Tunnel lining arc-shaped steel bar construction device

By using a combination device of arc steel bar tire frame and fixing fixture at the tunnel lining construction site, the rapid installation of arc steel bars is achieved, the problems of low construction efficiency and high labor intensity are solved, construction efficiency is improved and safety risks are reduced.

CN221942464UActive Publication Date: 2024-11-01CCCC SECOND HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420378993.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-11-01
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

The construction efficiency of the upper arc steel bars in the tunnel lining is low, the labor intensity is high, and the working environment is poor. Traditional construction methods require workers to place and transport large-diameter arc steel bars one by one, which poses safety risks.

Method used

Design a tunnel-lined arc steel bar construction device, including arc steel bar tire frame, fixing fixture and special spreader. By fixing arc steel bars in the arc steel bar tire frame and hoisting them to the mobile trolley as a whole, avoiding on-site transportation , use positioning rods and fixing fixtures to achieve rapid installation.

Benefits of technology

The rapid installation of arc steel bars has been achieved, which has reduced the labor intensity of workers, improved construction efficiency, and reduced safety risks on the site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221942464U_ABST
    Figure CN221942464U_ABST
Patent Text Reader

Abstract

The utility model discloses a tunnel lining arc-shaped reinforcing steel bar construction device which comprises an arc-shaped reinforcing steel bar jig frame which is in an arc shape matched with arc-shaped reinforcing steel bars, the arc-shaped reinforcing steel bars are sequentially arranged on the arc-shaped reinforcing steel bar jig frame in the vertical direction at intervals, and the distance between the arc-shaped reinforcing steel bars is consistent with the distance between positioning clamping grooves in a movable trolley formwork. The multiple arc steel bars are located in the same plane in the vertical direction; the fixing clamp is used for fixing a plurality of arc steel bars; the special lifting appliance is connected with the fixing clamp and used for lifting the multiple arc steel bars fixed by the fixing clamp. The arc-shaped steel bars are placed in the arc-shaped steel bar jig frame near a construction site according to the fixed intervals required by the design and are fixed through the fixing clamps, and then the arc-shaped steel bars are integrally hoisted to the movable trolley, so that the arc-shaped steel bars can be quickly mounted, the labor intensity of operators is reduced, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel lining circular arc steel bar construction, and more specifically, to a tunnel lining circular arc steel bar construction device. Background Art

[0002] The traditional construction method of the arc steel bars on the tunnel lining is to process and thread the upper large arc steel bars in sections, and then transport them to the site. Workers need to place them one by one in the template on the top of the mobile trolley, and then connect them through threaded sleeves or welding. The above arc steel bar construction method has the following problems:

[0003] 1) Low construction efficiency: Workers need to place the large-diameter arc steel bars transported to the site one by one into the positioning slots in the template on the upper part of the mobile trolley, which consumes a lot of time;

[0004] 2) High labor intensity: The length of the arc-shaped steel bar is about 12m, and a single steel bar requires at least two workers to carry it;

[0005] 3) Poor working environment: On-site construction faces many safety risk factors. Utility Model Content

[0006] One purpose of the utility model is to provide a tunnel lining arc steel bar construction device, which can realize rapid installation of the arc steel bars by placing the arc steel bars at a fixed interval in an arc steel bar frame near the construction site according to the design requirements and fixing them with fixing clamps, and then hoisting the entire device onto a mobile trolley, thereby reducing the labor intensity of operators and improving construction efficiency.

[0007] In order to solve the above technical problems, the utility model provides a tunnel lining circular arc steel bar construction device, comprising: a circular arc steel bar frame, which is an arc shape matching the circular arc steel bars, a plurality of circular arc steel bars are vertically arranged on the circular arc steel bar frame in sequence, and the spacing is consistent with the spacing of the positioning slots on the mobile trolley template, and the plurality of circular arc steel bars are vertically located in the same plane; a fixing clamp, which is used to fix the plurality of circular arc steel bars; a special hoist, which is connected to the fixing clamp and is used to hoist the plurality of circular arc steel bars fixed by the fixing clamp.

[0008] Preferably, a plurality of groups of positioning rods are vertically spaced apart on the side of the arc-shaped steel bar frame, and the plurality of positioning rods included in each group of positioning rods are located in the same horizontal plane. The plurality of positioning rods included in each group of positioning rods are telescopically connected to the arc-shaped steel bar frame, and the plurality of positioning rods, when extended, are just used to position and place a horizontal arc steel bar.

[0009] Preferably, a stopper is provided at the outer end of the positioning rod, which is used to limit the circular arc steel bar.

[0010] Preferably, the fixing clamp comprises a pair of clamp bodies which are arranged opposite to each other, and a plurality of recessed holes are provided on the opposite surfaces of the pair of clamp bodies in a one-to-one correspondence, which are respectively used to clamp a plurality of arc steel bars, and the pair of clamp bodies are connected by bolts for disassembly, and the fixing clamp is also provided with a lifting ring for lifting with a special lifting tool.

[0011] Preferably, the special lifting device is provided with three lifting points, which are respectively connected to three fixing clamps, one of which is clamped in the middle of the arc steel bar, and the other two fixing clamps are symmetrically located on both sides of the middle fixing clamp and clamp the arc steel bar.

[0012] Preferably, the lifting point in the middle of the special lifting device is connected to a fixing fixture via a hand chain hoist for adjusting the lifting distance.

[0013] The utility model at least has the following beneficial effects:

[0014] The utility model hoists the qualified arc steel bars into the arc steel frame frame and fixes the spacing of the arc steel bars by means of a fixing clamp. Then the arc steel bars are hoisted as a whole to the upper template surface of the mobile trolley and the fixing clamp is removed. The arc steel bars directly fall into the positioning grooves of the template, avoiding the workers carrying the steel bars on site. The arc steel bars can be quickly installed, the construction efficiency of the arc steel bars is improved, and the labor intensity of the operators is reduced.

[0015] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a top view of the initial state of the arc-shaped steel bar frame of the utility model after the arc steel bars are placed;

[0017] Figure 2 It is a top view of the arc-shaped steel bar frame of the utility model after the arc steel bars are placed;

[0018] Figure 3 This is a front view of the arc-shaped steel bar tire frame of the utility model;

[0019] Figure 4 This is a schematic diagram of the fixing fixture structure of the utility model;

[0020] Figure 5 This is a front view of the overall hoisting of the arc steel bar of the utility model;

[0021] Figure 6 It is a schematic diagram of the hoisting and adjusting posture of the arc steel bar of the utility model.

[0022] Description of reference numerals:

[0023] 1. Arc-shaped steel bar frame, 101. Positioning rod, 2. Special lifting device, 3. Fixing clamp, 4. Arc steel bar, 5. Hand winch. DETAILED DESCRIPTION

[0024] In order to better understand the purpose, structure and function of the utility model, the utility model is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement it according to the description.

[0025] It should be noted that, in the description of the present invention, the terms "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0026] like Figures 1 to 6 As shown, the utility model provides a tunnel lining circular arc steel bar construction device, comprising: an arc steel bar frame 1, which is in an arc shape matching the circular arc steel bar 4, a plurality of circular arc steel bars 4 are vertically arranged on the arc steel bar frame 1 in sequence, and the spacing is consistent with the spacing of the positioning slots on the mobile trolley template, and the plurality of circular arc steel bars 4 are vertically located in the same plane; a fixing clamp 3, which is used to fix the plurality of circular arc steel bars 4; a special hoist 2, which is connected to the fixing clamp 3 and is used to hoist the plurality of circular arc steel bars 4 fixed by the fixing clamp 3.

[0027] A plurality of arc steel bars 4 are placed on the arc steel bar frame 1 in sequence, and then clamped and fixed by the fixing clamp 3 to form an integral structure. Finally, the arc steel bars 4 are hoisted to the upper surface of the mobile trolley template by connecting the fixing clamp 3 with the special hoist 2. After the fixing clamp is released, the plurality of arc steel bars 4 automatically fall into the positioning slots on the mobile trolley template. There is no need to adjust the spacing, which greatly improves the construction efficiency.

[0028] In another embodiment, Figures 1 to 3 As shown, the side of the arc-shaped steel bar frame 1 is vertically spaced with multiple groups of positioning rods 101, and the multiple positioning rods 101 included in each group of positioning rods 101 are located in the same horizontal plane. The multiple positioning rods 101 included in each group of positioning rods 101 are telescopically connected to the arc-shaped steel bar frame 1. After the multiple positioning rods 101 are extended, they are just used to position and place a horizontal circular arc steel bar 4. The outer end of the positioning rod 101 is provided with a stopper, which is used to limit the circular arc steel bar 4.

[0029] like Figure 1As shown, in the initial state, a plurality of arc steel bars 4 are placed as a whole on the top of the arc steel bar frame 1; Figure 2 As shown, the multiple positioning rods 101 of the bottom layer are extended, and the arc steel bars 4 located at the top of the arc steel bar frame 1 are moved to the multiple positioning rods 101 of the bottom layer for positioning support, and then the above steps are repeated to extend the positioning rods 101 of the second layer, the third layer and the top layer in sequence, and the arc steel bars 4 are placed in sequence. After the multiple arc steel bars 4 are placed, they are located in the same vertical direction, and then they are clamped as a whole by the fixing clamp 3 and then turned over and hoisted onto the mobile trolley. The multiple positioning rods 101 of the same layer are symmetrically arranged, and the extension lengths of the positioning rods 101 at different positions are set to be different according to the curvature of the arc steel bar 4 to meet the placement of the arc steel bar. At the same time, the position of the arc steel bar 4 is limited by the block to achieve the arc steel bar 4 in the same vertical direction. The frame of the arc steel bar frame 1 is a frame structure formed by rods such as steel sections, and a sleeve is arranged on it corresponding to each positioning rod 101, which is used to accommodate the positioning rod 101, so that the positioning rod 101 can be extended and retracted in the sleeve to achieve the placement of arc steel bars 4 of different layers. The bottom of the arc-shaped steel bar tire frame 1 is also provided with rollers for moving and walking.

[0030] In another embodiment, Figure 4 As shown, the fixing clamp 3 includes a pair of clamp bodies, which are arranged opposite to each other, and the opposite surfaces of the pair of clamp bodies are provided with a plurality of concave holes corresponding to each other, which are respectively used to clamp a plurality of arc steel bars 4. The pair of clamp bodies are connected by bolts for disassembly, and the fixing clamp 3 is also provided with a lifting ring for lifting with a special lifting device 2.

[0031] In another embodiment, Figure 5 and Figure 6 As shown, the special hoist 2 is provided with three lifting points, which are respectively connected to three fixing clamps 3, one of which is clamped in the middle of the arc steel bar 4, and the other two fixing clamps 3 are symmetrically located on both sides of the middle fixing clamp 3 and clamp the arc steel bar 4. The lifting point in the middle of the special hoist 2 is connected to the fixing clamp 3 through a hand chain hoist 5 for adjusting the lifting spacing.

[0032] The quick construction device for arc-shaped steel bars for tunnel lining consists of an arc-shaped steel bar frame 1, a special hoist 2, and a steel bar fixing fixture 3. The specific working principle is as follows:

[0033] 1) hoist the arc steel bar 4 into the arc steel bar frame 1, and temporarily fix the arc steel bar 4 according to the spacing required by the design through the positioning rod 101; Figures 1 to 3 As shown;

[0034] 2) Use a fixing fixture 3 to fix the arc steel bar 4 in the arc steel bar frame 1, a total of 3 fixing fixtures 3; the fixing fixture 3 is as follows Figure 4 As shown;

[0035] 3) Use the special lifting device 2 to lift the fixed arc steel bar 4 and the fixing fixture 3 to the upper part of the mobile trolley; Note: The special lifting device 2 has three lifting points in total, and the middle lifting point uses a hand chain hoist 5 with adjustable lifting distance; See the schematic diagram of the lifting of the arc steel bar 4 Figure 5 ;

[0036] 4) Fine-tune the hand chain hoist 5 to make the arc steel bar 4 in a vertical state (such as Figure 6 As shown), after loosening the fixing clamp 3, the arc steel bar 4 automatically falls into the positioning slot of the upper template of the mobile trolley, and there is no need to adjust the spacing, which greatly improves the construction efficiency.

[0037] It can be understood that the present invention is described by some embodiments, and those skilled in the art know that various changes or equivalent substitutions can be made to these features and embodiments without departing from the spirit and scope of the present invention. Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation mode. They can be fully applied to various fields suitable for the present invention. For those familiar with the art, other modifications can be easily realized. Therefore, without departing from the general concept defined by the claims and the equivalent scope, the present invention is not limited to specific details and the illustrations shown and described here.

Claims

1. A tunnel lining circular arc steel bar construction device, characterized in that: include: The arc steel bar frame is in an arc shape matching the arc steel bar, and a plurality of arc steel bars are arranged on the arc steel bar frame in sequence in the vertical direction, and the spacing is consistent with the spacing of the positioning slots on the mobile trolley template, and the plurality of arc steel bars are located in the same plane in the vertical direction; A fixing fixture, which is used to fix multiple arc steel bars; A special hoist is connected to a fixing clamp and is used for hoisting a plurality of arc steel bars fixed by the fixing clamp.

2. The tunnel lining circular arc steel bar construction device according to claim 1, characterized in that: A plurality of groups of positioning rods are arranged at vertical intervals on the side of the arc-shaped steel bar frame, and the plurality of positioning rods contained in each group of positioning rods are located in the same horizontal plane. The plurality of positioning rods contained in each group of positioning rods are telescopically connected to the arc-shaped steel bar frame, and the plurality of positioning rods are used to position and place a horizontal arc steel bar after being extended.

3. The tunnel lining circular arc steel bar construction device according to claim 2, characterized in that: A stopper is provided at the outer end of the positioning rod, which is used to limit the circular arc steel bar.

4. The tunnel lining circular arc steel bar construction device according to claim 1, characterized in that: The fixing clamp includes a pair of clamp bodies, which are arranged opposite to each other. The opposite surfaces of the pair of clamp bodies are provided with a plurality of concave holes corresponding to each other, which are respectively used to clamp a plurality of arc steel bars. The pair of clamp bodies are disassembled and connected by bolts. The fixing clamp is also provided with a lifting ring for lifting with a special lifting device.

5. The tunnel lining circular arc steel bar construction device according to claim 1, characterized in that: The special lifting device is provided with three lifting points, which are respectively connected to three fixing clamps, one of which is clamped in the middle of the arc steel bar, and the other two fixing clamps are symmetrically located on both sides of the fixing clamp in the middle and clamp the arc steel bar.

6. The tunnel lining circular arc steel bar construction device according to claim 5, characterized in that: The lifting point in the middle of the special lifting device is connected to a fixing fixture through a hand chain hoist to adjust the lifting distance.