Traction type drilling and blasting trolley

By designing a trailed drilling and explosion trolley, using the combination of the trolley owner's frame, walking system and traction equipment, the problems of inflexible movement and safety hazards of rollover of traditional drilling and explosion trolleys are solved, and a more efficient and safe underground hole room is achieved Excavation construction.

CN221942446UActive Publication Date: 2024-11-01中国水利水电第七工程局有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420117446.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-11-01
Estimated Expiration
2034-01-17

AI Technical Summary

Technical Problem

Traditional drilling and explosion trolleys are not flexible enough during the excavation of underground cave chambers, and there are safety risks of rollover when lifting the loader, especially when excavating large cave chambers, which is poor in versatility, making it difficult to ensure construction progress and safety.

Method used

A traction drilling and explosion trolley was designed, using the trolley owner frame, walking system and traction equipment. The walking system and traction equipment are connected through a wire rope to achieve horizontal movement and ensure the flexibility and safety of the trolley.

Benefits of technology

It improves the mobility efficiency and safety of drilling and explosion trolleys, reduces the requirements of mobile devices, reduces the risk of rollover, and ensures construction progress and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221942446U_ABST
    Figure CN221942446U_ABST
Patent Text Reader

Abstract

A traction type drilling and blasting trolley comprises a trolley main frame, a trolley platform, traction equipment and a walking system. The trolley main frame comprises a transverse frame and longitudinal beams, the transverse frame is arranged along the section of a tunnel and is provided with a plurality of trusses in parallel, the longitudinal beams are arranged in parallel in the length direction of the tunnel, the longitudinal beams are perpendicular to the transverse frame, and the transverse frame is welded and connected into a whole; a plurality of trolley platforms are evenly, symmetrically and fixedly arranged on the two sides of the trolley main frame. The walking system is installed at the bottom of the trolley main frame and firmly connected with longitudinal beams at the bottom of the trolley main frame, the walking system is composed of wheels, bearings and longitudinal main beams, and the wheels are installed at the bottom of the walking system and connected with the longitudinal main beams of the walking system; the traction equipment is independent of the trolley and connected with the walking system through a steel wire rope. Compared with a traditional drilling and blasting trolley, the traction type drilling and blasting trolley has the advantages that the walking efficiency is improved, the requirement for moving equipment is lowered, the construction progress is guaranteed, and the safety risk is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field:

[0001] The utility model belongs to the technical field of water conservancy and hydropower engineering, road engineering and municipal engineering construction, in particular to the technical field of underground cavern excavation, specifically, a traction-type drilling and blasting trolley. Background technology:

[0002] When the New Austrian Tunneling Method is used for underground cavern cyclic excavation construction, the drilling and blasting trolley needs to be moved for each cycle of drilling and blasting. Traditional drilling and blasting trolleys are generally lifted by a loader and then moved horizontally, which has poor versatility. In the case of large-scale cavern excavation, the drilling and blasting trolley has a large span and a high height, and a good balance position must be found to prevent the drilling and blasting trolley from tipping over. Summary of the invention:

[0003] The utility model provides a traction-type drilling and blasting trolley in view of the deficiencies in the prior art. The drilling and blasting trolley can move horizontally, thereby ensuring the flexible and safe movement of the drilling and blasting trolley.

[0004] In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions:

[0005] The utility model provides a traction-type drilling and blasting trolley, which comprises a trolley main frame, a trolley platform, a traction device and a walking system; the trolley main frame comprises a transverse frame and a longitudinal beam, the transverse frame is arranged along the cross section of a tunnel, a plurality of transverse frames are arranged in parallel along the length direction of the tunnel, a plurality of longitudinal beams are arranged in parallel along the length direction of the tunnel, each longitudinal beam is arranged vertically with the plurality of transverse frames, and the plurality of transverse frames are welded and connected into a whole; a plurality of trolley platforms are evenly and symmetrically fixedly arranged on both sides of the trolley main frame; the walking system is installed at the bottom of the trolley main frame and is firmly connected to the longitudinal beam at the bottom of the trolley main frame, the walking system is composed of wheels, bearings and longitudinal main beams, the wheels are symmetrically installed at the bottom of the walking system and are connected to the longitudinal main beams of the walking system; the traction device is independent of the trolley and is connected to the walking system by a steel wire rope.

[0006] The trolley main frame has four transverse frames arranged in parallel along the length direction of the tunnel, the four transverse frames are evenly spaced, the longitudinal beams are vertically arranged to the four transverse frames, and the four transverse frames are welded and connected into a whole.

[0007] The main frame of the trolley is made of steel, and Q235 steel is selected. The longitudinal beam of the main frame of the trolley is made of I-beam or channel steel, and the transverse frame is made of I-beam.

[0008] The trolley main frame adopts I20a I-beam.

[0009] The trolley platform is made of Q235 steel, and the trolley platform is rigidly connected to the trolley main frame.

[0010] The walking system is made of Q235 steel.

[0011] The longitudinal main beam of the walking system is made of double-jointed I20a I-beams.

[0012] The wheels are solid rubber wheels with a diameter of 500 mm, and four of them are symmetrically arranged.

[0013] The towable drilling and blasting trolley determines the size of the trolley main frame and the size of the trolley platform according to the different shapes of the cavern excavation, configures the wheels according to the weight of the trolley, and flexibly configures the walking system and traction equipment according to on-site needs.

[0014] Compared with the prior art, the utility model has the following beneficial effects:

[0015] 1. The bottom of the utility model is provided with a walking system, which is convenient to move and has low requirements on the traction moving equipment.

[0016] 2. The utility model is flexible, has high travel efficiency, and can stop at any time. The utility model is used for drilling and blasting construction, and the function of moving the drilling and blasting trolley is achieved through traction equipment, which solves the problem that the drilling and blasting trolley is not flexible enough and requires high mobile auxiliary equipment.

[0017] 3. The utility model eliminates safety risks such as rollover, and solves the potential safety hazard of rollover when the loader lifts the drilling and blasting trolley for horizontal movement.

[0018] In summary, compared with the traditional drilling and blasting trolley, the utility model improves the travel efficiency, reduces the requirements for mobile equipment, ensures the construction progress, and reduces the safety risks. Description of the drawings:

[0019] Figure 1 It is a structural front view of the utility model;

[0020] Figure 2 It is a structural side view of the utility model.

[0021] Reference numerals in the figures:

[0022] 1- trolley main frame, 2- wheels, 3- trolley platform, 4- traction equipment, 5- walking system. Specific implementation method:

[0023] The present invention is further described below in conjunction with specific implementation methods. The specific implementation methods are further descriptions of the principles of the present invention and do not limit the present invention in any way. Technologies identical or similar to the present invention do not exceed the scope of protection of the present invention.

[0024] See also Figure 1-Figure 2The utility model provides a traction-type drilling and blasting trolley, which includes a trolley main frame 1, a trolley platform 3, a traction device 4, and a walking system 5.

[0025] The trolley main frame 1 includes a transverse frame and a longitudinal beam; the transverse frame is arranged along the tunnel cross section and parallel to the tunnel length direction, and the four transverse frames are evenly spaced. Multiple longitudinal beams are arranged parallel to the tunnel length direction, and each longitudinal beam is arranged perpendicular to the four transverse frames, and the four transverse frames are welded and connected into a whole. The trolley main frame 1 adopts steel, and Q235 steel is selected. The longitudinal beam of the trolley main frame 1 adopts I-beam or channel steel, and the transverse frame adopts I-beam. According to the different sizes of cavern excavation and the weight of the trolley, the appropriate steel is selected to ensure the stability of the drilling and blasting trolley itself. In this embodiment, the trolley main frame 1 adopts I20a I-beam, and the size of the profile can be increased or decreased as appropriate according to the size / weight of the trolley.

[0026] A plurality of trolley platforms 3 are evenly and symmetrically fixedly arranged on both sides of the trolley main frame 1. The trolley platforms 3 are made of Q235 steel. The trolley platforms 3 are rigidly connected to the trolley main frame 1. The trolley platforms 3 are used by construction workers to perform drilling and blasting construction.

[0027] The walking system 5 is installed at the bottom of the trolley main frame 1 and is firmly connected to the longitudinal beam of the trolley main frame 1. Q235 steel is selected. The walking system 5 is composed of wheels 2, bearings, and longitudinal main beams. In this embodiment, the longitudinal main beam of the walking system 5 adopts double-pieced I20a I-beams. The wheels 2 are symmetrically installed at the bottom of the walking system 5 and connected to the longitudinal main beam of the walking system 5. The wheels 2 are solid rubber wheels with a diameter of 500mm and have sufficient bearing capacity. There are 4 wheels symmetrically arranged. The walking system 5 needs to have sufficient rigidity to bear the weight of the trolley and is combined with the wheels 2 to form a complete rolling walking system.

[0028] The traction device 4 is independent of the trolley and is connected to the traveling system 5 by a steel wire rope. The traction device 4 tows the trolley through the steel wire rope to provide a power source for the traveling of the traction-type drilling and blasting trolley.

[0029] The towable drilling and blasting trolley can determine the size of the trolley main frame 1 according to different shapes of cavern excavation, determine the size of the trolley platform 3 according to needs, configure wheels 2 according to the weight of the trolley, and flexibly configure the walking system 5 and the traction equipment 4 according to on-site needs.

[0030] The use of the traction drilling and blasting trolley is as follows:

[0031] Step 1: After the initial support of underground cavern cyclic excavation is completed, the traction drilling and blasting trolley is put into place.

[0032] Step 2: The construction workers stand on the trolley platform 3 to perform hole making operations, charge charging and connection, and the process is completed.

[0033] Step 3: The traction device 4 is in place, and the traction device 4 is connected to the traction-type drilling and blasting trolley.

[0034] Step 4: Start the traction device 4, and the traction-type drilling and blasting trolley moves away from the excavation and blasting working face.

[0035] Step 5: Blasting and clearing of slag, the traction drilling and blasting trolley is put into place again for initial support construction.

[0036] During use, the trolley main frame 1 and the trolley platform 3 need to be determined by calculation to ensure that the trolley main frame 1 and the trolley platform 3 have sufficient bearing capacity and match the size of the cave excavation. The walking system 5 and the wheels 2 need to be determined by calculation to ensure that the wheel pressure and the bearing capacity of the walking system 5 can withstand the deadweight and construction load of the towed drilling and blasting trolley. When the towed drilling and blasting trolley is traveling, the travel speed is appropriately reduced, which can be determined through experiments. Too fast a travel speed may cause unnecessary safety hazards.

Claims

1. A traction-type drilling and blasting trolley, characterized by: The drilling and blasting trolley comprises a trolley main frame (1), a trolley platform (3), a traction device (4), and a traveling system (5); the trolley main frame (1) comprises a transverse frame and a longitudinal beam, wherein the transverse frame is arranged along the tunnel cross section and four transverse frames are arranged in parallel along the tunnel length direction, the four transverse frames are evenly spaced, a plurality of longitudinal beams are arranged in parallel along the tunnel length direction, each longitudinal beam is arranged perpendicularly to the four transverse frames, and the four transverse frames are welded and connected to form a whole; a plurality of trolley platforms (3) are evenly and symmetrically fixedly arranged on both sides of the trolley main frame (1), and the trolley platforms (3) are rigidly connected to the trolley main frame (1); the trolley main frame (1), the trolley platform (3), and the traveling system (5) are all made of Q 235 steel, the longitudinal beam of the trolley main frame (1) is made of I20a I-beam or channel steel, and the transverse frame is made of I20a I-beam; the walking system (5) is installed at the bottom of the trolley main frame (1) and is firmly connected to the longitudinal beam at the bottom of the trolley main frame (1); the walking system (5) is composed of wheels (2), bearings, and longitudinal main beams; the wheels (2) are symmetrically installed at the bottom of the walking system (5) and connected to the longitudinal main beam of the walking system (5); the longitudinal main beam is made of double-piece I20a I-beams; the wheels (2) are solid rubber wheels with a diameter of 500 mm, and four of them are symmetrically arranged; the traction device (4) is independent of the trolley and is connected to the walking system (5) by steel wire ropes.