Roof drilling dustproof mechanism

By setting up sliding collection tubes and collection bottles on the side of the electric hammer, the pollution problem of gravel falling when drilling the electric hammer is solved, and environmental and health protection is achieved, ensuring the cleanliness of the construction environment and the health and safety of workers.

CN221968500UActive Publication Date: 2024-11-08CHINA RAILWAY 14TH CONSTR BUREAU GRP 4TH ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420311951.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-20
Publication Date
2024-11-08
Estimated Expiration
2034-02-20

AI Technical Summary

Technical Problem

During the drilling process of electric hammers, more gravel drilled under the drill bit will fall on the construction workers, polluting the environment and affecting the health of workers.

Method used

Design a dust-proof mechanism for drilling on the roof, including a sliding collection tube on the side of the electric hammer, with a curved part and a vertical part at the upper end of the collection tube. The drill bit passes through the vertical part, and the falling gravel will enter the collection tube, collecting There is a collection bottle at the bottom of the tube, and a sleeve and a tension spring on the side of the hammer. The collection tube is reset after the drilling hole is completed to prevent contamination.

Benefits of technology

Effectively prevent gravel from polluting the environment and workers' health, and ensure the cleanliness of the construction environment and the health and safety of workers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221968500U_ABST
    Figure CN221968500U_ABST
Patent Text Reader

Abstract

The utility model discloses a roof drilling dustproof mechanism which comprises a collecting pipe arranged on the side face of an electric hammer in a sliding mode, the upper end of the collecting pipe is provided with a bending portion bending towards the electric hammer, the end portion of the bending portion is provided with a vertical portion, and a drill bit penetrates through the bending portion to enter the vertical portion. When a roof is drilled, the upper end of the vertical part is in contact with the roof, a person holds the electric hammer by hand to move upwards, the drill bit drills the roof, and broken stones falling during drilling can enter the collecting pipe, cannot pollute the environment and cannot fall on the body of a worker, so that the physical and psychological health of the worker is protected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a roof drilling dust prevention mechanism. Background Art

[0002] The electric hammer consists of an electric motor, a gear reducer, a crank-connecting rod impact mechanism, a rotary drill mechanism, an overload protection device, a power switch and a power connection device. It can generally be divided into two types: an impact electric hammer and a rotary electric hammer. It is mainly used for drilling holes in brittle materials such as masonry, concrete and ceramics.

[0003] However, when the electric hammer is drilling holes in the roof, the drill bit will drill down a lot of debris that will fall on the construction workers, polluting the environment and also affecting the workers' health. Utility Model Content

[0004] The utility model aims to solve the above problems and provide a roof drilling dust prevention mechanism, which can automatically collect the drilled gravel, prevent dust from polluting the environment and protect the health of workers.

[0005] The technical solution adopted by the utility model to solve its technical problems is:

[0006] A roof drilling dust prevention mechanism comprises a collecting pipe slidably arranged on the side of an electric hammer, wherein the upper end of the collecting pipe is provided with a curved portion bent toward the electric hammer, the end of the curved portion is provided with a vertical portion, and a drill bit passes through the curved portion and enters into the vertical portion.

[0007] Furthermore, a collecting bottle is provided at the bottom of the collecting tube.

[0008] Furthermore, the upper end of the collecting bottle is threadedly connected to the bottom of the collecting tube.

[0009] Furthermore, a sleeve is provided on the side of the electric hammer, and the collecting pipe passes through the sleeve and is slidably connected with the sleeve.

[0010] Furthermore, a tension spring is provided between the bottom of the sleeve and the collecting bottle.

[0011] Furthermore, the collecting tube is provided with a limiting rod which cooperates with the bottom of the sleeve.

[0012] The beneficial effects of the utility model are:

[0013] 1. The utility model includes a collecting pipe slidably arranged on the side of the electric hammer, the upper end of the collecting pipe is provided with a curved portion bent toward the electric hammer, the end of the curved portion is provided with a vertical portion, and the drill bit passes through the curved portion and enters the vertical portion. When drilling a hole in the roof, the upper end of the vertical portion contacts the roof, a person holds the electric hammer and moves upward, and the drill bit drills a hole in the roof. The broken stones that fall during drilling will enter the collecting pipe, which will not pollute the environment and will not fall on the workers, thereby protecting the workers' physical and mental health. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solutions in the embodiments of the utility model or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0015] Figure 1 It is a schematic diagram of the structure of the utility model;

[0016] Figure 2 It is the front view of the utility model.

[0017] In the figure: electric hammer 1, collecting tube 2, bending part 3, vertical part 4, collecting bottle 5, sleeve 6, tension spring 7, and limiting rod 8. DETAILED DESCRIPTION

[0018] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0019] like Figure 1 As shown, a roof drilling dust prevention mechanism includes a collecting pipe 2 slidably arranged on the side of an electric hammer 1, the upper end of the collecting pipe 2 is provided with a curved portion 3 bent toward the electric hammer 1, the end of the curved portion 3 is provided with a vertical portion 4, the drill bit passes through the curved portion 3 and enters the vertical portion 4, and the upper end opening of the vertical portion 4 is connected to the outside. When drilling a hole in the roof, the upper end of the vertical portion 4 contacts the roof, a person holds the electric hammer 1 and moves upward, and the drill bit drills a hole in the roof. The broken stones that fall during drilling will enter the collecting pipe 2, which will not pollute the environment, and will not fall on the workers, thereby protecting the workers' physical and mental health.

[0020] like Figure 1 As shown, a collecting bottle 5 is provided at the bottom of the collecting pipe 2, and the gravel passes through the collecting pipe 2 and enters the collecting bottle 5 for collection.

[0021] The upper end of the collecting bottle 5 is threadedly connected to the bottom of the collecting tube 2 , so as to facilitate pouring out the gravel in the collecting bottle 5 .

[0022] like Figure 1 As shown, a sleeve 6 is provided on the side of the electric hammer 1, and the collecting pipe 2 passes through the sleeve 6 and is slidably connected with the sleeve 6. When drilling, the electric hammer 1 moves up to drill a hole on the roof, and the sleeve 6 slides upward on the collecting pipe 2.

[0023] like Figure 2 As shown, a tension spring 7 is provided between the bottom of the sleeve 6 and the collecting bottle 5. When the sleeve 6 moves upward, the tension spring 7 is stretched, and after the drilling is completed, the collecting tube 2 is reset under the action of the tension spring 7.

[0024] like Figure 2 As shown, the collecting tube 2 is provided with a limiting rod 8 which cooperates with the bottom of the sleeve 6. The limiting rod limits the position between the collecting tube 2 and the electric hammer 1 to prevent the collecting tube 2 from moving up too long and the drill bit from separating from the upper end of the collecting tube 2.

[0025] In the description of the present invention, it should be noted that the terms "left", "right", "up", "down", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0026] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection, it can be a direct connection, it can be an indirect connection through an intermediate medium, and it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

Claims

1. A roof drilling dust prevention mechanism, characterized in that: The invention comprises a collecting pipe (2) which is slidably arranged on the side of an electric hammer (1); the upper end of the collecting pipe (2) is provided with a curved portion (3) which is bent towards the electric hammer (1); the end of the curved portion (3) is provided with a vertical portion (4); and the drill bit passes through the curved portion (3) and enters into the vertical portion (4).

2. A roof drilling dust prevention mechanism as claimed in claim 1, characterized in that: A collecting bottle (5) is provided at the bottom of the collecting tube (2).

3. A roof drilling dust prevention mechanism as claimed in claim 2, characterized in that: The upper end of the collecting bottle (5) is threadedly connected to the bottom of the collecting tube (2).

4. A roof drilling dust prevention mechanism as claimed in claim 2, characterized in that: A sleeve (6) is provided on the side of the electric hammer (1), and the collecting pipe (2) passes through the sleeve (6) and is slidably connected to the sleeve (6).

5. A roof drilling dust prevention mechanism as claimed in claim 4, characterized in that: A tension spring (7) is provided between the bottom of the sleeve (6) and the collecting bottle (5).

6. A roof drilling dust prevention mechanism as claimed in claim 5, characterized in that: The collecting pipe (2) is provided with a limiting rod (8) which cooperates with the bottom of the sleeve (6).