Steel structure damping and buffering structure for building construction
By using polygonal rubber support columns, combination structures of positive triangular rubber piles and reverse triangular rubber piles and fixed ring sleeve design in steel structures for construction, combined with shock absorbing springs and dampers, the problem of easy fatigue of rubber support is solved. Achieve more effective shock absorption and extended service life.
Patent Information
- Application Number
- CN202420645266.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-29
AI Technical Summary
In the existing steel structure shock-absorbing buffer structure for construction, rubber support is prone to fatigue and aging under long-term repeated loads, resulting in a reduced shock-absorbing effect.
Using a combined structure of polygonal rubber support columns, regular triangular rubber piles and reverse triangular rubber piles, the combination design of first- and second-level fixed ring sleeves is used to disperse the support pressure using the stable triangle shape of regular triangular and reverse triangular rubber piles, and the support pressure is dispersed through The thermal expansion and contraction mechanism avoids deformation caused by thermal expansion, and combines shock absorbing springs and dampers to enhance shock absorbing effect.
Effectively prevent fatigue and aging of the support shaft under repeated loads, extends service life, and assists shock absorption through spring seats and dampers during vibration, enhancing shock absorption effect.
Smart Images

Figure CN221941675U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of buffer structures, in particular to a steel structure shock-absorbing buffer structure for building construction. Background Art
[0002] High-rise steel structure buildings are widely used due to their high structural strength, good seismic performance, fast construction speed and other advantages. However, during the construction and use process, in order to improve the seismic resistance of the structure and reduce the damage caused by earthquakes, special shock-absorbing and buffering measures need to be taken. The existing shock-absorbing and buffering structures usually use rubber bearings to absorb and consume vibration energy and reduce the vibration response of the structure during use. However, rubber bearings are prone to fatigue and aging under long-term repeated loads, thereby reducing the shock-absorbing effect. Therefore, we propose a steel structure shock-absorbing and buffering structure for construction to solve the above-mentioned problems. Utility Model Content
[0003] In order to overcome the existing shock-absorbing and buffering structures, rubber bearings are usually used to absorb and consume vibration energy and reduce the vibration response of the structure during use. However, rubber bearings are prone to fatigue and aging under long-term repeated loads, thereby reducing the shock-absorbing effect.
[0004] The technical solution of the utility model is: a shock-absorbing and buffering structure of a steel structure for construction, comprising a support shaft, a support seat and a support seat; the support shaft comprises a primary fixing ring sleeve, a secondary fixing ring sleeve and a polygonal rubber support column, the upper end of the support shaft is provided with a support seat for supporting the upper steel structure, the support seat comprises a support plate and a pressure seat, a support seat for supporting the buffer structure is provided below the support shaft, the support seat comprises a support plate and a spring seat, and the support seat and the support seat are fixedly connected by the support shaft.
[0005] Preferably, by combining the polygonal rubber support column, the regular triangular rubber pile and the reverse triangular rubber pile, when the support column performs shock absorption and buffering on the steel structure, the regular triangular rubber pile and the reverse triangular rubber pile support and absorb shock together with the polygonal rubber support column through their own stable triangular shape. Compared with the previous support shaft, the utility model can effectively disperse the support pressure of the support shaft through the regular triangular rubber pile and the reverse triangular rubber pile inside the support shaft, and effectively prevent the support shaft from being easily fatigued and aged under repeated loads. By combining the primary fixing ring sleeve with the secondary fixing ring sleeve, when the weather is relatively hot, the polygonal rubber pile and other modules between the primary fixing ring sleeve and the secondary fixing ring sleeve can expand and contract with heat through the gap between the primary fixing ring sleeve and the secondary fixing ring sleeve, thereby avoiding deformation and damage of the support shaft due to thermal expansion and contraction and shortening its service life. By combining the primary arc clip with the primary fixing groove, when the staff installs the shock absorption and buffering structure, they can support the bottom of the upper steel structure through the primary fixing groove, and position the upper steel structure by clamping the upper steel structure with a plurality of primary arc clips at the bottom edge of the upper steel structure.
[0006] Preferably, a polygonal fixing groove is provided in the center of the primary fixing ring sleeve, the polygonal rubber support column is located in the center of the polygonal fixing groove, a plurality of groups of regular triangular rubber piles are arranged around the outer end of the polygonal rubber support column, a plurality of groups of reverse triangular rubber piles are arranged around the outer end of the plurality of groups of regular triangular rubber piles, the plurality of groups of regular triangular rubber piles and the plurality of groups of reverse triangular rubber piles are closely fitted to each other, and the polygonal rubber support column, the regular triangular rubber piles and the reverse triangular rubber piles are combined so that when the support column performs shock absorption and buffering on the steel structure, the regular triangular rubber piles and the reverse triangular rubber piles support and absorb shock together with the polygonal rubber support column through their own stable triangular shape. Compared with previous support shafts, the utility model can effectively disperse the supporting pressure of the support shaft through the regular triangular rubber piles and reverse triangular rubber piles inside the support shaft, and effectively prevent the support shaft from being easily fatigued and aged under repeated loads.
[0007] Preferably, a plurality of groups of polygonal rubber piles are arranged around the outer end of the first-level fixing ring sleeve, and the plurality of groups of polygonal rubber piles are arranged in sequence end to end around the outer end of the first-level fixing ring sleeve. The second-level fixing ring sleeve is sleeved on the outer end of the plurality of groups of polygonal rubber piles. The first-level fixing ring sleeve is combined with the second-level fixing ring sleeve, so that when the weather is hot, the polygonal rubber piles and other modules between the first-level fixing ring sleeve and the second-level fixing ring sleeve can expand and contract with heat through the gap between the first-level fixing ring sleeve and the second-level fixing ring sleeve, thereby avoiding deformation and damage of the support shaft due to thermal expansion and contraction, shortening the service life.
[0008] Preferably, a plurality of groups of first-level arc clips are arranged around the upper end of the support plate, and a first-level fixing groove is opened between the plurality of groups of first-level arc clips. The pressure seat is located at the lower end of the support plate, and a card groove is provided at the center of the lower end of the pressure seat. By combining the first-level arc clip and the first-level fixing groove, when the staff installs the shock-absorbing and buffering structure, they can support the bottom of the upper steel structure through the first-level fixing groove, and position the upper steel structure by clamping the bottom edge of the upper steel structure with a plurality of first-level arc clips.
[0009] Preferably, multiple groups of pressure seats are provided, and the multiple groups of pressure seats are arranged around the lower end of the support plate. A primary connecting ring is provided between the multiple groups of pressure seats, and a primary connecting groove is opened in the center of the primary connecting ring. The upper end of the support shaft extends to the interior of the primary connecting groove. The primary connecting ring is combined with the primary connecting groove, so that the staff can insert the upper end of the support shaft into the interior of the primary connecting groove during installation, thereby connecting the support shaft and the support seat together.
[0010] Preferably, a secondary connecting ring is provided at the center of the upper end of the support plate, a secondary connecting groove is opened at the center of the secondary connecting ring, the lower end of the support shaft extends to the interior of the secondary connecting groove, a plurality of spring seats are provided, and the plurality of spring seats are arranged around the outer side of the secondary connecting ring, a shock-absorbing spring is provided at the upper end of the spring seat, a spring damping is provided inside the shock-absorbing spring, a damper is provided at the center of the shock-absorbing spring, a fixed seat is provided at the upper end of the shock-absorbing spring, a fixed clamping shaft is provided at the center of the upper end of the fixed seat, the fixed clamping shaft and the clamping groove match and engage with each other, and the secondary connecting ring is combined with the secondary connecting seat so that the staff can connect the support seat with the lower end of the support shaft through the secondary connecting groove, and the clamping groove and the fixed clamping groove are engaged with each other, so that the support plate and the support plate can be connected as a whole through the shock-absorbing spring, and the spring seat, shock-absorbing spring and damper are combined so that when encountering vibration, the shock-absorbing springs on the plurality of spring seats can be assisted by the damper for shock absorption, thereby reducing the shock-absorbing pressure of the support shaft.
[0011] Preferably, a plurality of groups of secondary arc clips are arranged around the lower end of the support plate, and a secondary fixing groove is opened between the plurality of groups of secondary arc clips. By combining the secondary arc clips with the secondary fixing grooves, the staff can first fix the support base to the upper end of the lower steel structure through the secondary fixing grooves during installation, and fix the edge of the lower steel structure through the plurality of groups of secondary arc clips for positioning.
[0012] Beneficial effects of the utility model:
[0013] 1. By combining the polygonal rubber support column, the regular triangular rubber pile and the reverse triangular rubber pile, when the support column performs shock absorption and buffering on the steel structure, the regular triangular rubber pile and the reverse triangular rubber pile support and shock absorption together with the polygonal rubber support column through their own stable triangular shape. Compared with the previous support shaft, the utility model can effectively disperse the support pressure of the support shaft through the regular triangular rubber pile and the reverse triangular rubber pile inside the support shaft, and effectively prevent the support shaft from being prone to fatigue and aging under repeated loads. By combining the primary fixing ring sleeve with the secondary fixing ring sleeve, when the weather is hot, the polygonal rubber pile and other modules between the primary fixing ring sleeve and the secondary fixing ring sleeve can expand and contract with heat through the gap between the primary fixing ring sleeve and the secondary fixing ring sleeve, thereby avoiding deformation and damage of the support shaft due to thermal expansion and contraction, shortening the service life. By combining the primary arc clip with the primary fixing groove, when the staff installs the shock absorption and buffering structure, they can support the bottom of the upper steel structure through the primary fixing groove, and position the upper steel structure by clamping the bottom edge of the upper steel structure with multiple primary arc clips.
[0014] 2. By combining the primary connecting ring with the primary connecting groove, the staff can insert the upper end of the support shaft into the first connecting groove during installation to connect the support shaft with the support seat. By combining the secondary connecting ring with the secondary connecting seat, the staff can connect the support seat with the lower end of the support shaft through the secondary connecting groove. The clamping groove and the fixed clamping groove are engaged with each other, so that the support plate and the support plate can be connected as a whole through the shock-absorbing spring. By combining the spring seat, the shock-absorbing spring and the damper, when encountering vibration, the shock-absorbing springs on the multiple groups of spring seats can be connected through The damper is used to assist in shock absorption, thereby reducing the shock absorption pressure of the support shaft. The secondary arc clip is combined with the secondary fixing groove so that the staff can first fix the support base to the upper end of the lower steel structure through the secondary fixing groove during installation, and use multiple groups of secondary arc clips to fix the edge of the lower steel structure for positioning. This solves the problem of existing shock-absorbing and buffering structures. During use, rubber bearings are usually used to absorb and consume vibration energy and reduce the vibration response of the structure. However, rubber bearings are prone to fatigue and aging under long-term repeated loads, thereby reducing the shock absorption effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0016] Figure 2 It is a schematic diagram of the support shaft of the utility model;
[0017] Figure 3 This is a schematic diagram of a support seat of the utility model;
[0018] Figure 4It is a schematic diagram of the support seat of the utility model.
[0019] Explanation of the reference numerals in the accompanying drawings: 1. Support shaft; 101. Polygonal rubber support column; 102. Inverse triangular rubber pile; 103. Regular triangular rubber pile; 104. Primary fixing ring sleeve; 105. Multilateral fixing groove; 106. Polygonal rubber pile; 107. Secondary fixing ring sleeve; 2. Support seat; 201. Support plate; 202. Primary arc clamp; 203. Primary fixing groove; 204. Press seat; 205. Clamp groove; 206. Primary connecting ring; 207. Primary connecting groove; 3. Support seat; 301. Support plate; 302. Secondary arc clamp; 303. Secondary fixing groove; 304. Secondary connecting ring; 305. Secondary connecting groove; 306. Spring seat; 307. Shock-absorbing spring; 308. Damper; 309. Fixed seat; 310. Fixed clamp shaft. DETAILED DESCRIPTION
[0020] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0021] See also Figure 1-2 The utility model provides an embodiment: a shock-absorbing and buffering structure of a steel structure for construction, comprising a support shaft 1, a support seat 2 and a support seat 3; the support shaft 1 comprises a primary fixing ring sleeve 104, a secondary fixing ring sleeve 107 and a polygonal rubber support column 101, the upper end of the support shaft 1 is provided with a support seat 2 for supporting the upper steel structure, the support seat 2 comprises a supporting plate 201 and a pressure seat 204, a support seat 3 for supporting a buffer structure is provided below the support shaft 1, the support seat 3 comprises a supporting plate 301 and a spring seat 306, and the support seat 2 and the support seat 3 are fixedly connected through the support shaft 1.
[0022] Please continue reading Figure 1-2In this embodiment, a polygonal fixing groove 105 is provided at the center of the primary fixing ring sleeve 104, and the polygonal rubber support column 101 is located at the center of the polygonal fixing groove 105. A plurality of groups of regular triangular rubber piles 103 are arranged around the outer end of the polygonal rubber support column 101, and a plurality of groups of reverse triangular rubber piles 102 are arranged around the outer end of the plurality of groups of regular triangular rubber piles 103. The plurality of groups of regular triangular rubber piles 103 and the plurality of groups of reverse triangular rubber piles 102 fit closely with each other. By combining the polygonal rubber support column 101, the regular triangular rubber piles 103 and the reverse triangular rubber piles 102, when the support column performs shock absorption and buffering on the steel structure, the regular triangular rubber piles 103 and the reverse triangular rubber piles 102 perform support and shock absorption together with the polygonal rubber support column 101 through their own stable triangular shapes. Compared with the previous support shaft 1, the utility model can The rubber piles 103 and the inverted triangular rubber piles 102 effectively disperse the supporting pressure of the support shaft 1, and effectively prevent the support shaft 1 from being easily fatigued and aged under repeated loads. A plurality of groups of polygonal rubber piles 106 are arranged around the outer end of the primary fixing ring sleeve 104, and the plurality of groups of polygonal rubber piles 106 are arranged in sequence end to end around the outer end of the primary fixing ring sleeve 104. The secondary fixing ring sleeve 107 is sleeved on the outer ends of the plurality of groups of polygonal rubber piles 106. The primary fixing ring sleeve 104 is combined with the secondary fixing ring sleeve 107, so that when the weather is relatively hot, the polygonal rubber piles 106 and other modules between the primary fixing ring sleeve 104 and the secondary fixing ring sleeve 107 can expand and contract with heat through the gap between the primary fixing ring sleeve 104 and the secondary fixing ring sleeve 107, thereby avoiding deformation and damage of the support shaft 1 due to thermal expansion and contraction, which shortens the service life.
[0023] See also Figure 1-3 In this embodiment, a plurality of groups of first-level arc-shaped clips 202 are arranged around the upper end of the support plate 201, and a first-level fixing groove 203 is opened between the plurality of groups of first-level arc-shaped clips 202. The pressure seat 204 is located at the lower end of the support plate 201, and a card slot 205 is arranged at the center of the lower end of the pressure seat 204. The first-level arc-shaped clip 202 is combined with the first-level fixing groove 203, so that when the staff installs the shock-absorbing and buffering structure, the first-level fixing groove 203 can be used to support the bottom of the upper steel structure, and the plurality of first-level arc-shaped clips 202 can be clamped on the bottom edge of the upper steel structure to prevent the upper steel structure from being damaged. The steel structure is positioned, and a plurality of pressure seats 204 are provided. The plurality of pressure seats 204 are arranged around the lower end of the support plate 201. A primary connecting ring 206 is provided between the plurality of pressure seats 204. A primary connecting groove 207 is provided in the center of the primary connecting ring 206. The upper end of the support shaft 1 extends to the interior of the primary connecting groove 207. The primary connecting ring 206 is combined with the primary connecting groove 207 so that the staff can insert the upper end of the support shaft 1 into the interior of the primary connecting groove 207 during installation, thereby connecting the support shaft 1 to the support seat 2 together.
[0024] See also Figure 1-4 In this embodiment, a secondary connecting ring 304 is provided at the center of the upper end of the support plate 301, and a secondary connecting groove 305 is opened at the center of the secondary connecting ring 304. The lower end of the support shaft 1 extends to the inside of the secondary connecting groove 305. A plurality of spring seats 306 are provided, and the plurality of spring seats 306 are arranged around the outer side of the secondary connecting ring 304. A shock absorbing spring 307 is provided at the upper end of the spring seat 306, and a spring damping is provided inside the shock absorbing spring 307. A damper 308 is provided at the center of the shock absorbing spring 307. A fixed seat 309 is provided at the upper end of the shock absorbing spring 307. A fixed clamping shaft 310 is provided at the center of the upper end of the fixed seat 309. The fixed clamping shaft 310 and the clamping groove 205 are matched and engaged with each other. The secondary connecting ring 304 is combined with the secondary connecting seat, so that the staff can connect the support seat 3 to the lower end of the support shaft 1 through the secondary connecting groove 305. , through the mutual engagement of the card slot 205 and the fixed card slot 205, the support plate 201 and the support plate 301 can be connected as a whole through the shock-absorbing spring 307, and the spring seat 306, the shock-absorbing spring 307, and the damper 308 are combined, so that when encountering vibration, the shock-absorbing springs 307 on the multiple groups of spring seats 306 can assist in shock absorption through the damper 308, thereby reducing the shock-absorbing pressure of the support shaft 1, and the lower end of the support plate 301 is surrounded by multiple groups of secondary arc cards 302, and the multiple groups of secondary arc cards 302 are provided with secondary fixing grooves 303. The secondary arc cards 302 are combined with the secondary fixing grooves 303, so that when installing, the staff first fixes the support seat 3 to the upper end of the lower steel structure through the secondary fixing grooves 303, and fixes the edge of the lower steel structure through the multiple groups of secondary arc cards 302 for positioning.
[0025] When working, the staff first fixes the support seat 3 to the upper end of the lower steel structure through the secondary fixing groove 303, then inserts the lower end of the support shaft 1 into the secondary connecting groove 305, and then fixes the support seat 2 to the upper end of the support shaft 1 through the primary connecting groove 207, and at the same time, engages the slot 205 at the center of the lower end of the pressure seat 204 with the fixed clamping shaft 310 at the upper end of the fixed seat 309.
[0026] When vibration occurs, the supporting pressure of the support shaft 1 is effectively dispersed through the positive triangular rubber piles 103 and the reverse triangular rubber piles 102 inside the support shaft 1 to enhance the shock absorption effect, while preventing the support shaft 1 from fatigue under repeated loads. In addition, the shock-absorbing springs 307 on the multiple groups of spring seats 306 can assist in shock absorption through the dampers 308, thereby reducing the shock absorption pressure of the support shaft 1.
[0027] When the weather is hot, the polygonal rubber pile 106 and other modules between the primary fixing ring 104 and the secondary fixing ring 107 can expand and contract with heat through the gap between the primary fixing ring 104 and the secondary fixing ring 107 .
[0028] According to the above steps, when vibration occurs, the polygonal rubber support column 101, the regular triangular rubber pile 103, the reverse triangular rubber pile 102 and the polygonal rubber pile 106 inside the support shaft 1 can effectively disperse the support pressure and the vibration pressure transmitted by the vibration, thereby enhancing the shock absorption effect. At the same time, the shock-absorbing springs 307 on the multiple groups of spring seats 306 can assist in shock absorption through the damper 308, so that the shock-absorbing pressure of the support shaft 1 is dispersed and transmitted to the multiple shock-absorbing springs 307, thereby reducing the shock-absorbing pressure of the support shaft 1.
[0029] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of those skilled in the art without departing from the purpose of the present invention.
Claims
1. A steel structure shock absorbing and buffering structure for construction, comprising a support shaft (1); characterized in that: It also includes a support seat (2) and a support seat (3); the support shaft (1) includes a primary fixing ring sleeve (104), a secondary fixing ring sleeve (107) and a polygonal rubber support column (101); the upper end of the support shaft (1) is provided with a support seat (2) for supporting the upper steel structure; the support seat (2) includes a support plate (201) and a pressure seat (204); the lower part of the support shaft (1) is provided with a support seat (3) for supporting the buffer structure; the support seat (3) includes a support plate (301) and a spring seat (306); the support seat (2) and the support seat (3) are fixedly connected via the support shaft (1).
2. The steel structure shock absorbing and buffering structure for construction according to claim 1 is characterized in that: A polygonal fixing groove (105) is provided at the center of the primary fixing ring sleeve (104), the polygonal rubber support column (101) is located at the center of the polygonal fixing groove (105), a plurality of groups of regular triangular rubber piles (103) are arranged around the outer end of the polygonal rubber support column (101), a plurality of groups of reverse triangular rubber piles (102) are arranged around the outer end of the plurality of groups of regular triangular rubber piles (103), and the plurality of groups of regular triangular rubber piles (103) and the plurality of groups of reverse triangular rubber piles (102) are closely fitted to each other.
3. The steel structure shock absorbing and buffering structure for construction according to claim 2 is characterized in that: A plurality of groups of polygonal rubber piles (106) are arranged around the outer end of the primary fixing ring sleeve (104), and the plurality of groups of polygonal rubber piles (106) are arranged in sequence end to end around the outer end of the primary fixing ring sleeve (104), and a secondary fixing ring sleeve (107) is sleeved on the outer ends of the plurality of groups of polygonal rubber piles (106).
4. The steel structure shock absorbing and buffering structure for construction according to claim 1 is characterized in that: A plurality of groups of primary arc-shaped clips (202) are arranged around the upper end of the support plate (201), a primary fixing groove (203) is provided between the plurality of groups of primary arc-shaped clips (202), a pressing seat (204) is located at the lower end of the support plate (201), and a clip groove (205) is provided at the center of the lower end of the pressing seat (204).
5. The steel structure shock absorbing and buffering structure for construction according to claim 4 is characterized in that: A plurality of pressure seats (204) are provided, and the plurality of pressure seats (204) are arranged around the lower end of the support plate (201). A primary connecting ring (206) is provided between the plurality of pressure seats (204). A primary connecting groove (207) is provided at the center of the primary connecting ring (206), and the upper end of the support shaft (1) extends into the interior of the primary connecting groove (207).
6. The steel structure shock absorbing and buffering structure for construction according to claim 1 is characterized in that: A secondary connecting ring (304) is provided at the center of the upper end of the support plate (301), a secondary connecting groove (305) is provided at the center of the secondary connecting ring (304), the lower end of the support shaft (1) extends to the inside of the secondary connecting groove (305), a plurality of spring seats (306) are provided, and the plurality of spring seats (306) are arranged around the outer side of the secondary connecting ring (304), a shock absorbing spring (307) is provided at the upper end of the spring seat (306), a spring damping is provided inside the shock absorbing spring (307), a damper (308) is provided at the center of the shock absorbing spring (307), a fixing seat (309) is provided at the upper end of the shock absorbing spring (307), a fixing clamping shaft (310) is provided at the center of the upper end of the fixing seat (309), and the fixing clamping shaft (310) and the clamping groove (205) are matched and engaged with each other.
7. The steel structure shock absorbing and buffering structure for construction according to claim 6 is characterized in that: A plurality of groups of secondary arc-shaped clips (302) are arranged around the lower end of the support plate (301), and a secondary fixing groove (303) is provided between the plurality of groups of secondary arc-shaped clips (302).