Basement side wall leakage curtain grouting repairing structure
By horizontally penetrating through through holes on the basement side wall and forming a waterproof layer with feeding parts and concrete, the problems of wall damage and cracks in the prior art are solved, and efficient waterproofing effect of basement side walls is achieved.
Patent Information
- Application Number
- CN202420084249.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-12
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-01-12
AI Technical Summary
The existing basement side wall waterproofing method requires slicing the leak points and re-pouring, resulting in large damage to the wall and cracks between the wall after later drying and the original wall.
Multiple through holes are opened horizontally in the vertical direction on the wall, and the slurry is transported through the flow guide cylinder in the feeding part and a high pressure to form a waterproof layer. Combined with the keel and sealing part, concrete is added to form a new waterproof layer to avoid cutting walls and reduce damage and cracks.
It is achieved by forming a new waterproof layer without destroying the original wall, reducing damage to the wall, avoiding cracks between the later poured wall and the original wall, and improving the waterproof effect.
Smart Images

Figure CN221972497U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of basement side wall waterproofing, and in particular to a curtain grouting repair structure for basement side wall leakage. Background Art
[0002] In recent years, urban construction land has been relatively tight, and the construction of basements has become more and more frequent. The occurrence of basement leakage has caused inconvenience to the use of buildings, caused steel bars to rust, affected the service life of buildings, and even affected the quality and safety of the structure.
[0003] The existing announcement number is CN217734388U, and the name is a construction structure for treating leakage on the back water surface of the outer wall of a basement, including a structural wall, a wall leakage range marked on the inner wall surface of the structural wall, a wall leakage decorative surface layer chiseling range formed by chiseling out the outer circle of the wall leakage range, a leveling layer applied within the chiseled range of the wall leakage decorative surface layer, a wall leakage repair sealing layer sprayed within the chiseled range of the wall leakage decorative surface layer, and a wall leakage repair anti-seepage layer sprayed on the wall leakage repair sealing layer. By re-constructing the wall leakage repair sealing layer, the wall leakage repair anti-seepage layer, the wall leakage repair reinforcement layer and the wall leakage repair decoration finishing restoration layer on the back water surface, the original structure is not destroyed, and the parts of the outer wall with leakage defects are waterproofed, reinforced, anti-seepage, plugged and other comprehensive treatments are carried out, and new leakage points will not be generated due to the destruction of the original structure.
[0004] With respect to the above-mentioned related technologies, the inventors found that the above-mentioned method of preventing basement wall leakage is to excavate and cut the wall at the leakage point, and then re-pour waterproofing on the wall at the leakage point. This method of preventing basement wall leakage requires cutting the leakage point of the basement wall and then re-pour waterproofing. This method causes great damage to the wall. The later poured wall cannot be integrated with the original wall, and there are cracks between the later dried wall and the original wall. Utility Model Content
[0005] In order to improve the existing method of preventing basement walls from leaking, it is necessary to cut the leaking points of the basement walls and then re-pour waterproofing. This method causes great damage to the walls. The walls poured later cannot be integrated with the original walls. There are cracks between the walls after drying later and the original walls. The present application provides a curtain grouting repair structure for basement side wall leakage.
[0006] The present application provides a basement side wall leakage curtain grouting repair structure adopts the following technical solution:
[0007] A curtain grouting repair structure for leakage of basement side wall comprises a wall body, a plurality of through holes are opened horizontally through the wall body in a vertical direction, and feeding pieces are horizontally inserted in the plurality of through holes of the wall body, a seepage surface is arranged on the outer side of the wall body, the feeding piece is used for conveying slurry to form a waterproof slurry layer between the wall body and the seepage surface, the feeding piece comprises a guide piece, a keel piece and a plugging piece, the guide piece comprises a guide tube, the guide tube is horizontally inserted in the through hole of the wall body, and a hole frame is fixed at one end of the guide tube close to the seepage surface, a baffle plate is arranged at one end of the guide tube close to the seepage surface, a guide rod is horizontally fixed on the baffle plate, and the guide rod on the baffle plate is slidably inserted on the hole frame, a spring is sleeved on the guide rod on the baffle plate, and two ends of the spring are respectively fixed on the baffle plate and the hole frame, the keel piece is sleeved on the outside of the guide tube, and concrete is filled between the keel piece and the through hole, and the plugging piece is assembled at one end of the guide tube away from the seepage surface.
[0008] By adopting the above technical scheme, in use, a plurality of through holes are horizontally opened from bottom to top in sequence on the side wall of the seepage basement, and then the feeding piece is horizontally inserted into the through hole on the side wall of the seepage basement, one end of the guide tube in the feeding piece is connected with the external slurry feeding device, and the slurry feeding device is turned on to convey the slurry into the guide tube under high pressure. When the slurry is conveyed from the other end of the guide tube, the conveyed slurry squeezes the guide rod on the baffle plate to slide on the hole frame, causing the spring on the guide rod in the baffle plate to deform, causing the baffle plate to slide out from the other end of the guide tube, and then the slurry flows out from the other end of the guide tube, and the slurry flows into the space between the wall and the seepage surface to form A waterproof slurry layer is formed, and then the keel piece is inserted into the through hole, and the sealing piece is threaded to press the keel piece and sleeved in the guide tube, and then concrete is poured into the through hole through the sealing piece. The presence of the keel piece increases the sealing and solidification firmness of the through hole, thereby forming a new waterproof layer between the wall and the seepage surface, and a plurality of through holes are opened horizontally through the wall in the vertical direction, and waterproof slurry is poured through the through holes to form a new waterproof layer between the wall and the seepage surface, thereby eliminating the need to cut the wall, reducing damage to the wall, and avoiding the problem that the wall poured in the later stage cannot be integrated with the original wall, and there are cracks between the wall after drying in the later stage and the original wall.
[0009] Optionally, a blocking plate is fixed through one end of the guide tube close to the water seepage surface, and a sealing ring is fixed on the outer end surface of the blocking plate, and an internal thread is provided on the end of the inner circumferential surface of the guide tube away from the water seepage surface.
[0010] By adopting the above technical solution, the sealing ring on the outer circle of the plugging plate at the end of the guide tube close to the seepage surface is tightly attached to the inner wall of the through hole during use, effectively preventing the injected slurry from overflowing from the through hole. At the same time, the internal thread on the guide tube is used for later assembly and connection of the plugging parts.
[0011] Optionally, the keel member includes a collar, which is sleeved on the outside of the guide tube, and a first waterproof felt is fixed on the end surface of the collar close to the blocking plate.
[0012] By adopting the above technical solution, the sleeve is sleeved on the outside of the guide tube during use, and the first waterproof felt arranged on the outside of the sleeve is pressed and fitted tightly to the outside of the blocking plate, thereby increasing the number of waterproof layers of the blocking plate.
[0013] Optionally, a plurality of steel bars are fixed on the end surface of the collar away from the blocking plate, and a plurality of positioning rings are transversely fixed on the plurality of steel bars, and the plurality of positioning rings are fixed on the outer circumferential surface of the guide cylinder.
[0014] By adopting the above technical solution, one end of multiple steel bars is pre-welded to the blocking plate, and then multiple positioning rings are used to be sleeved on the guide tube, so as to limit the support of the steel bars to maintain the support stability, thereby maintaining the support effectiveness of the steel bars and avoiding skewing during the later pouring.
[0015] Optionally, the blocking member includes a blocking ring tube, which is arranged at an end of the guide tube away from the water seepage surface, and a stud is vertically fixed to an end of the blocking ring tube close to the guide tube.
[0016] By adopting the above technical solution, the stud threadedly arranged at the end of the blocking ring tube is assembled on the end of the guide tube, thereby completing the connection and assembly of the blocking ring tube and the guide tube, and blocking the through hole in the basement side wall near the inner end.
[0017] Optionally, the stud is threadedly connected to the internal thread in the guide tube.
[0018] By adopting the above technical solution, the stud and the guide tube are assembled at the end of the guide tube, completing the connection and assembly of the sealing ring tube and the guide tube.
[0019] Optionally, a filling port is provided through the inner bottom surface of the sealing ring tube, and a sealing plug is filled on the filling port.
[0020] By adopting the above technical solution, the filling port opened on the sealing ring cylinder is used to guide the concrete slurry to flow into the through hole at a later stage, and cooperates with the keel member to form a firm sealing through hole.
[0021] Optionally, the interior of the sealing ring tube is filled with a slurry block, and a second waterproof felt is fixed on the outer end surface of the slurry block, and a decorative layer is fixed on the outer end surface of the second waterproof felt.
[0022] By adopting the above technical solution, the slurry block filled in the middle sealing ring is used in combination with the second waterproof felt to form a waterproof layer on the inside of the through hole, thereby increasing the waterproofness of the through hole. The decorative layer arranged on the outer end of the second waterproof felt is used to improve the aesthetics of the inner side wall of the basement.
[0023] In summary, the present application includes at least one of the following beneficial technical effects: during use, a plurality of through holes are horizontally opened from bottom to top on the side wall of the seeping basement, and then a feeding piece is horizontally inserted into the through hole on the side wall of the seeping basement, one end of the guide tube in the feeding piece is connected with an external slurry feeding device, and the slurry feeding device is turned on to deliver the slurry to the guide tube under high pressure. When the slurry is delivered from the other end of the guide tube, the delivered slurry squeezes the guide rod on the baffle plate to slide on the hole frame, causing the spring on the guide rod in the baffle plate to deform, causing the baffle plate to slide out from the other end of the guide tube, and then the slurry flows out from the other end of the guide tube, and the slurry flows into the wall and A waterproof slurry layer is formed between the seepage surfaces, and then the keel piece is inserted into the through hole, and the sealing piece is threaded to press the keel piece and sleeved in the guide tube, and then concrete is poured into the through hole through the sealing piece. The presence of the keel piece increases the sealing and solidification firmness of the through hole, thereby forming a new waterproof layer between the wall and the seepage surface, and a plurality of through holes are opened horizontally through the wall in the vertical direction, and waterproof slurry is poured through the through holes to form a new waterproof layer between the wall and the seepage surface, thereby eliminating the need to cut the wall, reducing damage to the wall, and avoiding the problem that the wall poured later cannot be integrated with the original wall, and there are cracks between the wall after drying later and the original wall. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 is an overall cross-sectional view of an embodiment of the present application;
[0025] Figure 2 This is a schematic diagram of the overall structure of the feeding member in the embodiment of the present application;
[0026] Figure 3 It is a schematic diagram of the structure of the feeding member in the embodiment of the present application in a disassembled state;
[0027] Figure 4 is a schematic structural diagram of the flow guide member of an embodiment of the present application in a disassembled state;
[0028] Figure 5 is a schematic structural diagram of a keel member in an exploded state according to an embodiment of the present application;
[0029] Figure 6 It is a schematic diagram of the structure of the sealing member in the embodiment of the present application in a disassembled state.
[0030] Explanation of the reference numerals in the accompanying drawings: 1. wall; 2. seepage surface; 3. through hole; 4. feeding piece; 41. guide piece; 411. guide tube; 412. blocking plate; 413. sealing ring; 414. hole frame; 415. baffle plate; 416. spring; 417. internal thread; 42. keel piece; 421. collar; 422. reinforcement rod; 423. positioning ring; 424. first waterproof felt; 43. sealing piece; 431. sealing ring tube; 432. stud; 433. slurry block; 434. second waterproof felt; 435. decorative layer; 436. filling port; 437. plug; 5. waterproof slurry layer. DETAILED DESCRIPTION
[0031] The present application is further described in detail below in conjunction with the accompanying drawings.
[0032] The present application embodiment discloses a curtain grouting repair structure for basement side wall leakage. Figure 1 , Figure 2 , Figure 3 and Figure 4 A curtain grouting repair structure for a leakage in a basement side wall comprises a wall 1, a plurality of through holes 3 are horizontally opened in the wall 1 in a vertical direction, and a feeder 4 is horizontally inserted in each of the plurality of through holes 3 of the wall 1, a seepage surface 2 is arranged on the outside of the wall 1, the feeder 4 is used to transport slurry to form a waterproof slurry layer 5 between the wall 1 and the seepage surface 2, the feeder 4 comprises a guide member 41, a keel member 42 and a blocking member 43, the guide member 41 comprises a guide tube 411, the guide tube 411 is horizontally inserted in the through hole 3 of the wall 1, and the interior of the guide tube 411 is close to the seepage surface 2 is fixed with a hole frame 414, an end of the guide tube 411 close to the seepage surface 2 is provided with a baffle plate 415, and a guide rod is horizontally fixed on the baffle plate 415, and the guide rod on the baffle plate 415 is slidably inserted into the hole frame 414, a spring 416 is sleeved on the guide rod on the baffle plate 415, and the two ends of the spring 416 are respectively fixed on the baffle plate 415 and the hole frame 414, the keel member 42 is sleeved on the outside of the guide tube 411, and the space between the keel member 42 and the through hole 3 is filled with concrete, and the blocking member 43 is assembled at the end of the guide tube 411 away from the seepage surface 2.
[0033] By adopting the above technical solution, during use, a plurality of through holes 3 are horizontally opened from bottom to top on the side wall of the seeping basement, and then the feeding piece 4 is horizontally inserted into the through hole 3 on the side wall of the seeping basement, and one end of the guide tube 411 in the feeding piece 4 is connected to the external slurry feeding device, and the slurry feeding device is turned on to convey the slurry into the guide tube 411 under high pressure. When the slurry is conveyed from the other end of the guide tube 411, the conveyed slurry squeezes the guide rod on the baffle plate 415 to slide on the hole frame 414, causing the spring 416 on the guide rod in the baffle plate 415 to deform, so that the baffle plate 415 slides out from the other end of the guide tube 411, and then the slurry flows out from the other end of the guide tube 411, and the slurry flows into the wall 1 and the seeping basement. A waterproof slurry layer 5 is formed between the water surface 2, and then the keel piece 42 is inserted into the through hole 3, and the sealing piece 43 is threaded to press the keel piece 42 and sleeved in the guide tube 411, and then concrete is poured into the through hole 3 through the sealing piece 43. The presence of the keel piece 42 increases the sealing and solidification firmness of the through hole 3, thereby forming a new waterproof layer between the wall 1 and the seepage surface 2, so that a plurality of through holes 3 are horizontally opened in the vertical direction on the wall 1, and waterproof slurry is poured into the through holes 3 to form a new waterproof layer between the wall 1 and the seepage surface 2, so that there is no need to cut the wall, reduce damage to the wall, and avoid the problem that the wall poured in the later stage cannot be integrated with the original wall, and there are cracks between the wall after drying in the later stage and the original wall.
[0034] Reference Figure 3 and Figure 4 A plugging plate 412 is fixed through one end of the guide tube 411 close to the seepage surface 2, and a sealing ring 413 is fixed on the outer end surface of the plugging plate 412. An internal thread 417 is provided on the inner circumferential surface of the guide tube 411 at one end away from the seepage surface 2. When in use, the sealing ring 413 on the outer circumference of the plugging plate 412 at the end of the guide tube 411 close to the seepage surface 2 is pressed against the inner wall of the through hole 3 to effectively prevent the injected slurry from overflowing from the through hole 3. At the same time, the internal thread 417 on the guide tube 411 is used for later assembly and connection of the plugging piece 43.
[0035] Reference Figure 3 and Figure 5The keel member 42 includes a collar 421 , which is sleeved on the outside of the guide tube 411 , and a first waterproof felt 424 is fixed on the end surface of the collar 421 close to the blocking plate 412 . During use, the ring 421 is sleeved on the outside of the guide tube 411, and the first waterproof felt 424 arranged on the outside of the ring 421 is pressed and fitted on the outside of the plugging plate 412, thereby increasing the waterproof layer of the plugging plate 412, and multiple steel bars 422 are fixed on the end face of the ring 421 away from the plugging plate 412, and multiple positioning rings 423 are transversely fixed on the multiple steel bars 422, and multiple positioning rings 423 are fixed on the outer circumferential surface of the guide tube 411. During use, one end of multiple steel bars 422 is pre-welded to the plugging plate 412, and then multiple positioning rings 423 are sleeved on the guide tube 411, so as to limit the support of the steel bars 422 to maintain the support stability, thereby maintaining the support effectiveness of the steel bars 422 and avoiding skewing during later pouring.
[0036] Reference Figure 3 and Figure 6 The plugging member 43 includes a plugging ring tube 431, which is arranged at one end of the guide tube 411 away from the seepage surface 2, and a stud 432 is vertically fixed to the end of the plugging ring tube 431 close to the guide tube 411, and the stud 432 horizontally arranged at the end of the plugging ring tube 431 is threadedly assembled on the end of the guide tube 411, thereby completing the connection and assembly of the plugging ring tube 431 and the guide tube 411, blocking the end of the basement side wall through hole 3 close to the inner side, the stud 432 is threadedly connected with the internal thread 417 in the guide tube 411, and the stud 432 is assembled with the guide tube 411 at the end of the guide tube 411, completing the connection and assembly of the plugging ring tube 431 and the guide tube 411, and a through hole is opened on the inner bottom surface of the plugging ring tube 431 There is a filling port 436, and the filling port 436 is filled with a plug 437. The filling port 436 opened on the sealing ring tube 431 is used to guide concrete slurry to flow into the through hole at a later time, and cooperates with the keel member 42 to form a firmly blocked through hole. The interior of the sealing ring tube 431 is filled with a slurry block 433, and a second waterproof felt 434 is fixed on the outer end face of the slurry block 433, and a decorative layer 435 is fixed on the outer end face of the second waterproof felt 434. During use, the slurry block 433 filled in the sealing ring tube 431 cooperates with the second waterproof felt 434 to form a waterproof layer on the inner side of the through hole 3, thereby increasing the waterproofness of the through hole 3, and the decorative layer 435 arranged on the outer end of the second waterproof felt 434 is used to improve the aesthetics of the inner side wall of the basement.
[0037] The implementation principle of the curtain grouting repair structure for basement side wall leakage in the embodiment of the present application is as follows: during use, a plurality of through holes 3 are horizontally opened from bottom to top in the basement side wall with water leakage, and then a feeding piece 4 is horizontally inserted into the through hole 3 on the basement side wall with water leakage, and one end of the guide tube 411 in the feeding piece 4 is connected to an external slurry feeding device, and the slurry feeding device is turned on to deliver the slurry to the guide tube 411 under high pressure. When the slurry is delivered from the other end of the guide tube 411, the delivered slurry squeezes the guide rod on the baffle plate 415 to slide on the hole frame 414, causing the spring 416 on the guide rod in the baffle plate 415 to deform, so that the baffle plate 415 is moved from the guide tube 411. The other end slides out, and then the slurry flows out from the other end of the guide tube 411, and the slurry flows into the wall 1 and the seepage surface 2 to form a waterproof slurry layer 5, and then the keel piece 42 is inserted into the through hole 3, and the sealing piece 43 is threaded to press the keel piece 42 and sleeved in the guide tube 411, and then concrete is poured into the through hole 3 through the sealing piece 43. The presence of the keel piece 42 increases the sealing and solidification firmness of the through hole 3, thereby forming a new waterproof layer between the wall 1 and the seepage surface 2, so that a plurality of through holes 3 are opened horizontally in the vertical direction on the wall 1, and the waterproof slurry is poured into the through holes 3 to enter the wall 1 and the seepage surface 2 to form a new waterproof layer, so that there is no need to cut the wall.
[0038] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A curtain grouting repair structure for basement side wall leakage, characterized in that: The invention comprises a wall (1), wherein a plurality of through holes (3) are horizontally penetrated in the vertical direction on the wall (1), and a feeding piece (4) is horizontally inserted into each of the plurality of through holes (3) of the wall (1), a water seepage surface (2) is arranged on the outside of the wall (1), and the feeding piece (4) is used to transport slurry to form a waterproof slurry layer (5) between the wall (1) and the water seepage surface (2), and the feeding piece (4) comprises a guide piece (41), a keel piece (42) and a blocking piece (43), and the guide piece (41) comprises a guide tube (411), and the guide tube (411) is horizontally inserted into the through hole (3) of the wall (1), and a portion of the guide tube (411) near the water seepage surface (2) is provided inside the guide tube (411). A hole frame (414) is fixed at one end of the guide tube (411), a material baffle plate (415) is provided at one end of the guide tube (411) close to the seepage surface (2), a guide rod is horizontally fixed on the material baffle plate (415), and the guide rod on the material baffle plate (415) is slidably plugged into the hole frame (414), a spring (416) is sleeved on the guide rod on the material baffle plate (415), and two ends of the spring (416) are respectively fixed on the material baffle plate (415) and the hole frame (414), the keel member (42) is sleeved on the outside of the guide tube (411), and concrete is filled between the keel member (42) and the through hole (3), and the blocking member (43) is assembled at one end of the guide tube (411) away from the seepage surface (2).
2. A curtain grouting repair structure for basement side wall leakage according to claim 1, characterized in that: A blocking plate (412) is fixedly passed through one end of the guide tube (411) close to the water seepage surface (2), and a sealing ring (413) is fixedly disposed on the outer end surface of the blocking plate (412). An internal thread (417) is formed on the inner circumferential surface of the guide tube (411) at one end away from the water seepage surface (2).
3. The curtain grouting repair structure for basement side wall leakage according to claim 1 is characterized by: The keel member (42) comprises a sleeve (421), the sleeve (421) being sleeved on the outside of the guide tube (411), and a first waterproof felt (424) is fixed on the end surface of the sleeve (421) close to the blocking plate (412).
4. A curtain grouting repair structure for basement side wall leakage according to claim 3, characterized in that: A plurality of steel bars (422) are fixed on the end surface of the collar (421) away from the blocking plate (412), a plurality of positioning rings (423) are transversely fixed on the plurality of steel bars (422), and the plurality of positioning rings (423) are fixed on the outer circumferential surface of the guide tube (411).
5. The curtain grouting repair structure for basement side wall leakage according to claim 2 is characterized by: The blocking member (43) comprises a blocking ring tube (431), which is arranged at an end of the guide tube (411) away from the water seepage surface (2), and a stud (432) is vertically fixed to an end of the blocking ring tube (431) close to the guide tube (411).
6. The curtain grouting repair structure for basement side wall leakage according to claim 5 is characterized by: The stud (432) is threadedly connected to the internal thread (417) in the guide tube (411).
7. The curtain grouting repair structure for basement side wall leakage according to claim 6 is characterized by: A filling port (436) is provided through the inner bottom surface of the sealing ring cylinder (431), and a sealing plug (437) is filled on the filling port (436).
8. The curtain grouting repair structure for basement side wall leakage according to claim 7 is characterized by: The interior of the sealing ring cylinder (431) is filled with a slurry block (433), and a second waterproof felt (434) is fixed on the outer end surface of the slurry block (433), and a decorative layer (435) is fixed on the outer end surface of the second waterproof felt (434).
Citation Information
Cited By
Basement side wall leakage curtain grouting repairing structure
CN224228308U
