Auxiliary tool for repairing pile head of cast-in-place concrete pile
By providing a removable and connected concrete cast-in-pile head repair auxiliary tool, the problems of long repair time and waterproof leakage in the prior art are solved, and efficient repair and cost reduction are achieved.
Patent Information
- Application Number
- CN202420096512.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-15
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-01-15
AI Technical Summary
In the prior art, concrete cast-injected pile heads have a long repair time and poor economicality, and there is a risk of waterproof leakage after repair, which cannot meet the quality acceptance requirements.
Provide a concrete cast-injected pile head repair auxiliary tool, including a formwork and a connecting piece. The first end and the second end of the formwork are removably connected through the connecting piece to form the side wall of the sleeve area and closely fit the pile head to avoid splicing. There are edges and corners in the area to realize the reuse of the template.
It improves the repair efficiency of cast-injected piles, reduces the cost of template production, avoids waterproof leakage, and enhances the waterproof effect after repair.
Smart Images

Figure CN221972518U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, and more specifically to an auxiliary tool for repairing the head of a concrete cast-in-place pile. Background Art
[0002] Concrete cast-in-place pile foundations are widely used in China, basically covering industrial buildings, civil buildings and public buildings. The pile head of the concrete cast-in-place pile is affected by various factors such as construction and pile cutting, resulting in the presence of damage and irregular shapes in the concrete of the pile head, which cannot meet the quality acceptance requirements of the pile foundation and will affect the waterproof effect of the pile head in the later stage.
[0003] In the prior art, such as Fig.11 As shown, wooden formwork splicing is generally used, that is, wooden formwork strips are laid around the pile head, and the outer circle of the wooden formwork strips is fixed with wire, and then concrete is poured to repair the pile head, or no formwork is used for repair. The wooden formwork splicing method makes the pile head repair time longer, less economical, and less applicable.
[0004] In addition, when the concrete is formed, there are edges and corners in the splicing parts. After the waterproofing construction, when the base plate concrete is poured, this part is subjected to a large shear force, which makes the waterproofing of this part at risk of being destroyed by the shear force, thereby causing waterproofing leakage.
[0005] Therefore, how to improve the repair efficiency of cast-in-place piles has become a technical problem that needs to be solved urgently by those skilled in the art. Utility Model Content
[0006] In view of this, the purpose of the utility model is to provide a concrete cast-in-place pile head repair auxiliary tool to improve the repair efficiency of the cast-in-place pile.
[0007] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0008] A concrete cast-in-place pile head repair auxiliary tool, comprising:
[0009] A template, wherein the template has a first end and a second end that are arranged opposite to each other, and the first end of the template is connected to the second end of the template, so that the template is surrounded to form a casing area for casing a cast-in-place pile, and a side wall of the casing area has a fitting surface that is tightly fitted with the outer side of the pile head of the cast-in-place pile;
[0010] A connecting piece is arranged at a connecting position between the first end and the second end of the template, and the first end of the template is detachably connected to the second end of the template through the connecting piece.
[0011] Optionally, in the above-mentioned concrete bored pile head repair auxiliary tool, the connecting piece is fixed to the first end of the template, the connecting piece includes a top plate, a bottom plate and a side plate, and the side plate includes a first side plate located on one side of the fitting surface and a second side plate arranged opposite to the first side plate, the top plate, the bottom plate and the side plate are spliced to form a through cavity for inserting the second end of the template, and the connecting piece is fixed to the second end of the template by a fastener.
[0012] Optionally, in the above-mentioned concrete cast-in-place pile head repair auxiliary tool, a plurality of adjustment screw holes are evenly spaced apart at the second end of the template, and corresponding limit slots are provided on the first side panel and the second side panel respectively, and the fastener passes through the limit slot of the second side panel, the adjustment screw hole and the limit slot of the first side panel in sequence to fix the connecting member and the second end of the template.
[0013] Optionally, in the above concrete cast-in-place pile head repair auxiliary tool, partition plates are respectively provided at both ends of the through cavity, and a reserved space for the fastener to pass through is provided between the two partition plates, and the partition plates are used to separate the first end of the template from the second end of the template;
[0014] The partition plate includes a first side surface and a second side surface arranged opposite to the first side surface, and the first end of the template is fixed between the first side surface of the partition plate and the first side plate of the connecting member, or the first end of the template is fixed between the second side surface of the partition plate and the second side plate of the connecting member.
[0015] Optionally, in the above-mentioned concrete cast-in-place pile head repair auxiliary tool, the partition plate includes a first partition plate and a second partition plate, the first partition plate is welded and fixed to the top plate, the second partition plate is welded and fixed to the bottom plate, and the first partition plate and the second partition plate are located on the same vertical plane.
[0016] Optionally, in the above-mentioned concrete cast-in-place pile head repair auxiliary tool, the top plate, the bottom plate and the side plate are fixedly connected by welding, and the first end of the template is welded and fixed to the side plate.
[0017] Optionally, in the above-mentioned concrete bored pile head repair auxiliary tool, the materials of the partition plate, the top plate, the bottom plate and the side plate are all aluminum plates, and the thickness of the partition plate, the top plate, the bottom plate and the side plates is not less than 5 mm.
[0018] Optionally, in the above-mentioned concrete bored pile head repair auxiliary tool, a scale mark corresponding to the pile head diameter of the bored pile is provided above the adjusting screw hole to facilitate adjustment of the diameter of the sleeve area of the template.
[0019] Optionally, in the above-mentioned concrete cast-in-place pile head repair auxiliary tool, the fastener is a bolt or a screw, and when the fastener passes through the limiting slot of the first side plate, the insertion end surface of the fastener is flush with the outer surface of the first side plate.
[0020] Optionally, in the above-mentioned concrete bored pile head repair auxiliary tool, the material of the template is aluminum plate, and the thickness of the template is 1mm to 2mm, the height of the through cavity is not less than the height of the template, and the height of the template is not less than 200mm.
[0021] The utility model provides a concrete cast-in-place pile head repair auxiliary tool, which connects the first end of the template and the second end of the template so that the template is surrounded to form a sleeve area for sleeve cast-in-place piles, and the side wall of the sleeve area has a fitting surface that is tightly fitted with the outer side of the pile head of the cast-in-place pile, thereby ensuring that the template fits the pile head of the cast-in-place pile, and avoiding the phenomenon of corners in the splicing part after the repair concrete is formed. At the same time, a connecting piece is provided at the connection position of the first end of the template and the second end of the template, and the first end of the template and the second end of the template are detachably connected through the connecting piece, thereby achieving the purpose of template reuse, improving the efficiency of template production and installation, reducing the production cost of the template, and improving the repair efficiency of cast-in-place piles.
[0022] Compared with the prior art, the concrete bored pile pile head repair auxiliary tool provided by the utility model is connected by the first end of the template and the second end of the template, so as to form a sleeve area for sleeved bored piles, and the side wall of the sleeve area has a fitting surface that is tightly fitted with the outer side of the pile head of the bored pile to ensure that the template and the pile head of the bored pile fit together, avoiding the phenomenon that after the traditional wooden template is spliced, the splicing part has edges and corners when the concrete is poured and repaired. At the same time, the first end of the template and the second end of the template are detachably connected by a connecting piece, so that the purpose of reusing the template is achieved. There is no need to re-splice the casting template every time the pile head of the bored pile is repaired, which improves the repair efficiency of the bored pile and reduces the production cost of the template. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are merely embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.
[0024] Figure 1 A schematic diagram of the structure of the repair auxiliary tool provided in the first embodiment of the utility model Figure 1 ;
[0025] Figure 2A schematic diagram of the structure of the repair auxiliary tool provided in the first embodiment of the utility model Figure 2 ;
[0026] Figure 3 This is an isometric view of a connecting member provided in Embodiment 1 of the present utility model;
[0027] Figure 4 A front view of a connecting member provided in Embodiment 1 of the present utility model;
[0028] Figure 5 A side view of a connecting piece provided in Embodiment 1 of the present utility model;
[0029] Figure 6 A top view of a connecting piece provided in Embodiment 1 of the present utility model;
[0030] Figure 7 A schematic diagram of the structure of a template provided in Embodiment 1 of the present utility model;
[0031] Figure 8 A front view of a connecting piece provided in the second embodiment of the present utility model;
[0032] Fig. 9 A bottom view of the connecting member provided in the second embodiment of the present utility model;
[0033] Fig.10 A schematic diagram of the structure of the template provided in the second embodiment of the present utility model;
[0034] Fig.11 A schematic structural diagram of a traditional template provided in an embodiment of the utility model.
[0035] Among them, 100 is a template, 101 is a sleeve area, 102 is a fitting surface, 103 is an adjustment screw hole, and 104 is a tooth groove;
[0036] 200 is a connecting member, 201 is a top plate, 202 is a bottom plate, 203 is a side plate, 2031 is a first side plate, 2032 is a second side plate, 2033 is a limiting slot, 2034 is a mounting slide, 2035 is a limiting end, 204 is a through cavity, 205 is a partition plate, 2051 is a first partition plate, 2052 is a second partition plate, 206 is a connecting plate, 2061 is a supporting belt, and 2062 is a toothed portion;
[0037] 300 is a fastener;
[0038] 400 for pile head;
[0039] 500 for wooden formwork. DETAILED DESCRIPTION
[0040] The core of the utility model is to provide a concrete cast-in-place pile head repair auxiliary tool to improve the repair efficiency of the cast-in-place pile.
[0041] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0042] like Figure 1 and Figure 2 As shown, the embodiment of the utility model discloses a concrete cast-in-place pile head repair auxiliary tool, including a template 100 and a connecting piece 200. It should be noted that, as Fig.11 As shown, in the prior art, wooden formwork 500 is generally used for splicing, that is, wooden formwork 500 strips are laid around the pile head 400, and the outer circle of the wooden formwork 500 strips is fixed by wire binding, and then concrete is poured to repair the pile head 400, or it is repaired without a formwork. The wooden formwork 500 splicing method makes the repair time of the pile head 400 longer, the economy is poor, and the applicability is poor. In addition, after the concrete is formed, there are edges and corners at the splicing part. After the waterproof construction, when the bottom plate concrete is poured, this part is subjected to a large shear force, so that the waterproofing of this part has the risk of being damaged by the shear force, thereby causing waterproof leakage. The concrete cast-in-place pile head repair auxiliary tool disclosed in the embodiment of the utility model is connected by the first end of the template 100 and the second end of the template 100, so as to form a sleeve area 101 for sleeve cast-in-place piles, and the side wall of the sleeve area 101 has a fitting surface 102 that is tightly fitted with the outer side of the pile head 400 of the cast-in-place pile, so as to ensure that the template 100 fits with the pile head 400 of the cast-in-place pile, avoid the phenomenon that the splicing part has angular edges when the cast-in-place concrete is cast after the traditional wooden template 500 is spliced, reduce the risk of waterproofing of the splicing part being damaged by shear force, and avoid the occurrence of waterproof leakage. At the same time, the first end of the template 100 and the second end of the template 100 are detachably connected through the connecting piece 200, so as to achieve the purpose of reusing the template 100, and there is no need to re-splice the casting template 100 each time the pile head 400 of the cast-in-place pile is repaired, thereby improving the repair efficiency of the cast-in-place pile and reducing the production cost of the template 100.
[0043] like Figure 7As shown, the template 100 has a first end and a second end that are relatively arranged, and the first end of the template 100 is connected to the second end of the template 100, so that the template 100 is surrounded to form a casing area 101 for casing the cast-in-place pile, and the side wall of the casing area 101 has a fitting surface 102 that is tightly fitted with the outer side of the pile head 400 of the cast-in-place pile, thereby ensuring that the template 100 and the pile head 400 of the cast-in-place pile are completely fitted, which can avoid the phenomenon of angular edges in the splicing part after the repair concrete is formed, reduce the risk of waterproofing of the splicing part being damaged by shear force, and prevent waterproofing leakage. At the same time, Figure 1 and Figure 2 As shown, a connector 200 is provided at the connection position between the first end of the template 100 and the second end of the template 100, and the first end of the template 100 and the second end of the template 100 are detachably connected via the connector 200, thereby achieving the purpose of reusability of the template 100, improving the efficiency of manufacturing and installing the template 100, reducing the manufacturing cost of the template 100, and improving the repair efficiency of the cast-in-place piles.
[0044] Furthermore, if Figure 1 and Figure 2 As shown, in one embodiment, the connecting member 200 is fixed to the first end of the template 100. Figures 3 to 6 As shown, the connecting member 200 includes a top plate 201, a bottom plate 202 and a side plate 203, and the side plate 203 includes a first side plate 2031 located on one side of the bonding surface 102 and a second side plate 2032 arranged opposite to the first side plate 2031. Figure 3 and Figure 5 As shown, the top plate 201, the bottom plate 202 and the side plate 203 are spliced to form a through cavity 204 into which the second end of the template 100 can be inserted, and the connecting piece 200 is fixed to the second end of the template 100 by a fastener 300. Specifically, a plurality of adjusting screw holes 103 are arranged at equal intervals on the second end of the template 100, and corresponding limiting slots 2033 are provided on the first side plate 2031 and the second side plate 2032, respectively. The fastener 300 passes through the limiting slot 2033 of the second side plate 2032, the adjusting screw hole 103 and the limiting slot 2033 of the first side plate 2031 in sequence, thereby fixing the connecting piece 200 and the second end of the template 100. The limiting slots 2033 on the first side plate 2031 and the second side plate 2032 can prevent the template 100 from loosening after being tightly fitted to the outer side of the pile head 400 of the cast-in-place pile. Figure 4As shown, the limiting slot 2033 includes an installation slide 2034 and limiting ends 2035 arranged at both ends of the installation slide 2034. The installation slide 2034 can facilitate the operator to install and position the limiting slot 2033 and the adjusting screw hole 103. After the operator installs the fastener 300 through the installation slide 2034 and the adjusting screw hole 103 corresponding to the diameter of the pile head 400 of the cast-in-place pile on the template 100, since the template 100 is made of aluminum plate, the template 100 has elasticity, so that the second end of the template 100 will move along the circumferential direction of the sleeve area 101 until the fastener 300 abuts against the limiting end 2035, thereby realizing the installation and fixation of the second end of the connector 200 and the template 100.
[0045] In the above embodiment, the top plate 201, the bottom plate 202 and the side plate 203 are all made of aluminum plates, and the thickness of the top plate 201, the bottom plate 202 and the side plate 203 is not less than 5 mm, so as to ensure the strength of the connecting member 200, thereby improving the service life of the repair auxiliary tool, and at the same time increasing the connection area of the top plate 201, the bottom plate 202 and the side plate 203, and improving the connection strength of the top plate 201, the bottom plate 202 and the side plate 203. Among them, the length of the side plate 203 is 390 mm, the width of the side plate 203 is 200 mm, the thickness of the side plate 203 is 5 mm, the length of the top plate 201 and the bottom plate 202 is 390 mm, the width of the top plate 201 and the bottom plate 202 is 17 mm, and the thickness of the top plate 201 and the bottom plate 202 is 5 mm. Meanwhile, the template 100 is made of an aluminum plate with a length of 2562 mm, the height of the template 100 is not less than 200 mm, and the thickness of the template 100 is 1 mm. In order to ensure that the height of the through cavity 204 is not less than the height of the template 100, the height of the template 100 is 200 mm, so that the template 100 can be inserted from one end of the through cavity 204 and extended from the other end of the through cavity 204, thereby adjusting the diameter size of the sleeve area 101 of the template 100 to adapt to the pile head 400 of the cast-in-place pile with different diameters. It should be noted that the top plate 201, the bottom plate 202 and the side plate 203 are connected by welding to form the connecting piece 200, and the first end of the template 100 is welded and fixed to the side plate 203. In addition, the connecting piece 200 and the template 100 can be processed and assembled at the construction site, and local materials can be used, so the manufacturing cost is low. In addition, by cooperating with the fastener 300, the connector 200 and the template 100 to achieve a detachable connection, the repair auxiliary tool can be reused many times, and there is no need to re-splice the casting template 100 every time the pile head 400 of the cast-in-place pile is repaired, thereby improving the repair efficiency of the cast-in-place pile and reducing the production cost of the template 100.
[0046] Furthermore, if Figure 7As shown, the second end of the template 100 is provided with 9 adjusting screw holes 103 at equal intervals, and the spacing between adjacent adjusting screw holes 103 is 157 mm, and each screw hole corresponds to the diameter size of the pile head 400 of the cast-in-place pile. At the same time, in order to facilitate the operator to adjust the diameter of the sleeve area 101 of the template 100, a scale mark corresponding to the diameter of the pile head 400 of the cast-in-place pile is provided above each adjusting screw hole 103. The operator can check the scale mark corresponding to the diameter of the pile head 400 of the cast-in-place pile provided above the adjusting screw hole 103 through the installation slide 2034 on the second side plate 2032 of the connecting member 200, so as to quickly position the fastener 300 to the position of the adjusting screw hole 103 corresponding to the diameter of the pile head 400 of the target cast-in-place pile, so as to fix the second end of the template 100 and the connecting member 200, thereby improving the positioning and installation efficiency between the fastener 300 and the adjusting screw hole 103. By setting the scale mark, the operator can adjust the diameter of the sleeve area 101 of the template 100 according to the diameter of the pile head 400 of the cast-in-place pile in advance. When pouring, the template 100 only needs to be directly sleeved on the pile head 400 of the cast-in-place pile, thereby improving the installation efficiency of the template 100 and further improving the repair efficiency of the cast-in-place pile. Figure 1 and Figure 2 As shown, the fastener 300 is a bolt or a screw. When the fastener 300 passes through the limit slot 2033 of the first side plate 2031, the insertion end surface of the fastener 300 is flush with the outer surface of the first side plate 2031, so as to ensure that the outer surface of the first side plate 2031 of the connector 200 fits the outer side of the pile head 400 of the cast-in-place pile, and avoid the phenomenon of angular joints after the repair concrete is formed.
[0047] Furthermore, if Figure 3 and Figure 6As shown, a partition plate 205 is provided at each end of the through cavity 204, and there is a reserved space between the two partition plates 205 for the fastener 300 to pass through. The partition plate 205 separates the first end of the template 100 from the second end of the template 100, so that the second end of the template 100 can be quickly inserted into the connector 200, thereby achieving the fixation between the connector 200 and the second end of the template 100. At the same time, the spacing between the two partition plates 205 is not less than the length of the limiting slot 2033, thereby forming a reserved space for the fastener 300 to pass through, so as to ensure that the fastener 300 is not affected by the partition plate 205. Among them, the partition plate 205 includes a first side surface and a second side surface arranged opposite to the first side surface. The first side surface of the partition plate 205 is the side surface close to the first side plate 2031 of the connector 200, and the second side surface of the partition plate 205 is the side surface away from the first side plate 2031, that is, the side surface close to the second side plate 2032 of the connector 200. Furthermore, the first end of the template 100 can be fixed between the first side surface of the partition plate 205 and the first side plate 2031 of the connector 200. Of course, the first end of the template 100 can also be fixed between the second side surface of the partition plate 205 and the second side plate 2032 of the connector 200. In this embodiment, the first end of the template 100 is fixed between the first side surface of the partition plate 205 and the first side plate 2031 of the connector 200, and the first end of the template 100 is fixed to the first side plate 2031 of the connector 200 by welding. In order to ensure that the first end of the template 100 can be fixed to the first side plate 2031 of the connecting member 200 by welding, there is a gap of not less than 1 mm between the first side plate 205 of the partition plate 205 and the first side plate 2031 of the connecting member 200. At the same time, in order to ensure that the second end of the template 100 can pass through the reserved space between the second side plate 205 of the partition plate 205 and the second side plate 2032 of the connecting member 200, there is a gap of not less than 1 mm between the second side plate 205 of the partition plate 205 and the second side plate 2032 of the connecting member 200. At this time, the second end of the template 100 can pass through the reserved space between the second side plate 205 of the partition plate 205 and the second side plate 2032 of the connecting member 200, and be fixed by the fastener 300, so as to achieve the purpose of quickly connecting and fixing the second end of the template 100 and the connecting member 200.
[0048] Furthermore, if Figure 3 and Figure 5As shown, the partition plate 205 includes a first partition plate 2051 and a second partition plate 2052, and the first partition plate 2051 is welded and fixed on the top plate 201, and the second partition plate 2052 is welded and fixed on the bottom plate 202, and the first partition plate 2051 and the second partition plate 2052 are located on the same vertical plane. By designing the partition plate 205 as a split piece consisting of the first partition plate 2051 and the second partition plate 2052, the material cost can be saved while separating the first end of the template 100 from the second end of the template 100. In addition, since the partition plate 205 is a split piece, in order to ensure the strength of the partition plate 205, in this embodiment, the partition plate 205 is made of an aluminum plate with a thickness of 5 mm to improve the strength of the partition plate 205, thereby increasing the service life of the repair auxiliary tool.
[0049] like Figures 8 to 10 As shown, in another specific embodiment, the connector 200 includes a connecting plate 206. For ease of understanding, the two opposite ends of the connecting plate 206 are defined as a first end and a second end, respectively. The first end of the template 100 is welded and fixed to the first end of the connecting plate 206. A support belt 2061 is provided at the first end of the connecting plate 206. The support belt 2061 is surrounded at the first end of the connecting plate 206 to form an opening for the second end of the template 100 to pass through. At the same time, the support belt 2061 can support the second end of the template 100 to prevent the second end of the template 100 from falling off. In addition, in order to adjust the diameter of the sleeve area 101 of the template 100 so that the template 100 can adapt to the pile heads 400 of cast-in-place piles of different diameters, as shown in FIG. Fig.10 As shown, a plurality of tooth grooves 104 are continuously arranged at the second end of the template 100, and the distribution length of the tooth grooves 104 can be determined according to the diameter range of the pile head 400 of the cast-in-place pile involved in the specific engineering project. Figure 8 and Fig. 9 As shown, in order to fix the connecting member 200 and the second end of the template 100, a tooth portion 2062 is provided at the second end of the connecting plate 206 to cooperate with the tooth groove 104 at the second end of the template 100. Figure 8As shown, the connecting plate 206 is provided with an arc-shaped guide surface, so that the second end of the template 100 can pass through the opening formed by the support belt 2061 along the arc-shaped guide surface of the connecting plate 206, and at the same time, the clamping tooth portion 2062 at the second end of the connecting plate 206 clamps the tooth groove 104 at the second end of the template 100 to prevent the second end of the template 100 from being loosened, thereby realizing the fast connection and fixing of the second end of the template 100 and the connecting plate 206. Through the cooperation between the tooth groove 104 at the second end of the template 100 and the clamping tooth portion 2062 at the second end of the connecting plate 206, the adjustment accuracy of the diameter of the sleeve area 101 of the template 100 can be improved, which is more precise than the adjustment by the cooperation of the fastener 300 and the adjustment screw hole 103, but the processing cost of the connecting member 200 and the template 100 is relatively high, and the manufacturing process is relatively complicated, which can be completed by pre-manufacturing at the manufacturer.
[0050] It should be noted that the operator can select the adjustment method of the connector 200 and the template 100 according to the cost investment and actual needs of the specific project, so as to further improve the adaptability of the repair auxiliary tool.
[0051] The concrete cast-in-place pile head repair auxiliary tool disclosed in the embodiment of the utility model is connected by connecting the first end of the template 100 and the second end of the template 100 so that the template 100 is surrounded to form a sleeve area 101 for sleeve cast-in-place piles, and the side wall of the sleeve area 101 has a fitting surface 102 that is tightly fitted with the outer side of the pile head 400 of the cast-in-place pile, thereby ensuring that the template 100 fits the pile head 400 of the cast-in-place pile, and avoiding the phenomenon of corners in the splicing part after the repair concrete is formed. At the same time, a connector 200 is provided at the connection position of the first end of the template 100 and the second end of the template 100, and the first end of the template 100 and the second end of the template 100 are detachably connected through the connector 200, thereby achieving the purpose of the template 100 being reusable, improving the efficiency of the template 100 in making and installing, reducing the production cost of the template 100, and improving the repair efficiency of the cast-in-place pile.
[0052] Compared with the prior art, the concrete bored pile pile head repair auxiliary tool disclosed in the embodiment of the utility model is connected by the first end of the template 100 and the second end of the template 100, so as to form a sleeve area 101 for sleeved bored piles, and the side wall of the sleeve area 101 has a fitting surface 102 that is tightly fitted with the outer side of the pile head 400 of the bored pile, so as to ensure that the template 100 fits with the pile head 400 of the bored pile, and avoid the phenomenon that after the traditional wooden template 500 is spliced, the splicing part has edges and corners when the concrete is poured and repaired. At the same time, the first end of the template 100 and the second end of the template 100 are detachably connected by the connecting piece 200, so as to achieve the purpose of reusing the template 100, and there is no need to re-splice the casting template 100 every time the pile head 400 of the bored pile is repaired, thereby improving the repair efficiency of the bored pile and reducing the production cost of the template 100.
[0053] The terms "first" and "second" in the specification and claims of the utility model and the above-mentioned drawings are used to distinguish different objects, rather than to describe a specific order. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but may include steps or units that are not listed.
[0054] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A concrete cast-in-place pile head repair auxiliary tool, characterized in that: include: A template (100), wherein the template (100) has a first end and a second end that are arranged opposite to each other, and the first end of the template (100) is connected to the second end of the template (100), so that the template (100) encloses a casing area (101) for casing a cast-in-place pile, and a side wall of the casing area (101) has a fitting surface (102) that is tightly fitted to the outer side of the pile head (400) of the cast-in-place pile; A connecting member (200) is arranged at a connecting position between the first end and the second end of the template (100), and the first end of the template (100) and the second end of the template (100) are detachably connected via the connecting member (200).
2. The concrete cast-in-place pile head repair auxiliary tool according to claim 1, characterized in that: The connecting member (200) is fixed to the first end of the template (100), and the connecting member (200) includes a top plate (201), a bottom plate (202) and a side plate (203), and the side plate (203) includes a first side plate (2031) located on one side of the fitting surface (102) and a second side plate (2032) arranged opposite to the first side plate (2031). The top plate (201), the bottom plate (202) and the side plate (203) are spliced to form a through cavity (204) for inserting the second end of the template (100), and the connecting member (200) is fixed to the second end of the template (100) by a fastener (300).
3. The concrete cast-in-place pile head repair auxiliary tool according to claim 2, characterized in that: A plurality of adjusting screw holes (103) are arranged at equal intervals on the second end of the template (100); and limiting slots (2033) are correspondingly provided on the first side plate (2031) and the second side plate (2032); the fastener (300) passes through the limiting slot (2033) of the second side plate (2032), the adjusting screw hole (103) and the limiting slot (2033) of the first side plate (2031) in sequence to fix the connecting member (200) and the second end of the template (100).
4. The concrete cast-in-place pile head repair auxiliary tool according to claim 2, characterized in that: The two ends of the through cavity (204) are respectively provided with partition plates (205), and a reserved space for the fastener (300) to pass through is provided between the two partition plates (205), and the partition plates (205) are used to separate the first end of the template (100) from the second end of the template (100); The partition plate (205) includes a first side surface and a second side surface arranged opposite to the first side surface, and the first end of the template (100) is fixed between the first side surface of the partition plate (205) and the first side plate (2031) of the connecting member (200), or the first end of the template (100) is fixed between the second side surface of the partition plate (205) and the second side plate (2032) of the connecting member (200).
5. The concrete cast-in-place pile head repair auxiliary tool according to claim 4, characterized in that: The partition plate (205) includes a first partition plate (2051) and a second partition plate (2052), wherein the first partition plate (2051) is welded and fixed to the top plate (201), and the second partition plate (2052) is welded and fixed to the bottom plate (202), and the first partition plate (2051) and the second partition plate (2052) are located on the same vertical plane.
6. The concrete cast-in-place pile head repair auxiliary tool according to claim 5, characterized in that: The top plate (201), the bottom plate (202) and the side plate (203) are fixedly connected by welding, and the first end of the template (100) is fixedly welded to the side plate (203).
7. The concrete cast-in-place pile head repair auxiliary tool according to claim 6, characterized in that: The materials of the partition plate (205), the top plate (201), the bottom plate (202) and the side plate (203) are all aluminum plates, and the thickness of the partition plate (205), the top plate (201), the bottom plate (202) and the side plate (203) is not less than 5 mm.
8. The concrete cast-in-place pile head repair auxiliary tool according to claim 3, characterized in that: A scale mark corresponding to the diameter of the pile head (400) of the cast-in-place pile is arranged above the adjusting screw hole (103) to facilitate adjustment of the diameter of the sleeve area (101) of the template (100).
9. The concrete cast-in-place pile head repair auxiliary tool according to claim 3, characterized in that: The fastener (300) is a bolt or a screw, and when the fastener (300) passes through the limiting slot (2033) of the first side plate (2031), the insertion end surface of the fastener (300) is flush with the outer surface of the first side plate (2031).
10. The concrete cast-in-place pile head repair auxiliary tool according to claim 2, characterized in that: The template (100) is made of an aluminum plate, and the thickness of the template (100) is 1 mm to 2 mm. The height of the through cavity (204) is not less than the height of the template (100), and the height of the template (100) is not less than 200 mm.