Large-tonnage wire rod pay-off device
By using the steps shaft, load-bearing universal ball and deep groove ball bearing in the large tonnage strip line laying device, the problems of bearing damage and pallet deformation in the conventional line laying frame are solved, and the stability and service life of the equipment are achieved Improvement.
Patent Information
- Application Number
- CN202420038394.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-08
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-01-08
AI Technical Summary
Conventional rotary tray mounts are prone to bearing damage and pallet deformation during use, especially when dealing with large tonnage strips, which leads to unstable equipment operation and inefficiency.
A large tonnage disc strip line laying device is designed, using step shaft, load-bearing universal ball, deep groove ball bearing and pallet structure. The rotation speed of the brake disc is adjusted through nylon rod, spring and top wire to ensure the stability and depth of the pallet. Service life of groove ball bearings.
It effectively avoids the problems of pallet deformation and short bearing life, improves the stability and service life of the equipment, and ensures the smooth line release process of large tonnage strips.
Smart Images

Figure CN221966438U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of metal wire cold drawing, in particular to a large-tonnage wire rod pay-off device. Background Art
[0002] The processing of wire rods requires the assistance of wire pay-off equipment to smoothly release the wire. With the improvement of smelting technology, the weight of wire rods is getting heavier and heavier, reaching 2-3 tons per coil. Due to the simple design of conventional turntable pay-off racks, bearing damage and tray deformation often occur during use. Utility Model Content
[0003] The utility model provides a large-tonnage wire rod pay-off device to solve the problems of short bearing life and easy deformation of a tray.
[0004] In order to solve the above technical problems, the technical solution of the utility model is: a large-tonnage wire rod pay-off device, including a base, a stepped shaft is welded at the center of the base, four load-bearing universal balls are fixed on the base around the stepped shaft, the axial hole of the brake disc and the stepped shaft are connected by a deep groove ball bearing, the brake disc is located on the top of the load-bearing universal ball, a tray is welded on the top of the brake disc, and a material rack is welded at the top center of the tray; the brake includes a bracket, a nylon rod, a spring, and a top screw are installed in sequence in the upper cylindrical tube of the bracket, the top screw is threadedly connected to the cylindrical tube, the outer end of the nylon rod corresponds to the outer circumferential position of the brake disc, and the bottom of the bracket is fixed on the base.
[0005] Furthermore, four load-bearing universal balls are fixed on the base around the stepped shaft by bolts.
[0006] Furthermore, the brake disc is coaxial with the tray.
[0007] Furthermore, the tray is formed by welding a plurality of concentric circular pipes.
[0008] Furthermore, the material rack is formed by welding four inverted L-shaped pipes.
[0009] Furthermore, the bottom of the bracket is fixed to the base by bolts.
[0010] The utility model increases the service life of the deep groove ball bearing and avoids deformation of the tray. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is the front view of the utility model;
[0012] Figure 2 It is a top view of the utility model;
[0013] Figure 3 It is a schematic diagram of the brake structure.
[0014] Among them: 1. Base; 2. Load-bearing universal ball; 3. Stepped shaft; 4. Brake disc; 5. Deep groove ball bearing; 6. Brake; 7. Tray; 8. Material rack; 9. Top screw; 10. Spring; 11. Nylon rod; 12. Bracket. DETAILED DESCRIPTION
[0015] The following is combined with Figure 1-3 The specific implementation methods of the utility model are further described.
[0016] A large-tonnage wire rod pay-off device comprises a base 1, a stepped shaft 3 is welded at the center of the base 1, four load-bearing universal balls 2 are fixed around the stepped shaft 3 on the base 1 by bolts, the shaft hole of the brake disc 4 is connected to the stepped shaft 3 by a deep groove ball bearing 5, the brake disc 4 is located at the top of the load-bearing universal ball 2, ensuring that the brake disc 4 can rotate smoothly, a tray 7 is welded on the top of the brake disc 4, the brake disc 4 is coaxial with the tray 7, and the tray 7 is welded by a plurality of concentric circular ring pipes, which can prevent the wire rod from being entangled between the brake disc 4 and the stepped shaft 3 due to the scattering of the wire rod, and the top center of the tray 7 is welded It is connected to a material rack 8, which includes four inverted L-shaped pipes welded together. The material rack 8 plays a role in supporting the disc to prevent the disc from tipping over; the brake 6 includes a bracket 12, and a nylon rod 11, a spring 10, and a top screw 9 are installed in the upper cylindrical tube of the bracket 12 in sequence. The top screw 9 is threadedly connected to the cylindrical tube, and the outer end of the nylon rod 11 corresponds to the outer circumferential position of the brake disc 4. The bottom of the bracket 12 is fixed to the base 1 by bolts, and the force is provided by the top screw 9 and the spring 10. The friction between the brake disc 4 and the nylon rod 11 is controlled by adjusting the tightness of the top screw 9, thereby adjusting the rotation speed of the wire-releasing device.
[0017] Use a crane to place the wire rod on the pallet 7, and try to ensure that the center of the wire rod circle coincides with the center of the rack 8 to prevent the wire rod from tipping over and ensure the stability of rotation. Adjust the tightness of the top screw 9 according to the requirements of the wire release speed. The four load-bearing universal balls 2 can share the force of the deep groove ball bearing 5, which increases the service life of the deep groove ball bearing 5 and prevents the deformation of the pallet 7 due to gravity.
[0018] The above is only a preferred specific implementation method of the utility model, but the protection scope of the utility model is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the utility model, according to the technical scheme and utility model concept of the utility model, shall be covered by the protection scope of the utility model.
Claims
1. Large tonnage wire rod pay-off device, characterized in that: The invention comprises a base (1), a stepped shaft (3) is welded at the center of the base (1), four load-bearing universal balls (2) are fixed around the stepped shaft (3) on the base (1), the shaft hole of the brake disc (4) is connected to the stepped shaft (3) via a deep groove ball bearing (5), the brake disc (4) is located on the top of the load-bearing universal ball (2), a tray (7) is welded on the top of the brake disc (4), and a material rack (8) is welded at the top center of the tray (7); the brake (6) comprises a bracket (12), a nylon rod (11), a spring (10), and a top screw (9) are installed in sequence in the upper cylindrical tube of the bracket (12), the top screw (9) is threadedly connected to the cylindrical tube, the outer end of the nylon rod (11) corresponds to the outer circumference of the brake disc (4), and the bottom of the bracket (12) is fixed on the base (1).
2. The large-tonnage wire rod pay-off device according to claim 1, characterized in that: Four load-bearing universal balls (2) are fixed on the base (1) around the stepped shaft (3) by bolts.
3. The large-tonnage wire rod pay-off device according to claim 1, characterized in that: The brake disc (4) is coaxial with the tray (7).
4. The large-tonnage wire rod pay-off device according to claim 1, characterized in that: The tray (7) is formed by welding a plurality of concentric circular tubes.
5. The large-tonnage wire rod pay-off device according to claim 1, characterized in that: The material rack (8) is formed by welding four inverted L-shaped pipes.
6. The large-tonnage wire rod pay-off device according to claim 1, characterized in that: The bottom of the bracket (12) is fixed to the base (1) by means of bolts.