Modularized integrated building first floor drainage pipeline construction structure
By using a combination of concrete prefabricated pipe trench and mortar pad in modular integrated buildings, the connection and maintenance of the first-level drainage pipes is solved, the construction efficiency and cost reduction is achieved, the on-site construction process is simplified, and the later maintenance is facilitated. .
Patent Information
- Application Number
- CN202420226014.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-01-29
AI Technical Summary
In modular integrated buildings, the first-story drainage pipeline needs to be separately connected to the construction in the later stage, resulting in high construction costs, long cycles and high pollution. The construction cycle of traditional cast-in-place maintenance mezzanine is long, affecting later operation and maintenance.
The design of prefabricated concrete pipe trench is adopted, combined with the GB50015-2019 "Building Water Supply and Drainage Design Standards", standardized components are produced in the factory, mortar cushion is laid on site and prefabricated pipe trench is placed until the last pipe trench extends to the building exterior wall, which is convenient for later maintenance. , reduce production costs and construction pollution.
The construction process is simplified, production costs and on-site construction pollution are reduced, construction efficiency is improved, and pipeline maintenance and maintenance are facilitated in the later stage, solving the problems of medium and high costs and long cycles of traditional methods.
Smart Images

Figure CN221972593U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of assembled module buildings, in particular to a first-floor drainage pipeline construction structure of a modular integrated building. Background Art
[0002] Prefabricated modular integrated buildings are one of the forms of building construction reform that the country is vigorously developing. It is a kind of building, structure, electromechanical, etc. decomposed into separate small modules, which are both independent and closely integrated as a whole. Modules can be mass-produced in factories, highly integrated and precise. After the modules are produced, they are transported to the site for hoisting to complete the construction of the building. It is a typical example of building industrialization. Compared with traditional construction methods, it can greatly shorten the construction time, reduce carbon emissions, reduce on-site construction noise and dust, and reduce the risk factor of on-site construction. For the water supply and drainage profession, the main body of the first floor building and the indoor pipelines have been partially completed in the factory. After the modules are hoisted on site, the indoor pipelines are connected to the drainage outlet pipes on the first floor. This results in the first floor drainage outlet pipes being unable to reserve pre-buried pipelines in advance like traditional cast-in-place construction. The usual practice is to cast a maintenance interlayer under the cast-in-place slab on the first floor, which is costly and has a long construction period. Now a modular integrated building first floor pipeline installation construction structure using prefabricated concrete trenches is designed. While providing installation space for the first floor discharge pipe, it can simplify the construction process, speed up the construction progress, and facilitate later maintenance. Utility Model Content
[0003] In view of the problems existing in the prior art, the utility model provides a construction structure for the drainage pipes on the first floor of a modular integrated building. The drainage pipes on the first floor of a modular integrated building need to be separately connected and constructed in the later stage. In combination with the relevant requirements of GB50015-2019 "Design Standard for Building Water Supply and Drainage", a construction structure for the drainage pipes on the first floor of a modular integrated building is designed using prefabricated concrete trenches.
[0004] In order to achieve the above purpose, the technical solution of the utility model is as follows:
[0005] The utility model provides a modular integrated building ground floor drainage pipeline construction structure, comprising: a raft foundation, a prefabricated pipe trench, a ground floor structural plate, and a ground floor module box;
[0006] A mortar cushion layer is laid on the raft foundation for placing the prefabricated pipe trench, so that the top of the prefabricated pipe trench is flush with or slightly lower than the bottom of the first-floor structural slab;
[0007] The first-floor module box is hoisted on the first-floor structural plate;
[0008] There are multiple prefabricated pipe trenches arranged, and the last prefabricated pipe trench extends from the building exterior wall to the outdoor inspection well;
[0009] A drainage cast iron pipe is installed in the prefabricated pipe trench for connecting with the drainage pipe of the first-floor module box.
[0010] Preferably, the thickness of the mortar cushion layer is 50 mm.
[0011] Preferably, the drainage cast iron pipe is also connected to a plastic pipe conversion elbow, and the plastic pipe conversion elbow is also connected to a UPVC pipe.
[0012] Preferably, the first-floor structural plate is also pre-buried with a steel pipe sleeve.
[0013] Preferably, the bottom plate of the first-floor module box is also pre-buried with UPVC direct pipe fittings.
[0014] Preferably, the UPVC pipe is connected to one end of a UPVC direct pipe fitting via a steel pipe sleeve; the other end of the UPVC direct pipe fitting is connected to a drainage pipe.
[0015] Preferably, a maintenance passage is reserved on one side of the first-floor module box and the prefabricated pipe trench, and the outdoor inspection well is placed in the maintenance passage.
[0016] Preferably, a gap is left between the two adjacent prefabricated trenches.
[0017] The technical solution of the utility model has the following beneficial effects:
[0018] 1. The utility model solves the problem that the indoor drainage pipes of the first floor modules of modular integrated buildings and the underground drainage outlet pipes need to be connected with space under the first floor structural plate;
[0019] 2. The utility model solves the problem of high cost of the traditional cast-in-place whole pipe interlayer;
[0020] 3. The utility model solves the problems of long construction period and heavy pollution of traditional cast-in-place maintenance interlayer;
[0021] 4. The utility model solves the problem of operation and maintenance of buried pipelines in the later stage.
[0022] 5. The utility model designs the pipe trench in advance to form a standardized component and reduce production costs. The pipe trench is produced in advance in the factory. After the raft foundation is completed on site, a 50mm mortar cushion is laid at the predetermined position of the raft foundation to place the pipe trench and level it, so that the top of the pipe trench is flush with or slightly lower than the bottom of the first-floor structural slab, until the last pipe trench extends to the outer wall of the building. After the first-floor structural slab is cast and the module is hoisted, the installer enters the pipe trench to connect the drainage outlet pipe with the module drainage pipe and install the outlet pipe. After the pipeline is installed, the pipe trench is backfilled from the outer wall with a small machine, and the backfill soil can be cleared out for maintenance during the later maintenance of the pipeline. Compared with the traditional cast-in-place maintenance mezzanine, the production cost of standardized prefabricated pipe trenches is lower. The prefabricated pipe trench is produced in advance in the factory and then transported to the site for hoisting, which is convenient for construction and reduces the workload and construction pollution on site. Later, the operating personnel can enter the pipe trench through the entrance on the outer wall of the pipe trench, which is convenient for maintenance and repair of the pipeline. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a schematic diagram of the construction structure of the drainage pipe on the first floor of the modular integrated building of the utility model;
[0024] Figure 2 This is a cross-sectional diagram of the construction structure of the drainage pipe on the first floor of the modular integrated building of the utility model;
[0025] Figure 3 This is a schematic diagram of the disassembly of the prefabricated pipe trench of the utility model. DETAILED DESCRIPTION
[0026] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0027] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0028] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0029] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] In the present invention, unless otherwise expressly specified or limited, a first feature is “on” or “below” a second feature.
[0031] “Under” may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, the first feature being “above”, “above”, and “above” the second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. The first feature being “under”, “below”, and “below” the second feature includes the first feature being directly below and obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0032] Reference Figures 1 to 3 The utility model provides a modular integrated building ground floor drainage pipeline construction structure, including: a raft foundation 1, a prefabricated pipe trench 2, a ground floor structural plate 3, and a ground floor module box 4;
[0033] A mortar cushion layer of a certain thickness is laid on the raft foundation 1 for placing the prefabricated pipe trench, so that the top of the prefabricated pipe trench is flush with or slightly lower than the bottom of the first-floor structural slab; the thickness of the mortar cushion layer is 50 mm;
[0034] The first-floor module box 4 is hoisted on the first-floor structural plate 3; a toilet module is arranged in the first-floor module box 4;
[0035] The prefabricated trench 2 is arranged in multiple forms, such as prefabricated trench module 1, prefabricated trench module 2, and prefabricated trench module 3, wherein the last prefabricated trench 2 extends to the exterior wall of the building and connects to the outdoor inspection well. The size of a single prefabricated trench 2 can be customized according to the needs of different projects, but generally the length of the prefabricated trench 2 should not be less than 500mm, the net width should not be less than 600mm, and the net height should not be less than 1000mm. The thickness c of the single-sided wall of the module and the reinforcement are determined according to the structural force calculation; a drainage cast iron pipe 5 is installed in the prefabricated trench 2 for connecting to the drainage pipe 10 of the first-floor module box 4, and the drainage cast iron pipe 5 is a flexible interface machine-made water-repellent cast iron pipe;
[0036] The drainage cast iron pipe 5 is also connected to a plastic pipe conversion elbow 6, which is also connected to a UPVC pipe 7. The first floor structural plate 3 is also pre-buried with a steel pipe sleeve 8; the bottom plate of the first floor module box 4 is also pre-buried with a UPVC direct pipe fitting 9; the UPVC pipe 7 (on-site connection) is connected to one end of the UPVC direct pipe fitting 9 (the bottom does not extend out of the bottom plate of the first floor module box 4, and is installed in the factory) through the steel pipe sleeve 8; the other end of the UPVC direct pipe fitting 9 is connected to the drainage pipe 10.
[0037] A maintenance passage 11 is reserved on one side of the first-floor module box 4 and the prefabricated pipe trench 2, and the outdoor inspection well is placed in the maintenance passage 11. A gap is reserved between two adjacent prefabricated pipe trenches 2, and the gap is set to 10 mm.
[0038] Working principle of this utility model:
[0039] Before the construction of the on-site raft foundation 2, the size parameters of the prefabricated concrete trench 5 components are designed in advance according to the drainage route of the first floor of the modular building, and standardized components are produced in the factory;
[0040] After the raft foundation 2 is completed on site, a 50mm mortar cushion is laid at a predetermined position on the raft foundation 2 to place a concrete prefabricated pipe trench and level it, so that the top of the prefabricated pipe trench 5 is flush with or slightly lower than the bottom of the first-floor structural slab 3, until the last pipe trench is extended to the outer wall of the building and connected to the inspection well, and a maintenance passage 11 with a length and width of 1m and the same height as the pipe trench is dug out mechanically at the outer wall;
[0041] After backfilling the raft foundation 2 with concrete 12, the first-floor structural slab 3 is constructed. The pipeline passes through the first-floor structural slab 3 and the steel casing 8 is pre-buried in advance. After the concrete of the first-floor cast-in-place slab 3 is fully solidified, the first-floor module box 4 is hoisted;
[0042] After the hoisting of the first-floor module box 4 is completed, the pipeline installation personnel enter the pipe trench from the maintenance channel to connect the drainage cast iron pipe 5 with the drainage pipe 10 in the first-floor module box 4 and install the outlet pipe;
[0043] After the installation of the cast iron drainage pipe 5 in the prefabricated pipe trench 2 is completed, the inspection channel and the entrance of the prefabricated pipe trench 2 are backfilled with soil with a small machine. When the cast iron drainage pipe 5 is maintained at a later stage, the backfill soil can be taken out and maintenance can be carried out.
[0044] The above description is only a preferred embodiment of the utility model, and does not limit the patent scope of the utility model. All equivalent structural changes made by using the contents of the utility model specification and drawings under the utility model concept, or directly / indirectly used in other related technical fields are included in the patent protection scope of the utility model.
Claims
1. A modular integrated building ground floor drainage pipe construction structure, It is characterized in that include: Raft foundation, prefabricated trench, first floor structural slab, first floor module box; A mortar cushion layer is laid on the raft foundation for placing the prefabricated pipe trench, so that the top of the prefabricated pipe trench is flush with or slightly lower than the bottom of the first-floor structural slab; The first-floor module box is hoisted on the first-floor structural plate; There are multiple prefabricated pipe trenches arranged, and the last prefabricated pipe trench extends from the building exterior wall to the outdoor inspection well; A drainage cast iron pipe is installed in the prefabricated pipe trench for connecting with the drainage pipe of the first-floor module box.
2. The modular integrated building ground floor drainage pipeline construction structure according to claim 1, It is characterized in that The thickness of the mortar cushion layer is 50 mm.
3. The modular integrated building ground floor drainage pipeline construction structure according to claim 1, It is characterized in that The drainage cast iron pipe is also connected to a plastic pipe conversion elbow, and the plastic pipe conversion elbow is also connected to a UPVC pipe.
4. The modular integrated building ground floor drainage pipeline construction structure according to claim 3, It is characterized in that The first-floor structural plate is also pre-buried with a steel pipe sleeve.
5. The modular integrated building ground floor drainage pipeline construction structure according to claim 4, It is characterized in that The bottom plate of the first-floor module box is also pre-buried with UPVC direct pipe fittings.
6. The modular integrated building ground floor drainage pipeline construction structure according to claim 5, It is characterized in that The UPVC pipe is connected to one end of the UPVC direct pipe fitting through the steel pipe sleeve; the other end of the UPVC direct pipe fitting is connected to the drainage pipe.
7. The modular integrated building ground floor drainage pipeline construction structure according to claim 5, It is characterized in that A maintenance passage is reserved on one side of the first-floor module box and the prefabricated pipe trench, and the outdoor inspection well is placed in the maintenance passage.
8. The modular integrated building ground floor drainage pipeline construction structure according to claim 7, It is characterized in that A gap is left between two adjacent prefabricated trenches.