Building foundation raft embedded pipe protection device
By using steel casing and support components in the building foundation raft, the problem of equipment casing reduces the strength of concrete components is solved, and construction safety and efficiency are improved.
Patent Information
- Application Number
- CN202420252928.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-01
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-02-01
AI Technical Summary
When the equipment casing is set in concrete components, its strength will be reduced, affecting construction safety.
A built-in pipe protection device for building foundation raft slabs is designed, including steel casing and support components. The support components are composed of multiple horizontal cross rods, longitudinal vertical rods and oblique support rods. The strength of the concrete member is improved through fixed connections, and Reinforcement ribs are provided on the surface of the protective sleeve to enhance resistance to deformation.
Effectively protect the equipment from deforming, ensure the strength and construction safety of concrete components, improve construction quality and efficiency, and reduce costs.
Smart Images

Figure CN221941445U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building construction, and in particular to a protection device for embedded pipes in a building foundation raft. Background Art
[0002] Equipment sleeve is a component that guides and protects equipment through the wall. It is mainly used in basement projects. Whether it is a rigid wall sleeve or a flexible wall sleeve, it can protect the pipeline equipment to pass through concrete components effectively and safely.
[0003] The location of the equipment casing is the weakest part of the concrete component. In some special buildings, due to the equipment process requirements, the equipment needs to be buried in the concrete component for a long distance. However, using the equipment casing to assist the equipment to be buried in the concrete component will reduce the strength of the part of the concrete component and reduce the safety of its main body. Utility Model Content
[0004] The embodiment of the present application provides a device for protecting pipes embedded in a building foundation raft slab, which is used to solve the problem that the current equipment casing will reduce the strength of concrete components.
[0005] The embodiment of the present application provides a device for protecting pipes buried in a building foundation raft, comprising a protective sleeve and a support assembly;
[0006] The protective casing is configured as a steel casing;
[0007] There are multiple support components, and the multiple support components are arranged along the extension direction of the protection sleeve. The protection sleeve is penetrated in each support component, and the protection sleeve is fixedly connected to each support component.
[0008] In a feasible implementation, the plurality of support components are evenly distributed along the extension direction of the protective sleeve.
[0009] In a feasible implementation, the support assembly includes a first horizontal cross bar, a second horizontal cross bar, a longitudinal vertical bar and a diagonal brace. The longitudinal vertical bar and the diagonal brace are both arranged between the first horizontal cross bar and the second horizontal cross bar. The two ends of the longitudinal vertical bar are respectively fixedly connected to the first horizontal cross bar and the second horizontal cross bar; the two ends of the diagonal brace are respectively fixedly connected to the first horizontal cross bar and the second horizontal cross bar. The protective sleeve is arranged on one side of the longitudinal vertical bar, and the protective sleeve is respectively fixedly connected to the first horizontal cross bar and the second horizontal cross bar.
[0010] In a feasible implementation, the buried pipe protection device in the building foundation raft slab also includes a connecting rod, which is arranged along the extension direction of the protective sleeve, and all the supporting components are fixedly connected to the connecting rod.
[0011] In a feasible implementation, the device for protecting the buried pipes in the building foundation raft slab further includes a water stop ring, which is arranged at the end of the protective sleeve.
[0012] In a feasible implementation, the buried pipe protection device in the building foundation raft slab also includes a reinforcing wing ring, which is sleeved on the protective sleeve, and the protective sleeve is fixedly connected to the first horizontal cross bar and the second horizontal cross bar through the reinforcing wing ring.
[0013] In a feasible implementation, reinforcing ribs are provided on the surface of the protective sleeve.
[0014] In a feasible implementation, the reinforcing ribs include first reinforcing ribs and second reinforcing ribs, the first reinforcing ribs are arranged on the surface of the protective sleeve along the extension direction of the protective sleeve, and the second reinforcing ribs are arranged alternately with the first reinforcing ribs.
[0015] The embodiment of the present application provides a device for protecting buried pipes in a building foundation raft, including a protective sleeve and a support assembly. The protective sleeve is configured as a steel sleeve, so as to provide greater strength protection for the equipment, and is not easily deformed, ensuring that the strength of the concrete component will not be affected by the provision of the protective sleeve; there are multiple support assemblies, and the multiple support assemblies are arranged along the extension direction of the protective sleeve, the protective sleeve is passed through the support assembly, and the protective sleeve is fixedly connected to the support assembly. The support assembly can support and connect the protective sleeve, strengthen the strength of the concrete component, ensure the safety of the main structure of the concrete component, and ensure the construction quality. At the same time, it is simple to process, convenient to construct, low in cost, reasonable in force, and improves efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The drawings described herein are used to provide further understanding of the present invention and constitute a part of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present application and do not constitute improper limitations on the present invention.
[0017] In the attached picture:
[0018] Figure 1 It is a structural schematic diagram of a pipe protection device embedded in a building foundation raft provided in one embodiment of the present application;
[0019] Description of reference numerals:
[0020] 100-protection sleeve; 200-support assembly; 300-connecting rod; 400-water stop ring; 500-reinforced wing ring;
[0021] 110-reinforcement rib; 210-first horizontal cross bar; 220-second horizontal cross bar; 230-longitudinal vertical bar; 240-diagonal brace;
[0022] 111 - first reinforcing rib; 112 - second reinforcing rib. DETAILED DESCRIPTION
[0023] In order to enable those skilled in the art to better understand the technical solutions in the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work should fall within the scope of protection of the present application.
[0024] In the description of the embodiments of the present application, the terms "first" and "second" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present application, "plurality" means at least two, for example, two, three, etc., unless otherwise clearly and specifically defined.
[0025] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0026] Equipment sleeve is a kind of component that guides and protects equipment through the wall. It is mainly used in basement projects. Whether it is a rigid wall sleeve or a flexible wall sleeve, it can protect the pipeline equipment to pass through the concrete components effectively and safely.
[0027] The location of the equipment casing is the weakest part of the concrete component. In some special buildings, due to the equipment process requirements, the equipment needs to be buried in the concrete component for a long distance. However, using the equipment casing to assist the equipment to be buried in the concrete component will reduce the strength of the part of the concrete component and reduce the safety of its main body.
[0028] In order to solve the above problems, an embodiment of the present application provides a device for protecting pipes embedded in a building foundation raft. The solution provided by the embodiment of the present application will be described in detail below in conjunction with the drawings in the specification.
[0029] Figure 1 It is a structural schematic diagram of a device for protecting pipes buried in a building foundation raft provided in one embodiment of the present application.
[0030] Reference Figure 1 As shown, an embodiment of the present application provides a device for protecting pipes buried in a building foundation raft, including a protective sleeve 100 and a support assembly 200 .
[0031] The buried pipe protection device of the building foundation raft is arranged in the concrete component, and the equipment casing or equipment can be arranged in the protection casing 100. The protection casing 100 is preferably a hard casing, and exemplarily, the protection casing 100 is configured as a steel casing, so as to protect the equipment arranged in the protection casing 100; at the same time, since the steel casing has high strength and is not easy to deform, it can ensure that the strength of the concrete component is not affected by the installation of the protection casing 100, thereby ensuring the safety of the main structure of the concrete component.
[0032] In addition, there are multiple support assemblies 200, and the multiple support assemblies 200 are arranged along the extension direction of the protective sleeve 100. The protective sleeve 100 is inserted into each support assembly 200, and the protective sleeve 100 is fixedly connected to each support assembly 200. The support assembly 200 can support and connect the protective sleeve 100, and can strengthen the strength of the concrete component and ensure the safety of the main structure of the concrete component. It should be noted that the extension direction of the protective sleeve 100 can refer to Figure 1 The x direction is shown in .
[0033] For example, the steel casing is made of Q235 galvanized steel pipe according to the required pipeline laying, and its diameter is slightly larger than the equipment diameter.
[0034] In addition, in order to ensure that the protective sleeve 100 is evenly stressed, the plurality of support assemblies 200 are evenly distributed along the extension direction of the protective sleeve 100 .
[0035] Continue to refer to Figure 1 As shown, illustratively, the support assembly 200 includes a first horizontal crossbar 210 , a second horizontal crossbar 220 , a longitudinal vertical bar 230 , and a diagonal brace bar 240 .
[0036] Among them, the first horizontal cross bar 210 and the second horizontal cross bar 220 can be arranged opposite to each other up and down. The longitudinal vertical bar 230 and the diagonal brace 240 are both arranged between the first horizontal cross bar 210 and the second horizontal cross bar 220. Specifically, the two ends of the longitudinal vertical bar 230 are fixedly connected to the first horizontal cross bar 210 and the second horizontal cross bar 220 respectively; the two ends of the diagonal brace 240 are fixedly connected to the first horizontal cross bar 210 and the second horizontal cross bar 220 respectively, so as to improve the overall strength of the support assembly 200 and enhance the anti-deformation ability. Exemplarily, the two ends of the longitudinal vertical bar 230 are welded to the first horizontal cross bar 210 and the second horizontal cross bar 220 respectively, and the two ends of the diagonal brace 240 are welded to the first horizontal cross bar 210 and the second horizontal cross bar 220 respectively.
[0037] In some other examples, the two ends of the diagonal support rod 240 can be welded together with the first horizontal cross bar 210 and the longitudinal vertical bar 230, and / or the two ends of the diagonal support rod 240 can be welded together with the second horizontal cross bar 220 and the longitudinal vertical bar 230, so as to improve the overall strength of the support assembly 200 and enhance its anti-deformation ability.
[0038] In some other examples, the support assembly 200 can be made of steel bars with a diameter of 18 mm. The steel bar skeleton is formed by bending multiple sections of steel bars, including oblique steel bars, longitudinal steel bars, and short steel bars. The steel bars of various shapes are connected into a steel bar group skeleton by welding.
[0039] The protective sleeve 100 is disposed on one side of the longitudinal vertical rod 230, and the protective sleeve 100 is respectively fixedly connected to the first horizontal cross bar 210 and the second horizontal cross bar 220. It can be understood that the first horizontal cross bar 210, the second horizontal cross bar 220, the longitudinal vertical rod 230 and the diagonal brace 240 can support and protect the protective sleeve 100 to prevent the protective sleeve 100 from deformation.
[0040] Continue to refer to Figure 1 As shown, the buried pipe protection device in the building foundation raft slab also includes a connecting rod 300, which is arranged along the extension direction of the protection sleeve 100, and each support assembly 200 is fixedly connected to the connecting rod 300. The connecting rod 300 connects the multiple support assemblies 200 so that the multiple support assemblies 200 form a whole, thereby improving the ability to resist extrusion deformation, preventing the deformation of the protection sleeve 100 to the greatest extent, and enhancing the structural strength of the concrete component to ensure the safety of the main structure of the concrete component.
[0041] Continue to refer to Figure 1 As shown, the embedded pipe protection device for the building foundation raft slab further includes a water stop ring 400, which is arranged at the end of the protective sleeve 100 to prevent water seepage from flowing along the surface of the protective sleeve 100 in the concrete. The water stop ring 400 is made of a galvanized steel plate with a thickness of 3 mm, and its inner diameter is the same as the outer diameter of the protective sleeve 100.
[0042] Continue to refer to Figure 1As shown, the embedded pipe protection device of the building foundation raft slab also includes a reinforcing wing ring 500, which is sleeved on the protective sleeve 100, and the protective sleeve 100 is fixedly connected to the first horizontal cross bar 210 and the second horizontal cross bar 220 through the reinforcing wing ring 500. Exemplarily, the reinforcing wing ring 500 is welded to the protective sleeve 100, and the protective sleeve 100 is welded to the first horizontal cross bar 210 and the second horizontal cross bar 220 through the reinforcing wing ring 500. The reinforcing wing ring 500 is made of galvanized steel plate with a thickness of 3 mm, and the inner ring diameter is the same as the outer diameter of the protective sleeve 100. Adjacent reinforcing wing rings 500 are arranged on the protective sleeve 100 at intervals of 1 m.
[0043] In addition, in some examples, the surface of the protective sleeve 100 is provided with reinforcing ribs 110. Exemplarily, the reinforcing ribs 110 include first reinforcing ribs 111 and second reinforcing ribs 112, the first reinforcing ribs 111 are arranged on the surface of the protective sleeve 100 along the extension direction of the protective sleeve 100, and the second reinforcing ribs 112 and the first reinforcing ribs 111 are arranged alternately, thereby improving the anti-extrusion deformation capability of the protective sleeve 100 and avoiding the occurrence of the problem of reduced safety of the concrete component caused by the deformation of the protective sleeve 100.
[0044] It can be understood that the embedded pipe protection device for the building foundation raft provided in the embodiment of the present application can ensure the safety of the buried equipment pipes, and can also effectively reduce the risk of the pipes in the raft being crushed and cracked. The construction quality is guaranteed, and the processing is simple, the construction is convenient, the cost is low, the force is reasonable, and the efficiency is improved.
[0045] It is easy to understand that those skilled in the art can combine, split, reorganize, etc. the embodiments of the present application to obtain other embodiments based on the several embodiments provided in the present application, and these embodiments do not exceed the protection scope of the present application.
[0046] The above specific implementation methods further explain in detail the purpose, technical solutions and beneficial effects of the embodiments of the present application. It should be understood that the above are only specific implementation methods of the embodiments of the present application and are not used to limit the protection scope of the embodiments of the present application. Any modifications, equivalent substitutions, improvements, etc. made on the basis of the technical solutions of the embodiments of the present application should be included in the protection scope of the embodiments of the present application.
Claims
1. A protection device for buried pipes in a building foundation raft, characterized in that: It comprises a protective sleeve (100) and a supporting assembly (200); The protective casing (100) is configured as a steel casing; The supporting assembly (200) comprises a plurality of supporting assemblies (200), the plurality of supporting assemblies (200) are arranged along the extension direction of the protective sleeve (100), the protective sleeve (100) is inserted into each supporting assembly (200), and the protective sleeve (100) is fixedly connected to each supporting assembly (200).
2. The device for protecting pipes buried in building foundation raft according to claim 1, characterized in that: A plurality of support components (200) are evenly distributed along the extension direction of the protection sleeve (100).
3. The device for protecting pipes buried in building foundation raft according to claim 1, characterized in that: The support assembly (200) comprises a first horizontal crossbar (210), a second horizontal crossbar (220), a longitudinal vertical bar (230) and an oblique brace (240); The longitudinal vertical rod (230) and the diagonal brace rod (240) are both arranged between the first horizontal crossbar (210) and the second horizontal crossbar (220); the two ends of the longitudinal vertical rod (230) are respectively fixedly connected to the first horizontal crossbar (210) and the second horizontal crossbar (220); the two ends of the diagonal brace rod (240) are respectively fixedly connected to the first horizontal crossbar (210) and the second horizontal crossbar (220); The protective sleeve (100) is arranged on one side of the longitudinal vertical rod (230), and the protective sleeve (100) is fixedly connected to the first horizontal cross rod (210) and the second horizontal cross rod (220) respectively.
4. The device for protecting pipes buried in building foundation raft according to claim 1, characterized in that: The device for protecting pipes buried in a building foundation raft further comprises a connecting rod (300), wherein the connecting rod (300) is arranged along the extension direction of the protective sleeve (100), and all the supporting assemblies (200) are fixedly connected to the connecting rod (300).
5. The device for protecting pipes buried in building foundation raft according to claim 1, characterized in that: The device for protecting pipes buried in a building foundation raft further comprises a water stop ring (400), and the water stop ring (400) is arranged at the end of the protective sleeve (100).
6. The device for protecting pipes buried in building foundation raft according to claim 3, characterized in that: The buried pipe protection device for the building foundation raft slab also includes a reinforcing wing ring (500), wherein the reinforcing wing ring (500) is sleeved on the protective sleeve (100), and the protective sleeve (100) is fixedly connected to the first horizontal cross bar (210) and the second horizontal cross bar (220) via the reinforcing wing ring (500).
7. The device for protecting buried pipes in building foundation raft according to any one of claims 1 to 6, characterized in that: The surface of the protective sleeve (100) is provided with reinforcing ribs (110).
8. The device for protecting pipes buried in building foundation raft slabs according to claim 7, characterized in that: The reinforcing rib (110) comprises a first reinforcing rib (111) and a second reinforcing rib (112); the first reinforcing rib (111) is arranged on the surface of the protective sleeve (100) along the extension direction of the protective sleeve (100); and the second reinforcing rib (112) is arranged alternately with the first reinforcing rib (111).
