Support structure for ultra-small clear distance overpass abandoned tunnel of newly-built tunnel
By setting up reinforced support sections and backfill structures and support reinforced structures in the newly built tunnel, the problem of surrounding rock instability in the construction of the abandoned tunnel through ultra-small clearance is solved, and the stability and construction safety of the tunnel are improved Improve construction efficiency.
Patent Information
- Application Number
- CN202420738173.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-11
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-04-11
AI Technical Summary
During the construction of a new tunnel, when the ultra-small clear distance is crossed to the abandoned tunnel, it is easy to cause disturbance of the middle-clamp rock and instability of the surrounding rock of the new tunnel, increasing the risk of construction safety accidents, and low construction efficiency.
The super-small clear distance upper span of the new tunnel is adopted, including the installation of reinforced support sections in the new tunnel and the installation of backfill structures and support reinforcement structures in the abandoned tunnel, through a full-ring steel frame, steel mesh, and spraying concrete Grouting and reinforcing of layers and steel pipes to improve tunnel stability and construction safety.
It significantly improves the stability and construction safety of newly built tunnels, reduces the impact of abandoned tunnels on newly built tunnels, and improves construction efficiency.
Smart Images

Figure CN221973532U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of tunnel engineering construction, and in particular relates to a newly-built tunnel ultra-small clear distance upper-span abandoned tunnel support structure. Background Art
[0002] With the development of my country's transportation industry, tunnel construction is increasing. In the process of tunnel construction, auxiliary tunnels are often built to assist construction. After the tunnel construction is completed, some auxiliary tunnels lose their use value and are abandoned. When a new tunnel line crosses over an abandoned tunnel area, the distance between it and the abandoned tunnel is often small, mostly with a small clearance or even an ultra-small clearance. The blasting and excavation construction process will disturb the interlayer rock. Due to the existence of abandoned tunnels under the tunnel, it is very easy to cause partial or overall instability and collapse of the surrounding rock of the new tunnel arch, resulting in construction safety accidents.
[0003] Therefore, it is hoped that there will be a construction method for a new tunnel to cross an abandoned tunnel with an ultra-small clearance, which can well strengthen the support of the new tunnel, reasonably dispose of the abandoned tunnel, reduce the impact of the abandoned tunnel on the safety of the new tunnel construction, and improve the construction efficiency of the new tunnel section crossing the abandoned tunnel. Utility Model Content
[0004] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described below.
[0005] The utility model provides the following technical solutions: a newly built tunnel ultra-small clearance over-abandoned tunnel support structure, comprising a newly built tunnel and an abandoned tunnel, wherein the newly built tunnel crosses the abandoned tunnel from above; a backfill structure is arranged in the abandoned tunnel, and the backfill structure is symmetrical with the newly built tunnel as the center; the backfill structure comprises a middle backfill structure and backfill structures on both sides, wherein the middle backfill structure completely blocks the entire cross section of the abandoned tunnel, and the backfill structures on both sides are located at both ends of the middle backfill structure, and the backfill structures on both sides are in a step shape;
[0006] A reinforced support section is set up in the newly built tunnel, and the reinforced support section is symmetrical on the left and right with the mileage center of the intersection of the newly built tunnel and the abandoned tunnel as the origin.
[0007] Furthermore, the scope of the middle backfill structure is 5 meters on both sides of the excavation outline of the new tunnel, and the scope of the backfill structures on both sides is 6 meters on both ends of the middle backfill structure.
[0008] Furthermore, a supporting reinforcement structure is provided in the abandoned tunnel, and the supporting reinforcement structure includes a supporting steel pipe group arranged at equal intervals along the length direction of the abandoned tunnel, the supporting steel pipe group includes steel pipes and steel plates, the steel pipes in the supporting steel pipe group are distributed in a fan shape, the bottom of the steel pipe is welded to the steel plate, and the top of the steel pipe is supported to the arch of the abandoned tunnel; the backfill structure wraps the supporting reinforcement structure.
[0009] Furthermore, the primary support structure of the reinforced support section of the newly built tunnel includes a full-ring steel frame, a steel mesh and a sprayed concrete layer. The full-ring steel frame is installed on the inner wall of the newly built tunnel. The full-ring steel frames are arranged at intervals along the length of the newly built tunnel. Steel meshes are laid between the full-ring steel frames to cover the inner wall of the newly built tunnel. The sprayed concrete layer is arranged on the inner wall of the newly built tunnel to wrap the full-ring steel frame and the steel mesh.
[0010] Furthermore, the scope of the reinforced support section in the newly built tunnel is 15m before and after the mileage center of the intersection between the newly built tunnel and the abandoned tunnel.
[0011] Furthermore, steel pipe grouting reinforcement is set at the bottom of the invert within the intersection of the new tunnel and the abandoned tunnel. The reinforcement range is within 4m below the bottom of the new tunnel. The steel pipe grouting holes radiate from the invert downward, and the grouting diffusion radius is greater than or equal to 1m.
[0012] Furthermore, the height of each step of the backfill structure on both sides is 50-60 cm.
[0013] Furthermore, a step platform is provided along the slope of the bottom surface of the abandoned tunnel, and the steel plate supporting the steel pipe group is supported on the tread of the step platform.
[0014] Compared with the prior art, the advantages of the present invention are:
[0015] The utility model provides a newly-built tunnel ultra-small clearance upper crossing abandoned tunnel supporting structure, by arranging a reinforced support section in the newly-built tunnel, arranging a backfill structure in the abandoned tunnel, and increasing the grouting structure of the newly-built tunnel invert within the abandoned tunnel range, thereby improving the stability of the newly-built tunnel, reasonably disposing of the abandoned tunnel, reducing the influence of the abandoned tunnel on the newly-built tunnel, and significantly improving the safety of the ultra-small clearance construction of the newly-built tunnel and the construction efficiency of the upper crossing section. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the structure of the utility model (direction of the cross section of the newly built tunnel);
[0017] Figure 2 This is a schematic diagram of the structure of the utility model (abandoned tunnel cross section direction);
[0018] Figure 3 This is a schematic diagram of the installation of the supporting steel pipe group (direction of the new tunnel section);
[0019] Figure 4 Schematic diagram of the installation of the supporting steel pipe group (direction of the abandoned tunnel section).
[0020] In the figure: 1-new tunnel; 2-abandoned tunnel; 3-supporting steel pipe group; 4-original arch frame in the abandoned tunnel; 5-vertical shaft; 6-steel flower pipe; 7-backfill structure on both sides; 8-middle backfill structure; 9-step platform; 10-primary support structure. DETAILED DESCRIPTION
[0021] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] like Figure 1 , Figure 2 As shown: a new tunnel ultra-small clearance over the abandoned tunnel support structure, including a new tunnel 1 and an abandoned tunnel 2, the new tunnel 1 crosses the abandoned tunnel 2 from above.
[0023] A backfill structure is set in the abandoned tunnel 2, and the backfill structure is symmetrical with the newly built tunnel 1 as the center; the backfill structure includes a middle backfill structure 8 and two side backfill structures 7. The range of the middle backfill structure 8 is between 5 meters on both sides of the excavation outline of the newly built tunnel 1, and the range of the two side backfill structures 7 is 6 meters on both ends of the middle backfill structure 8. The middle backfill structure 8 completely blocks the entire section of the abandoned tunnel 2, and the two side backfill structures 7 are located at both ends of the middle backfill structure 8. The two side backfill structures 7 are in a step shape. The height of each step of the two side backfill structures 7 is 50-60 cm.
[0024] When pouring the backfill structure 7 on both sides, the template positioning reinforcement is driven into the template in time after pouring one layer to facilitate the template support of the next layer. In order to make the abandoned tunnel 2 arch backfill dense, it is necessary to add an appropriate amount of expansion agent to the concrete.
[0025] like Figure 3 , Figure 4 As shown: a supporting reinforcement structure is also provided in the abandoned tunnel 2, and the supporting reinforcement structure includes supporting steel pipe groups 3 arranged at equal intervals along the length direction of the abandoned tunnel 2, and a supporting steel pipe group 3 is arranged at an interval of 2m in the abandoned tunnel 2, and the supporting steel pipe group 3 includes steel pipes and steel plates. The steel pipes in the supporting steel pipe group 3 are distributed in a fan shape, and the circumferential angle spacing of the steel pipes is 30°. The wall thickness of the steel pipe is 6mm and φ150. The bottom of the steel pipe is welded to the steel plate, the pad is 4m long and 2m wide, and the top of the steel pipe is supported to the arch of the abandoned tunnel 2; the backfill structure wraps the supporting reinforcement structure.
[0026] The support and reinforcement structure serves as a supporting structure in the process of the new tunnel 1 crossing over the abandoned tunnel 2. After the new tunnel 1 crosses over the abandoned tunnel 2 and the abandoned tunnel 2 is backfilled, the support and reinforcement structure is combined with the backfill structure to support the upper new tunnel 1, thereby increasing the compressive strength of the backfill structure.
[0027] During construction, a vertical shaft 5 is constructed at a position tangent to the edge of the abandoned tunnel 2 in the newly built tunnel 1, and construction work is carried out by entering the abandoned tunnel 2 from the vertical shaft 5.
[0028] A step platform 9 is arranged along the slope of the bottom surface of the abandoned tunnel, and the steel plate supporting the steel pipe group 3 is supported on the tread of the step platform 9 .
[0029] A reinforced support section is set in the newly built tunnel 1, and the reinforced support section is symmetrical with the intersection mileage center of the newly built tunnel 1 and the abandoned tunnel 2 as the origin. The scope of the reinforced support section in the newly built tunnel 1 is 15m before and after the intersection mileage center of the newly built tunnel 1 and the abandoned tunnel 2.
[0030] The primary support structure 10 of the reinforced support section of the newly built tunnel 1 includes a full-ring steel frame, a steel mesh and a sprayed concrete layer. The full-ring steel frame is installed on the inner wall of the newly built tunnel 1. The full-ring steel frames are arranged at intervals along the length direction of the newly built tunnel 1. Steel meshes are laid between the full-ring steel frames to cover the inner wall of the newly built tunnel 1. The sprayed concrete layer is arranged on the inner wall of the newly built tunnel 1 to wrap the full-ring steel frame and the steel mesh.
[0031] The full-ring steel frame adopts I20a steel frame, and the spacing between the full-ring steel frames is 0.8m / frame. The full-ring steel frame is fixed with Φ25 low prestressed resin hollow anchor rods at the arch position of the newly built tunnel 1. The single Φ25 low prestressed resin hollow anchor rod is 4.5m long. The full-ring steel frame is fixed with Φ22 mortar anchor rods at the side wall position of the newly built tunnel 1. The single Φ22 mortar anchor rod is 4.5m long. The spraying thickness of the sprayed concrete layer is 27cm.
[0032] The bottom of the invert within the intersection of the new tunnel 1 and the abandoned tunnel 2 is provided with a steel tube 6 for grouting reinforcement. The reinforcement range is within 4m below the bottom of the new tunnel 1. The grouting holes of the steel tube 6 are radially arranged from the invert downward, and the grouting diffusion radius is greater than or equal to 1m. The grouting material mainly uses ordinary silicate cement single-liquid slurry, and the water-cement ratio of ordinary silicate cement single-liquid slurry is 0.8 to 1:1. The slurry mix ratio must be appropriately optimized according to the field test, and the final grouting pressure is 0.5MPa.
[0033] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A new tunnel ultra-small clearance over-abandoned tunnel support structure, comprising a new tunnel (1) and an abandoned tunnel (2), wherein the new tunnel (1) crosses the abandoned tunnel (2) from above; characterized in that: A backfill structure is arranged in the abandoned tunnel (2), and the backfill structure is symmetrical with respect to the newly built tunnel (1) on the left and right sides; the backfill structure includes a middle backfill structure (8) and two side backfill structures (7), the middle backfill structure (8) completely blocks the entire cross section of the abandoned tunnel (2), and the two side backfill structures (7) are located at both ends of the middle backfill structure (8), and the two side backfill structures (7) are in a step shape; A reinforced support section is set in the newly built tunnel (1), and the reinforced support section is symmetrical with the intersection mileage center of the newly built tunnel (1) and the abandoned tunnel (2) as the origin.
2. A new tunnel ultra-small clearance overpass abandoned tunnel support structure according to claim 1, characterized in that: The range of the middle backfill structure (8) is 5 meters on both sides of the excavation outline of the newly built tunnel (1), and the range of the backfill structures (7) on both sides is 6 meters on both ends of the middle backfill structure (8).
3. A new tunnel ultra-small clearance overpass abandoned tunnel support structure according to claim 2, characterized in that: A supporting reinforcement structure is also provided in the abandoned tunnel (2), the supporting reinforcement structure comprising a supporting steel pipe group (3) arranged at equal intervals along the length direction of the abandoned tunnel (2), the supporting steel pipe group (3) comprising steel pipes and steel plates, the steel pipes in the supporting steel pipe group (3) being distributed in a fan shape, the bottom of the steel pipe being welded to the steel plate, and the top of the steel pipe being supported to the vault of the abandoned tunnel (2); the backfill structure wraps the supporting reinforcement structure inside.
4. A new tunnel ultra-small clearance overpass abandoned tunnel support structure according to claim 1, characterized in that: The primary support structure (10) of the reinforced support section of the newly built tunnel (1) comprises a full-ring steel frame, a steel mesh and a sprayed concrete layer. The full-ring steel frame is installed on the inner wall of the newly built tunnel (1). The full-ring steel frames are arranged at intervals along the length direction of the newly built tunnel (1). Steel meshes are laid between the full-ring steel frames to cover the inner wall of the newly built tunnel (1). The sprayed concrete layer is arranged on the inner wall of the newly built tunnel (1) to wrap the full-ring steel frame and the steel mesh.
5. A new tunnel ultra-small clearance overpass abandoned tunnel support structure according to claim 4, characterized in that: The scope of the reinforced support section in the newly built tunnel (1) is 15m before and after the intersection mileage center of the newly built tunnel (1) and the abandoned tunnel (2).
6. The ultra-small clearance support structure for a newly built tunnel over an abandoned tunnel according to claim 1 is characterized by: A steel flower pipe (6) is arranged at the bottom of the invert within the intersection of the newly built tunnel (1) and the abandoned tunnel (2) for grouting reinforcement. The reinforcement range is within 4 m below the bottom of the newly built tunnel (1). The grouting holes of the steel flower pipe (6) are radially arranged from the invert downward, and the grouting diffusion radius is greater than or equal to 1 m.
7. The ultra-small clearance support structure for a newly built tunnel over an abandoned tunnel according to claim 2 is characterized by: The height of each step of the backfill structure (7) on both sides is 50-60 cm.
8. The ultra-small clearance support structure for a newly built tunnel over an abandoned tunnel according to claim 3 is characterized by: A step platform (9) is arranged along the slope on the bottom surface of the abandoned tunnel, and a steel plate supporting the steel pipe group (3) is supported on the tread of the step platform (9).