Vertical shaft construction operation layer structure
By designing a construction layer structure including the outer ring, inner ring and excavation equipment in the shaft excavation technology, the problems of poor adaptability and high safety risks of rock formations are solved, and a high degree of automation and efficient shaft excavation is achieved, ensuring that Construction safety and efficiency.
Patent Information
- Application Number
- CN202420800551.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-04-17
AI Technical Summary
The existing vertical shaft excavation technology has problems such as poor adaptability, high safety risks and low automation. Especially when workers perform eyebrows, loading, and detonation operations, exposed surrounding rocks and debris are prone to falling and hurting people.
A vertical shaft construction work layer structure is designed, including an outer ring and an inner ring coaxial to the shaft. The outer ring is fixed to the surrounding rock by hydraulic boots. Excavation equipment and slag-out hoist are provided on the inner ring, and the main truss is erected. The arc-shaped platform, the hydraulic boot is equipped with a telescopic sensor, which realizes 360° working surface and real-time guided deviation correction, and combines the slag output bucket and the slag output hoist for rapid slag output.
It has achieved high safety and high automation vertical shaft excavation, which can reach 1500 meters deep, variable diameter, high safety in mechanical rock breaking, high construction efficiency, and strong adaptability of rock formations, ensuring personnel safety to the greatest extent.
Smart Images

Figure CN221973508U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of shaft excavation, in particular to a shaft construction operation layer structure. Background Art
[0002] Existing shaft excavation technology and equipment have various shortcomings, such as poor adaptability to rock formations, high safety risks, high construction costs, and complex construction techniques. For example, when workers are drilling, charging, and detonating on the excavation face, broken stones on the exposed surrounding rock or debris on the side of the wellhead are likely to fall and injure people. Utility Model Content
[0003] In view of the problems existing in the above-mentioned prior art, the utility model aims to provide a shaft construction working layer structure to solve the problems of poor rock stratum adaptability, high safety risks and low degree of automation existing in the prior shaft excavation construction.
[0004] In order to achieve the above-mentioned purpose, the utility model proposes a shaft construction working layer structure, comprising an outer ring and an inner ring coaxially arranged with the shaft, the outer ring and the inner ring rotatably cooperate, the outer ring is fixed to the surrounding rock of the shaft by a plurality of hydraulic support shoes, and also comprises excavation equipment fixed on the inner ring, a slag winch arranged outside the shaft and a plurality of main trusses arranged above the inner ring, a slag bucket is suspended inside the shaft by the slag winch, the excavation equipment comprises a crusher, a slag excavator, an anchor drill, a dustproof spraying system and an initial support spraying anchor equipment, one end of each of the main trusses is fixed on the outer ring, and the other end is converged at the center of the outer ring and fixed together, an arc platform is set between adjacent two main trusses, the arc platform is arranged outside, and all the arc platforms are spliced to form a ring-shaped bottom maintenance platform, a plurality of mounting supports are also provided along the circumferential direction at the bottom of the outer ring, and an auxiliary supporting oil cylinder is provided downward on the mounting support.
[0005] In the above scheme: the outer ring is provided with a driving motor for driving the inner ring to rotate circumferentially, and the excavation equipment can adjust the working position according to actual requirements, that is, the rotation adjustment of the inner ring can provide a 360° working surface for the excavation equipment.
[0006] In the above scheme: the hydraulic support shoe is equipped with an extension sensor, and the extension sensor is used to feedback the extension amount of the hydraulic support shoe to measure the equipment posture in real time, perform excavation guidance and correction.
[0007] In the above scheme: the slag discharge bucket is a self-unloading slag bucket, and two groups of slag discharge buckets and slag discharge winches are provided to quickly discharge slag.
[0008] In the above scheme: the number of the hydraulic support shoes is consistent with the number of the main trusses, and the hydraulic support shoes are arranged one by one at the corresponding positions of the main trusses on the outer ring to ensure the installation stability of the support layer.
[0009] The beneficial effects of the utility model are:
[0010] 1. The slag excavator, slag bucket and slag winch are used to carry out cyclic slag discharge, that is, the upper slag discharge method is used, and the operating depth can reach 1,500 meters; 2. The deep well construction with a diameter of 5 to 25 meters can be achieved by changing the diameter; 3. Mechanical rock breaking is used with high safety; 4. A highly integrated intelligent shaft boring machine is used for construction to realize parallel operations of excavation, slag discharge, anchor spraying and support, with a high degree of automation, high construction efficiency and strong adaptability to rock formations; 5. Unmanned construction of the face is implemented to ensure personnel safety to the greatest extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a structural schematic diagram of the utility model.
[0012] Figure 2 It is a top view of the utility model.
[0013] Figure 3 It is a schematic diagram of the layout of the slag winch. DETAILED DESCRIPTION
[0014] like Figure 1 As shown in FIG. 3 , a shaft construction working layer structure is mainly composed of an outer ring 1 and an inner ring 2 coaxially arranged with the shaft, excavation equipment fixed on the inner ring 2, a slag winch 4 arranged outside the shaft and a plurality of main trusses 11 arranged above the inner ring 2.
[0015] The outer ring 1 and the inner ring 2 are rotatably matched, and the outer ring 1 is fixed on the surrounding rock of the shaft through a plurality of hydraulic support shoes 3.
[0016] A slag bucket 5 is suspended inside the shaft by a slag winch 4, and the slag bucket 5 is a self-unloading bucket. The excavation equipment includes a crusher 6, a slag excavator 7, an anchor drill 8, a dust spray system 9 and a primary support spray anchor equipment 10.
[0017] One end of each main truss 11 is fixed on the outer ring 1, and the other end is gathered at the center of the outer ring 1 and fixed together. An arc platform is set between two adjacent main trusses 11, and the arc platform is arranged on the outside. All arc platforms are spliced to form a circular bottom maintenance platform 12.
[0018] A plurality of mounting supports are provided along the circumferential direction at the bottom of the outer ring 1, and an auxiliary supporting cylinder 13 is provided downwardly on the mounting support. When the shaft is excavated, the auxiliary supporting cylinder 13 is in a retracted state. When lining or maintenance is performed, the auxiliary supporting cylinder 23 should be extended to perform supporting operations.
[0019] Preferably, the outer ring 1 is provided with a driving motor 14 for driving the inner ring 2 to rotate circumferentially, and the excavation equipment can adjust the working position according to actual requirements, that is, the rotation adjustment of the inner ring 2 can provide a 360° working surface for the excavation equipment.
[0020] Preferably, the hydraulic gripper shoe 3 is equipped with an extension sensor 15, and the extension sensor 15 is used to feed back the extension amount of the hydraulic gripper shoe 3 to measure the posture of the equipment in real time, and to perform excavation guidance and deviation correction.
[0021] Preferably, the slag hopper 5 is a self-unloading slag hopper, and two groups of slag hoppers 5 and slag hoists 4 are provided to quickly discharge slag.
[0022] Preferably, the number of hydraulic support shoes 3 is the same as the number of main trusses 11, and the hydraulic support shoes 3 are arranged one by one at the corresponding positions of the main trusses on the outer ring to ensure the installation stability of the supporting layer.
Claims
1. A working layer structure for shaft construction, comprising an outer ring (1) and an inner ring (2) coaxially arranged with the shaft, wherein the outer ring (1) and the inner ring (2) are rotatably matched, and the outer ring (1) is fixed to the surrounding rock of the shaft by a plurality of hydraulic support shoes (3), characterized in that: It also includes excavation equipment fixed on the inner ring (2), a slag winch (4) arranged outside the shaft, and multiple groups of main trusses (11) arranged above the inner ring (2). A slag bucket (5) is suspended inside the shaft through the slag winch (4). The excavation equipment includes a crusher (6), a slag excavator (7), an anchor drill (8), a dust spraying system (9) and an initial support spraying anchor equipment (10). One end of each of the main trusses (11) is fixed on the outer ring (1), and the other end converges at the center of the outer ring (1) and is fixed together. An arc platform is set between two adjacent main trusses (11). The arc platform is set on the outside, and all the arc platforms are spliced to form a ring-shaped bottom maintenance platform (12). A plurality of mounting supports are also provided at the bottom of the outer ring (1) along the circumferential direction, and an auxiliary support cylinder (13) is provided downward on the mounting support.
2. The vertical shaft construction working layer structure according to claim 1 is characterized in that: The outer ring (1) is provided with a driving motor (14) for driving the inner ring (2) to rotate in a circumferential direction.
3. The vertical shaft construction working layer structure according to claim 1 is characterized in that: The hydraulic support shoe (3) is equipped with an extension and contraction sensor (15).
4. The vertical shaft construction working layer structure according to claim 1 is characterized in that: The slag discharge hopper (5) is a self-unloading slag hopper, and two groups of slag discharge hoppers (5) and slag discharge winches (4) are provided.
5. The vertical shaft construction working layer structure according to claim 1 is characterized in that: The number of the hydraulic support shoes (3) is the same as that of the main trusses (11), and the hydraulic support shoes (3) are arranged one by one at the positions corresponding to the main trusses on the outer ring.
