Flue structure for increasing boiler exhaust gas temperature under low load
By adding bypass air supply ducts and regulating valves to the boiler flue structure, the problem of insufficient smoke exhaust temperature under low load is solved, combustion efficiency and economic benefits are improved, and the safe operation of the dust collector is ensured.
Patent Information
- Application Number
- CN202420513877.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-15
AI Technical Summary
At low loads in winter, the smoke exhaust temperature of the boiler is lower than 100℃, causing the tail dust collector bag to bond, affecting the boiler operation cycle, and the coal pellet combustion efficiency is reduced, resulting in an increase in energy consumption.
Design a flue structure, including the main air duct, air preheater and bypass air duct, by setting a bypass air duct in front and back of the air preheater and setting a regulating valve on the bypass air duct, add Cold air enters the main air duct to increase the smoke exhaust temperature and ensure the safe operation of the dust collector.
It effectively improves the smoke exhaust temperature of the boiler under low load, optimizes the combustion efficiency of coal particles, reduces energy consumption, and enhances the peak-shaving capacity and economic benefits of the boiler.
Smart Images

Figure CN221944251U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of boilers, in particular to a flue structure for improving the exhaust temperature of boiler smoke under low load. Background Art
[0002] In order to optimize the economic benefits of coal-using enterprises and reduce energy consumption, the operating parameters of the boiler are raised from sub-high temperature and sub-high pressure to high temperature and high pressure or higher levels, thereby significantly improving the efficiency of generating electricity. In addition, precise control of the exhaust gas temperature during boiler operation is a key link in reducing energy consumption and improving efficiency.
[0003] In view of the above situation, the structure of the boiler was adjusted when it was designed. Through the further use of the economizer, its energy consumption can be effectively reduced. However, the above structural design will be lower than 100℃ under low load in winter. When the exhaust gas temperature is low, it will form adhesion on the bag of the tail dust collector, causing the negative pressure of the tail dust collector to increase, affecting the operation cycle of the boiler. Utility Model Content
[0004] In order to solve the above technical problems, the present application provides a flue structure for increasing the exhaust temperature of boiler smoke under low load.
[0005] The present application provides a flue structure for increasing the exhaust temperature of boiler smoke under low load, which adopts the following technical solution:
[0006] A flue structure for increasing the exhaust temperature of boiler smoke under low load, characterized by comprising:
[0007] A main air duct, wherein the main air duct is formed as a tubular member with two ends opened so that hot flue gas is input from the upper end of the air duct and transmitted toward the lower end of the air duct;
[0008] An air preheater, the air preheater being arranged along the length direction of the air duct and at least a part of the air preheater being arranged in the air duct;
[0009] an ignition combustion chamber, the ignition combustion chamber being arranged at one side of the main air duct and being connected with one end of the air preheater through a connecting pipe;
[0010] A bypass air supply pipe, one end of which is connected to one end of the air inlet of the air preheater, and the other end of which is connected to the connecting pipe.
[0011] When the boiler is running, the wind temperature in the wind chamber will affect the cracking degree of coal particles. When the wind temperature is high, it will help the cracking of coal particles. This makes the coal particles burn more fully, which can play a certain role in reducing the amount of coal fed. At this time, since the amount of coal used is relatively appropriate, the amount of boiler flue gas can be controlled within a lower range, so that the thermal efficiency of the boiler reaches the best balance. When the temperature of the wind chamber decreases, the cracking effect of coal particles becomes worse, and the heat in the coal particles is not fully released. In order to meet the requirements of load, it is necessary to increase the amount of coal fed and the primary air volume. When the amount of coal and air volume increase, the amount of flue gas in the furnace will increase. The air coefficient of the boiler increases, and the exhaust temperature rises slightly.
[0012] The present application adds two bypass air supply ducts before and after the air preheater, and sends the cold air to the main air ducts on the left and right sides behind the air preheater. When the boiler is under low load, cold air will be sent into the main air duct. Since the air volume sent to the ignition combustion chamber is a fixed value, when the amount of hot air entering the ignition combustion chamber decreases, the amount of cold air that is short-circuited in front of the air preheater and enters the main air duct will increase accordingly. The cold air of some air preheaters is short-circuited, and the amount of cold air entering the air preheater will decrease. In this case, the air preheater's absorption of flue gas is reduced, and the exhaust gas temperature rises. While ensuring the safe operation of the dust collector, the bypass air supply duct increases the low-load adjustment range, thereby generating economic benefits for the enterprise.
[0013] Furthermore, the air preheater includes a first air pre-duct and a second air pre-duct which are spaced apart from each other, the first air pre-duct is provided with a first hot air outlet and a first cold air inlet, and the second air pre-duct is provided with a second hot air outlet and a second cold air inlet.
[0014] Furthermore, the first cold air inlet is connected to a primary fan.
[0015] Furthermore, one end of the bypass air supply duct is arranged between the primary fan and the first cold air inlet.
[0016] Furthermore, a regulating valve is provided on the bypass air supply pipe to control the amount of primary cold air passing through the bypass air supply pipe into the ignition combustion chamber.
[0017] The technical solution of the present application adjusts the air volume by setting a regulating valve on the bypass air supply duct. After the regulating valve is adjusted, the exhaust gas temperature can be accurately controlled. While ensuring the safe operation of the dust collector, the low-load adjustment range is increased, thereby generating economic benefits for the enterprise.
[0018] Furthermore, it is characterized in that the air preheater is provided with three passes.
[0019] Through the above technical scheme, the present application sets up a three-pass air preheater, which can effectively increase the air preheater's absorption of flue gas heat so that it can meet the heat demand required for coal particle combustion, and add an ash cooler to control the furnace temperature. After this design and layout, the boiler's peak-shaving capacity is enhanced.
[0020] Furthermore, the diameter of the bypass air supply pipe is any one of Φ325, Φ377, Φ426, and Φ477.
[0021] In summary, the present application includes at least one of the following beneficial technical effects:
[0022] 1. The present application adds two bypass air supply ducts before and after the air preheater, sends the cold air to the main air ducts on the left and right sides behind the air preheater, and installs a regulating valve on the bypass. When the boiler is under low load, cold air will be sent into the main air duct. Since the air volume sent to the ignition combustion chamber is a fixed value, when the amount of hot air entering the ignition combustion chamber decreases, the amount of cold air that is short-circuited in front of the air preheater and enters the main air duct will increase accordingly. The cold air of some air preheaters is short-circuited, and the amount of cold air entering the air preheater will decrease. In this case, the air preheater's absorption of flue gas is reduced, and the exhaust gas temperature rises. While ensuring the safe operation of the dust collector, the bypass air supply duct increases the low-load adjustment range, thereby generating economic benefits for the enterprise.
[0023] 2. The technical solution of the present application adjusts the air volume by setting a regulating valve on the bypass air supply duct. After the regulating valve is adjusted, the exhaust gas temperature can be accurately controlled. While ensuring the safe operation of the dust collector, the low-load adjustment range is increased, thereby generating economic benefits for the enterprise. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a structural schematic diagram of a flue structure for increasing the exhaust temperature of a boiler under low load in Example 1 of the present application.
[0025] Explanation of the accompanying drawings: 1. Main air duct; 2. Air preheater; 3. Ignition combustion chamber; 4. Bypass air supply duct; 41. Regulating valve; 21. First air preheating duct; 22. Second air preheating duct; 211. First cold air inlet; 212. First hot air outlet; 221. Second cold air inlet; 222. Second hot air outlet; 5. Primary fan. DETAILED DESCRIPTION
[0026] The following is combined with Figure 1 This application is described in further detail.
[0027] Example 1 of the present application discloses a flue structure for increasing the exhaust temperature of a boiler under low load.
[0028] A flue structure for increasing the exhaust temperature of a boiler under low load comprises a main air duct 1 of a vertically arranged tubular structure, at the lower end of the main air duct 1, there is a smoke exhaust port arranged vertically with the main air duct 1, hot smoke can enter through the upper end of the main air duct 1 and be transferred to the smoke exhaust port through the internal pipe of the main air duct 1, and then be discharged from the smoke exhaust port.
[0029] Inside the main air duct 1, a first air pre-duct 21 and a second air pre-duct 22 are folded and spaced apart along the length direction thereof. The first air pre-duct 21 and the second air pre-duct 22 are bent along the length direction thereof and a part of each of them is arranged in the air duct along the radial direction of the air duct. The first air pre-duct 21 is provided with a first cold air inlet 211 and a first hot air outlet 212, and the second air pre-duct 22 is provided with a second cold air inlet 221 and a second hot air outlet 222, wherein the first cold air inlet 211 is arranged at the lower end of the second cold air inlet 221, and the first cold air inlet 211 and the second cold air inlet 221 are both arranged at one side of the lower end of the air duct, and the first hot air outlet 212 and the second hot air outlet 222 are both arranged at the other side of the upper end of the air duct, and the first hot air outlet 212 is arranged at the lower end of the second hot air outlet 222.
[0030] At the first hot air outlet 212, an ignition combustion chamber 3 is connected and arranged. The ignition combustion chamber 3 is formed into a funnel-shaped chamber. At one end of the ignition combustion chamber 3, an ignition channel is vertically connected and arranged. The first hot air outlet 212 is connected to the ignition channel.
[0031] The first air pre-duct 21 and the second air pre-duct 22 arranged in the air duct are both provided with three returns. At the first cold air inlet 211 of the first air pre-duct 21, a primary fan 5 is connected, and a bypass air supply pipe 4 is connected between the primary fan 5 and the first cold air inlet 211. The other end of the bypass air supply pipe 4 is arranged between the first hot air outlet 212 and the ignition channel. A regulating valve 41 is also provided on the bypass air supply pipe 4 to control the amount of cold air introduced into the ignition tube by the bypass air supply pipe 4.
[0032] It should be noted that the diameter of the bypass air supply pipe 4 provided in the present application includes but is not limited to Φ325, Φ377, Φ426, and Φ477, and the diameter of the bypass air supply pipe 4 is mainly adjusted according to the size of different boilers.
[0033] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A flue structure for increasing the exhaust temperature of boiler flue gas under low load, characterized in that: include: A main air duct (1), the main air duct (1) being formed as a tubular member with both ends open so that hot flue gas is input from the upper end of the air duct and transmitted toward the lower end of the air duct; An air preheater (2), the air preheater (2) being arranged along the length direction of the air duct and at least a portion of the air preheater (2) being arranged in the air duct; An ignition combustion chamber (3), the ignition combustion chamber (3) being arranged at one side of the main air duct (1) and being connected to one end of the air preheater (2) via a connecting pipeline; A bypass air supply pipe (4), one end of the bypass air supply pipe (4) is connected to one end of the air inlet of the air preheater (2), and the other end of the bypass air supply pipe (4) is connected to the connecting pipe.
2. A flue structure for increasing the exhaust temperature of boiler under low load according to claim 1, characterized in that: The air preheater (2) comprises a first air preheating duct (21) and a second air preheating duct (22) which are spaced apart from each other, the first air preheating duct (21) being provided with a first hot air outlet (212) and a first cold air inlet (211), and the second air preheating duct (22) being provided with a second hot air outlet (222) and a second cold air inlet (221).
3. A flue structure for increasing the exhaust temperature of boiler smoke under low load according to claim 2, characterized in that: The first cold air inlet (211) is connected to a primary fan (5).
4. A flue structure for increasing the exhaust temperature of boiler smoke under low load according to claim 3, characterized in that: One end of the bypass air supply pipe (4) is arranged between the primary air fan (5) and the first cold air inlet (211).
5. The flue structure for increasing the exhaust temperature of boiler smoke under low load according to claim 1, characterized in that: The bypass air supply pipe (4) is provided with a regulating valve (41) to control the volume of primary cold air passing through the bypass air supply pipe (4) into the ignition combustion chamber (3).
6. A flue structure for increasing the exhaust temperature of boiler smoke under low load according to claim 1, characterized in that: The air preheater (2) is provided with three passes.