Integrated trolley for tunnel construction
By designing an integrated trolley, the problem of steel bar binding and second lining casting cannot be carried out simultaneously in tunnel construction, zero process connection is achieved, construction efficiency is improved and the risks of high-altitude operations are reduced.
Patent Information
- Application Number
- CN202420690804.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-07
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-04-07
AI Technical Summary
During tunnel construction, the disconnection space between the steel bar binding trolley and the second lining trolley causes the steel bar binding and the second lining pouring to be unable to be carried out simultaneously, affecting construction efficiency and increasing the safety risks of high-altitude operations.
An integrated trolley was designed, including formwork, pouring system and work platform. The formwork and pouring system were connected to each other. The trolley skeleton was located below the working platform, allowing steel bar binding and two-lined concrete pouring on one platform to realize the process. Zero connection.
The synchronous construction of steel bar binding and second-lined concrete pouring is realized, which reduces the connection time between processes, improves construction efficiency, reduces the risk of high-altitude operations, and saves the use time and space of the tooling.
Smart Images

Figure CN221942459U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction, and in particular to an integrated trolley for tunnel construction. Background Art
[0002] At present, the conventional configuration of the tunnel lining construction process is waterproof board hanging trolley, steel bar binding trolley and secondary lining trolley. There is some disconnected space between the trolleys, and they cannot be completely connected, which indirectly leads to the inability to achieve seamless connection between the various processes, increases the process time, and affects the construction efficiency. In particular, the disconnected space between the steel bar binding trolley and the secondary lining trolley leads to the inability to carry out the steel bar binding construction and the secondary lining pouring construction at the same time, and it is impossible to achieve 100% streamlined operation. At the same time, too many construction trolleys also increase the safety risks of high-altitude operations.
[0003] The safe step distance in tunnel construction is an important factor affecting the excavation of the face. Therefore, speeding up the lining construction is a necessary measure to ensure the normal excavation of the face. To speed up the lining construction, it is necessary to optimize the various processes of the lining construction. Among them, the most influential is the process connection problem between the lining reinforcement and the lining pouring construction. At present, there is a disconnected space between the conventionally configured rebar binding trolley and the secondary lining trolley due to the platform at the end of the trolley, which makes it impossible to carry out the rebar binding construction and the secondary lining pouring construction at the same time, affecting the construction efficiency. Therefore, it is of great significance for the present application to provide an integrated trolley for tunnel construction that can improve the on-site construction efficiency and can simultaneously carry out the rebar binding and the secondary lining concrete pouring. Utility Model Content
[0004] In view of the deficiencies in the prior art, the purpose of the present invention is to solve one or more problems in the prior art. For example, one of the purposes of the present invention is to provide an integrated trolley for tunnel construction that can improve on-site construction efficiency and can simultaneously perform steel bar binding and secondary lining concrete pouring.
[0005] In order to achieve the above-mentioned purpose, the utility model provides an integrated trolley for tunnel construction, which may include: a template, a casting system, a working platform and a trolley frame, wherein the template includes an arch template arranged above the working platform and side templates arranged on both sides of the trolley frame, and the arch template and the side template are connected to each other; the casting system includes a plurality of branch pipe assemblies, which are respectively arranged on both sides of the trolley frame; one end of the working platform is used for steel bar binding construction, and the other end is used for casting construction; the trolley frame is located under the working platform.
[0006] According to one or more exemplary embodiments of the present invention, a plurality of pouring openings may be provided on the side formwork to pour secondary lining concrete.
[0007] According to one or more exemplary embodiments of the present invention, the plurality of branch pipe assemblies may correspond one to one to the plurality of pouring ports.
[0008] According to one or more exemplary embodiments of the present utility model, the trolley frame may include a plurality of vertical braces, diagonal braces and transverse braces, wherein the transverse brace passes through an intersection between every two diagonal braces, and a transverse brace is disposed between every two vertical braces.
[0009] According to one or more exemplary embodiments of the present utility model, the trolley frame may further include two longitudinal beams arranged in parallel, and the longitudinal beams are located below the vertical support.
[0010] According to one or more exemplary embodiments of the present utility model, the trolley frame may further include two rows of legs arranged below the longitudinal beam, and each row of legs is arranged at intervals and plays a supporting role.
[0011] According to one or more exemplary embodiments of the present invention, ladders may be provided at both ends of the working platform.
[0012] According to one or more exemplary embodiments of the present utility model, the integrated trolley may further include a walking system, and the walking system is arranged at both ends of the bottom of the integrated trolley to move the trolley.
[0013] According to one or more exemplary embodiments of the present invention, the length of the integrated trolley is 6 to 12 meters.
[0014] According to one or more exemplary embodiments of the present invention, the number of the pouring ports may include 6, 8 or 10.
[0015] Compared with the prior art, the beneficial effects of the present invention include at least one of the following:
[0016] (1) The integrated trolley for tunnel construction provided by the utility model realizes that the steel bar binding and the secondary lining concrete pouring share a platform, with a large operating space, and can achieve full coverage of the secondary lining concrete pouring section and the steel bar binding section without the need for frequent movement of the trolley.
[0017] (2) The utility model provides an integrated trolley for tunnel construction with zero connection between the working procedures. The steel bar binding construction at the front end of the trolley and the mold closing and secondary lining concrete pouring of the rear end of the trolley can be carried out simultaneously. When the steel bar binding at the front end is completed, the rear end trolley can basically reach the demolding and walking conditions at the same time. The integrated trolley moves to the next section for construction, realizing zero connection between the steel bar and the secondary lining construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The above and other objects and / or features of the present invention will become more apparent through the following description in conjunction with the accompanying drawings, in which:
[0019] Figure 1 A schematic cross-sectional structure diagram of an integrated trolley for tunnel construction in an exemplary embodiment of the utility model is shown;
[0020] Figure 2 A schematic side structural diagram of an integrated trolley for tunnel construction in an exemplary embodiment of the utility model is shown.
[0021] Description of reference numerals:
[0022] 1-formwork, 11-arch formwork, 12-side formwork, 2-casting system, 21-branch pipe assembly, 3-working platform, 4-trolley frame, 41-vertical support, 42-diagonal support, 43-horizontal support, 44-longitudinal beam, 45-leg, 5-casting port, 6-ladder, 7-walking system. DETAILED DESCRIPTION
[0023] Hereinafter, an integrated trolley for tunnel construction of the present invention will be described in detail with reference to the accompanying drawings and exemplary embodiments.
[0024] The utility model provides an integrated trolley for tunnel construction that can be used to simultaneously perform the lining reinforcement binding construction of the next section when the tunnel secondary lining is poured. The front end of the trolley is used for reinforcement binding, and the rear end is used for secondary lining pouring, thereby avoiding the time waste caused by waiting for the secondary lining trolley to be demoulded to meet the space required for the lining reinforcement binding of the next section. The tunnel lining structure can be 6m / plate, and the tunnel secondary lining pouring and lining reinforcement trolley can be set as an integrated trolley of 12m in length, so that the lining reinforcement of the next section can be constructed simultaneously when the concrete is poured for the secondary lining of one section. The front 6m of the integrated trolley is a reinforcement binding platform, and the rear 6m is a secondary lining template trolley, and the two platforms share a trolley frame.
[0025] Exemplary Embodiment 1
[0026] Figure 1 A schematic cross-sectional structure diagram of an integrated trolley for tunnel construction in an exemplary embodiment of the utility model is shown; Figure 2 A schematic side structural diagram of an integrated trolley for tunnel construction in an exemplary embodiment of the utility model is shown.
[0027] The present exemplary embodiment provides an integrated trolley for tunnel construction.
[0028] like Figure 1 to Figure 2 As shown in , the integrated trolley for tunnel construction mainly includes: a template 1, a casting system 2, a working platform 3 and a trolley frame 4.
[0029] Among them, the template 1 may include an arch template 11 arranged above the working platform 3 and a side template 12 arranged on both sides of the trolley frame 4, and the arch template 11 and the side template 12 are connected to each other. The casting system 2 may include a plurality of branch pipe assemblies 21, which are respectively arranged on both sides of the trolley frame 4. One end of the working platform 3 is used for steel bar binding construction, and the other end is used for casting construction. The trolley frame 4 is located under the working platform 3.
[0030] In this exemplary embodiment, a plurality of pouring ports 5 may be provided on the side formwork 12 to pour the secondary lining concrete. A plurality of branch pipe assemblies 21 may correspond to a plurality of pouring ports 5 one by one for pouring. The number of pouring ports may include 6, 8 or 10.
[0031] In this exemplary embodiment, the trolley frame 4 may include a plurality of vertical supports 41, diagonal supports 42 and transverse supports 43, wherein the transverse supports 43 pass through the intersection between every two diagonal supports 42, and a transverse support 43 is arranged between every two vertical supports 41. The trolley frame 4 may also include two longitudinal beams 44 arranged in parallel, and the longitudinal beams 44 are located below the vertical supports 41. The trolley frame 4 may also include two rows of legs 45 arranged below the longitudinal beams 44, and each row of legs is arranged at intervals and plays a supporting role.
[0032] In this exemplary embodiment, ladders 6 may be provided at both ends of the working platform to facilitate operation by personnel.
[0033] In this exemplary embodiment, the integrated trolley for tunnel construction may further include a travel system 7, which is arranged at both ends of the bottom of the integrated trolley to move the trolley. During construction, the integrated trolley moves toward the end where the steel bar binding construction is performed. The length of the integrated trolley for tunnel construction may be 6 to 12 meters, for example, 6.5 meters, 8.5 meters, 10.5 meters, or 11.5 meters.
[0034] In this exemplary embodiment, the working process / use method of the integrated trolley for tunnel construction may include:
[0035] After the construction of the waterproof board of the first section is completed, the waterproof board hanging trolley moves to the second section, the front end of the integrated trolley moves to the first section, and the steel bar binding construction is carried out on the front operating platform of the integrated trolley;
[0036] After the reinforcement of the first section is completed, the integrated trolley continues to move forward to the next section. At this time, the front end of the trolley is located in the second section for reinforcement binding, and the rear end of the trolley is located in the first section for trolley mold closing.
[0037] After the reinforcement of the first section is completed, the integrated trolley continues to move forward to the next section. At this time, the front end of the trolley is located in the second section for reinforcement construction, and the rear end of the trolley is located in the first section for trolley mold closing. After the mold closing is completed, the second lining concrete is poured, which does not affect the reinforcement construction of the front end of the integrated trolley.
[0038] After the second lining concrete is poured, it takes one day to reach the demoulding strength. At this time, the reinforcement binding of the next concrete segment to be poured is basically completed, and the integrated trolley will demould and move to the next segment. The front end of the trolley will carry out reinforcement binding construction, and the rear end of the trolley will close the mold. From then on, each segment can form a seamless assembly line operation.
[0039] In summary, the integrated trolley for tunnel construction can save the time for steel bar binding construction at the disconnected part between the lining trolley and the steel bar trolley, ensuring fast and efficient construction under the condition of high progress requirements for special projects. On average, the steel bar binding construction of one section can save 30% of time, while improving the efficiency of tooling use, saving tunnel tooling space, achieving energy conservation and emission reduction, and has good promotion and application value.
[0040] Although the integrated trolley for tunnel construction of the utility model has been described above in combination with exemplary embodiments, it should be clear to those skilled in the art that various modifications and changes may be made to the exemplary embodiments of the utility model without departing from the spirit and scope defined by the claims.
Claims
1. An integrated trolley for tunnel construction, characterized in that: The integrated trolley includes: a template, a casting system, a working platform and a trolley frame, wherein: The template includes an arch template arranged above the working platform and side templates arranged on both sides of the trolley frame, and the arch template and the side template are connected to each other; The pouring system includes a plurality of branch pipe assemblies, which are respectively arranged on both sides of the trolley frame; One end of the working platform is used for steel bar binding construction, and the other end is used for pouring construction; The trolley frame is located under the working platform.
2. The integrated trolley for tunnel construction according to claim 1, characterized in that: The side formwork is provided with a plurality of pouring openings for pouring secondary lining concrete.
3. The integrated trolley for tunnel construction according to claim 2, characterized in that: The plurality of branch pipe assemblies correspond one-to-one to the plurality of pouring ports.
4. The integrated trolley for tunnel construction according to claim 1, characterized in that: The trolley frame includes a plurality of vertical braces, diagonal braces and transverse braces. The transverse brace passes through the intersection between every two diagonal braces, and a transverse brace is arranged between every two vertical braces.
5. The integrated trolley for tunnel construction according to claim 4, characterized in that: The trolley frame also includes two longitudinal beams arranged in parallel, and the longitudinal beams are located below the vertical supports.
6. The integrated trolley for tunnel construction according to claim 5, characterized in that: The trolley frame also includes two rows of legs arranged below the longitudinal beam, and each row of legs is arranged at intervals and plays a supporting role.
7. The integrated trolley for tunnel construction according to claim 1, characterized in that: Ladders are also provided at both ends of the working platform.
8. The integrated trolley for tunnel construction according to claim 1, characterized in that: The integrated trolley further comprises a walking system, and the walking system is arranged at two ends of the bottom of the integrated trolley to enable the trolley to move.
9. The integrated trolley for tunnel construction according to claim 1, characterized in that: The length of the integrated trolley is 6 to 12 meters.
10. The integrated trolley for tunnel construction according to claim 2, characterized in that: The number of the pouring ports includes 6, 8 or 10.