Hole-opening-free double-pipe type grouting pile

Through the dual casing mode and sealing unit design of open-hole-free double-tube grouting piles, the complex construction and slurry retraction problems during the construction of micro grouting piles are solved, and the rapid and economical foundation reinforcement effect is achieved.

CN221972354UActive Publication Date: 2024-11-08SHANGHAI GEOTECHN INVESTIGATIONS & DESIGN INST
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202323412294.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-14
Publication Date
2024-11-08
Estimated Expiration
2033-12-14

AI Technical Summary

Technical Problem

During the construction process of existing micro grouting piles, there are problems such as complex construction process, long time, and may cause underground slurry reflux, making it difficult to effectively control the underground grouting process.

Method used

Adopt open-hole-free double-tube grouting pile, through the double-tube mode of inner sleeve and outer sleeve casing, there is no hole in the inner sleeve, and the outer sleeve is equipped with multiple slurry holes, between the inner sleeve and outer sleeve A sealing unit is provided, and the inner sleeve is lifted upward during the grouting process, and the slurry flows out from the bottom of the inner sleeve, and flows into the soil through the slurry holes to form a reinforced grouting body.

Benefits of technology

It achieves fast construction speed, good quality and low cost, and is suitable for foundation reinforcement, can effectively control the slurry output, save construction period and reduce project budget.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972354U_ABST
    Figure CN221972354U_ABST
Patent Text Reader

Abstract

The utility model discloses a trepanning-free double-pipe type grouting pile which comprises an inner sleeve, an outer sleeve, an outer sleeve and an inner sleeve, the inner sleeve is hollow, and grout can flow in from the top of the inner sleeve and flow out from the bottom of the inner sleeve; the outer sleeve is arranged on the outer side of the inner sleeve in a sleeving mode, a plurality of first grout outlet holes are formed in the outer sleeve in the height direction, and the inner sleeve can slide relative to the outer sleeve; the sealing unit is arranged between the inner sleeve and the outer sleeve, and the sealing unit is used for sealing the space between the outer side wall of the inner sleeve and the inner side wall of the outer sleeve; and the grouting device is connected to the bottom of the outer sleeve, and a plurality of second grout outlet holes are formed in the grouting device. The micro pile grouting device is suitable for grouting construction of foundation reinforcement micro piles, and has the advantages of being high in applicability, high in construction speed, good in construction quality control, low in construction cost and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of foundation treatment, in particular to a double-tube grouting pile without opening a hole. Background Art

[0002] The demand for foundation treatment has always been urgent during the construction process. There are many methods for foundation treatment, such as replacement method, preloading method, dynamic tamping method, vibroflotation method and various types of piles, etc. Each method has its advantages and disadvantages. Micro grouting piles, as a process with fast construction speed, small environmental impact and good reinforcement effect, have been adopted in many engineering projects.

[0003] The micro-grouting piles used in the current foundation treatment process are mainly divided into two categories: tree root piles and grouting steel pipe piles. The construction of tree root piles mainly adopts the method of drilling holes in advance and then lowering micro-reinforcement cages for grouting. During the operation of this method, due to the complex construction process, the construction time required is long, and it may cause underground grouting and other situations, and it is impossible to judge the underground grouting process. Micro-grouting steel pipe piles are currently mainly constructed by drilling holes, which have the same engineering problems as tree root piles. Utility Model Content

[0004] Based on this, it is necessary to provide a double-tube grouting pile without drilling holes to address the above technical problems.

[0005] A double-tube grouting pile without opening a hole, comprising:

[0006] An inner sleeve, wherein the interior of the inner sleeve is hollow, and the slurry can flow into from the top of the inner sleeve and flow out from the bottom of the inner sleeve;

[0007] An outer sleeve is sleeved on the outer side of the inner sleeve, the outer sleeve is provided with a plurality of first slurry outlet holes along the height direction, and the inner sleeve can slide relative to the outer sleeve;

[0008] A sealing unit is disposed between the inner sleeve and the outer sleeve, and is used to seal between the outer wall of the inner sleeve and the inner wall of the outer sleeve;

[0009] The grouting device is connected to the bottom of the outer casing, and a plurality of second slurry outlet holes are opened on the grouting device.

[0010] In one embodiment, threaded connecting pipes are provided at both upper and lower ends of the inner sleeve.

[0011] In one embodiment, the sealing unit includes an upper sealing ring and a lower sealing ring, which are respectively sleeved on the upper and lower outer wall of the inner sleeve, and the outer surfaces of the upper and lower sealing rings are in sealing contact with the inner wall of the outer sleeve.

[0012] In one of the embodiments, a conical base is provided at the bottom of the grouting device, and a plurality of third grouting holes are provided on the conical base.

[0013] In one of the embodiments, the top of the grouting device is threadedly connected to the bottom of the outer sleeve.

[0014] In one embodiment, the diameter of the second slurry outlet hole is smaller than the diameter of the first slurry outlet hole.

[0015] The above-mentioned double-tube grouting pile without drilling holes adopts a double-casing mode, in which no holes are drilled on the inner casing, and multiple first slurry outlet holes are opened on the outer casing. A sealing unit is arranged between the inner casing and the outer casing. During the grouting process, the inner casing is lifted upward, and the slurry flows out from the bottom of the inner casing, flows into the soil through the first slurry outlet hole and the second slurry outlet hole, and forms a reinforced grouting body with the outer casing and remains in the soil. It is suitable for grouting construction of micro-pile for foundation reinforcement, and has the advantages of strong applicability, fast construction speed, good control of construction quality, and low construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0017] Figure 1 It is a schematic diagram of the upper structure of the double-tube grouting pile without opening holes of the utility model;

[0018] Figure 2 It is a schematic diagram of the lower structure of the double-tube grouting pile without opening holes of the utility model;

[0019] Figure 3 It is a structural schematic diagram of the inner sleeve of the utility model;

[0020] Figure 4 It is a structural schematic diagram of the outer sleeve of the utility model;

[0021] Figure 5 It is a structural schematic diagram of a grouting device of the utility model;

[0022] Figure 6 This is a usage diagram of the double-tube grouting pile without opening holes of the utility model. DETAILED DESCRIPTION

[0023] In order to facilitate the understanding of the present invention, the present invention will be described more comprehensively with reference to the accompanying drawings. The accompanying drawings provide preferred embodiments of the present invention. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present invention more thorough and comprehensive.

[0024] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be an intermediate element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be an intermediate element at the same time.

[0025] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention.

[0026] See also Figure 1-6 As shown, an embodiment of the utility model provides a double-tube grouting pile without opening a hole, comprising:

[0027] An inner sleeve 1, wherein the inner sleeve 1 is hollow, and the slurry can flow into the inner sleeve 1 from the top and flow out from the bottom of the inner sleeve 1;

[0028] The outer sleeve 2 is sleeved on the outside of the inner sleeve 1. The outer sleeve 2 is provided with a plurality of first slurry outlet holes 21 along the height direction. The inner sleeve 1 can slide relative to the outer sleeve 2. In this embodiment, the diameter and number of the first slurry outlet holes 21 need to match the grouting rate, grouting pressure, grouting amount, etc., and should be avoided as much as possible from being opened in the same cross section to ensure that the outer sleeve 2 has sufficient strength.

[0029] A sealing unit 3 is provided between the inner sleeve 1 and the outer sleeve 2, and is used to seal between the outer wall of the inner sleeve 1 and the inner wall of the outer sleeve 2;

[0030] The grouting device 4 is connected to the bottom of the outer casing 2, and a plurality of second grouting holes 41 are provided on the grouting device 4. Optionally, the diameter and length of the grouting device 4 can be customized according to specific grouting requirements. If it is difficult to press in, a threaded structure can be added to the wall of the grouting device 4, and it can be drilled into the soil by a rotary drilling or vibration sinking method. Furthermore, the diameter and number of the second grouting holes 41 match the grouting rate, and they are avoided as much as possible from being opened on the same cross section to ensure that the grouting pipe body has sufficient strength.

[0031] The above-mentioned double-tube grouting pile without drilling holes adopts a double-casing mode, in which no holes are drilled on the inner casing 1, and multiple first slurry outlet holes 21 are opened on the outer casing 2. A sealing unit 3 is arranged between the inner casing 1 and the outer casing 2. During the grouting process, the inner casing 1 is lifted upward, and the slurry flows out from the bottom of the inner casing 1, flows into the soil through the first slurry outlet hole 21 and the second slurry outlet hole 41, and forms a reinforced grouting body with the outer casing 2 and remains in the soil. It is suitable for foundation reinforcement micro-pile grouting construction, has strong applicability, can effectively control the slurry output, save construction period, and reduce project budget.

[0032] In one embodiment of the utility model, both upper and lower ends of the inner sleeve 1 are provided with threaded connecting pipes 11. In this way, auxiliary equipment such as push-pull rods can be quickly connected to facilitate driving the inner sleeve 1 to move upward or downward.

[0033] In one embodiment of the utility model, the sealing unit 3 includes an upper sealing ring 31 and a lower sealing ring 32, and the upper sealing ring 31 and the lower sealing ring 32 are respectively sleeved on the upper part and the lower part of the outer wall of the inner sleeve 1, and the outer surfaces of the upper sealing ring 31 and the lower sealing ring 32 are in sealing contact with the inner wall of the outer sleeve 2.

[0034] In this embodiment, the upper sealing ring 31 and the lower sealing ring 32 can be made of elastic materials such as rubber to prevent the slurry from flowing back from the gap between the inner and outer sleeves during the grouting process.

[0035] In one embodiment of the present invention, a conical base 5 is provided at the bottom of the grouting device 4, and a plurality of third grouting holes 51 are provided on the conical base 5. In this way, the grouting range of the grouting device 4 can be increased.

[0036] In one embodiment of the utility model, the top of the grouting device 4 is threadedly connected to the bottom of the outer sleeve 2. In this way, the installation and quick disassembly of the grouting device 4 are convenient.

[0037] In one embodiment of the present invention, the diameter of the second pulp outlet hole 41 is smaller than the diameter of the first pulp outlet hole 21 , so as to reduce the blockage of the second pulp outlet hole 41 .

[0038] The method of using the utility model is as follows:

[0039] 1. Use on-site RTK, GPS, total station and other surveying methods to complete the surveying of grouting points;

[0040] 2. Stop the grouting machine at the drilling point, connect the hole-opening device to break the hard floor and drill through the miscellaneous fill layer;

[0041] 3. The grouting hole of the grouting device is blocked with bentonite, the grouting device is connected to the outer pipe, and the grouting device is pressed down to the predetermined depth. When the hard soil layer is difficult to press down, the grouting device is sent to the predetermined depth by rotary drilling or vibration sinking;

[0042] 4. Install the puller, connect the mixer, connect the grouting pump, and prepare the special grouting slurry;

[0043] 5. Insert the inner casing into the outer casing, connect the inner casing to the grouting pipe, open the plug by pressure, flush the bentonite in the grouting device by pressure, and then carry out the grouting construction;

[0044] 6. While the grouting construction is in progress, the inner casing 1 is lifted upwards to ensure the continuity of the grouting construction, and the impact of the grouting on the surrounding environment is monitored through the construction;

[0045] 7. When the grouting construction reaches the expected parameters, stop grouting, pull out the pipe and stop construction, and the grouting is completed.

[0046] In summary, the utility model has the following advantages:

[0047] (1) A variety of different types of pile-forming equipment can be used, and different drill bits can be selected for different soil layers. The selection of grouting equipment is more extensive and more versatile. By improving the grouting drill bit and dynamic grouting process, the soil penetration depth of micro-disturbance grouting can be effectively increased by using a rotary drilling or vibration sinking method. The simple construction process can greatly reduce the construction process, speed up the construction speed, and save the construction period. At the same time, it ensures that the grouting piles formed have good integrity, high strength, and high bearing capacity;

[0048] (2) The location of the opening can be freely selected to meet the construction requirements on site. Upward grouting can form grouting steel pipe piles, effectively improving the bearing capacity of the foundation;

[0049] (3) It is applicable to various scenarios such as foundation reinforcement, composite foundation, isolation piles, tunnel micro-disturbance grouting, foundation pit water stopping, etc. in various strata. The total amount of underground grouting can be effectively controlled, thereby controlling the budget of the project, effectively saving additional engineering expenses, and generating better economic benefits. The way in which the inner tube can be recycled can further control cost expenditure. In general, the utility model has the characteristics of higher economy, wider application range, and better reinforcement effect.

[0050] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0051] The above-mentioned embodiments only express several implementation methods of the utility model, but they cannot be understood as limiting the scope of the utility model patent. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model patent shall be based on the attached claims.

Claims

1. A double-tube grouting pile without opening holes. It is characterized in that include: An inner sleeve, wherein the interior of the inner sleeve is hollow, and the slurry can flow into from the top of the inner sleeve and flow out from the bottom of the inner sleeve; An outer sleeve is sleeved on the outer side of the inner sleeve, the outer sleeve is provided with a plurality of first slurry outlet holes along the height direction, and the inner sleeve can slide relative to the outer sleeve; A sealing unit is disposed between the inner sleeve and the outer sleeve, and is used to seal between the outer wall of the inner sleeve and the inner wall of the outer sleeve; The grouting device is connected to the bottom of the outer casing, and a plurality of second slurry outlet holes are opened on the grouting device.

2. The double-tube grouting pile without opening holes as claimed in claim 1, It is characterized in that The upper and lower ends of the inner sleeve are both provided with threaded connecting pipes.

3. The double-tube grouting pile without opening holes as claimed in claim 1, It is characterized in that The sealing unit comprises an upper sealing ring and a lower sealing ring, which are respectively sleeved on the upper and lower outer wall portions of the inner sleeve, and the outer surfaces of the upper and lower sealing rings are in sealing contact with the inner wall of the outer sleeve.

4. The double-tube grouting pile without opening holes as claimed in claim 1, It is characterized in that A conical base is provided at the bottom of the grouting device, and a plurality of third grouting holes are provided on the conical base.

5. The double-tube grouting pile without opening holes as claimed in claim 4, It is characterized in that The top of the grouting device is threadedly connected to the bottom of the outer sleeve.

6. The double-tube grouting pile without opening holes as claimed in claim 1, It is characterized in that The aperture of the second slurry outlet hole is smaller than the aperture of the first slurry outlet hole.

Citation Information

Cited By

  • Grouting device of cast-in-place pile foundation and construction method of cast-in-place pile

    CN122082435A

  • A grouting device for a cast-in-place pile foundation and a construction method for a cast-in-place pile foundation

    CN122082435B