Pneumatic ash conveying system
By combining the pipelines of the economizer and the two electric fields of the electrostatic dust removal pneumatic ash transfer system in the power plant, and adding blower and pressure sensors, the problem of poor ash transfer during high-load operation is solved, and the stable operation of the system is achieved and efficient ash transfer.
Patent Information
- Application Number
- CN202322699600.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-09
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-10-09
AI Technical Summary
The existing electrostatic dust removal pneumatic ash transfer system in the power plant cannot adapt to the automatic ash transfer demand in the variable load section when operating at high load, resulting in mutual elimination of ash transfer units and poor ash transfer, which is prone to accumulation or blockage of ash. Manual operation is required. Affects the safe and stable operation and power generation efficiency of the electro-dust removal system.
A pneumatic ash transfer system was designed. By combining the pipelines of the A, B and two electric fields of the economizer as an integrated pipeline, an electric field is independently set up to use ash transfer pipeline, and a blower and pressure sensor are added. The pneumatic gate valve controls the flow of materials to ensure ash delivery efficiency and system stability.
It improves the efficiency of ash transfer, avoids clogging and accumulation of dust, ensures the normal operation of the unit during high load operation, and reduces manual intervention and environmental pollution.
Smart Images

Figure CN221970677U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of dust removal and ash conveying, in particular to a pneumatic ash conveying system. Background Art
[0002] The ash conveying system of 2×1000MW coal-fired units of a power generation company adopts a positive pressure dense phase pneumatic ash conveying system, which is a double-tube type. The fly ash collected by the #1 and #2 electrostatic precipitators and economizer ash hoppers is transported to the ash storage bin for storage through the air pressure of the ash conveying air compressor.
[0003] Ash storage: set up raw ash storage, coarse ash storage and fine ash storage. The coarse ash from the economizer and the electric field ash hopper of the electrostatic precipitator can be sent to the raw ash storage for sorting or to the coarse ash storage through the ash pipeline branch valve; the ash from the electric field ash hoppers of the electrostatic precipitator, the second, third, fourth and fifth electric fields, can be sent to the raw ash storage for sorting or to the fine ash storage through the ash pipeline branch valve (please refer to Figure 5 ).
[0004] When the unit is running at high load and the coal consumption is above 520t / h, the ash conveying system will experience the following situations: Situation 1: During the high-load and large-coal-volume operation of the unit, the second electric field transports ash to the ash bin through the DN150 pipelines of the second, third, fourth and fifth ash conveying units. Then the dropping time of the second electric field silo pump can only be reduced to about 10 seconds, and the ash conveying time is more than 350 seconds. In addition, there is a blockage in the DN150 ash conveying pipeline. Long-term operation of the second electric field silo pump will result in a high material level.
[0005] Case 2: Since the ash transportation of the DN150 pipeline of the second electric field is not smooth, the switching valve is used to switch to the shared ash transportation pipeline with the first electric field, so that the DN225 pipeline of the first unit of the first electric field and the DN125 pipeline of the economizer A column and the DN150 pipeline of the first unit of the second electric field share a DN225 ash transportation pipe to the ash bin, and the DN225 pipeline of the second unit of the first electric field and the DN125 pipeline of the economizer B column and the DN150 pipeline of the second unit of the second electric field share a DN225 ash transportation pipe to the ash bin. During high load periods, the three ash transportations share a DN225 ash transportation mother pipe, which reduces the effective ash transportation time of the first and second units of the first electric field, causing the feed amount of the ash hopper of the first and second units of the first electric field to be greater than the discharge amount. After long-term high-load and large-coal volume operation, the ash hopper gradually shows high material level.
[0006] Case 3: When a pipe is blocked during operation of an electric field, a DN65 clearing valve is installed on the system pipeline, but this valve is manually operated, which is inconvenient. The current operating procedure after pipe blockage is to open the exhaust valve, and the fly ash returns to the ash hopper from the exhaust pipe. The exhaust pipe is a metal pipe with no wear-resistant layer inside. After being washed by fly ash, leakage occurs at the elbow, and the leaking elbow is located about ten meters above the ground, which causes certain difficulties for maintenance work. During maintenance, a ten-meter-high scaffolding must be set up for high-altitude welding operations. In addition, the leakage causes certain pollution to the environment, and the workload of cleaning the fly ash on the ground increases.
[0007] Based on the above, the present application proposes a pneumatic ash conveying system. Utility Model Content
[0008] The utility model proposes a pneumatic ash conveying system, which solves the problem that the various ash conveying units in the existing electrostatic precipitator pneumatic ash conveying system of the power plant cannot adapt to the demand for automatic ash conveying of the electrostatic precipitator in the variable load section, and the ash conveying units are easily squeezed out, resulting in poor ash conveying, which in turn affects the safe and stable operation of the entire electrostatic precipitator ash conveying system, and causes ash accumulation or ash blockage, requiring manual DCS to perform ash conveying operations; in severe cases, the high material level alarm of the silo pump is triggered, and manual ash cleaning is required, resulting in the electrostatic precipitator being unable to operate normally with load, the output of the boiler unit is reduced, and the problem of power generation with load is affected.
[0009] The technical solution of the utility model is achieved in this way:
[0010] A pneumatic ash conveying system comprises a first ash conveying part, a second ash conveying part and a third ash conveying part;
[0011] The first ash conveying part includes a first pipeline X, a first pipeline Y and a first pipeline Z, wherein one side of the first pipeline X is respectively connected to the newly added raw ash bin and the newly added coarse ash bin; one side of the first pipeline Y is respectively connected to the economizer B side and the electrostatic precipitator second electric field B column; one side of the first pipeline Z is respectively connected to the economizer A side and the electrostatic precipitator second electric field A column; the other sides of the first pipeline Y and the first pipeline Z are connected to the other side of the first pipeline X;
[0012] The second ash conveying part includes a second pipeline X and a second pipeline Y. One side of the second pipeline X is provided with a coarse ash storage of an electric field A2 column and a raw ash storage of an electric field A2 column, and the other side of the second pipeline X is provided with an electric field A2 column of electrostatic precipitator; one side of the second pipeline Y is provided with a coarse ash storage of an electric field A1 column and a raw ash storage of an electric field A1 column, and the other side of the second pipeline X is provided with an electric field A1 column of electrostatic precipitator;
[0013] The third ash conveying part includes an ash removal storage, a third pipeline X and a third pipeline Y. One side of the third pipeline X and the third pipeline Y are connected to the ash removal storage; the other side of the third pipeline X is respectively connected to the electric field A column of the third electric precipitator, the electric field A column of the fourth electric precipitator and the electric field A column of the fifth electric precipitator; the other side of the third pipeline Y is respectively connected to the electric field B column of the third electric precipitator, the electric field B column of the fourth electric precipitator and the electric field B column of the fifth electric precipitator.
[0014] Furthermore, the first pipeline Y is provided with two electric field B column blowing aids and two electric field B column pressure sensors corresponding to the second electric field B column of the electrostatic precipitator; the first pipeline Z is provided with two electric field A column blowing aids and two electric field A column pressure sensors corresponding to the second electric field A column of the electrostatic precipitator.
[0015] Furthermore, the second pipeline X is provided with an electric field A2 column blowing aid corresponding to an electric field A2 column of the electrostatic precipitator; the second pipeline Y is provided with an electric field A1 column blowing aid corresponding to an electric field A1 column of the electrostatic precipitator.
[0016] Furthermore, the third pipeline X is provided with three, four, and five electric field A column blow aids corresponding to the third electric field A column of the electrostatic precipitator, the fourth electric field A column of the electrostatic precipitator, and the fifth electric field A column of the electrostatic precipitator; the third pipeline Y is provided with three, four, and five electric field B column blow aids corresponding to the third electric field B column of the electrostatic precipitator, the fourth electric field B column of the electrostatic precipitator, and the fifth electric field B column of the electrostatic precipitator.
[0017] Furthermore, pneumatic gate valves are respectively provided on the pipelines corresponding to the economizer B side, the electrostatic precipitator second electric field B column, the newly added raw ash storage, the newly added coarse ash storage, the economizer A side, the electrostatic precipitator second electric field A column, the coarse ash storage of electric field A2 column, the raw ash storage of electric field A2 column, the electrostatic precipitator first electric field A2 column, the coarse ash storage of electric field A1 column, the raw ash storage of electric field A1 column, the electrostatic precipitator first electric field A1 column, the electrostatic precipitator third electric field A column, the electrostatic precipitator fourth electric field A column, the electrostatic precipitator fifth electric field A column, the electrostatic precipitator third electric field B column, the electrostatic precipitator fourth electric field B column and the electrostatic precipitator fifth electric field B column.
[0018] Furthermore, pressure sensors are respectively provided on the pipelines corresponding to the economizer B side, economizer A side, electrostatic precipitator three electric field A column, electrostatic precipitator four electric field A column, electrostatic precipitator five electric field A column, electrostatic precipitator three electric field B column, electrostatic precipitator four electric field B column and electrostatic precipitator five electric field B column.
[0019] Furthermore, it also includes a fourth ash conveying part, which includes a fourth pipeline, an electric field A3 column coarse ash storage, an electric field A3 column raw ash storage respectively arranged on one side of the fourth pipeline, and an electric field A3 column of electric precipitator arranged on the other side of the fourth pipeline;
[0020] The fourth pipeline corresponds to an electric field A3 column coarse ash storage, an electric field A3 column raw ash storage and a pneumatic gate valve at an electric field A3 column of the electrostatic precipitator, and an electric field A3 column blowing aid and an electric field A3 column pressure sensor are respectively provided at the electric field A3 column of the electrostatic precipitator.
[0021] Beneficial effects of the technical solution provided by this application:
[0022] The pneumatic ash conveying system adds an integrated pipeline consisting of the first pipeline X, the first pipeline Y and the first pipeline Z, and merges the pipelines of the economizer A side and B side and the A column and B column of the second electric field of the electrostatic precipitator into one pipeline for conveying to the ash storage. After the transformation, the first electric field of the second ash conveying part uses the ash conveying pipeline alone to convey ash, which improves the conveying efficiency, ensures the effective ash conveying time, and the unit can operate normally. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 This is a schematic diagram of the pneumatic ash conveying system of the utility model;
[0025] Figure 2 This is a schematic diagram of the first ash conveying part of the utility model;
[0026] Figure 3 This is a schematic diagram of the second ash conveying part of the utility model;
[0027] Figure 4 This is a schematic diagram of the third ash conveying part of the utility model;
[0028] Figure 5 This is a schematic diagram of the fourth ash conveying part of the utility model;
[0029] Figure 6 This is a schematic diagram of the ash transportation relationship of the newly added pipeline in the utility model.
[0030] In the figure:
[0031] 100 first ash conveying section, 110 first pipeline X, 111 newly added coarse ash storage, 112 newly added raw ash storage, 120 first pipeline Y, 121 second electric field B column of electrostatic precipitator, 121a second electric field B column blowing aid, 121b second electric field B column pressure sensor, 122 economizer B side, 130 first pipeline Z, 131 second electric field A column of electrostatic precipitator, 131a second electric field A blowing aid, 131b second electric field A column pressure sensor, 132 economizer A side;
[0032] 200 second ash conveying part, 210 second pipeline X, 211 a coarse ash storage of electric field A2 column, 212 a raw ash storage of electric field A2 column, 213 electrostatic precipitator a electric field A2 column, 213a a blower of electric field A2 column, 220 second pipeline Y, 221 a coarse ash storage of electric field A1 column, 222 a raw ash storage of electric field A1 column, 223 electrostatic precipitator a electric field A1 column, 223a a blower of electric field A1 column;
[0033] 300 the third ash conveying section, 310 the ash removal storage, 320 the third pipeline X, 320a the third, fourth and fifth electric field A column blower, 321 the third electric field A column of the electrostatic precipitator, 322 the fourth electric field A column of the electrostatic precipitator, 323 the fifth electric field A column of the electrostatic precipitator, 330 the third pipeline Y, 330a the third, fourth and fifth electric field B column blower, 331 the third electric field B column of the electrostatic precipitator, 332 the fourth electric field B column of the electrostatic precipitator, 333 the fifth electric field B column of the electrostatic precipitator;
[0034] 400 the fourth ash conveying section, 410 the fourth pipeline, 411 a coarse ash storage of an electric field A3 column, 412 a raw ash storage of an electric field A3 column, 413 an electrostatic precipitator of an electric field A3 column, 413a an air blower of an electric field A3 column, 413 a pressure sensor of an electric field A3 column. DETAILED DESCRIPTION
[0035] The technical solution of the utility model will be described clearly and completely in conjunction with the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0036] Reference Figure 1-6 , a pneumatic ash conveying system, comprising a first ash conveying part 100, a second ash conveying part 200 and a third ash conveying part 300;
[0037] The first ash conveying part 100 includes a first pipeline X 110, a first pipeline Y 120 and a first pipeline Z 130, wherein one side of the first pipeline X 110 is respectively connected to the newly added raw ash bin 112 and the newly added coarse ash bin 111; one side of the first pipeline Y 120 is respectively connected to the economizer B side 122 and the second electric field B column 121 of the electrostatic precipitator; one side of the first pipeline Z 130 is respectively connected to the economizer A side 132 and the second electric field A column 131 of the electrostatic precipitator; the other sides of the first pipeline Y 120 and the first pipeline Z 130 are connected to the other side of the first pipeline X 110;
[0038] The second ash conveying part 200 includes a second pipeline X 210 and a second pipeline Y 220. One side of the second pipeline X 210 is provided with a coarse ash storehouse 211 and a raw ash storehouse 212 of an electric field A2 column, and the other side of the second pipeline X 210 is provided with an electric field A2 column 213 of an electrostatic precipitator; one side of the second pipeline Y 220 is provided with a coarse ash storehouse 221 and a raw ash storehouse 222 of an electric field A1 column, and the other side of the second pipeline X 210 is provided with an electrostatic precipitator and an electric field A1 column 223;
[0039] The third ash conveying section 300 includes an ash removal bin 310, a third pipeline X320 and a third pipeline Y330. One side of the third pipeline X320 and the third pipeline Y330 are connected to the ash removal bin 310; the other side of the third pipeline X320 is respectively connected to the electrostatic precipitator third electric field A column 321, the electrostatic precipitator fourth electric field A column 322 and the electrostatic precipitator fifth electric field A column 323; the other side of the third pipeline Y330 is respectively connected to the electrostatic precipitator third electric field B column 331, the electrostatic precipitator fourth electric field B column 332 and the electrostatic precipitator fifth electric field B column 333.
[0040] It also includes a fourth ash conveying section 400, which includes a fourth pipeline 410, an electric field A3 column coarse ash bin 411 and an electric field A3 column raw ash bin 412 respectively arranged on one side of the fourth pipeline 410, and an electric field A3 column 413 for electrostatic precipitator arranged on the other side of the fourth pipeline 410; the fourth pipeline 410 corresponds to an electric field A3 column coarse ash bin 411, an electric field A3 column raw ash bin 412 and a pneumatic gate valve at an electric field A3 column 413 for electrostatic precipitator, and an electric field A3 column blower 413a and an electric field A3 column pressure sensor 413b are respectively arranged at the electric field A3 column 413 for electrostatic precipitator.
[0041] The first pipeline X 110, the first pipeline Y 120 and the first pipeline Z 130 of the first ash conveying part 100 are integrated pipelines, so that the ash conveying pipelines of the second electric field and the economizer are reasonably allocated, and the mutual influence and crowding of the ash conveying process are solved. The A1, A2 and A3 units of the first electric field are arranged independently, which reduces the ash conveying frequency and the easy occurrence of pipe blockage or ash high material phenomenon.
[0042] In some embodiments, the first pipeline Y120 is provided with a second electric field B column blower 121a and a second electric field B column pressure sensor 121b corresponding to the second electric field B column 121 of the electrostatic precipitator. The first pipeline Z130 is provided with a second electric field A column blower 131a and a second electric field A column pressure sensor 131b corresponding to the second electric field A column 131 of the electrostatic precipitator. In some embodiments, the second pipeline X210 is provided with a first electric field A2 column blower 213a corresponding to the first electric field A2 column 213 of the electrostatic precipitator. The second pipeline Y220 is provided with a first electric field A1 column blower 223a corresponding to the first electric field A1 column 223 of the electrostatic precipitator. The third pipeline X320 is provided with a third, fourth and fifth electric field A column blower 320a corresponding to the third electric field A column 321 of the electrostatic precipitator, the fourth electric field A column 322 of the electrostatic precipitator and the fifth electric field A column 323 of the electrostatic precipitator. The third pipeline Y330 is provided with three, four and five electric field B column blowers 330a corresponding to the electrostatic precipitator three electric field B column 331, the electrostatic precipitator four electric field B column 332 and the electrostatic precipitator five electric field B column 333.
[0043] The blower generates high-speed airflow by rotating blades or centrifugal fans to deliver air or gas to the target area. It can increase the oxygen supply required in the combustion process, improve combustion efficiency, reduce fuel consumption and the amount of pollutants emitted. It can provide enough air force to form a dense phase flow of solid particles such as fly ash in the ash conveying pipeline, so that it can be smoothly transported to the ash storage bin for storage. The use of the blower can increase the conveying capacity of the ash conveying pipeline and avoid problems such as blockage and ash accumulation.
[0044] In some embodiments, pressure sensors are respectively provided on the pipelines corresponding to the economizer B side 122, the economizer A side 132, the electrostatic precipitator three electric field A column 321, the electrostatic precipitator four electric field A column 322, the electrostatic precipitator five electric field A column 323, the electrostatic precipitator three electric field B column 331, the electrostatic precipitator four electric field B column 332 and the electrostatic precipitator five electric field B column 333.
[0045] The pressure sensor is set to adapt to the pressure range of the medium in the ash conveying pipeline and has sufficient measurement accuracy and stability. Common pressure ranges can be selected according to specific applications, for example, a range of tens of kilopascals to hundreds of kilopascals. It is used to monitor pressure changes inside the pipeline to ensure normal operation of the pipeline and provide operating parameters for pipeline control and fault diagnosis.
[0046] In some embodiments, pneumatic gate valves are respectively provided on the pipelines corresponding to the economizer B side 122, the second electric field B column 121 of the electrostatic precipitator, the newly added raw ash bin 112, the newly added coarse ash bin 111, the economizer A side 132, the second electric field A column 131 of the electrostatic precipitator, the coarse ash bin 211 of the first electric field A2 column, the raw ash bin 212 of the first electric field A2 column, the first electric field A2 column 213 of the electrostatic precipitator, the coarse ash bin 221 of the first electric field A1 column, the raw ash bin 222 of the first electric field A1 column, the first electric field A1 column 223 of the electrostatic precipitator, the third electric field A column 321 of the electrostatic precipitator, the fourth electric field A column 322 of the electrostatic precipitator, the fifth electric field A column 323 of the electrostatic precipitator, the third electric field B column 331 of the electrostatic precipitator, the fourth electric field B column 332 of the electrostatic precipitator and the fifth electric field B column 333 of the electrostatic precipitator.
[0047] The pneumatic gate valve is a valve device used to control the flow of solid particles, dust and other materials in the ash conveying pipeline. It drives the gate to open and close through the pneumatic actuator to control and regulate the flow of materials. The pneumatic actuator can respond quickly, allowing the gate to open and close quickly, thereby quickly cutting off or passing the material flow.
[0048] Analysis on improvement of ash conveying in electric field after transformation
[0049] Analysis of the improvement of ash conveying in the first electric field after the economizer and the second electric field convey ash separately:
[0050] Before the transformation: the economizer and the second electric field occupied the ash transportation time of the first electric field, which could not meet the requirements for normal operation of the unit;
[0051] After the transformation: one electric field uses a separate ash conveying pipeline to transport ash, the transportation efficiency is improved, the effective ash conveying time can be guaranteed, and the unit can operate normally.
[0052] The specific transformation plan is summarized as follows:
[0053] Pipeline 1: one electric field and one unit, the pipe diameter is DN225 / DN250;
[0054] Pipeline 2: One electric field two units, pipe diameter is DN225 / DN250;
[0055] Pipeline three: one electric field three units, pipe diameter is DN225 / DN250;
[0056] Pipeline 4: ash conveying units of the third electric field A / B column, the fourth electric field A / B column, and the fifth electric field A / B column, with a pipe diameter of DN150;
[0057] New pipelines: The two DN125 pipelines in economizer row A and row B and the two DN150 pipelines in the second electric field row A and row B are merged into one pipeline for transporting to the ash storage, with pipe diameters of DN125 and DN150 / DN225.
[0058] After the renovation, there are five pipelines, 4 DN225 + 1 DN150 pipelines, the specific layout is as follows Figure 1 .
[0059] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A pneumatic ash conveying system, comprising a first ash conveying part (100), a second ash conveying part (200) and a third ash conveying part (300), characterized in that: The first ash conveying section (100) comprises a first pipeline X (110), a first pipeline Y (120) and a first pipeline Z (130), wherein one side of the first pipeline X (110) is respectively connected to a newly added raw ash storage (112) and a newly added coarse ash storage (111); one side of the first pipeline Y (120) is respectively connected to a B side of an economizer (122) and a second electric field B column (121) of an electrostatic precipitator; one side of the first pipeline Z (130) is respectively connected to an A side of an economizer (132) and a second electric field A column (131) of an electrostatic precipitator; the other sides of the first pipeline Y (120) and the first pipeline Z (130) are connected to the other side of the first pipeline X (110); The second ash conveying section (200) comprises a second pipeline X (210) and a second pipeline Y (220); one side of the second pipeline X (210) is provided with a coarse ash storage (211) and a raw ash storage (212) of an electric field A2 column, and the other side of the second pipeline X (210) is provided with an electric field A2 column (213) of electrostatic precipitator; one side of the second pipeline Y (220) is provided with a coarse ash storage (221) and a raw ash storage (222) of an electric field A1 column, and the other side of the second pipeline X (210) is provided with an electric field A1 column (223) of electrostatic precipitator; The third ash conveying section (300) comprises an ash removal bin (310), a third pipeline X (320) and a third pipeline Y (330), one side of the third pipeline X (320) and the third pipeline Y (330) are connected to the ash removal bin (310); the other side of the third pipeline X (320) is respectively connected to the third electric field A column (321) of the electrostatic precipitator, the fourth electric field A column (322) of the electrostatic precipitator and the fifth electric field A column (323) of the electrostatic precipitator; the other side of the third pipeline Y (330) is respectively connected to the third electric field B column (331) of the electrostatic precipitator, the fourth electric field B column (332) of the electrostatic precipitator and the fifth electric field B column (333) of the electrostatic precipitator.
2. The pneumatic ash conveying system according to claim 1, characterized in that: The first pipeline Y (120) is provided with two electric field B column blowers (121a) and two electric field B column pressure sensors (121b) corresponding to the second electric field B column (121) of the electrostatic precipitator; the first pipeline Z (130) is provided with two electric field A column blowers (131a) and two electric field A column pressure sensors (131b) corresponding to the second electric field A column (131) of the electrostatic precipitator.
3. The pneumatic ash conveying system according to claim 1, characterized in that: The second pipeline X (210) is provided with an electric field A2 column blower (213a) corresponding to the electric field A2 column (213) of the electrostatic precipitator; the second pipeline Y (220) is provided with an electric field A1 column blower (223a) corresponding to the electric field A1 column (223) of the electrostatic precipitator.
4. The pneumatic ash conveying system according to claim 1, characterized in that: The third pipeline X (320) is provided with three, four and five electric field A column blowers (320a) corresponding to the third electric field A column (321) of the electrostatic precipitator, the fourth electric field A column (322) of the electrostatic precipitator and the fifth electric field A column (323) of the electrostatic precipitator; the third pipeline Y (330) is provided with three, four and five electric field B column blowers (330a) corresponding to the third electric field B column (331) of the electrostatic precipitator, the fourth electric field B column (332) of the electrostatic precipitator and the fifth electric field B column (333) of the electrostatic precipitator.
5. The pneumatic ash conveying system according to claim 1, characterized in that: Pneumatic gate valves are respectively provided on the pipelines corresponding to the economizer B side (122), the electrostatic precipitator second electric field B column (121), the newly added raw ash storage (112), the newly added coarse ash storage (111), the economizer A side (132), the electrostatic precipitator second electric field A column (131), the first electric field A2 column coarse ash storage (211), the first electric field A2 column raw ash storage (212), the first electric field A2 column (213), the first electric field A1 column coarse ash storage (221), the first electric field A1 column raw ash storage (222), the first electric field A1 column (223), the electrostatic precipitator third electric field A column (321), the electrostatic precipitator fourth electric field A column (322), the electrostatic precipitator fifth electric field A column (323), the electrostatic precipitator third electric field B column (331), the electrostatic precipitator fourth electric field B column (332) and the electrostatic precipitator fifth electric field B column (333).
6. The pneumatic ash conveying system according to claim 1, characterized in that: Pressure sensors are respectively provided on the pipelines corresponding to the economizer B side (122), the economizer A side (132), the electrostatic precipitator three electric field A column (321), the electrostatic precipitator four electric field A column (322), the electrostatic precipitator five electric field A column (323), the electrostatic precipitator three electric field B column (331), the electrostatic precipitator four electric field B column (332) and the electrostatic precipitator five electric field B column (333).
7. The pneumatic ash conveying system according to claim 1, characterized in that: The device further comprises a fourth ash conveying section (400), the fourth ash conveying section (400) comprising a fourth pipeline (410), an electric field A3 series coarse ash storage (411) and an electric field A3 series raw ash storage (412) respectively arranged on one side of the fourth pipeline (410), and an electric field A3 series (410) of electric precipitators arranged on the other side of the fourth pipeline (410); The fourth pipeline (410) corresponds to an electric field A3 column coarse ash storage (411), an electric field A3 column raw ash storage (412) and a pneumatic gate valve at an electric field A3 column (410) of an electrostatic precipitator, and an electric field A3 column blower (413a) and an electric field A3 column pressure sensor (413b) are respectively provided at the electric field A3 column (410) of the electrostatic precipitator.
Citation Information
Cited By
DCS automatic ash conveying logic system
CN118963268A
Dcs automatic ash conveying logic system