Pipe-jacking construction slag transporting vehicle

By using a screw lifting mechanism to adjust the wheel camber angle in the pipe hoisting slag truck, the problem of traditional slag trucks adapting to different pipe shapes and tracks is solved, efficient and safe slag transportation is achieved, and construction costs are reduced .

CN221942447UActive Publication Date: 2024-11-01CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420474188.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-12
Publication Date
2024-11-01
Estimated Expiration
2034-03-12

AI Technical Summary

Technical Problem

During pipe hoisting construction, traditional slag trucks are difficult to adapt to pipes of different shapes, resulting in low transportation efficiency. The installation of traditional rail slag trucks is time-consuming and labor-intensive, easy to damage, affecting construction progress and safety.

Method used

A pipe hoisting construction slag truck was designed, and the screw lifting mechanism was used to adjust the slop angle of the wheel to ensure that the tires were in close contact with the pipe wall. Combined with the structure of the frame unit and the slag transport bucket, avoiding track installation and improving flexibility. Sex and durability.

Benefits of technology

It improves transportation efficiency, reduces the resistance and overturning risks during the slag transportation process, reduces construction costs, and enhances construction safety and equipment durability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221942447U_ABST
    Figure CN221942447U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of building construction, and particularly relates to a pipe jacking construction slag transporting vehicle which comprises a slag transporting hopper and a vehicle frame unit arranged below the slag transporting hopper. The frame unit comprises a frame body and wheel lifting units symmetrically arranged on the front side and the rear side of the muck conveying hopper and arranged on the frame body. The wheel lifting unit comprises a screw rod, a central buckle connected with the bottom of the screw rod, bearings symmetrically hinged to the two sides of the central buckle, and positioning wheels connected with the bearings; the bearing is connected with the frame body through buckles at the two ends; the two-end buckles comprise connecting clamping blocks connected with the wheel body and connecting shafts arranged in the connecting clamping blocks. A sliding groove is formed in the bearing; the connecting shaft is arranged in the sliding groove. Compared with a traditional track-free slag transporting vehicle, the pipe jacking construction slag transporting vehicle has the advantages of being convenient to operate, safe in slag transporting in a pipeline, simple in structure, easy to operate and use, high in efficiency and low in cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of building construction, and in particular relates to a slag transport vehicle for pipe jacking construction. Background Art

[0002] With the increasing number of pipe jacking construction in urban road projects, higher requirements have been put forward for how to reduce the impact of underground pipe jacking projects on road traffic, surrounding structures and surrounding residents during construction. In order to minimize the impact on the ground environment, trenchless construction technology has received more and more attention in the laying and transformation of underground pipelines. As a trenchless technology, the pipe jacking construction technology adopted in recent years has been widely used in urban road pipeline transformation projects, but the following problems have arisen during the construction process; First: During the construction process of the pipe jacking, as the pipe jacking continues to lengthen, it is very difficult to use manual labor to slag out. How to conveniently transport soil slag in the pipeline and improve work efficiency is a difficult point for construction personnel to discuss. Second: Due to the different shapes of pipelines, it is necessary to make the slag truck meet the slag discharge requirements of pipelines of various shapes. At present, there is no slag truck that can adapt to various pipeline shapes, resulting in low construction efficiency and affecting the construction progress. Third: Guide rails are laid in pipelines, and battery vehicles are used to pull rail-mounted slag transport vehicles to remove slag. Not only is the installation and removal of the guide rails time-consuming and labor-intensive, but the guide rails are also prone to deformation and weld cracking due to long-term loads during use, thus affecting normal slag transportation. Utility Model Content

[0003] The utility model aims to overcome the defects in the prior art and provide a multifunctional slag transport vehicle.

[0004] In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions:

[0005] A slag transport vehicle for pipe jacking construction, comprising a slag transport bucket and a frame unit arranged below the slag transport bucket; the frame unit comprises a frame body and a wheel lifting unit symmetrically arranged at the front and rear sides of the slag transport bucket and arranged on the frame body;

[0006] The wheel lifting unit comprises a screw rod, a center buckle connected to the bottom of the screw rod, bearings symmetrically hinged on both sides of the center buckle, and a positioning wheel connected to the bearing;

[0007] The bearing is connected to the frame body through buckles at both ends; the buckles at both ends include a connecting block connected to the wheel body and a connecting shaft arranged in the connecting block; a slide groove is arranged on the bearing; and the connecting shaft is arranged in the slide groove.

[0008] The wheel body comprises two parallel load-bearing beams, a structural beam connecting the front and rear sides and the middle of the load-bearing beams, a connecting beam connecting the slag bucket, and a mounting beam for mounting the screw rod.

[0009] The screw rod is connected to the mounting beam; a rotating disk is arranged on the screw rod.

[0010] The slag bucket is connected to the frame body through an L-shaped card; one end of the L-shaped card is connected to the slag bucket; the other end is connected to the frame body; the end connected to the frame body is connected to the frame body through a positioning pin.

[0011] There are two L-shaped cards, which are symmetrically arranged on the front and rear sides of the slag bucket.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] The utility model of the slag truck for pipe jacking construction adjusts the camber angle of the directional wheel by lifting the screw rod, so that the directional wheel is in full vertical contact with the pipe wall, reducing the resistance during operation and the overturning of the slag truck during operation. It can adapt to the construction of pipelines of different shapes. It solves the shortcomings of traditional slag trucks that are time-consuming and labor-intensive to operate and easy to overturn; it does not need to pre-install tracks in the pipeline, effectively solves the shortcomings of the track slag truck that is easy to wear, and improves work efficiency; compared with traditional trackless slag trucks, the utility model of the slag truck for pipe jacking construction has the advantages of convenient operation, safe slag transportation in pipelines, simple structure, easy operation and use, high efficiency and low cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a schematic diagram of the overall structure of the utility model slag transport vehicle for pipe jacking construction;

[0015] Figure 2 It is a left side cross-sectional schematic diagram of the utility model slag transport vehicle for pipe jacking construction;

[0016] Figure 3 It is a front side cross-sectional schematic diagram of the utility model of the slag transport vehicle for pipe jacking construction;

[0017] Figure 4 It is a top view cross-sectional schematic diagram of the utility model of the slag transport vehicle for pipe jacking construction;

[0018] Figure 5 It is a schematic diagram of the working inside a circular pipe of the slag transport vehicle for pipe jacking construction of the utility model;

[0019] Figure 6 It is a schematic diagram of the working inside a rectangular pipe of the slag transport vehicle for pipe jacking construction of the utility model;

[0020] In the figure: a slag bucket 1, a screw 2, a center buckle 3, a bearing 4, a positioning wheel 5, buckles at both ends 6, a connecting block 61, a connecting shaft 62, a slide 41, a load-bearing beam 7, a structural beam 8, a turntable 9, an L-shaped card 10, a positioning pin 11, and a jacking pipe 12. DETAILED DESCRIPTION

[0021] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and the best embodiment.

[0022] Figure 1-4 A slag transport vehicle for pipe jacking construction is shown, comprising a slag transport bucket 1 and a frame unit arranged below the slag transport bucket; the frame unit comprises a frame body and a wheel lifting unit symmetrically arranged at the front and rear sides of the slag transport bucket and arranged on the frame body;

[0023] The wheel lifting unit comprises a screw 2, a center buckle 3 connected to the bottom of the screw, bearings 4 symmetrically hinged on both sides of the center buckle, and a positioning wheel 5 connected to the bearing;

[0024] The bearing is connected to the frame body through the clips 6 at both ends; the clips at both ends include a connecting block 61 connected to the wheel body and a connecting shaft 62 arranged in the connecting block; a slide groove 41 is arranged on the bearing; and the connecting shaft 62 is arranged in the slide groove 41.

[0025] The wheel body comprises two parallel load-bearing beams 7, a structural beam 8 connecting the front and rear sides and the middle of the load-bearing beams, a connecting beam connecting the slag bucket, and a mounting beam for mounting the screw rod.

[0026] The screw rod 2 is connected to the mounting beam; a turntable 9 is arranged on the screw rod 2 .

[0027] The slag bucket 1 is connected to the vehicle frame body through an L-shaped card 10; one end of the L-shaped card is connected to the slag bucket; the other end is connected to the vehicle frame body; the end connected to the vehicle frame body is connected to the vehicle frame body through a positioning pin 11. There are two L-shaped cards 10, which are symmetrically arranged on the front and rear sides of the slag bucket.

[0028] Figure 5 It is a schematic diagram of the working inside a circular pipe of the slag transport vehicle for pipe jacking construction of the utility model; Figure 6 It is a schematic diagram of the working inside a rectangular pipe of the slag transport vehicle for pipe jacking construction of the utility model;

[0029] It can be seen from its schematic diagram and working schematic diagram that the utility model of the slag truck for pipe jacking construction adjusts the camber angle of the directional wheel by lifting the screw rod, so that the directional wheel is in full vertical contact with the pipe wall, reducing the resistance during operation and the overturning of the slag truck during operation. To adapt to the construction of pipelines of different shapes. It solves the shortcomings of traditional slag trucks that are time-consuming and labor-intensive to operate and easy to overturn; there is no need to pre-install tracks in the pipeline, which effectively solves the shortcomings of the track slag truck that is easy to wear and improves work efficiency; compared with traditional trackless slag trucks, the utility model of the slag truck for pipe jacking construction has the advantages of convenient operation, safe slag transportation in pipelines, simple structure, easy operation and use, high efficiency and low cost.

[0030] The above contents are only preferred embodiments of the present invention. For ordinary technicians in this field, according to the concept of the present invention, there will be changes in the specific implementation methods and application scopes. The contents of this specification should not be understood as limiting the present invention.

Claims

1. A slag transport vehicle for pipe jacking construction, characterized in that: It comprises a slag bucket and a frame unit arranged below the slag bucket; the frame unit comprises a frame body and a wheel lifting unit symmetrically arranged at the front and rear sides of the slag bucket and arranged on the frame body; The wheel lifting unit comprises a screw rod, a center buckle connected to the bottom of the screw rod, bearings symmetrically hinged on both sides of the center buckle, and a positioning wheel connected to the bearing; The bearing is connected to the frame body through buckles at both ends; the buckles at both ends include a connecting block connected to the frame body and a connecting shaft arranged in the connecting block; a slide groove is arranged on the bearing; and the connecting shaft is arranged in the slide groove.

2. The slag transport vehicle for pipe jacking construction according to claim 1, characterized in that: The frame body comprises two parallel load-bearing beams, a structural beam connecting the front and rear sides and the middle of the load-bearing beams, a connecting beam connecting the slag bucket, and a mounting beam for mounting the screw rod.

3. The slag transport vehicle for pipe jacking construction according to claim 2, characterized in that: The screw rod is connected to the mounting beam; a rotating disk is arranged on the screw rod.

4. The slag transport vehicle for pipe jacking construction according to claim 1, characterized in that: The slag bucket is connected to the frame body through an L-shaped card; one end of the L-shaped card is connected to the slag bucket; the other end is connected to the frame body; the end connected to the frame body is connected to the frame body through a positioning pin.

5. The slag transport vehicle for pipe jacking construction according to claim 4, characterized in that: There are two L-shaped cards, which are symmetrically arranged on the front and rear sides of the slag bucket.