Overwater pile clamping and cutting operation platform
By designing a water pile clamping and pile cutting operation platform, the structural shape formed by welding can be used to clamp and pile cutting, the pile foundation stability and pile cutting needs in offshore wind power projects are solved, and the operation safety and rigidity are improved .
Patent Information
- Application Number
- CN202420589041.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-03-25
AI Technical Summary
In offshore wind power projects, pile foundations after the pile sinking are completed need to be clamped to prevent deformation and displacement. At the same time, pile cutting is required before the concrete bearing construction, and the existing technology is difficult to meet these needs at the same time.
A water pile clamping and pile cutting operation platform is designed, including a horizontal platform composed of a plurality of first main beams, second main beams and secondary beams. The holes for steel pipe piles to pass through are formed by welding, and guardrails are provided and The hanging ears can not only clamp piles but also provide a pile cutting operation platform, improving the safety and stability of the operation.
The structural shape formed by welding can not only connect steel pipe piles together to realize the pile clamping function, but also provide a pile cutting operation platform, which improves the safety and stiffness of the operation and enhances the stability of the pile foundation.
Smart Images

Figure CN221972319U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water engineering, and more specifically to an above-water pile clamping and pile cutting operation platform. Background Art
[0002] Offshore wind power has the characteristics of abundant resources, high power generation utilization hours, no land occupation and suitability for large-scale development. It is the latest frontier of global wind power development.
[0003] When the foundation of an offshore wind power project is a pile group structure, after the pile foundation of a machine position is sunk, the pile foundation that has been sunk needs to be clamped to prevent deformation and displacement of a single pile caused by long-term wind loads and wave loads; at the same time, before the construction of the offshore wind power concrete foundation, each steel pipe pile needs to be cut to the designed pile top elevation. Utility Model Content
[0004] In view of this, the utility model provides an above-water pile clamping and pile cutting operation platform, which can meet the needs of pile clamping and pile cutting operations at the same time.
[0005] The utility model provides an above-water pile clamping and pile cutting operation platform, comprising: a horizontal platform composed of a plurality of first main beams, second main beams and secondary beams;
[0006] A plurality of the first main beams are sequentially connected end to end to form a closed regular polygon;
[0007] A plurality of the second main beams are connected perpendicularly and parallel to each other in a regular polygon;
[0008] A plurality of the secondary beams are connected between any adjacent second main beams, and between any adjacent first main beams and the second main beams;
[0009] The first main beam, the second main beam and the secondary beam form a hole for the steel pipe pile to pass through;
[0010] The above-water pile clamping and cutting operation platform also includes guardrails and lifting lugs;
[0011] The plurality of guardrails are vertically connected to the plurality of first main beams in sequence, and the sides of the plurality of guardrails are connected in sequence;
[0012] The plurality of lifting ears are respectively arranged on the second main beam.
[0013] In a possible implementation, the first main beam includes an even number;
[0014] The plurality of first main beams are sequentially connected end to end to form a closed regular polygon with an even number of sides.
[0015] In a possible implementation, the first main beams include 8;
[0016] The eight first main beams are connected end to end in sequence to form a closed regular octagon.
[0017] In a possible implementation, the second main beams include four;
[0018] Any two second main beams are parallel to each other, symmetrically arranged on both sides of the first symmetry axis and connected inside the regular octagon; Any two second main beams are parallel to each other, symmetrically arranged on both sides of the second symmetry axis and connected inside the regular octagon;
[0019] The first symmetry axis and the second symmetry axis intersect.
[0020] In a possible implementation, a plurality of the secondary beams constitute a main support area;
[0021] The plurality of secondary beams in the main support area are connected parallel to and perpendicular to each other, and are connected between the second main beams which are parallel to each other.
[0022] In a possible implementation, a plurality of the secondary beams form a first triangular support area;
[0023] The plurality of secondary beams in the first triangular support area are connected parallel to and perpendicular to each other, and are connected between the intersecting second main beams.
[0024] In a possible implementation, a plurality of the secondary beams form a second triangular support area;
[0025] The plurality of secondary beams in the second triangular support area are parallel, perpendicular and intersectingly connected to each other, and are connected between the second main beam and the first main beam.
[0026] In a possible implementation manner, the secondary beam is connected between the first triangular supporting area and the second triangular supporting area.
[0027] In a possible implementation, the lifting lug is disposed at an intersection of the first triangular supporting area and the second triangular supporting area on the second main beam.
[0028] In a possible implementation, the horizontal platform further includes a diamond-shaped pedal net;
[0029] The diamond-shaped pedal net is arranged on the top of the main support area, the first triangular support area and the second triangular support area.
[0030] Compared with the prior art, the present invention provides at least the following beneficial effects:
[0031] In the embodiment provided by the utility model, the above-water pile clamping and pile cutting operation platform is composed of a first main beam, a second main beam and a secondary beam, and its structural shape can not only connect multiple steel pipe piles together to realize the pile clamping function, but also provide an operation platform for later pile cutting, thereby improving the safety of the operation. The first main beam, the second main beam and the secondary beam are welded together, which improves the rigidity of the above-water pile clamping and pile cutting operation platform, is conducive to the clamping of steel pipe piles, and improves the stability of the pile foundation after the pile sinking is completed and before the foundation is constructed.
[0032] Of course, any product implementing the present utility model does not necessarily need to achieve all of the above-mentioned technical effects at the same time.
[0033] Other features and advantages of the present invention will become apparent from the following detailed description of exemplary embodiments of the present invention with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the present invention and, together with the description, serve to explain the principles of the present invention.
[0035] Figure 1 A three-dimensional structural diagram of an above-water pile clamping and pile cutting operation platform provided by the utility model;
[0036] Figure 2 A schematic diagram of the use of an above-water pile clamping and pile cutting operation platform provided by the utility model;
[0037] Figure 3 A schematic diagram of the top view of the structure of an above-water pile clamping and pile cutting operation platform provided by the utility model;
[0038] Figure 4 This is a schematic diagram of the top view of another water pile clamping and cutting operation platform provided by the utility model;
[0039] Figure 5 This is a schematic diagram of the top view of another water pile clamping and cutting operation platform provided by the utility model;
[0040] Figure 6 The present invention is a schematic diagram of a three-dimensional structure of a lifting ear provided by the present invention. DETAILED DESCRIPTION
[0041] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that unless otherwise specifically stated, the relative arrangement of components and steps, numerical expressions and numerical values set forth in these embodiments do not limit the scope of the present invention.
[0042] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the present invention, its application, or uses.
[0043] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered part of the specification.
[0044] In all examples shown and discussed herein, any specific values should be interpreted as merely exemplary and not limiting. Therefore, other examples of the exemplary embodiments may have different values.
[0045] It should be noted that like reference numerals and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.
[0046] The utility model embodiment provides an above-water pile clamping and pile cutting operation platform, referring to Figures 1 to 3 As shown, the embodiment of the utility model provides an above-water pile clamping and pile cutting operation platform, comprising: a horizontal platform 10 consisting of a plurality of first main beams 11, second main beams 12 and secondary beams 13;
[0047] A plurality of first main beams 11 are connected end to end in sequence to form a closed regular polygon;
[0048] A plurality of second main beams 12 are connected perpendicularly and parallel to each other in a regular polygon;
[0049] A plurality of secondary beams 13 are connected between any adjacent second main beams 12 and between any adjacent first main beams 11 and second main beams 12;
[0050] The first main beam 11, the second main beam 12 and the secondary beam 13 form a hole K for the steel pipe pile 40 to pass through;
[0051] The above-water pile clamping and pile cutting operation platform further comprises a guardrail 20 and a lifting lug 30;
[0052] The plurality of guardrails 20 are vertically connected to the plurality of first main beams 11 in sequence, and the sides of the plurality of guardrails 20 are connected in sequence;
[0053] A plurality of lifting eyes 30 are respectively disposed on the second main beam 12 .
[0054] It is understood that the above-water pile clamping and cutting operation platform includes a horizontal platform 10, which is formed by welding a plurality of first main beams 11 end to end to form a regular polygon. A second main beam 12 is connected to the inside of the regular polygon for support and reinforcement. A plurality of secondary beams 13 are connected between the second main beams 12, or between the first main beams 11 and the second main beams 12. The secondary beams 13 are used to further support and reinforce the horizontal platform 10, and form a plane for operation.
[0055] It should be noted that the second main beam 12 is connected to the regular polygon formed by the first main beam 11, dividing the horizontal platform 10 into multiple areas. Located in the central area of the regular polygon, the secondary beam 13 is connected between the second main beams 12, which can completely cover the central area. However, the secondary beam 13 is connected between the first main beam 11 and the second main beam 12, which cannot be completely covered, and a hole K needs to be reserved for the steel pipe pile 40 to pass through.
[0056] Furthermore, the above-water pile clamping and cutting operation platform further comprises a guardrail 20 and a lifting lug 30. The guardrail 20 is connected to the first main beam 11, surrounds the horizontal platform 10, and plays a protective role. The lifting lug 30 is arranged on the second main beam 12. After the above-water pile clamping and cutting operation platform is welded as a whole, it can be hoisted, transferred, etc. through the lifting lug 30.
[0057] Furthermore, the first main beam 11 and the second main beam 12 can both be made of double 36b channel steel, and the secondary beam 13 can be made of a single 14a I-beam. The guardrail 20 is a 48.3mm seamless steel pipe.
[0058] In the embodiment provided by the utility model, the above-water pile clamping and pile cutting operation platform is composed of a first main beam, a second main beam and a secondary beam, and its structural shape can not only connect multiple steel pipe piles together to realize the pile clamping function, but also provide an operation platform for later pile cutting, thereby improving the safety of the operation. The first main beam, the second main beam and the secondary beam are welded together, which improves the rigidity of the above-water pile clamping and pile cutting operation platform, is conducive to the clamping of steel pipe piles, and improves the stability of the pile foundation after the pile sinking is completed and before the foundation is constructed.
[0059] In another optional embodiment provided by the present utility model, the first main beam 11 includes an even number;
[0060] The plurality of first main beams 11 are sequentially connected end to end to form a closed regular polygon with an even number of sides.
[0061] It is understandable that in this embodiment, the first main beams 11 are an even number, and exemplary, they may be 6, 8, 10, 12, etc. An even number of first main beams 11 are connected end to end, and the lengths of the first main beams 11 are equal, forming a closed regular polygon with even sides. For example, a regular hexagon, a regular octagon, a regular decagon, a regular dodecagon, etc. In general, the number of first main beams 11, and the number of sides of the corresponding polygon, corresponds to the number of steel pipe piles 40 that need to be clamped in this project.
[0062] In another optional embodiment provided by the present utility model, the first main beam 11 includes 8;
[0063] The eight first main beams 11 are connected end to end in sequence to form a closed regular octagon.
[0064] In this embodiment, there are eight steel pipe piles 40 that need to be clamped and cut, so the first main beam 11 includes eight pieces that are connected to form a regular octagon.
[0065] In another optional embodiment provided by the present utility model, the second main beam 12 includes 4;
[0066] Any two second main beams 12 are parallel to each other, symmetrically arranged on both sides of the first symmetry axis x and connected inside the regular octagon; any two second main beams 12 are parallel to each other, symmetrically arranged on both sides of the second symmetry axis y and connected inside the regular octagon;
[0067] The first axis of symmetry x and the second axis of symmetry y intersect.
[0068] It can be understood that the first symmetry axis x is on the extension line of the diagonal of the regular octagonal horizontal platform 10. The second symmetry axis y intersects the first symmetry axis x, and further, the second symmetry axis y is perpendicular to the first symmetry axis x.
[0069] Furthermore, the second main beam 12 is connected to the regular polygon formed by the first main beam 11. Take the horizontal platform 10 as a regular octagon as an example. At this time, four second main beams 12 are set. The four second main beams 12 are symmetrically arranged about the first symmetry axis x and the second symmetry axis y, respectively. And the vertical distance between any second main beam 12 and the symmetry axis is equal. The second main beam 12 divides the horizontal platform 10 into at least 9 areas. Among them, the edge area along the first main beam 11 is used as a clamping pile, and the steel pipe pile 40 passes through and is fixed. Other areas can constitute the platform area during the pile cutting operation.
[0070] In another optional embodiment provided by the present utility model, refer to Figure 4 As shown, a plurality of secondary beams 13 constitute the main support area A1;
[0071] The plurality of secondary beams 13 in the main support area A1 are connected parallel to and perpendicular to each other, and are connected between the second main beams 12 which are parallel to each other.
[0072] It can be understood that the main support area A1 is the symmetrical central area of the horizontal platform 10, which is in the shape of a "cross". It should be noted that the portion of the main support area A1 extending in the direction of the first main beam 11 should not be too long, and sufficient area of the hole K needs to be reserved for clamping the pile. The area of the hole K needs to be compatible with the size of the steel pipe pile 40 and the size of the pile clamping device. Multiple secondary beams 13 are connected parallel to and perpendicular to the second main beams 12 to form a grid structure, which enhances the rigidity of the horizontal platform 10 and provides sufficient working space.
[0073] In another optional embodiment provided by the present utility model, continue to refer to Figure 4 As shown, a plurality of secondary beams 13 form a first triangular support area A2;
[0074] The plurality of secondary beams 13 of the first triangular support area A2 are connected parallel to and perpendicular to each other, and are connected between the intersecting second main beams 12 .
[0075] It is understandable that the first triangular support area A2 is located between the two intersecting main beams 12. At least two secondary beams 13 are parallel to each other and connected at a 45° angle between the intersecting second main beams 12, and a plurality of secondary beams 13 are parallel to each other and vertically connected between the above two secondary beams.
[0076] When the main support area A1 is in a "cross" shape, the first triangular support areas A2 include four, which are respectively connected to the corners of the main support area A1. The main support area A1 and the plurality of first triangular support areas A2 also form an octagonal platform area.
[0077] In another optional embodiment provided by the present utility model, continue to refer to Figure 4 As shown, a plurality of secondary beams 13 form a second triangular support area A3;
[0078] The multiple secondary beams 13 of the second triangular support area A3 are parallel, perpendicular, and intersectingly connected to each other, and are connected between the second main beam 12 and the first main beam 11 .
[0079] It can be understood that the second triangular support area A3 is connected between the first main beam 11 and the second main beam 12, that is, the corner formed when the second main beam 12 is connected to the first main beam 11. When the horizontal platform 10 is a regular octagon and the second main beam 12 includes 4, the corner of the octagon forms a larger area. In order to meet the needs of clamping piles, after setting the first triangular support area A2, the second triangular support area A3 can also be set to further reduce the area of the hole K at the corner of the octagon. Not only can it meet the needs of clamping piles, but also increase the working space and enhance the strength of the horizontal platform 10.
[0080] Further, at least one of the two ends of the secondary beam 13 in the second triangular support area A3 is connected to the first main beam 11 and the second main beam 12, respectively, to form a triangular area. The position where the secondary beam 13 is connected to the second main beam 12 can be connected to the first triangular support area A2. In the second triangular support area A3, the secondary beams 13 are connected parallel to each other and / or vertically. Of course, in some other embodiments, the secondary beams 13 can also be connected at an angle, as long as the secondary beams 13 can be arranged in a closed manner in the second triangular support area A3.
[0081] In another optional embodiment provided by the present invention, a secondary beam 13 is connected between the first triangular support area A2 and the second triangular support area A3 to further increase the strength of the horizontal platform 10 .
[0082] In another optional embodiment provided by the present utility model, refer to Figures 1 to 6 As shown, the lifting lug 30 is disposed at the intersection of the first triangular supporting area A2 and the second triangular supporting area A3 on the second main beam 12 .
[0083] It can be understood that the first triangular support area A2 and the second triangular support area A3 are evenly distributed at the intersection of the second main beam 12, and the secondary beam 13 is connected in all directions thereto, which has high strength. A lifting lug 30 is provided here to facilitate the lifting and movement of the platform.
[0084] Further, the lifting lug 30 includes a main board 31, a reinforcing plate 33 connected to the bottom of the main board 31, and a reinforcing plate 32 with a through hole disposed on the main board 31. The main board 31, the reinforcing plate 32 and the reinforcing plate 33 can all be 20 mm steel plates.
[0085] In another optional embodiment provided by the present utility model, refer to Figure 5 As shown, the horizontal platform 10 also includes a diamond-shaped pedal net 50;
[0086] The diamond-shaped pedal net 50 is disposed on the top of the main support area A1 , the first triangular support area A2 and the second triangular support area A3 .
[0087] It can be understood that the main support area A1, the first triangular support area A2, the second triangular support area A3, and the top of the triangular area formed by the first triangular support area A2, the second triangular support area A3 and the secondary beam 13 are all provided with a diamond-shaped pedal net 50. The diamond-shaped pedal net 50 has a specification of 60mm×80mm, which prevents stepping on empty space during operation and improves operation safety.
[0088] In summary, the above-water pile clamping and pile cutting operation platform provided by the utility model achieves at least the following beneficial effects:
[0089] In the embodiment provided by the utility model, the above-water pile clamping and pile cutting operation platform is composed of a first main beam, a second main beam and a secondary beam, and its structural shape can not only connect multiple steel pipe piles together to realize the pile clamping function, but also provide an operation platform for later pile cutting, thereby improving the safety of the operation. The first main beam, the second main beam and the secondary beam are welded together, which improves the rigidity of the above-water pile clamping and pile cutting operation platform, is conducive to the clamping of steel pipe piles, and improves the stability of the pile foundation after the pile sinking is completed and before the foundation is constructed.
[0090] Although some specific embodiments of the present invention have been described in detail by way of examples, it should be understood by those skilled in the art that the above examples are for illustration only and are not intended to limit the scope of the present invention. It should be understood by those skilled in the art that the above embodiments may be modified without departing from the scope and spirit of the present invention. The scope of the present invention is defined by the appended claims.
Claims
1. A water pile clamping and cutting operation platform, It is characterized in that include: A horizontal platform consisting of a plurality of first main beams, second main beams and secondary beams; A plurality of the first main beams are sequentially connected end to end to form a closed regular polygon; A plurality of the second main beams are connected perpendicularly and parallel to each other in a regular polygon; A plurality of the secondary beams are connected between any adjacent second main beams, and between any adjacent first main beams and the second main beams; The first main beam, the second main beam and the secondary beam form a hole for the steel pipe pile to pass through; The above-water pile clamping and cutting operation platform also includes guardrails and lifting lugs; The plurality of guardrails are vertically connected to the plurality of first main beams in sequence, and the sides of the plurality of guardrails are connected in sequence; The plurality of lifting ears are respectively arranged on the second main beam.
2. The above-water pile clamping and cutting operation platform according to claim 1, It is characterized in that The first main beams include an even number; The plurality of first main beams are sequentially connected end to end to form a closed regular polygon with an even number of sides.
3. The above-water pile clamping and cutting operation platform according to claim 2, It is characterized in that The first main beams include 8; The eight first main beams are connected end to end in sequence to form a closed regular octagon.
4. The above-water pile clamping and cutting operation platform according to claim 3, It is characterized in that The second main beam includes 4; Any two second main beams are parallel to each other, symmetrically arranged on both sides of the first symmetry axis and connected inside the regular octagon; Any two second main beams are parallel to each other, symmetrically arranged on both sides of the second symmetry axis and connected inside the regular octagon; The first symmetry axis and the second symmetry axis intersect.
5. The above-water pile clamping and cutting operation platform according to claim 1, It is characterized in that A plurality of said secondary beams constitute a main support area; The plurality of secondary beams in the main support area are connected parallel to and perpendicular to each other, and are connected between the second main beams which are parallel to each other.
6. The above-water pile clamping and cutting operation platform according to claim 5, It is characterized in that A plurality of said secondary beams form a first triangular support region; The plurality of secondary beams in the first triangular support area are connected parallel to and perpendicular to each other, and are connected between the intersecting second main beams.
7. The above-water pile clamping and cutting operation platform according to claim 6, It is characterized in that A plurality of said secondary beams form a second triangular support area; The plurality of secondary beams in the second triangular support area are parallel, perpendicular and intersectingly connected to each other, and are connected between the second main beam and the first main beam.
8. The above-water pile clamping and cutting operation platform according to claim 7, It is characterized in that The secondary beam is connected between the first triangular supporting area and the second triangular supporting area.
9. The above-water pile clamping and cutting operation platform according to claim 7, It is characterized in that The lifting lug is arranged at the intersection of the first triangular supporting area and the second triangular supporting area on the second main beam.
10. The above-water pile clamping and cutting operation platform according to claim 7, It is characterized in that The horizontal platform also includes a diamond-shaped pedal net; The diamond-shaped pedal net is arranged on the top of the main support area, the first triangular support area and the second triangular support area.