Prefabricated assembly type double-layer reinforcing mesh device for tunnel

By using prefabricated and assembled double-layer steel mesh device in tunnel construction, the design of mutual anchor fixing components and fixing ribs is solved, the problem of time-consuming and labor-intensive manual binding is achieved, mechanized construction and adapting to the needs of different types of tunnels, and improving the Construction efficiency and safety.

CN221942452UActive Publication Date: 2024-11-01CHINA COMMUNICATIONS CONSTRUCTION +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420257355.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-02
Publication Date
2024-11-01
Estimated Expiration
2034-02-02

Smart Images

  • Figure CN221942452U_ABST
    Figure CN221942452U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of prefabricated assembly type double-layer reinforcing mesh mechanical construction, and discloses a tunnel prefabricated assembly type double-layer reinforcing mesh device which comprises a prefabricated assembly type double-layer reinforcing mesh. According to the tunnel prefabricated assembly type double-layer reinforcing mesh device, through the arrangement of the mutual anchoring fixing assemblies, the stress ribs and the fixing ribs, in the tunnel construction period, a prefabricated assembly type double-layer reinforcing mesh needs to be used as a main construction means of a reinforcing steel bar project; a rectangular overlapping area is formed by the fixing rib and one end of the longitudinally distributed rectangular rib when the fixing rib penetrates through the interior of the prefabricated assembly type double-layer reinforcing mesh, so that the two sections of the prefabricated assembly type double-layer reinforcing mesh are mutually anchored and fixed, and then the effect of one-time mechanical construction of the tunnel double-layer reinforcing mesh is achieved; therefore, the effect that hoisting equipment of any model and tunnels of any unconventional section size can be matched by adjusting different longitudinal lengths and different section sizes of the prefabricated assembly type double-layer reinforcing mesh is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of mechanized construction of prefabricated assembled double-layer steel mesh, in particular to a tunnel prefabricated assembled double-layer steel mesh device. Background Art

[0002] With the full construction of high-speed railway projects, urban rail projects, intercity railway projects and urban rail transit projects, underground tunnel crossing construction projects have developed rapidly. During the construction period, the reinforcement engineering in the tunnel project is crucial. Most of the reinforcement engineering is manual binding and installation of steel bars to form steel mesh.

[0003] The prefabricated steel mesh disclosed in the publication number CN206319489U can greatly improve the structural performance and increase the stability of its structural performance after the entire steel mesh is cast into one with the concrete structure, thereby being able to meet the architectural design of high-load and high-safety factor structures, improving and accelerating the development of the industry.

[0004] However, the prefabricated steel mesh has the following disadvantages:

[0005] (1) Manual binding, installation, splicing and assembly are time-consuming and labor-intensive, resulting in high labor costs, extended or even uncontrollable construction period, complex on-site working environment and unguaranteed safety of construction. Utility Model Content

[0006] The technical problem solved by the utility model is to provide a tunnel prefabricated assembled double-layer steel mesh device which is highly practical, can be simply operated and has a relatively simple structure, thus solving the time-consuming and labor-intensive problems of manual binding, installation, splicing and assembly proposed in the above-mentioned background technology.

[0007] To achieve the above objectives, the utility model is implemented through the following technical solutions: a tunnel prefabricated assembled double-layer steel mesh device, including a prefabricated assembled double-layer steel mesh, the prefabricated assembled double-layer steel mesh is divided into an inner layer and an outer layer, and both the inner layer and the outer layer are provided with stress-bearing bars, and the stress-bearing bars are distributed in an inner and outer double-layer annular distribution, and one end of the prefabricated assembled double-layer steel mesh is provided with an inter-anchor fixing component for connection and fixing.

[0008] Optionally, the mutual anchoring fixing assembly includes a fixing rib arranged at one end of the prefabricated assembled double-layer steel mesh, and the surface of the fixing rib penetrates and is connected to the interior of the prefabricated assembled double-layer steel mesh composed of an inner layer and an outer layer.

[0009] Optionally, rectangular ribs are sleeved on the outer surface of the stress-bearing ribs, and the rectangular ribs are longitudinally distributed and simultaneously sleeve and fix the stress-bearing ribs arranged on the inner layer and the outer layer.

[0010] Optionally, the fixed rib forms a rectangular overlapping area with one end of the longitudinally distributed rectangular rib when penetrating the interior of the prefabricated assembled double-layer steel mesh.

[0011] Optionally, the stress-bearing bars are distributed in a straight line array from left to right at equal intervals, and the rectangular bars are distributed longitudinally and sleeved on the surface of the stress-bearing bars.

[0012] Optionally, the fixing ribs are distributed in a circumferential direction, and there are four fixing ribs, which simultaneously penetrate the interior of one end of the prefabricated assembled double-layer steel mesh.

[0013] The utility model provides a tunnel prefabricated double-layer steel mesh device, which has the following beneficial effects:

[0014] 1. The prefabricated and assembled double-layer steel mesh device for the tunnel, through the setting of mutual anchoring fixing components, force bars and fixed bars, needs to use the prefabricated and assembled double-layer steel mesh as the main construction means of the steel bar project during the tunnel construction, and the fixed bars form a rectangular overlapping area with one end of the longitudinally distributed rectangular bars when penetrating the interior of the prefabricated and assembled double-layer steel mesh, so that the two sections of the prefabricated and assembled double-layer steel mesh are mutually anchored and fixed, thereby achieving the effect of one-time mechanized construction of the double-layer steel mesh for the tunnel, thereby achieving the effect of matching any type of lifting equipment and any unconventional cross-sectional size tunnel by adjusting the different longitudinal lengths and different cross-sectional sizes of the prefabricated and assembled double-layer steel mesh. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0016] Figure 2 This is a schematic diagram of the force-bearing reinforcement structure of the utility model;

[0017] Figure 3 This is a schematic diagram of the rectangular overlapping area structure of the utility model;

[0018] Figure 4 This is a schematic diagram of the rectangular rib structure of the utility model;

[0019] Figure 5 This is a schematic diagram of the fixed rib structure of the utility model.

[0020] In the figure: 1. Prefabricated and assembled double-layer steel mesh; 2. Mutually anchored fixing components; 3. Rectangular reinforcement; 4. Stress-bearing reinforcement; 5. Fixing reinforcement; 6. Rectangular overlapping area. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figures 1 to 5 The utility model provides a technical solution: a prefabricated assembled double-layer steel mesh device for a tunnel, comprising a prefabricated assembled double-layer steel mesh 1, the prefabricated assembled double-layer steel mesh 1 is divided into an inner layer and an outer layer, and both the inner layer and the outer layer are provided with stress-bearing bars 4, and the stress-bearing bars 4 are distributed in an inner and outer double-layer annular direction, and one end of the prefabricated assembled double-layer steel mesh 1 is provided with an inter-anchor fixing component 2 for connection and fixing.

[0023] See also Figure 1 The force-bearing bars 4 are distributed in a straight line array from left to right with equal spacing, and the rectangular bars 3 are distributed longitudinally and sleeved on the surface of the force-bearing bars 4.

[0024] See also Figure 5 The outer surface of the stress-bearing reinforcement 4 is sleeved with a rectangular reinforcement 3, which is longitudinally distributed and simultaneously sleeves and fixes the stress-bearing reinforcement 4 arranged on the inner layer and the outer layer.

[0025] By setting the rectangular ribs 3, since the rectangular ribs 3 are longitudinally distributed and simultaneously sleeve and fix the stress-bearing ribs 4 set in the inner layer and the outer layer, the stress-bearing ribs 4 can be firmly sleeved and fixed, thereby improving the overall firmness of the device.

[0026] See also Figure 3 When the fixing rib 5 penetrates the interior of the prefabricated assembled double-layer steel mesh 1 , it forms a rectangular overlapping area 6 with one end of the longitudinally distributed rectangular rib 3 .

[0027] See also Figure 2 The fixing ribs 5 are distributed in a circumferential direction, and there are four fixing ribs 5 , which simultaneously penetrate the interior of one end of the prefabricated assembled double-layer steel mesh 1 .

[0028] Embodiment 1:

[0029] See also Figure 2 , Figure 3 and Figure 5The mutually anchoring fixing component 2 includes a fixing rib 5 arranged at one end of the prefabricated assembled double-layer steel mesh 1, and the surface of the fixing rib 5 penetrates and is connected to the interior of the prefabricated assembled double-layer steel mesh 1 composed of an inner layer and an outer layer. When the fixing rib 5 penetrates the interior of the prefabricated assembled double-layer steel mesh 1, it forms a rectangular overlapping area 6 with one end of the longitudinally distributed rectangular rib 3. The fixing rib 5 is distributed in an annular direction, and the number of the fixing ribs 5 is four, and they penetrate the interior of one end of the prefabricated assembled double-layer steel mesh 1 at the same time. During the tunnel construction, the prefabricated assembled double-layer steel mesh 1 needs to be used as the main construction means of the steel bar project, and the fixing rib 5 forms a rectangular overlapping area 6 with one end of the longitudinally distributed rectangular rib 3 when penetrating the interior of the prefabricated assembled double-layer steel mesh 1, so that the two sections of the prefabricated assembled double-layer steel mesh 1 are mutually anchored and fixed, thereby achieving the effect of one-time mechanized construction of the tunnel double-layer steel mesh, thereby achieving the effect of matching any type of lifting equipment and any unconventional cross-sectional size tunnel by adjusting the different longitudinal lengths and different cross-sectional sizes of the prefabricated assembled double-layer steel mesh 1.

[0030] In the utility model, the working steps of the device are as follows:

[0031] The first step: During the tunnel construction, the prefabricated assembled double-layer steel mesh 1 is used as the main construction method of the steel reinforcement project, and the fixed ribs 5 are passed through the interior of the prefabricated assembled double-layer steel mesh 1 to form a rectangular overlapping area 6 with one end of the longitudinally distributed rectangular ribs 3, so that the two sections of the prefabricated assembled double-layer steel mesh 1 are anchored to each other, thereby achieving the effect of one-time mechanized construction of the tunnel double-layer steel mesh.

[0032] It should be noted that the equipment structure and drawings of the utility model mainly describe the principle of the utility model. In terms of the technology of the design principle, the settings of the power mechanism, power supply system and control system of the device are not fully described. On the premise that the technical personnel in this field understand the principle of the above utility model, the details of the power mechanism, power supply system and control system can be clearly known. The control method of the application document is automatic control through a controller, and the control circuit of the controller can be realized by simple programming by the technical personnel in this field;

[0033] The standard parts used therein can all be purchased from the market and can be customized according to the instructions and drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt conventional models in the prior art, and the structures and principles of the components known to technical personnel in this field can be known by these technical personnel through technical manuals or through conventional experimental methods.

[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A tunnel prefabricated double-layer steel mesh device, comprising a prefabricated double-layer steel mesh (1), characterized in that: The prefabricated assembled double-layer steel mesh (1) is divided into an inner layer and an outer layer, and both the inner layer and the outer layer are provided with stress-bearing bars (4), and the stress-bearing bars (4) are distributed in an inner and outer double-layer annular direction. One end of the prefabricated assembled double-layer steel mesh (1) is provided with an inter-anchor fixing component (2) for connection and fixing.

2. A tunnel prefabricated double-layer steel mesh device according to claim 1, characterized in that: The mutually anchoring fixing assembly (2) comprises a fixing rib (5) arranged at one end of the prefabricated assembled double-layer steel mesh (1), and the surface of the fixing rib (5) penetrates and is connected to the interior of the prefabricated assembled double-layer steel mesh (1) composed of an inner layer and an outer layer.

3. A tunnel prefabricated double-layer steel mesh device according to claim 1, characterized in that: The outer surface of the stress-bearing ribs (4) is sleeved with rectangular ribs (3), and the rectangular ribs (3) are longitudinally distributed and simultaneously sleeved and fixed to the stress-bearing ribs (4) arranged on the inner layer and the outer layer.

4. A tunnel prefabricated double-layer steel mesh device according to claim 2, characterized in that: When the fixing rib (5) penetrates the interior of the prefabricated assembled double-layer steel mesh (1), it forms a rectangular overlapping area (6) with one end of the longitudinally distributed rectangular rib (3).

5. The tunnel prefabricated double-layer steel mesh device according to claim 3, characterized in that: The force-bearing ribs (4) are distributed in a straight line array at equal intervals from left to right, and the rectangular ribs (3) are distributed longitudinally and sleeved on the surface of the force-bearing ribs (4).

6. A tunnel prefabricated double-layer steel mesh device according to claim 2, characterized in that: The fixing ribs (5) are distributed in a circumferential direction, and there are four fixing ribs (5) which simultaneously penetrate the interior of one end of the prefabricated assembled double-layer steel mesh (1).