Building construction discharging platform

By setting fixing rings, rubber pads, hooks and barbs on the construction unloading platform, the problem of garbage drop and cleaning during disassembly of protective nets is solved, the safety and stability of use is improved, and the installation and disassembly of fixing frames is simplified. Installation process.

CN221941981UActive Publication Date: 2024-11-01SHAANXI TIANCHUANG ENGINEERING DESIGN CO LTD SHANDONG BRANCH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420479960.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2024-11-01
Estimated Expiration
2034-03-13

AI Technical Summary

Technical Problem

The existing construction unloading platform is prone to causing construction waste to fall everywhere during the dismantling of the protective net, causing safety hazards, and the top side panels are inconvenient for cleaning, which increases the labor intensity of staff.

Method used

A construction unloading platform was designed. By setting up a fixed ring, rubber pad, hook and barb, the installation position of the hook is limited, which facilitates the disassembly and assembly of the leaked net and the direct collection and treatment of garbage in the protective net to avoid the drop of garbage, and through The lower installation buckle, limit buckle, suspension buckle and upper installation buckle are simplified in the disassembly and assembly and use of the fixing frame.

Benefits of technology

It improves the safety of the unloading table, reduces the cleaning labor intensity of staff, reduces the difficulty of installing the fixed frame, and ensures stability during use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941981U_ABST
    Figure CN221941981U_ABST
Patent Text Reader

Abstract

The utility model provides a building construction discharging platform, and belongs to the technical field of building engineering. Comprising a discharging table, a lower mounting buckle is fixedly mounted on the outer side of the discharging table, a limiting buckle is movably connected to the inner side of the lower mounting buckle, a fixing frame is fixedly mounted on the outer side of the limiting buckle, and a leakage net is fixedly mounted at the bottom end of the fixing frame. By arranging the leakage net, the worker can conveniently and directly collect and process the construction waste accumulated on the surface of the protective net, the worker does not need to sweep the construction waste, and meanwhile, the worker can conveniently clean the construction waste. And meanwhile, through a lower mounting buckle, a limiting buckle, a hanging buckle and an upper mounting buckle, workers can conveniently and rapidly disassemble and assemble the fixing frame.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building engineering, in particular to a building construction unloading platform. Background Art

[0002] In construction projects, a construction unloading platform refers to a temporary or permanent facility used to safely and efficiently unload construction materials in construction projects. It is usually located at the construction site and is used to unload concrete, sand, gravel, cement and other construction materials to meet construction needs. The design of the unloading platform should take into account factors such as the safe unloading of materials, space limitations at the construction site, convenience of construction personnel, and efficiency of unloading operations to ensure that materials can be accurately and efficiently unloaded to the designated location. The unloading platform can be a temporary steel frame structure or a permanent equipment, such as a concrete unloading platform.

[0003] Although the construction unloading platforms currently on the market use protective nets to protect the construction waste that falls from the top of the unloading platforms during use, the construction waste accumulated on the surface of the protective nets can easily fall everywhere during the removal of the protective nets, posing a safety hazard. In addition, the unloading platform is equipped with side panels on the top, which makes it inconvenient for workers to clean the protective nets, further increasing the labor intensity of workers in handling construction waste. Therefore, the present application provides a construction unloading platform to meet the needs. Utility Model Content

[0004] The technical problem to be solved by the utility model is to provide a construction unloading platform to solve the problem that the existing construction unloading platforms on the market currently use a protective net to protect the construction waste dropped from the top of the unloading platform during use, but in the process of dismantling the protective net, it is easy to cause the construction waste accumulated on the surface of the protective net to fall everywhere, causing safety hazards, and the unloading platform has a side panel installed on the top, which makes it inconvenient for the staff to clean the protective net, further increasing the labor intensity of the staff in handling the construction waste.

[0005] In order to solve the above technical problems, the utility model provides the following technical solutions:

[0006] A construction unloading platform comprises an unloading platform, wherein a lower mounting buckle is fixedly mounted on the outer side of the unloading platform, a limit buckle is movably connected to the inner side of the lower mounting buckle, a fixed frame is fixedly mounted on the outer side of the limit buckle, and a leakage net is fixedly mounted on the bottom end of the fixed frame.

[0007] Optionally, one side of the fixed frame contacts the outer side of the unloading platform, and the fixed frame is fixedly connected to the leakage net via a fixed ring and a hook.

[0008] Optionally, a protective net is equidistantly fixedly installed on the inner side of the fixed frame, hanging buckles are fixedly installed at both corners of the top of the fixed frame, upper mounting buckles are symmetrically fixedly installed on the top of three sides of the unloading platform, fixing rings are symmetrically fixedly installed on both sides of the bottom end of the fixed frame, and a rubber pad is fixedly installed at the inner side of the fixing ring corresponding to the bottom end of the fixed frame.

[0009] Optionally, a hook is movably connected to the inner side of the fixed ring, barbs are fixedly installed on both sides of the outer side of the hook, a leakage net is fixedly connected to the bottom ends of the four hooks, and lifting ears are fixedly installed at equal distances on the bottom of both sides of the unloading platform.

[0010] Optionally, the number of the lower mounting buckles is six, and they are respectively located at the bottom positions of the three sides of the unloading platform, the lower mounting buckles are grouped in pairs, and the bottom ends of each two lower mounting buckles are fixedly connected to the top edges of the fixed frame through limiting buckles.

[0011] Optionally, the outer side of the suspension buckle is snap-connected with the inner side of the upper mounting buckle, the number of the fixing frames is three, and the three fixing frames are in contact with each other in sequence.

[0012] Optionally, the suspension buckle consists of a fixed end and a movable end, and the fixed end and the movable end are connected by rotation, and the limiting buckle consists of a fixed end and a movable end, and the fixed end and the movable end are connected by a hinge.

[0013] Optionally, the bottom end of the fixed end of the limiting buckle is fixedly connected to the top end of the fixed frame, and the outer side of the movable end of the limiting buckle is snap-connected to the inner side of the lower mounting buckle.

[0014] Optionally, the bottom end of the fixed end of the hanging buckle is fixedly connected to the top end of the fixed frame, and the outer side of the movable end of the hanging buckle is snap-connected to the inner side of the upper mounting buckle.

[0015] Optionally, the hook is in an M shape, and the outer side of the hook is in extrusion contact with the bottom end of the rubber pad.

[0016] Compared with the prior art, the utility model has at least the following beneficial effects:

[0017] In the above scheme, by setting a fixing ring, a rubber pad, a hook and a barb, the installation position of the hook can be limited, which makes it convenient for the staff to disassemble and assemble the leakage net. By setting the leakage net, it is convenient for the staff to directly collect and dispose of the construction waste accumulated on the surface of the protective net, avoiding the need for the staff to clean the construction waste. At the same time, it can also avoid the phenomenon of construction waste falling and causing safety hazards during the disassembly of the protective net, further improving the safety of the unloading platform during use. At the same time, through the lower installation buckle, limit buckle, suspension buckle and upper installation buckle, it is convenient for the staff to quickly disassemble and assemble the fixed frame, reducing the difficulty for the staff to install the fixed frame, and ensuring the stability of the fixed frame during use. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The accompanying drawings, which are incorporated herein and constitute part of the specification, illustrate embodiments of the present invention and, together with the description, further serve to explain the principles of the present invention and enable those skilled in the relevant art to make and use the present invention.

[0019] Figure 1 This is a schematic diagram of the three-dimensional structure of the construction unloading platform;

[0020] Figure 2 This is a schematic diagram of the installation structure of the limit buckle of the construction unloading platform;

[0021] Figure 3 This is a schematic diagram of the hook installation structure for the construction unloading platform;

[0022] Figure 4 This is a schematic diagram of the installation structure of the buckle on the unloading platform of the construction.

[0023] [reference numerals]

[0024] 1. Unloading platform; 2. Lower mounting buckle; 3. Limiting buckle; 4. Fixed frame; 5. Protective net; 6. Suspension buckle; 7. Fixed ring; 8. Rubber pad; 9. Hook; 10. Barb; 11. Net; 12. Upper mounting buckle; 13. Lifting ear.

[0025] As shown in the figure, in order to clearly implement the structure of the embodiment of the utility model, specific structures and devices are marked in the figure, but this is only for illustrative purposes and is not intended to limit the utility model to the specific structure, device and environment. According to specific needs, ordinary technicians in this field can adjust or modify these devices and environments. DETAILED DESCRIPTION

[0026] The following is a detailed description of a construction unloading platform provided by the utility model in combination with the accompanying drawings and specific embodiments. At the same time, it is explained here that in order to make the embodiments more detailed, the following embodiments are the best and preferred embodiments, and those skilled in the art may also adopt other alternatives to implement some known technologies; and the accompanying drawings are only for more specific description of the embodiments, and are not intended to specifically limit the utility model.

[0027] It should be noted that the references to "one embodiment", "an embodiment", "an exemplary embodiment", "some embodiments" and the like in the specification indicate that the embodiments described may include specific features, structures or characteristics, but not every embodiment may include the specific features, structures or characteristics. In addition, when a specific feature, structure or characteristic is described in conjunction with an embodiment, it should be within the knowledge of a person skilled in the art to implement such feature, structure or characteristic in conjunction with other embodiments (whether or not explicitly described).

[0028] In general, a term can be understood, at least in part, from its use in context. For example, depending, at least in part, on the context, the term "one or more" as used herein can be used to describe any feature, structure, or characteristic in the singular sense, or can be used to describe a combination of features, structures, or characteristics in the plural sense. Additionally, the term "based on" can be understood as not necessarily intended to convey an exclusive set of factors, but can instead, depending, at least in part, on the context, allow for the presence of other factors that are not necessarily explicitly described.

[0029] It is to be understood that the meanings of “on,” “over,” and “above” in the present invention should be interpreted in the broadest manner, so that “on” not only means “directly on” something, but also includes the meaning of being “on” something with intervening features or layers, and “on” or “above” not only means “on” or “above” something, but also includes the meaning of being “on” or “above” something with no intervening features or layers.

[0030] Additionally, spatially relative terms such as "under," "beneath," "lower," "above," "upper," and the like may be used herein for descriptive convenience to describe the relationship of one element or feature to another element or features, as shown in the accompanying drawings. Spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the accompanying drawings. The device may be oriented in other ways, and the spatially relative descriptors used herein may be similarly interpreted accordingly.

[0031] like Figures 1 to 4The embodiment of the utility model provides a construction unloading platform, including an unloading platform 1, a lower mounting buckle 2 is fixedly installed on the outer side of the unloading platform 1, and a limiting buckle 3 is movably connected to the inner side of the lower mounting buckle 2. A fixed frame 4 is fixedly installed on the outer side of the limiting buckle 3, and the limiting buckle 3 is composed of a fixed end and a movable end, and the fixed end and the movable end are connected by a hinge, which is convenient for the staff to rotate the fixed frame 4, and the bottom end of the fixed end of the limiting buckle 3 is fixedly connected to the top of the fixed frame 4, and the outer side of the movable end of the limiting buckle 3 is clamped and connected with the inner side of the lower mounting buckle 2, which is convenient for the staff to limit the edge position of the fixed frame 4 to avoid the parallel shaking of the fixed frame 4 when in use. There are three fixed frames 4, and the three fixed frames 4 are in contact with each other in sequence, so as to limit the positions between the three fixed frames 4. There are six lower mounting buckles 2, which are respectively located at the bottom positions of the three sides of the unloading platform 1, and the lower mounting buckles 2 form a group of two, and the bottom ends of every two lower mounting buckles 2 are connected to the top edges of the fixed frames 4 by limiting The buckle 3 is fixedly connected, and a leakage net 11 is fixedly installed at the bottom of the fixed frame 4, which can collect and process the construction waste rolling down the surface of the protection net 5. One side of the fixed frame 4 is in contact with the outer side of the unloading platform 1, and the fixed frame 4 is fixedly connected to the leakage net 11 through a fixing ring 7 and a hook 9. A protection net 5 is fixedly installed equidistantly on the inner side of the fixed frame 4 to prevent the construction waste above the unloading platform 1 from falling and causing safety hazards. Suspension buckles 6 are fixedly installed at the corners of the top of the fixed frame 4. The suspension buckle 6 consists of a fixed end and a movable end, and the fixed end and the movable end are connected by rotation. The bottom end of the fixed end of the suspension buckle 6 is fixedly connected to the top of the fixed frame 4, and the outer side of the movable end of the suspension buckle 6 is snap-connected with the inner side of the upper mounting buckle 12, which is convenient for the staff to fix the position of the fixed frame 4 and ensure the stability of the fixed frame 4 when in use. The upper mounting buckles 12 are symmetrically fixedly installed on the top of the three sides of the unloading platform 1, and the outer side of the suspension buckle 6 is snap-connected with the inner side of the upper mounting buckle 12, which can fix the position of the suspension buckle 6 after moving.

[0032] By embedding the movable end inside the limiting buckle 3 into the inner side of the lower mounting buckle 2, the position of the limiting buckle 3 can be limited. At this time, the movable end inside the limiting buckle 3 and the fixed end are hinged, so that the fixed frame 4 fixedly connected to the fixed end inside the limiting buckle 3 can be rotated. During the rotation of the fixed frame 4, the top of the fixed frame 4 is fixedly connected to the inside of the suspension buckle 6, and the fixed end inside the suspension buckle 6 is rotatably connected to the movable end, so that the movable end inside the suspension buckle 6 can be rotated, and then the outer side of the fixed end of the suspension buckle 6 can be embedded into the inner side of the upper mounting buckle 12. At this time, one side of the fixed frame 4 contacts the outer side of the unloading platform 1, thereby completing the installation of the fixed frame 4, and then completing the placement of the protective net 5 fixedly installed inside the fixed frame 4, ensuring the stability of the fixed frame 4 during use, and also facilitating the staff to disassemble and assemble the fixed frame 4 later.

[0033] like Figure 1 , Figure 3 and Figure 4 As shown, the fixing rings 7 are symmetrically fixedly installed on both sides of the bottom end of the fixing frame 4, and a rubber pad 8 is fixedly installed at the bottom end of the fixing frame 4 corresponding to the inner position of the fixing ring 7. A hook 9 is movably connected to the inner side of the fixing ring 7, and the hook 9 is M-shaped. The outer side of the hook 9 is squeezed and contacted with the bottom end of the rubber pad 8, which can limit the position of the hook 9 after moving to avoid the hook 9 sliding around when in use. Barbs 10 are fixedly installed on both sides of the outer side of the hook 9, and the M shape of the hook 9 cooperates with the two barbs 10 to avoid the hook 9 and the fixing ring 7 from being separated. A leakage net 11 is fixedly connected to the bottom ends of the four hooks 9, and ears 13 are fixedly installed at the bottom of both sides of the unloading platform 1 at equal distances, which is convenient for the staff to suspend the edges when installing the unloading platform 1.

[0034] The lifting ear 13 is convenient for the staff to suspend the unloading platform 1 when installing it. By moving the hook 9, the hook 9 passes through the inner side of the fixing ring 7, and the moving direction of the hook 9 can be limited. When the hook 9 moves to the appropriate position, the rubber pad 8 fixedly installed at the bottom of the fixing frame 4 squeezes the outer side of the hook 9, and the position of the hook 9 after the move can be limited to avoid the hook 9 from sliding around. At the same time, the barb 10 fixedly installed on the outer side of the hook 9 contacts the fixing ring 7 later, and the hook 9 and the fixing ring 7 can be prevented from being separated, thereby ensuring the safety of the hook 9 when in use. At the same time, the end of the hook 9 is fixedly connected to the leakage net 11, and the position of the leakage net 11 can be fixed, thereby completing the installation of the leakage net 11. Through the leakage net 11, the construction waste accumulated on the surface of the protective net 5 during the rotation of the fixing frame 4 in the later stage can be rolled, and then the construction waste can be rolled to the inner side of the leakage net 11. Through the leakage net 11, the construction waste can be collected and processed, and the staff does not need to clean the surface of the protective net 5, which is also convenient for the staff to carry and process the construction waste collected in the later stage.

[0035] The working principle provided by the utility model is that, through the lifting ear 13, the edge of the unloading platform 1 can be supported by the staff during the installation of the unloading platform 1. After that, the staff moves the hook 9 fixedly connected to the top of the leakage net 11, so that the hook 9 passes through the inner side of the fixing ring 7, and the moving direction of the hook 9 can be limited. When the hook 9 moves to the appropriate position, the rubber pad 8 fixedly installed at the bottom end of the fixing frame 4 squeezes the hook 9, and the position of the hook 9 can be limited. At this time, the barb 10 fixedly installed on the outside of the hook 9 can prevent the hook 9 from being separated from the fixing ring 7, thereby completing the installation of the leakage net 11. After that, the staff moves the fixing frame 4, and embeds the limiting buckle 3 fixedly installed on one side of the top of the fixing frame 4 into the lower installation buckle fixedly installed on the bottom of the outer side of the unloading platform 1. The inner side of the mounting buckle 2 can limit the position of the edge of the fixed frame 4. At this time, the outer side of the suspension buckle 6 fixedly installed on the other side of the top of the fixed frame 4 is embedded in the inner side of the upper mounting buckle 12 fixedly installed on the outer top of the unloading platform 1, so that the position of the hanging buckle 6 after movement can be limited, and then the position of the fixed frame 4 can be fixed, thereby completing the installation of the protective net 5 fixedly connected to the inner side of the fixed frame 4. Afterwards, when the staff disassembles the protective net 5, due to the hinged connection at the two ends of the limit buckle 3, the fixed frame 4 can be rotated, and then the construction waste accumulated on the surface of the protective net 5 can roll into the inside of the leakage net 11, and the construction waste can be collected through the leakage net 11, and then the staff only needs to disassemble the hook 9 in the later stage to transport and process the construction waste.

[0036] The present invention covers any substitution, modification, equivalent method and scheme made on the essence and scope of the present invention. In order to make the public have a thorough understanding of the present invention, specific details are described in detail in the following preferred embodiments of the present invention, and those skilled in the art can fully understand the present invention without the description of these details. In addition, in order to avoid unnecessary confusion about the essence of the present invention, well-known methods, processes, procedures, components and circuits are not described in detail.

[0037] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.

Claims

1. A construction unloading platform, characterized in that: It comprises a discharge platform, wherein a lower mounting buckle is fixedly mounted on the outer side of the discharge platform, a limiting buckle is movably connected on the inner side of the lower mounting buckle, a fixing frame is fixedly mounted on the outer side of the limiting buckle, and a leakage net is fixedly mounted on the bottom end of the fixing frame.

2. The construction unloading platform according to claim 1, characterized in that: One side of the fixing frame contacts the outer side of the unloading platform, and the fixing frame is fixedly connected with the leakage net through a fixing ring and a hook.

3. The construction unloading platform according to claim 2, characterized in that: Protective nets are equidistantly fixed on the inner side of the fixed frame, hanging buckles are fixedly installed at both corners of the top of the fixed frame, upper mounting buckles are symmetrically fixedly installed on the tops of three sides of the unloading platform, fixing rings are symmetrically fixedly installed on both sides of the bottom end of the fixed frame, and a rubber pad is fixedly installed at the inner side of the fixing ring corresponding to the bottom end of the fixed frame.

4. The construction unloading platform according to claim 3, characterized in that: A hook is movably connected to the inner side of the fixed ring, barbs are fixedly installed on both sides of the outer side of the hook, a leakage net is fixedly connected to the bottom ends of the four hooks, and lifting ears are fixedly installed at equal distances on the bottom of both sides of the unloading platform.

5. The construction unloading platform according to claim 1, characterized in that: There are six lower mounting buckles, which are respectively located at the bottom of three sides of the unloading platform. Two lower mounting buckles form a group, and the bottom ends of every two lower mounting buckles are fixedly connected to the top edges of the fixed frame through limiting buckles.

6. The construction unloading platform according to claim 3, characterized in that: The outer side of the hanging buckle is snap-connected with the inner side of the upper mounting buckle. There are three fixing frames, and the three fixing frames are in contact with each other in sequence.

7. The construction unloading platform according to claim 3, characterized in that: The suspension buckle is composed of a fixed end and a movable end, and the fixed end and the movable end are connected by rotation. The limit buckle is composed of a fixed end and a movable end, and the fixed end and the movable end are connected by a hinge.

8. The construction unloading platform according to claim 7, characterized in that: The bottom end of the fixed end of the limiting buckle is fixedly connected to the top end of the fixing frame, and the outer side of the movable end of the limiting buckle is clamped and connected to the inner side of the lower mounting buckle.

9. The construction unloading platform according to claim 7, characterized in that: The bottom end of the fixed end of the hanging buckle is fixedly connected to the top end of the fixed frame, and the outer side of the movable end of the hanging buckle is clamped and connected to the inner side of the upper mounting buckle.

10. The construction unloading platform according to claim 3, characterized in that: The hook is in an M shape, and the outer side of the hook is in extrusion contact with the bottom end of the rubber pad.