Temporary isolation guardrail device for road construction

By designing an adjustable temporary isolation guardrail device, the problem of inconvenient adjustment of the construction site device is solved, its stability and safety are enhanced, and it is suitable for temporary protection needs of road construction.

CN221942137UActive Publication Date: 2024-11-01JINAN GUIHUA DESIGN RES YUAN
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420536685.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-20
Publication Date
2024-11-01
Estimated Expiration
2034-03-20

AI Technical Summary

Technical Problem

The temporary isolation guardrail device for road construction is inconvenient for adjustment and storage during use, and cannot be flexibly adjusted according to actual conditions.

Method used

A device including a base, a main rod and a side box is designed, and the length adjustment of the main rod is achieved by providing the first and second protective rods, chutes and locking rings; at the same time, through structures such as counterweight cavity and reflective patches , enhances the stability and safety of the device.

Benefits of technology

It realizes flexible adjustment and fixation of the device, increases stability and safety during use, and facilitates application at the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221942137U_ABST
    Figure CN221942137U_ABST
Patent Text Reader

Abstract

The utility model discloses a temporary isolation guardrail device for road construction, and particularly relates to the technical field of road construction, the temporary isolation guardrail device comprises a base, a main rod and a side box, the top end of the base is provided with the main rod, one side of the base is provided with the side box, and the top end in the side box is provided with a first positioning shaft; a first protection rod is movably installed on the outer side of the first positioning shaft, a second positioning shaft is arranged in the sliding groove, and a second protection rod is movably installed in the side box on the outer side of the second positioning shaft. Through the arrangement of the first protection rod and the second protection rod, after the locking ring is slightly screwed to be loose, the main rod can be pulled towards the two sides, and at the moment, the second positioning shaft can move along the sliding groove, so that the overall using length can be adjusted through cross adjustment of the first protection rod and the second protection rod, and after adjustment is completed, the main rod can be pulled towards the two sides. And then the locking ring is tightened for fixing, so that the adjustability of the temporary isolation guardrail device for road construction during use is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of road construction, in particular to a temporary isolation guardrail device for road construction. Background Art

[0002] Temporary isolation guardrails are mainly used for temporary protection at construction sites, effectively preventing vehicles and personnel from falling into foundation pits. They are important protective measures for civilized and safe construction standardization. When the excavation depth of the foundation pit is large, the surrounding area must be equipped with foundation pit edge guardrails to play a role in safety protection.

[0003] When using temporary isolation guardrail devices for road construction, generally multiple sets of isolation guardrail devices are required for use in combination. However, it is not convenient to adjust the size and distance according to actual conditions during use, and it is also inconvenient to store them. Therefore, it is necessary to improve them to make them easier to use. Utility Model Content

[0004] The utility model aims to provide a temporary isolation guardrail device for road construction, so as to solve the problem in the above background technology that the temporary isolation guardrail device for road construction is inconvenient to adjust and use.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a temporary isolation guardrail device for road construction, comprising a base, a main pole and a side box, the main pole is installed at the top of the base, a side box is installed on one side of the base, a first positioning shaft is installed at the top of the inside of the side box, a first protective rod is movably installed on the outside of the first positioning shaft, a slide groove is provided at the bottom ends of both ends of the side box, a second positioning shaft is provided inside the slide groove, a second protective rod is movably installed inside the inside of the side box outside the second positioning shaft, and a locking ring is provided on the outside of the second positioning shaft.

[0006] Preferably, the outer side wall of the main pole is provided with a side window, a transparent plate is installed inside the side window, a positioning rod is installed at the center position inside the main pole, a reflective tube is provided on the outside of the positioning rod, a reflective sticker is provided on the outer side wall of the reflective tube, and a sealing cover is provided at the top of the main pole.

[0007] Preferably, four groups of side windows are arranged on the outer side wall of the main rod, and the four groups of side windows are symmetrically distributed.

[0008] Preferably, the cross section of the reflective tube is larger than the cross section of the positioning rod, and the reflective tube and the positioning rod form a detachable structure.

[0009] Preferably, the cross section of the bottom end of the sealing cover is smaller than the cross section of the top end of the main rod, and the sealing cover and the main rod form a snap-fit ​​structure.

[0010] Preferably, a counterweight cavity is provided inside the base, a sewage outlet is provided on one side of the base, a sewage outlet cap is provided on the outside of the sewage outlet, a feeding port is provided on one side of the top of the base, and a feeding cap is provided on the outside of the feeding port.

[0011] Preferably, the cross section of the second positioning shaft is smaller than the cross section of the sliding groove, and the second positioning shaft and the sliding groove form a sliding structure.

[0012] Preferably, the interior of the locking ring is provided with an internal thread, the surface of the second positioning shaft is provided with an external thread, and the locking ring is connected to the second positioning shaft via threads.

[0013] Compared with the prior art, the utility model has the following beneficial effects: by providing the first protection rod and the second protection rod, after the locking ring is slightly screwed to loosen, the main rod can be pulled to both sides, at this time, the second positioning shaft can move along the slide groove, so that the length of the whole can be adjusted during use by cross adjustment of the first protection rod and the second protection rod, and after the adjustment is completed, the locking ring can be tightened to fix it, thereby realizing the adjustability of the temporary isolation guardrail device for road construction during use;

[0014] By providing a counterweight cavity, after removing the charging cap, fillers such as water and sand can be added to the counterweight cavity inside the base through the charging port, thereby increasing the weight of the base when in use, increasing the stability when in use, and strengthening the stability of the temporary isolation guardrail device for road construction when in use;

[0015] By providing a transparent plate and a reflective sticker, after removing the sealing cover on the top of the main pole, the reflective tube and the reflective sticker can be placed in the sealing cover. When the environment is dark, when the surrounding light shines through the transparent plate to the surface of the reflective sticker, the reflective sticker can reflect the light and reflect it out through the transparent plate, thereby helping to increase safety during use and enhancing the safety of the temporary isolation guardrail device for road construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a front view cross-sectional structural schematic diagram of the utility model;

[0017] Figure 2 It is a schematic diagram of the top view structure of the utility model;

[0018] Figure 3 This is a schematic diagram of the main rod cross-sectional structure in the front view of the utility model;

[0019] Figure 4 This is a schematic diagram of the cross-sectional structure of the base of the utility model;

[0020] Figure 5 It is a schematic diagram of the side cross-sectional structure of the side box of the present utility model.

[0021] In the figure: 1. base; 2. main pole; 3. side window; 4. transparent plate; 5. positioning rod; 6. reflective tube; 7. reflective sticker; 8. sealing cover; 9. side box; 10. counterweight cavity; 11. sewage outlet; 12. sewage outlet cap; 13. feeding port; 14. feeding cap; 15. first positioning axis; 16. first protective rod; 17. slide groove; 18. second positioning axis; 19. second protective rod; 20. locking ring. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-5 The utility model provides an embodiment: a temporary isolation guardrail device for road construction, comprising a base 1, a main pole 2 and a side box 9, the top of the base 1 is equipped with a main pole 2, the outer side wall of the main pole 2 is provided with side windows 3, four groups of side windows 3 are provided on the outer side wall of the main pole 2, the four groups of side windows 3 are symmetrically distributed, a transparent plate 4 is installed inside the side window 3, a positioning rod 5 is installed at the center position inside the main pole 2, a reflective tube 6 is arranged outside the positioning rod 5, the cross section of the reflective tube 6 is larger than the cross section of the positioning rod 5, the reflective tube 6 and the positioning rod 5 form a detachable structure, a reflective sticker 7 is arranged on the outer side wall of the reflective tube 6, a sealing cover 8 is arranged on the top of the main pole 2, the cross section of the bottom end of the sealing cover 8 is smaller than the cross section of the top end of the main pole 2, and the sealing cover 8 and the main pole 2 form a snap-fit ​​structure;

[0024] Specifically, Figure 1 , Figure 2 and Figure 3 As shown, when in use, the reflective tube 6 and the reflective sticker 7 are installed inside the main pole 2 for use. When external light passes through the transparent plate 4 and shines on the surface of the reflective sticker 7, the reflective sticker 7 can assist in reflecting the light;

[0025] A side box 9 is installed on one side of the base 1, a counterweight chamber 10 is arranged inside the base 1, a sewage outlet 11 is arranged on one side of the base 1, a sewage outlet cap 12 is arranged outside the sewage outlet 11, a feeding port 13 is arranged on one side of the top of the base 1, and a feeding cap 14 is arranged outside the feeding port 13;

[0026] Specifically, Figure 1 , Figure 2 and Figure 4As shown, when in use, after removing the feeding cap 14 on the top of the base 1, water or sand or other objects can be poured into the counterweight cavity 10 inside the base 1 through the feeding port 13 to increase the weight of the base 1 when in use;

[0027] A first positioning shaft 15 is installed at the top end of the side box 9, and a first protection rod 16 is movably installed on the outside of the first positioning shaft 15. A slide groove 17 is provided at the bottom ends of both ends of the side box 9. A second positioning shaft 18 is provided inside the slide groove 17. The cross section of the second positioning shaft 18 is smaller than the cross section of the slide groove 17. The second positioning shaft 18 and the slide groove 17 form a sliding structure. A second protection rod 19 is movably installed inside the side box 9 outside the second positioning shaft 18. A locking ring 20 is provided on the outside of the second positioning shaft 18. The inside of the locking ring 20 is provided with an internal thread. The surface of the second positioning shaft 18 is provided with an external thread. The locking ring 20 is connected to the second positioning shaft 18 through threads.

[0028] Specifically, Figure 1 , Figure 2 and Figure 5 As shown, when in use, after the locking ring 20 on the outside of the second positioning shaft 18 is loosened, the main rod 2 can be pulled to both sides, and the first protective rod 16 and the second protective rod 19 on the inside are crossed, which can assist in adjusting the overall length during use.

[0029] Working principle: When in use, loosen the locking ring 20 at the side end of the side box 9, manually pull the main rod 2 to both sides, and the first protective rod 16 and the second protective rod 19 on the inside are staggered to adjust the distance between the two groups of main rods 2 to achieve the adjustment of the overall length. After the adjustment is completed, tighten the locking ring 20 again to fix it. After that, remove the sealing cover 8 on the top of the main rod 2, put the reflective tube 6 and the reflective sticker 7 in it, and the surrounding light shines on the reflective sticker through the transparent plate 4 on the surface of the main rod 2 7, the reflective tape 7 can assist in reflecting the light and reflect it out through the transparent plate 4. Finally, the feeding cap 14 on the top of the base 1 can be removed, and fillers such as sand and water can be injected into the counterweight cavity 10 in the base 1 through the feeding port 13 to assist in increasing the weight of the base 1 and increase the stability during use. After use, the locking ring 20 can be loosened, and the two sets of main rods 2 can be approached to each other, so that the first protective rod 16 and the second protective rod 19 can be converged to assist in the storage of the device.

[0030] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. A temporary isolation guardrail device for road construction, comprising a base (1), a main pole (2) and a side box (9), characterized in that: A main rod (2) is installed at the top of the base (1), a side box (9) is installed on one side of the base (1), a first positioning shaft (15) is installed at the top of the inside of the side box (9), a first protective rod (16) is movably installed on the outside of the first positioning shaft (15), a slide groove (17) is provided at the bottom of both ends of the side box (9), a second positioning shaft (18) is provided inside the slide groove (17), a second protective rod (19) is movably installed inside the inside of the side box (9) outside the second positioning shaft (18), and a locking ring (20) is provided on the outside of the second positioning shaft (18).

2. A temporary isolation guardrail device for road construction according to claim 1, characterized in that: The outer wall of the main rod (2) is provided with a side window (3), a transparent plate (4) is installed inside the side window (3), a positioning rod (5) is installed at the center position inside the main rod (2), a reflective tube (6) is provided outside the positioning rod (5), a reflective sticker (7) is provided on the outer wall of the reflective tube (6), and a sealing cover (8) is provided at the top end of the main rod (2).

3. A temporary isolation guardrail device for road construction according to claim 2, characterized in that: Four groups of side windows (3) are arranged on the outer side wall of the main rod (2), and the four groups of side windows (3) are symmetrically distributed.

4. A temporary isolation guardrail device for road construction according to claim 2, characterized in that: The cross section of the reflective tube (6) is larger than the cross section of the positioning rod (5), and the reflective tube (6) and the positioning rod (5) form a detachable structure.

5. A temporary isolation guardrail device for road construction according to claim 2, characterized in that: The cross section of the bottom end of the sealing cover (8) is smaller than the cross section of the top end of the main rod (2), and the sealing cover (8) and the main rod (2) form a snap-fit ​​structure.

6. A temporary isolation guardrail device for road construction according to claim 1, characterized in that: A counterweight chamber (10) is provided inside the base (1), a sewage outlet (11) is provided on one side of the base (1), a sewage outlet cap (12) is provided on the outside of the sewage outlet (11), a feeding port (13) is provided on one side of the top of the base (1), and a feeding cap (14) is provided on the outside of the feeding port (13).

7. A temporary isolation guardrail device for road construction according to claim 1, characterized in that: The cross section of the second positioning shaft (18) is smaller than the cross section of the sliding groove (17), and the second positioning shaft (18) and the sliding groove (17) form a sliding structure.

8. A temporary isolation guardrail device for road construction according to claim 1, characterized in that: The interior of the locking ring (20) is provided with an internal thread, the surface of the second positioning shaft (18) is provided with an external thread, and the locking ring (20) and the second positioning shaft (18) are connected via threads.