Bulletin board for constructional engineering management

By designing sliding components and adjustment screw systems on the construction engineering management bulletin board, multi-angle and height adjustment of the bulletin board is realized, solving the problem of poor adjustability in the prior art, and improving applicability and information acquisition efficiency.

CN221946759UActive Publication Date: 2024-11-01GUILIN LINGUI DISTRICT MARKET DEVELOPMENT SERVICE CENTER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420416801.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-05
Publication Date
2024-11-01
Estimated Expiration
2034-03-05

AI Technical Summary

Technical Problem

The existing construction project management bulletin board has poor adjustability and cannot be adjusted to any angle, and is insufficient inapplicability.

Method used

A bulletin board including a bulletin board base, a bracket and a lifting board is designed. By installing a first sliding assembly, a sliding plate, a support rod, an adjustment screw, a bearing and a connecting rotary rod, the tilt and height adjustment of the bulletin board is realized, and the height adjustment of the bulletin board is enhanced. Its adjustability.

Benefits of technology

The bulletin board can be adjusted at multiple angles and heights, and is suitable for different construction environments, improving the efficiency of construction personnel's information acquisition.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221946759U_ABST
    Figure CN221946759U_ABST
Patent Text Reader

Abstract

The utility model discloses a constructional engineering management bulletin board which comprises a bulletin board base, a support and a lifting board, the support is installed at the top of the bulletin board base, first sliding assemblies are installed at the two ends in the support, and sliding boards are installed on the inner sides of the first sliding assemblies in a sliding mode. And supporting rods are installed at the two ends of the top of the sliding plate, a lifting plate is installed at the tops of the supporting rods, a first screw hole is formed in the middle of the bottom of the support, and a first adjusting screw rod is installed in the first screw hole in a threaded mode. According to the bulletin board, the bulletin board body, the rotating shaft and the first bearing are installed, when the bulletin board is used, the rotating shaft can rotate in the first bearing, the rotating shaft drives the bulletin board body to rotate together, the inclination angle of the bulletin board body can be adjusted, and therefore the bulletin board body can be conveniently adjusted to the angle where engineering constructors can watch the bulletin board conveniently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering management tools, in particular to a construction engineering management bulletin board. Background Art

[0002] A construction project refers to an engineering entity formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. In the process of construction project management, various notices of the project management process are written on the bulletin board to allow construction personnel to quickly understand the information during the construction process.

[0003] The patent document with announcement number CN213458915U discloses a bulletin board for construction project management. The patent tightens the fastening bolts downward, and the fastening bolts engage with the slots to fix the adjusted angle. Through the mutual cooperation between the rotating shaft, the connecting rod and the slider, the angle of the bulletin board can be easily adjusted to obtain the best viewing effect. However, during the implementation of the patent, the fastening bolts need to be fixed in the corresponding slots on the support plate B before the support plate A can be fixed. This means that the fastening bolts can only be moved to the corresponding slot position after the support plate A is rotated to a specified angle, so that the support plate A cannot be adjusted to any angle, and its adjustability and applicability are poor. Utility Model Content

[0004] The purpose of the utility model is to provide a construction project management bulletin board to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering management bulletin board, comprising a bulletin board base, a bracket and a lifting plate, the top of the bulletin board base is installed with a bracket, and both ends of the inside of the bracket are installed with a first sliding component, the inner side of the first sliding component is slidably installed with a sliding plate, and both ends of the top of the sliding plate are installed with support rods, the top of the support rod is installed with a lifting plate, a first screw hole is provided at the middle position of the bottom of the bracket, and the internal thread of the first screw hole is installed with a first adjusting screw, a group of first bearings are symmetrically installed at one end of the top of the lifting plate, and a rotating shaft is installed inside the first bearing, a bulletin board body is installed on the outside of the rotating shaft, a second sliding component is installed at the end of the top of the lifting plate away from the first bearing, and a connecting plate is slidably installed on the top of the second sliding component, a third bearing is installed at the end of the connecting plate away from the first bearing, and a second connecting rotating rod is installed inside the third bearing.

[0006] Preferably, one end of the connecting plate away from the third bearing is hinged with a connecting rod, and one end of the connecting rod away from the connecting plate is hinged to the bulletin board body.

[0007] Preferably, an adjusting screw is installed at one end of the top of the lifting plate away from the first bearing, and a second adjusting screw is installed on the internal thread of the adjusting screw, and the second adjusting screw is connected to the second connecting rotating rod.

[0008] Preferably, a second bearing is installed at a middle position of the bottom of the sliding plate, and a first connecting rotating rod is installed inside the second bearing, and one end of the first connecting rotating rod away from the second bearing is connected to the first adjusting screw.

[0009] Preferably, a handle is installed at the bottom of the first adjusting screw, and an anti-slip rubber sleeve is installed on the outer side of the handle.

[0010] Preferably, a group of reinforcing plates are symmetrically installed on the outer sides of the support rods, and the ends of the reinforcing plates away from the support rods are connected to the lifting plates.

[0011] Preferably, universal wheels are installed at the four corners of the bottom of the bulletin board base, and braking devices are installed on the universal wheels.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. The construction project management notice board is equipped with a notice board body, a rotating shaft and a first bearing. When in use, the rotating shaft can rotate inside the first bearing, and the rotating shaft drives the notice board body to rotate together, so that the inclination angle of the notice board body can be adjusted, so that the notice board body can be adjusted to an angle that is convenient for construction personnel to watch;

[0014] 2. The construction project management notice board is equipped with an adjusting screw, a connecting plate, a connecting rod, a second adjusting screw and a second sliding assembly. When in use, the connecting plate can be driven to move by rotating the second adjusting screw clockwise or counterclockwise, so that the connecting rod is pushed or pulled by force to rotate the notice board body, and the inclination angle of the notice board body can be adjusted. The adjustment process is relatively convenient, and the notice board body can be adjusted to different inclination angles. It has strong adjustability and applicability.

[0015] 3. The construction project management bulletin board is installed with a first adjusting screw, a sliding plate, a first sliding assembly, a second bearing and a first connecting rotating rod. When in use, the first adjusting screw is rotated so that the first adjusting screw moves through the thread, and the first adjusting screw drives the sliding plate to move through the second bearing and the first connecting rotating rod, so that the height of the lifting plate can be adjusted, and the bulletin board body can be adjusted to a specified height for use. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a front cross-sectional schematic diagram of the utility model;

[0017] Figure 2It is a main schematic diagram of the utility model;

[0018] Figure 3 It is a partial structural schematic diagram of the utility model;

[0019] Figure 4 It is a side view schematic diagram of the lifting plate of the utility model.

[0020] In the figure: 1. bulletin board base; 2. bracket; 3. first adjusting screw; 4. first screw hole; 5. sliding plate; 6. support rod; 7. lifting plate; 8. adjusting screw; 9. connecting plate; 10. bulletin board body; 11. connecting rod; 12. rotating shaft; 13. first bearing; 14. first sliding assembly; 15. second bearing; 16. first connecting rotating rod; 17. second adjusting screw; 18. second sliding assembly; 19. second connecting rotating rod; 20. third bearing. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figure 1-4 The utility model provides an embodiment: a construction engineering management bulletin board, including a bulletin board base 1, a bracket 2 and a lifting plate 7, the top of the bulletin board base 1 is installed with a bracket 2, and both ends of the inside of the bracket 2 are installed with a first sliding component 14, the inner side of the first sliding component 14 is slidably installed with a sliding plate 5, and both ends of the top of the sliding plate 5 are installed with a support rod 6, and the top of the support rod 6 is installed with a lifting plate 7, a first screw hole 4 is provided at the middle position of the bottom of the bracket 2, and the first adjusting screw 3 is installed with the internal thread of the first screw hole 4, a group of first bearings 13 are symmetrically installed at one end of the top of the lifting plate 7, and a rotating shaft 12 is installed inside the first bearing 13, and a bulletin board body 10 is installed outside the rotating shaft 12, a second sliding component 18 is installed at one end of the top of the lifting plate 7 away from the first bearing 13, and a connecting plate 9 is slidably installed at the top of the second sliding component 18, a third bearing 20 is installed at one end of the connecting plate 9 away from the first bearing 13, and a second connecting rotating rod 19 is installed inside the third bearing 20.

[0023] In this implementation:

[0024] Furthermore, one end of the connecting plate 9 away from the third bearing 20 is hinged with a connecting rod 11, and the other end of the connecting rod 11 away from the connecting plate 9 is hinged to the bulletin board body 10. The connecting plate 9 drives the connecting rod 11 to move together, so that the connecting rod 11 is pushed or pulled by force to rotate the bulletin board body 10, so that the inclination angle of the bulletin board body 10 can be adjusted, and the bulletin board body 10 can be adjusted to an angle that is convenient for construction personnel to watch.

[0025] Furthermore, an adjusting screw 8 is installed at one end of the top of the lifting plate 7 away from the first bearing 13, and a second adjusting screw 17 is installed on the internal thread of the adjusting screw 8. The second adjusting screw 17 is connected to the second connecting rotating rod 19. The second adjusting screw 17 moves inside the adjusting screw 8 through the thread, and the second adjusting screw 17 drives the second connecting rotating rod 19 to move together, so that the second connecting rotating rod 19 drives the connecting plate 9 to move through the third bearing 20, and the connecting plate 9 drives the connecting rod 11 to move together, so that the connecting rod 11 can be pushed or pulled by force to rotate the bulletin board body 10.

[0026] Furthermore, a second bearing 15 is installed at the middle position of the bottom of the sliding plate 5, and a first connecting rod 16 is installed inside the second bearing 15. The end of the first connecting rod 16 away from the second bearing 15 is connected to the first adjusting screw 3. When in use, by rotating the first adjusting screw 3, the first adjusting screw 3 moves through the thread, and the first adjusting screw 3 drives the sliding plate 5 to move through the second bearing 15 and the first connecting rod 16, the height of the lifting plate 7 can be adjusted, and the bulletin board body 10 can be adjusted to a specified height for use.

[0027] Furthermore, a handle is installed at the bottom of the first adjusting screw 3 , and a non-slip rubber sleeve is installed on the outer side of the handle to facilitate workers to rotate the first adjusting screw 3 .

[0028] Furthermore, a group of reinforcing plates are symmetrically installed on the outer sides of the support rods 6, and the ends of the reinforcing plates away from the support rods 6 are connected to the lifting plates 7, so that the support rods 6 and the lifting plates 7 can be firmly installed.

[0029] Furthermore, universal wheels are installed at the four corners of the bottom of the bulletin board base 1, and brake devices are installed on the universal wheels to facilitate the movement of the device.

[0030] Working principle:

[0031] When in use, the device is moved to a designated position, and the universal wheel is braked, and then the construction engineering manager can rotate the first adjusting screw 3 clockwise or counterclockwise, and the first adjusting screw 3 drives the first connecting rotating rod 16 to rotate, and the first connecting rotating rod 16 rotates inside the second bearing 15, and the first connecting rotating rod 16 will not drive the sliding plate 5 to rotate through the second bearing 15;

[0032] The first adjusting screw 3 moves inside the first screw hole 4 through the thread, and the first adjusting screw 3 drives the first connecting rotating rod 16 to move together, so that the first connecting rotating rod 16 drives the sliding plate 5 to move through the second bearing 15, and the sliding plate 5 drives the lifting plate 7 to move together through the support rod 6, so that the height of the lifting plate 7 can be adjusted, and the notice board body 10 can be adjusted to a specified height for use;

[0033] During use, various notifications during the project management process can be written on the bulletin board body 10, so that the construction personnel can quickly understand the information during the construction process;

[0034] At the same time, the construction project manager can rotate the second adjusting screw 17 clockwise or counterclockwise, and the second adjusting screw 17 drives the second connecting rod 19 to rotate, and the second connecting rod 19 rotates inside the third bearing 20, and the second connecting rod 19 will not drive the connecting plate 9 to rotate through the third bearing 20;

[0035] The second adjusting screw 17 moves inside the adjusting screw tube 8 through a thread, and the second adjusting screw 17 drives the second connecting rotating rod 19 to move together, so that the second connecting rotating rod 19 drives the connecting plate 9 to move through the third bearing 20, and the connecting plate 9 drives the connecting rod 11 to move together, so that the connecting rod 11 is pushed or pulled by force to rotate the bulletin board body 10, and the inclination angle of the bulletin board body 10 can be adjusted, and the bulletin board body 10 can be adjusted to an angle that is convenient for construction personnel to watch.

[0036] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. A construction project management bulletin board, comprising a bulletin board base (1), a bracket (2) and a lifting plate (7), characterized in that: A bracket (2) is installed on the top of the notice board base (1), and first sliding components (14) are installed at both ends of the bracket (2). A sliding plate (5) is slidably installed on the inner side of the first sliding component (14), and support rods (6) are installed at both ends of the top of the sliding plate (5). A lifting plate (7) is installed on the top of the support rod (6). A first screw hole (4) is provided at the middle position of the bottom of the bracket (2), and a first adjusting screw (3) is installed on the internal thread of the first screw hole (4). One end of the top of the lifting plate (7) is A group of first bearings (13) are symmetrically installed, and a rotating shaft (12) is installed inside the first bearing (13), and a notice board body (10) is installed on the outer side of the rotating shaft (12). A second sliding component (18) is installed at the top end of the lifting plate (7) away from the first bearing (13), and a connecting plate (9) is slidably installed on the top of the second sliding component (18), a third bearing (20) is installed at the end of the connecting plate (9) away from the first bearing (13), and a second connecting rotating rod (19) is installed inside the third bearing (20).

2. A construction project management bulletin board according to claim 1, characterized in that: The end of the connecting plate (9) away from the third bearing (20) is hinged with a connecting rod (11), and the end of the connecting rod (11) away from the connecting plate (9) is hinged with the bulletin board body (10).

3. A construction project management bulletin board according to claim 1, characterized in that: An adjusting screw (8) is installed at one end of the top of the lifting plate (7) away from the first bearing (13), and a second adjusting screw (17) is installed on the internal thread of the adjusting screw (8), and the second adjusting screw (17) is connected to a second connecting rotating rod (19).

4. A construction project management bulletin board according to claim 1, characterized in that: A second bearing (15) is installed at the middle position of the bottom of the sliding plate (5), and a first connecting rotating rod (16) is installed inside the second bearing (15). The end of the first connecting rotating rod (16) away from the second bearing (15) is connected to the first adjusting screw (3).

5. A construction project management notice board according to claim 1, characterized in that: A handle is installed at the bottom of the first adjusting screw (3), and an anti-slip rubber sleeve is installed on the outer side of the handle.

6. A construction project management notice board according to claim 1, characterized in that: A group of reinforcing plates are symmetrically mounted on the outer sides of the support rods (6), and the ends of the reinforcing plates away from the support rods (6) are connected to the lifting plates (7).

7. A construction project management notice board according to claim 1, characterized in that: Universal wheels are installed at the four corners of the bottom of the bulletin board base (1), and braking devices are installed on the universal wheels.