / or the caisson wall plate, and the cast-in-place top plate is connected to the prefabricated beam via a first connection structure, and the cast-in-place top plate is connected to the caisson wall plate via a second connection structure.

[0009] Furthermore,

[0010] The caisson wall plate is provided with a plurality of first slots along the circumferential direction, and both ends of the prefabricated beam are arranged in the first slots.

[0011] Furthermore,

[0012] The prefabricated beams include a first side beam and two middle beams, two first prefabricated small beams are installed between the two middle beams, and two second prefabricated small beams are installed between the first side beams and the caisson wall panels.

[0013] Furthermore,

[0014] The two middle beams are provided with corbels opposite to each other, and the two ends of the first prefabricated beam are arranged on the corbels.

[0015] Furthermore,

[0016] A corbel is arranged on one side of the first side beam away from the middle beam, and a second slot is correspondingly arranged on the caisson wall plate. One end of the second prefabricated small beam is arranged on the corbel, and the other end is arranged in the second slot.

[0017] Furthermore,

[0018] A hole is provided at the top between two of the first prefabricated small beams and between two of the second prefabricated small beams.

[0019] Furthermore,

[0020] The prefabricated beam is provided with a first notch on both sides, the caisson wall plate is provided with a second notch, and the two sides of the prefabricated cover plate are overlapped with the two first notches adjacent to the prefabricated beam, or one side of the prefabricated cover plate is overlapped with the first notch and the other side is overlapped with the second notch.

[0021] Furthermore,

[0022] The first connection structure includes an inverted U-shaped steel bar arranged on the top of the prefabricated beam, and the cast-in-place top plate is connected to the prefabricated beam through the steel bar.

[0023] Furthermore,

[0024] The second connection structure includes dowels arranged on the top of the caisson wall plate, the dowels include vertical sections and horizontal sections that are vertically connected, and the cast-in-place top plate is connected to the caisson wall plate through the dowels.

[0025] Furthermore,

[0026] A water-stop steel plate is pre-buried on the top of the caisson wall plate.

[0027] The utility model brings at least the following beneficial effects:

[0028] The utility model provides a caisson top plate structure, comprising: a prefabricated beam group, a caisson wall plate, a prefabricated cover plate and a cast-in-place top plate; the prefabricated beam group comprises a plurality of prefabricated beams arranged at intervals, and both ends of each of the prefabricated beams are connected to the caisson wall plate; both sides of the prefabricated cover plate are overlapped between adjacent prefabricated beams, or one side of the prefabricated cover plate is overlapped on the prefabricated beam and the other side is overlapped on the caisson wall plate; the cast-in-place top plate is cast above the prefabricated cover plate and / or the caisson wall plate, and the cast-in-place top plate is connected to the prefabricated beam by a first connecting structure, and the cast-in-place top plate is connected to the caisson wall plate by a second connecting structure.

[0029] When making a caisson, after the caisson sinks into place, first hoist the prefabricated beam to the corresponding position of the caisson wall panel, then set up the prefabricated cover panel, and finally cast the cast-in-place top panel as a whole on the prefabricated cover panel. The prefabricated beam-slab assembly consisting of the prefabricated beam, caisson wall panel and prefabricated cover panel is used as the bottom temporary support and formwork of the cast-in-place top panel, eliminating the traditional high-support formwork construction method inside the caisson. There is no need to set up support from the bottom during the construction of the cast-in-place top panel. After the construction of the cast-in-place top panel is completed, the prefabricated beam-slab assembly is retained as a permanent support structure. Since the prefabricated beam-slab assemblies are all prefabricated components, they only need to be hoisted and installed at the construction site, which not only eliminates the safety hazards caused by tall formwork supports, but also makes it safer and more reliable, and can speed up the construction speed and shorten the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the related technologies, the drawings required for use in the specific implementation methods or the related technical descriptions will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0031] Figure 1 A top view of the caisson top plate structure provided in the embodiment of the utility model Figure 1 ;

[0032] Figure 2 A top view of the caisson top plate structure provided in the embodiment of the utility model Figure 2 ;

[0033] Figure 3 A front view of the caisson top plate structure provided by an embodiment of the utility model;

[0034] Figure 4 A schematic diagram of the connection between the prefabricated beam and the cast-in-place top plate provided in an embodiment of the utility model;

[0035] Figure 5A schematic diagram of the connection between the caisson wall panel and the cast-in-place top panel provided in an embodiment of the utility model.

[0036] icon:

[0037] 100-prefabricated beam; 110-first side beam; 120-middle beam; 130-corbel; 210-first prefabricated small beam; 220-second prefabricated small beam; 230-hole; 300-caisson wall plate; 310-first slot; 320-second slot; 400-prefabricated cover plate; 500-cast-in-place top plate; 600-rebar; 700-inserted bars; 800-waterstop steel plate. DETAILED DESCRIPTION

[0038] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0039] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0040] In the description of the present utility model, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance. Physical quantities in formulas, if not separately marked, should be understood as basic quantities of the basic units of the International System of Units, or derived quantities derived from basic quantities through mathematical operations such as multiplication, division, differentiation or integration.

[0041] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0042] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0043] In conjunction with the accompanying drawings, some embodiments of the present invention are described in detail below. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.

[0044] Embodiment 1

[0045] The existing high-support formwork construction method is difficult, with problems such as complex support installation and disassembly, long construction period and potential safety hazards.

[0046] In view of this, an embodiment of the utility model provides a caisson top plate structure, including: a prefabricated beam group, a caisson wall plate 300, a prefabricated cover plate 400 and a cast-in-place top plate 500; the prefabricated beam group includes a plurality of prefabricated beams 100 arranged at intervals, and both ends of each prefabricated beam 100 are connected to the caisson wall plate 300; the two sides of the prefabricated cover plate 400 are overlapped between adjacent prefabricated beams 100, or, one side of the prefabricated cover plate 400 is overlapped on the prefabricated beam 100, and the other side is overlapped on the caisson wall plate 300; the cast-in-place top plate 500 is cast above the prefabricated cover plate 400 and / or the caisson wall plate 300, and the cast-in-place top plate 500 is connected to the prefabricated beam 100 through a first connecting structure, and the cast-in-place top plate 500 is connected to the caisson wall plate 300 through a second connecting structure.

[0047] When making a caisson, after the caisson is sunk into place, the prefabricated beam 100 is first hoisted to the corresponding position of the caisson wall panel 300, and then the prefabricated cover panel 400 is set up, and finally the cast-in-place top panel 500 is cast as a whole on the prefabricated cover panel 400. The prefabricated beam-slab assembly composed of the prefabricated beam 100, the caisson wall panel 300 and the prefabricated cover panel 400 is used as a temporary support and formwork at the bottom of the cast-in-place top panel 500, eliminating the traditional high-support formwork construction method inside the caisson. There is no need to set up support from the bottom during the construction of the cast-in-place top panel 500. After the construction of the cast-in-place top panel 500 is completed, the prefabricated beam-slab assembly is retained as a permanent support structure. Since the prefabricated beam-slab assemblies are all prefabricated components, they only need to be hoisted and installed at the construction site, which not only eliminates the safety hazards caused by high formwork supports, but also is safer and more reliable, and can speed up the construction speed and shorten the construction period.

[0048] In an optional manner of this embodiment, the caisson wall plate 300 is provided with a plurality of first slots 310 along the circumferential direction, and both ends of the prefabricated beam 100 are disposed in the first slots 310 .

[0049] See also Figure 1 One end of the prefabricated beam 100 is installed in the first slot 310 of the upper half of the caisson wall panel 300, and the other end is installed in the first slot 310 corresponding to the lower half of the caisson wall panel 300. During construction, it is only necessary to hoist the prefabricated beam 100 into the first slot 310 of the caisson wall panel 300.

[0050] In an optional manner of this embodiment, the prefabricated beam 100 includes a first side beam 110 and two middle beams 120, two first prefabricated small beams 210 are installed between the two middle beams 120, and two second prefabricated small beams 220 are installed between the first side beam 110 and the caisson wall panel 300.

[0051] Please continue to see Figure 1 , Figure 1 Six prefabricated beams 100 are shown in the figure. The six prefabricated beams 100 are parallel to each other and symmetrically arranged on both sides of the axis of the caisson wall plate 300. The farthest end of one side is the first side beam 110, and the two in the middle are the middle beams 120. After the prefabricated beams 100 are hoisted, the two first prefabricated small beams 210 are hoisted between the two middle beams 120, and the two second prefabricated small beams 220 are hoisted between the first side beam 110 and the caisson wall plate 300.

[0052] Furthermore, the two middle beams 120 are provided with corbels 130 opposite to each other, and both ends of the first prefabricated beam 210 are provided on the corbels 130. The first side beam 110 is provided with a corbel 130 on the side away from the middle beam 120, and the caisson wall plate 300 is provided with a second slot 320 correspondingly, and one end of the second prefabricated beam 220 is provided on the corbel 130, and the other end is provided in the second slot 320.

[0053] When prefabricated, the prefabricated beam 100 is provided with a corbel 130 according to the arrangement of the prefabricated small beams. The corbels 130 provided on the sides of the middle beam 120 and the first side beam 110 can be used for overlapping the first prefabricated small beam 210 and the second prefabricated small beam 220. The second slot 320 provided on the caisson wall panel 300 can ensure a secure connection of the second prefabricated small beam 220.

[0054] In an optional manner of this embodiment, a hole 230 is provided at the top between the two first prefabricated beams 210 and between the two second prefabricated beams 220 .

[0055] See also Figure 2A hole 230 is set on the top of the first prefabricated beam 210 and the second prefabricated beam 220. The two first prefabricated beams 210 are respectively located on both sides of the hole 230, and the two second prefabricated beams 220 are also respectively located on both sides of the hole 230.

[0056] In an optional manner of this embodiment, a first slot is provided on both sides of the prefabricated beam 100, a second slot is provided on the caisson wall plate 300, and both sides of the prefabricated cover plate 400 are overlapped with the two first slots of adjacent prefabricated beams 100, or one side of the prefabricated cover plate 400 is overlapped with the first slot and the other side is overlapped with the second slot.

[0057] See also Figure 3 A first notch is reserved on both sides of the prefabricated beam 100 for overlapping the prefabricated cover plate 400, and a second notch is reserved on the caisson wall plate 300 for overlapping the end prefabricated cover plate 400.

[0058] In an optional manner of this embodiment, the first connection structure includes an inverted U-shaped steel bar 600 disposed on the top of the prefabricated beam 100 , and the cast-in-place top plate 500 is connected to the prefabricated beam 100 through the steel bar 600 .

[0059] See also Figure 4 An inverted U-shaped steel bar 600 is reserved at the top of the prefabricated beam 100 to ensure the anchor connection between the cast-in-place top plate 500 and the prefabricated beam 100 after the casting of the cast-in-place top plate 500 is completed.

[0060] In an optional manner of this embodiment, the second connection structure includes a dowel 700 arranged on the top of the caisson wall panel 300, the dowel 700 includes a vertical section and a horizontal section vertically connected, and the cast-in-place top plate 500 is connected to the caisson wall panel 300 through the dowel 700.

[0061] See also Figure 5 When the caisson is prefabricated, a dowel bar 700 is reserved on the top of the caisson wall plate 300 to ensure the stability of the connection between the cast-in-place top plate 500 and the caisson wall plate 300 after the casting of the cast-in-place top plate 500 is completed.

[0062] In an optional manner of this embodiment, a water-stop steel plate 800 is pre-buried on the top of the caisson wall plate 300 .

[0063] Please continue to see Figure 5 The water-stopping steel plate 800 embedded in the top of the caisson wall panel 300 can ensure the water-stopping effect on the side.

[0064] It should also be noted that the upper parts of the prefabricated beam 100 , the prefabricated small beam and the prefabricated cover plate 400 are all pre-buried with lifting rings.

[0065] During construction, after the caisson sinks into place, the prefabricated beam 100 is first hoisted to the first slot 310 of the caisson wall panel 300, and then the prefabricated small beam is connected to the prefabricated beam 100 or the caisson wall panel 300, and then the concrete prefabricated cover plate 400 is installed, and finally the cast-in-place top plate 500 is integrally cast on the concrete prefabricated cover plate 400. After the construction of the cast-in-place top plate 500 is completed, the prefabricated beam and plate assembly is retained as a permanent structure. By using the prefabricated beam and plate assembly as temporary and permanent support, the cast-in-place top plate 500 does not need to be supported from the bottom during construction, and the prefabricated cover plate 400 is used as the bottom template for construction.

[0066] The caisson top plate structure eliminates the traditional high-support formwork construction method inside the caisson. At the same time, the prefabricated beam and slab components are all prefabricated components, which only need to be hoisted and installed on site. This not only eliminates the safety hazards caused by high formwork supports, but also speeds up construction.

[0067] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solution deviate from the scope of the technical solution of the embodiments of the utility model.

Claims

1. A caisson top plate structure, characterized in that: include: Precast beam groups, caisson sidings, precast cover slabs and cast-in-place top slabs; The prefabricated beam group includes a plurality of prefabricated beams arranged at intervals, and both ends of each of the prefabricated beams are connected to the caisson wall plate; The two sides of the prefabricated cover plate are overlapped between the adjacent prefabricated beams, or one side of the prefabricated cover plate is overlapped with the prefabricated beam, and the other side is overlapped with the caisson wall plate; The cast-in-place top plate is cast above the prefabricated cover plate and / or the caisson wall plate, and the cast-in-place top plate is connected to the prefabricated beam via a first connection structure, and the cast-in-place top plate is connected to the caisson wall plate via a second connection structure.

2. The caisson top plate structure according to claim 1, characterized in that: The caisson wall plate is provided with a plurality of first slots along the circumferential direction, and both ends of the prefabricated beam are arranged in the first slots.

3. The caisson top plate structure according to claim 1, characterized in that: The prefabricated beams include a first side beam and two middle beams, two first prefabricated small beams are installed between the two middle beams, and two second prefabricated small beams are installed between the first side beams and the caisson wall panels.

4. The caisson top plate structure according to claim 3, characterized in that: The two middle beams are provided with corbels opposite to each other, and the two ends of the first prefabricated beam are arranged on the corbels.

5. The caisson top plate structure according to claim 4, characterized in that: A corbel is arranged on one side of the first side beam away from the middle beam, and a second slot is correspondingly arranged on the caisson wall plate. One end of the second prefabricated small beam is arranged on the corbel, and the other end is arranged in the second slot.

6. The caisson top plate structure according to claim 5, characterized in that: A hole is provided at the top between two of the first prefabricated small beams and between two of the second prefabricated small beams.

7. The caisson top plate structure according to claim 1, characterized in that: The prefabricated beam is provided with a first notch on both sides, the caisson wall plate is provided with a second notch, and the two sides of the prefabricated cover plate are overlapped with the two first notches adjacent to the prefabricated beam, or one side of the prefabricated cover plate is overlapped with the first notch and the other side is overlapped with the second notch.

8. The caisson top plate structure according to claim 1, characterized in that: The first connection structure includes an inverted U-shaped steel bar arranged on the top of the prefabricated beam, and the cast-in-place top plate is connected to the prefabricated beam through the steel bar.

9. The caisson top plate structure according to claim 1, characterized in that: The second connection structure includes dowels arranged on the top of the caisson wall plate, the dowels include vertical sections and horizontal sections that are vertically connected, and the cast-in-place top plate is connected to the caisson wall plate through the dowels.

10. The caisson top plate structure according to claim 1, characterized in that: A water-stop steel plate is pre-buried on the top of the caisson wall plate.