Cast-in-place pile secondary hole cleaning device for slurry retaining wall hole forming

By using a steel cage, grouting pipe and air blowing pipe device in the pouring pile hole, the air compressor is used to clean the sediment and prevent the water from entering, the problem of sediment cannot be cleaned in traditional methods is solved, and the molding quality of construction is improved.

CN221972386UActive Publication Date: 2024-11-08BEIJING NO 3 CONSTR ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323467084.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-11-08
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

In construction, the traditional secondary hole cleaning method cannot effectively clean the sediment at the bottom of the cast pile hole, resulting in the impact of the forming quality.

Method used

A device including a steel cage, multiple grouting pipes and blowing pipes is designed. The grouting pipe is fixed on the side of the steel cage. The blowing pipe is connected to the air compressor. The sediment is blown away by sending air into the grouting pipe, and the grouting pipe is applied to the grouting pipe. A one-way check valve is installed at the bottom of the pipe to prevent water from entering.

Benefits of technology

The sediment at the bottom of the hole is effectively cleaned, the construction molding quality is improved, and the drying of the bottom of the hole is ensured and the effective elimination of the precipitate is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972386U_ABST
    Figure CN221972386U_ABST
Patent Text Reader

Abstract

The utility model discloses a cast-in-place pile secondary hole cleaning device for slurry retaining wall hole forming. The cast-in-place pile secondary hole cleaning device comprises a reinforcement cage, a grouting pipe, an air blowing pipe and an air compressor. Wherein the number of the grouting pipes is multiple, the multiple grouting pipes are evenly fixed to the side face of the reinforcement cage, and the reinforcement cage is arranged in a cast-in-place pile hole; the number of the air blowing pipes is the same as that of the grouting pipes, one ends of the multiple air blowing pipes are connected with one ends of the multiple grouting pipes correspondingly, and the other ends of the multiple air blowing pipes are connected with the air compressor. The grouting pipes are fixed to the periphery of the reinforcement cage, the tops of the grouting pipes are connected with the air compressor through the air blowing pipes, after the device is installed, the air compressor is started, air is supplied into the grouting pipes, sediment deposited at the bottom of a hole is blown away, and then the forming quality of construction is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a secondary hole cleaning device for a cast-in-place pile used for mud wall protection and hole forming. Background Art

[0002] In building construction, secondary hole cleaning of bored piles is a key process in the pile construction process. Traditional secondary hole cleaning methods include positive circulation, pump suction reverse circulation, air lift reverse circulation, etc. However, for these secondary hole cleaning methods, after the steel cage is hoisted, the conduit is installed and before the concrete is poured, during this period of time, the mud is in a static state, and the sediment at the bottom of the hole formed by gravity cannot be cleaned, resulting in excessive sediment thickness, which seriously affects the construction quality. Utility Model Content

[0003] In view of the deficiencies in the prior art, the utility model designs a secondary hole cleaning device for bored piles with mud wall protection, comprising: a steel cage, a grouting pipe, an air blowing pipe and an air compressor; wherein, the number of grouting pipes is multiple, and the multiple grouting pipes are evenly fixed on the sides of the steel cage, and the steel cage is arranged in the bored pile hole; the number of air blowing pipes is the same as the number of grouting pipes, one end of the multiple air blowing pipes is respectively connected to one end of the multiple grouting pipes, and the other ends of the multiple air blowing pipes are all connected to the air compressor.

[0004] Preferably, the other ends of the multiple grouting pipes are respectively provided with a one-way check valve.

[0005] Preferably, the steel cage includes: vertical steel bars and steel hoops; there are multiple vertical steel bars, and the multiple vertical steel bars are evenly arranged into a cylindrical structure; the steel hoops are arranged outside the cylindrical structure surrounded by the multiple vertical steel bars, and the multiple vertical steel bars are all connected to the steel hoops; the grouting pipe is fixedly connected to the vertical steel bars.

[0006] Preferably, the length of the grouting pipe is 75±25 cm longer than the length of the vertical steel bars.

[0007] Preferably, the grouting pipe is connected to the vertical steel bars via fixings.

[0008] Preferably, the fixing member is a binding wire.

[0009] Preferably, the grouting pipe and the air blowing pipe as well as the grouting pipe and the one-way check valve are connected by threads.

[0010] Compared with the closest prior art, the beneficial effects of the utility model are:

[0011] 1. The utility model fixes the grouting pipe around the steel cage, connects the air compressor through the air blowing pipe at the top of the grouting pipe, and after the device is installed, starts the air compressor to send air through the grouting pipe to blow away the sediment deposited at the bottom of the hole, thereby improving the molding quality of the construction.

[0012] 2. The utility model has a one-way check valve fixedly arranged at the bottom of the grouting pipe, which can effectively prevent the water at the bottom of the hole from entering the grouting pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a first structural schematic diagram of the secondary hole cleaning device for bored piles of the utility model.

[0014] Figure 2 This is a second structural schematic diagram of the secondary hole cleaning device for bored piles of the utility model.

[0015] Figure 3 It is a schematic diagram of the structure of fixing the grouting pipe of the utility model.

[0016] Figure 4 For this utility model Figure 3 Enlarged view of point A in the middle.

[0017] Figure 5 For this utility model Figure 3 Enlarged view of point B in the middle.

[0018] Reference numerals:

[0019] 1- cast-in-place pile hole, 2- vertical steel bars, 3- steel bar hoops, 4- grouting pipes, 5- air blowing pipes, 6- air compressors, 7- fixings, 8- one-way check valves. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0021] Example 1

[0022] like Figure 1-Figure 5 As shown, the utility model provides a secondary hole cleaning device for bored piles with mud wall protection, comprising: a steel cage, a grouting pipe 4, an air blowing pipe 5 and an air compressor 6; wherein, the number of the grouting pipes 4 is multiple, and the multiple grouting pipes 4 are evenly fixed on the side of the steel cage, and the steel cage is arranged in the bored pile hole; the number of the air blowing pipes 5 is the same as the number of the grouting pipes 4, one end of the multiple air blowing pipes 5 is respectively connected to one end of the multiple grouting pipes 4, and the other end of the multiple air blowing pipes 5 is connected to the air compressor 6. The grouting pipes are fixed around the steel cage, and the air compressor is connected to the top of the grouting pipes through the air blowing pipes. After the device is installed, the air compressor is started to send air through the grouting pipes to blow away the sediment deposited at the bottom of the hole, thereby increasing the molding quality of the construction.

[0023] In a preferred embodiment, the other ends of the plurality of grouting pipes 4 are respectively provided with one-way check valves 8, which can effectively prevent the water at the bottom of the hole from entering the grouting pipe.

[0024] In a preferred embodiment, the steel cage includes: vertical steel bars 2 and steel bar hoops 3; there are multiple vertical steel bars 2, and the multiple vertical steel bars 2 are evenly arranged into a cylindrical structure; the steel bar hoops 3 are arranged on the outside of the cylindrical structure surrounded by the multiple vertical steel bars 2, and the multiple vertical steel bars 2 are all connected to the steel bar hoops 3; the grouting pipes 4 are fixedly connected to the vertical steel bars 2.

[0025] In a preferred embodiment, the length of the grouting pipe 4 is 75±25 cm longer than the length of the vertical steel bar 2. The length of the grouting pipe 4 is longer than the length of the vertical steel bar 2, which facilitates the connection between the blowing pipe 5 and the grouting pipe 4.

[0026] In a preferred embodiment, the grouting pipe 4 is connected to the vertical reinforcement 2 via a fixing member 7. Preferably, the fixing member 7 is a binding wire.

[0027] In a preferred embodiment, the grouting pipe 4 and the air blowing pipe 5 as well as the grouting pipe 4 and the one-way check valve 8 are connected by threads. The threaded connection ensures the airtightness of the connection.

[0028] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be subject to various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of the claims of the present invention to be approved.

Claims

1. A secondary hole cleaning device for bored piles used for mud wall drilling, characterized in that: include: A steel cage, a grouting pipe (4), an air blowing pipe (5) and an air compressor (6); There are a plurality of grouting pipes (4), and the plurality of grouting pipes (4) are evenly fixed on the side of the steel cage, and the steel cage is arranged in the cast-in-place pile hole; The number of the air blowing pipes (5) is the same as the number of the grouting pipes (4); one end of the plurality of air blowing pipes (5) is respectively connected to one end of the plurality of grouting pipes (4); and the other ends of the plurality of air blowing pipes (5) are all connected to the air compressor (6).

2. The secondary hole cleaning device for bored piles used for mud wall drilling as claimed in claim 1, characterized in that: The other ends of the plurality of grouting pipes (4) are each provided with a one-way check valve (8).

3. The secondary hole cleaning device for bored piles used for mud wall drilling as claimed in claim 1, characterized in that: The steel cage comprises: vertical steel bars (2) and steel hoops (3); The number of the vertical steel bars (2) is multiple, and the multiple vertical steel bars (2) are evenly arranged in a cylindrical structure; The steel bar hoop (3) is arranged outside the cylindrical structure surrounded by the plurality of vertical steel bars (2), and the plurality of vertical steel bars (2) are all connected to the steel bar hoop (3); The grouting pipe (4) is fixedly connected to the vertical steel bars (2).

4. The secondary hole cleaning device for bored piles used for mud wall drilling as claimed in claim 3, characterized in that: The length of the grouting pipe (4) is 75±25 cm longer than the length of the vertical steel bars (2).

5. The secondary hole cleaning device for bored piles used for mud wall drilling as claimed in claim 3, characterized in that: The grouting pipe (4) is connected to the vertical steel bar (2) via a fixing member (7).

6. The secondary hole cleaning device for bored piles used for mud wall drilling as claimed in claim 5, characterized in that: The fixing member (7) is a binding wire.

7. The secondary hole cleaning device for bored piles used for mud wall drilling as claimed in claim 2, characterized in that: The grouting pipe (4) and the air blowing pipe (5) as well as the grouting pipe (4) and the one-way check valve (8) are both connected via threads.