Pipe jacking construction edge protection device

By setting up guardrail fixing devices and anti-disengagement devices on the gantry crane, the problem of frequent disassembly and assembly of edge protection devices during hand-excavated pipe hoisting construction is solved, the construction efficiency and safety are improved, and rapid assembly and reuse are achieved.

CN221942025UActive Publication Date: 2024-11-01SINOHYDRO BUREAU 14 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420447904.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-08
Publication Date
2024-11-01
Estimated Expiration
2034-03-08

AI Technical Summary

Technical Problem

During the construction of hand-excavated pipe hoisting, frequent disassembly and assembly of front-facing protective devices leads to wasting manpower and construction time, affecting the construction progress.

Method used

Design a front-facing protection device including a gantry crane, a guardrail fixing device, a guardrail and a guardrail anti-detachment device. By symmetrically setting the guardrail fixing device on the gantry crane legs, and using the guardrail anti-detachment device to improve assembly efficiency and safety .

Benefits of technology

It realizes rapid assembly and reuse, improves the construction efficiency and safety of hand-excavated pipes, and reduces the risk of falling off of edge protection devices.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221942025U_ABST
    Figure CN221942025U_ABST
Patent Text Reader

Abstract

The utility model discloses a pipe jacking construction limb protection device which comprises a portal crane and further comprises guardrail fixing devices, guardrails and guardrail anti-falling devices, the guardrail fixing devices are symmetrically arranged on a left supporting leg and a right supporting leg of the portal crane respectively, the guardrail fixing devices are of a U-shaped frame structure, and the guardrail anti-falling devices are arranged on the guardrail fixing devices. One side of the guardrail fixing device is fixedly connected with a supporting leg of the portal crane, the guardrail is placed in a U-shaped groove of the guardrail fixing device, the guardrail anti-falling device is fixedly connected with the end of the guardrail, and the guardrail anti-falling device is perpendicular to the horizontal plane. The pipe jacking construction edge protection device is simple in structure, convenient to use and capable of effectively improving the efficiency and safety of hand digging type pipe jacking construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of municipal engineering construction, and in particular relates to an edge protection device for pipe jacking construction. Background Art

[0002] Pipe jacking is a pipeline burial construction technology that does not involve excavation or requires minimal excavation. It is generally used in areas where the pipeline is buried at a deep depth or where the pipeline route does not meet the requirements of open excavation. Pipe jacking is to use the jacking force generated by the jacking equipment in the working well to overcome the friction between the pipeline and the surrounding soil, push the pipeline into the soil according to the designed slope, and transport the soil away. After one section of the pipe is pushed into the soil layer, the second section of the pipe is pushed in. This continues until the pipeline is pushed into the receiving well pit. The pipeline is buried between the two wells, following the tool pipe or tunnel boring machine.

[0003] Edge protection devices are essential safety protection facilities for pipe jacking projects. The main function of edge protection is to make the pipe jacking project on the construction site a relatively closed environment, which plays a more effective role in protecting the construction work inside and outside the pipe jacking project and avoiding construction safety hazards. The location where edge protection needs to be set up for pipe jacking projects is the periphery of the pipe jacking working well and the receiving well structure, and generally qualified steel pipes are used to set up through fasteners, and related facilities such as dense mesh, footboards and safety signs are set up. This type of edge protection device can meet the needs of equipment with a complete excavation system, such as the jacking of a mud-water balance mechanical pipe jacking machine. However, there is a problem of frequent disassembly and installation of edge protection devices for hand-dug pipe jacking construction. Hand-dug pipe jacking construction mainly involves manual excavation on the pipe jacking working surface, which is horizontally transported to the working well by a bucket truck, and then vertically transported to the ground by a gantry crane. Before hoisting to the ground, the edge protection railings on the outward transportation side of the gantry crane need to be dismantled, and the frequency of excavation is relatively high. If the edge protection is dismantled and installed each time, it will consume a lot of manpower and construction time, seriously affecting the construction progress of the hand-dug pipe jacking project. Utility Model Content

[0004] The technical problem to be solved by the utility model is to provide a pipe jacking construction edge protection device which has a simple structure, is easy to use and can effectively improve the efficiency and safety of hand-dig pipe jacking construction.

[0005] The technical solution of the utility model is: a device for protecting the edge of a pipe jacking construction, comprising a gantry crane, and also comprising: a guardrail fixing device, a guardrail, and a guardrail anti-detachment device, wherein a plurality of the guardrail fixing devices are symmetrically arranged on the left and right legs of the gantry crane, respectively; the guardrail fixing device is a U-shaped frame structure, one side of the guardrail fixing device is fixedly connected to the leg of the gantry crane, the guardrail is placed in a U-shaped groove of the guardrail fixing device, the guardrail anti-detachment device is fixedly connected to the end of the guardrail, and the guardrail anti-detachment device is perpendicular to the horizontal plane.

[0006] Furthermore, the other side of the guardrail fixing device forms an angle of 22.5 degrees with the vertical plane.

[0007] Furthermore, one end of the guardrail anti-slip device is in contact with the bottom side of the guardrail fixing device.

[0008] The beneficial effects of the utility model are as follows: a pipe jacking construction edge protection device of the utility model is achieved by symmetrically arranging a plurality of guardrail fixing devices on the legs of a gantry crane, and placing guardrails with guardrail anti-detachment devices at both ends in U-shaped grooves of the guardrail fixing devices, so that the edge protection device can be quickly assembled, and the same type of hand-dug pipe jacking working well pages can be reused, thereby improving the construction efficiency of hand-dug pipe jacking projects; in addition, the guardrails with guardrail anti-detachment devices at both ends are not easy to fall off from the guardrail fixing devices, thereby increasing the integrity and safety of the pipe jacking construction edge protection device. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] In order to more clearly illustrate the technical solutions in the embodiments of the utility model or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0010] Figure 1 The utility model is a schematic diagram of the main structure of a pipe jacking construction edge protection device.

[0011] Figure 2 The utility model is a side view structural diagram of an edge protection device for pipe jacking construction.

[0012] Figure 3 The utility model is a schematic diagram of the top view of the structure of an edge protection device for pipe jacking construction.

[0013] In the figure: 1-gantry crane, 2-guardrail fixing device, 3-guardrail, 4-guardrail anti-slip device. DETAILED DESCRIPTION

[0014] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the term "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, a direct connection, an indirect connection through an intermediate medium, or the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0015] like Figure 1-3As shown, a device for protecting the edge of a pipe jacking construction includes a gantry crane 1, and also includes: a guardrail fixing device 2 (φ25 steel bars), a guardrail 3 (φ48.3×3.6mm steel pipe with red and white reflective warning tape attached), and a guardrail anti-slip device 4 (φ25 steel bars). Several of the guardrail fixing devices 2 are symmetrically arranged on the left and right legs of the gantry crane 1, respectively. The guardrail fixing device 2 is a U-shaped frame structure, one side of the guardrail fixing device 2 is fixedly connected to the leg of the gantry crane 1, the guardrail 3 is placed in the U-shaped groove of the guardrail fixing device 2, the guardrail anti-slip device 4 is fixedly connected to the end of the guardrail 3, and the guardrail anti-slip device 4 is perpendicular to the horizontal plane.

[0016] Preferably, the other side of the guardrail fixing device 2 forms an angle of 22.5 degrees with the vertical plane.

[0017] Preferably, one end of the guardrail anti-slip device 4 is in contact with the bottom side of the guardrail fixing device 2 .

[0018] When in use, first determine the spacing and placement of the guardrail 3 on the gantry crane 1 according to the requirements for edge protection, process the φ25 steel bars into U-shaped guardrail fixtures 2 in advance and pull them to the site, and weld and install the guardrail fixtures 2 perpendicular to the ground according to the placement position of the gantry crane 1; the guardrail 3 uses a Ф48.3×3.6mm steel pipe, and the length of the steel pipe is selected according to the edge protection distance of the top pipe well on the excavation side, and a red and white reflective warning tape is pasted on the outside of the steel pipe; the railing anti-slip device 4 is welded and installed on both sides of the end of the guardrail 3. After the welding is completed, the railings are respectively set up on each layer of the railing fixtures to form a temporary edge protection device for the hand-excavated top pipe project; before each hoisting and excavation, the construction personnel, equipped with safety belts, remove each layer of guardrail 3 and place it at the bottom of the leg of the gantry crane 1. After the excavation is completed and the bucket truck is hoisted to the bottom of the well, the guardrail 3 is restored to its original state.

[0019] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the above embodiments and various changes can be made thereto within the knowledge scope of those skilled in the art.

Claims

1. A pipe jacking construction edge protection device, comprising a gantry crane (1), characterized in that: Also includes: A guardrail fixing device (2), a guardrail (3), and a guardrail anti-slip device (4), wherein a plurality of the guardrail fixing devices (2) are symmetrically arranged on the left and right legs of a gantry crane (1), the guardrail fixing device (2) is a U-shaped frame structure, one side of the guardrail fixing device (2) is fixedly connected to the leg of the gantry crane (1), the guardrail (3) is placed in the U-shaped groove of the guardrail fixing device (2), the guardrail anti-slip device (4) is fixedly connected to the end of the guardrail (3), and the guardrail anti-slip device (4) is perpendicular to the horizontal plane.

2. The edge protection device for pipe jacking construction according to claim 1 is characterized in that: The other side of the guardrail fixing device (2) forms an angle of 22.5 degrees with the vertical plane.

3. The edge protection device for pipe jacking construction according to claim 1, characterized in that: One end of the guardrail anti-slip device (4) is in contact with the bottom side of the guardrail fixing device (2).